CN203701143U - Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum - Google Patents
Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum Download PDFInfo
- Publication number
- CN203701143U CN203701143U CN201320809186.6U CN201320809186U CN203701143U CN 203701143 U CN203701143 U CN 203701143U CN 201320809186 U CN201320809186 U CN 201320809186U CN 203701143 U CN203701143 U CN 203701143U
- Authority
- CN
- China
- Prior art keywords
- template
- medium plate
- construction
- pba
- stratum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title abstract description 4
- 238000012407 engineering method Methods 0.000 claims description 12
- 238000000034 method Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 2
- 238000009415 formwork Methods 0.000 description 4
- 239000004927 clay Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320809186.6U CN203701143U (en) | 2013-12-09 | 2013-12-09 | Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320809186.6U CN203701143U (en) | 2013-12-09 | 2013-12-09 | Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203701143U true CN203701143U (en) | 2014-07-09 |
Family
ID=51051599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320809186.6U Expired - Fee Related CN203701143U (en) | 2013-12-09 | 2013-12-09 | Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203701143U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437770A (en) * | 2016-11-09 | 2017-02-22 | 湖南五新模板有限公司 | Hydraulic formwork trolley for rail top air duct post-pouring construction |
CN108316344A (en) * | 2018-02-02 | 2018-07-24 | 北京市政建设集团有限责任公司 | A kind of construction method of subway station hall layer |
-
2013
- 2013-12-09 CN CN201320809186.6U patent/CN203701143U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437770A (en) * | 2016-11-09 | 2017-02-22 | 湖南五新模板有限公司 | Hydraulic formwork trolley for rail top air duct post-pouring construction |
CN106437770B (en) * | 2016-11-09 | 2018-11-09 | 湖南五新模板有限公司 | A kind of hydraulic template trolley for pouring construction after rail against the wind road |
CN108316344A (en) * | 2018-02-02 | 2018-07-24 | 北京市政建设集团有限责任公司 | A kind of construction method of subway station hall layer |
CN108316344B (en) * | 2018-02-02 | 2020-01-07 | 北京市政建设集团有限责任公司 | Construction method of subway station hall layer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100577986C (en) | Goaf surrounding rock around gob-side supporting method under three soft geological condition | |
CN101864963B (en) | Large-section loess tunnel construction method | |
CN105256812B (en) | Foundation ditch prefabricated assembled concrete supporting construction and its construction method | |
CN104533446A (en) | Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel | |
CN202544925U (en) | One-hole dual-purpose tunnel drain hole structure | |
CN102650212B (en) | Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel | |
CN105064397A (en) | Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation | |
CN102966359A (en) | Working face ventilation oxidization zone roof control method | |
CN203429641U (en) | Single-side supporting formwork reinforcing structure system for building construction | |
CN103437348A (en) | Construction device and method of pile peripheral cemented soil cast-in-place stiffness core pile | |
CN102691302A (en) | Concrete structure for supporting deep foundation pit | |
CN102660955A (en) | Quick construction method for foundation pit slope support | |
CN104863588A (en) | Advanced pier column pre-arranging gob-side entry retaining method | |
CN105089693A (en) | Goaf-side-roadway-retaining wall roof-contact improving method | |
CN104563126B (en) | A kind of churning driven bored pile construction method | |
CN203701143U (en) | Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum | |
CN204436407U (en) | The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs | |
CN102852532A (en) | Grouting method for preventing rib walk caving | |
CN102493819B (en) | Method for controlling stability of surrounding rocks of laneway in coal seam | |
CN205188936U (en) | Novel manual work of combination formula is dug hole rectangle friction pile and is protected concrete wall | |
CN104832202A (en) | Hydraulic telescopic movable lining trolley for one-time lining | |
CN102493436A (en) | Novel manual tunneling construction method of rectangular anti-slide pile | |
CN102619248B (en) | Rock trenching machine and trenching method | |
CN204080820U (en) | A kind of concrete structure foundation ditch support replacement device | |
CN204080821U (en) | A kind of steel work foundation ditch support replacement device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd. Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee before: China thirteen Railway Construction Bureau Group Co.,Ltd. Address after: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee after: China thirteen Railway Construction Bureau Group Co.,Ltd. Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee before: CHINA RAILWAY 13TH BUREAU GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20161024 Address after: Residential building No. nine in Yantian District of Shenzhen city in Guangdong province 518000 3 floor Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP 2ND ENGINEERING Co.,Ltd. Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli Patentee before: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140709 |
|
CF01 | Termination of patent right due to non-payment of annual fee |