CN203701143U - Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum - Google Patents

Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum Download PDF

Info

Publication number
CN203701143U
CN203701143U CN201320809186.6U CN201320809186U CN203701143U CN 203701143 U CN203701143 U CN 203701143U CN 201320809186 U CN201320809186 U CN 201320809186U CN 203701143 U CN203701143 U CN 203701143U
Authority
CN
China
Prior art keywords
template
medium plate
construction
pba
stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320809186.6U
Other languages
Chinese (zh)
Inventor
曲建生
任伟
张东
宋战平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Thirteen Railway Construction Bureau Group Co ltd
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN201320809186.6U priority Critical patent/CN203701143U/en
Application granted granted Critical
Publication of CN203701143U publication Critical patent/CN203701143U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a template device for constructing a medium plate in a PBA (Pile-Beam-Arc) construction method station in a water-rich stratum. The device comprises a medium plate template and a rail top air flue template, wherein a support scaffold is arranged at the lower parts of the medium plate template and the rail top air flue template. According to the device, the medium plate is constructed by adopting a process of down digging the support scaffold, the operation is simple, the construction with water can be prevented, the construction quality of the medium plate can be guaranteed, the line production section of the construction can be lengthened, the job progress can be accelerated, a way of digging underground and operating on the ground can be realized, and the materials of construction can be revolved and used.

Description

Plate construction template device in PBA engineering method station, Fu Shui stratum
Technical field:
The utility model belongs to a kind of building operations equipment, particularly plate construction template device in a kind of Fu Shui stratum PBA engineering method station.
Background technology:
In PBA engineering method applies station in the process of plate, only having at present engineering method is clay model construction, and this kind of method is applicable to anhydrous stratum, once stratum in rich water state, soil property depression of bearing force, molding effect is poor.Therefore, cannot guarantee presentation quality with the concrete of clay model method construction, even plated construction intensity in impact.
Summary of the invention:
The purpose of this utility model is just to provide plate construction template device in PBA engineering method station, a kind of Fu Shui stratum, and this device is simple to operate, can avoid submersible, plate construction quality in assurance.
As above design, the technical solution of the utility model is: plate construction template device in PBA engineering method station, a kind of Fu Shui stratum, comprise middle template die plate and tread air channel template, it is characterized in that: support scaffolding is installed in middle template die plate and template bottom, tread air channel.
Above-mentioned support scaffolding adopts bowl fastening type scaffold.
Above-mentioned bowl fastening type scaffold hack lever length is 90cm, and hack lever is φ 48 scaffolds, scaffold horizontal spacing 900mm, and lay at longitudinal pitch 900mm interval.
Above-mentioned bowl fastening type scaffold hack lever length is 60cm, and hack lever is φ 48 scaffolds, scaffold horizontal spacing 900mm, and lay at longitudinal pitch 600mm interval.
The utility model makes, in process that in station, plate applies in Fu Shui stratum PBA engineering method, to avoid submersible, so both can guarantee the construction quality of plate in station, can speed up the work again, and the continuous productive process section that makes to construct lengthens, and material can reuse.
Accompanying drawing explanation:
Fig. 1 excavates sectional drawing under plate in station;
Fig. 2 is tread air channel formwork and formwork supports scaffold sectional drawing;
Fig. 3 is template die plate and support scaffolding sectional drawing in station.
1, plate in station; 2, tread air channel; 3, excavation scope under middle plate; 4, tread air channel formwork and formwork supports scaffold; 5, template die plate and support scaffolding in station.
The specific embodiment:
As shown in the figure: plate construction template device in PBA engineering method station, a kind of Fu Shui stratum, comprises middle template die plate and tread air channel template.Bowl fastening type scaffold is installed in middle template die plate and template bottom, tread air channel.Above-mentioned bowl fastening type scaffold hack lever length is 90cm or 60cm, and hack lever is φ 48 scaffolds, scaffold horizontal spacing 900mm, and lay at longitudinal pitch 900mm or 600mm interval.
The utility model digs plate in all round victory construction with brackets under adopting, simple to operate, avoid submersible, plate construction quality in assurance, and construction continuous productive process section lengthens, and speeds up the work, and realizes " tunneling is bright to be done ", and construction material also can have enough to meet the need utilization, economically feasible.

Claims (4)

1. a plate construction template device in PBA engineering method station, Fu Shui stratum, comprises middle template die plate and tread air channel template, it is characterized in that: support scaffolding is installed in middle template die plate and template bottom, tread air channel.
2. plate construction template device in Fu Shui according to claim 1 stratum PBA engineering method station, is characterized in that: above-mentioned support scaffolding adopts bowl fastening type scaffold.
3. plate construction template device in Fu Shui according to claim 1 stratum PBA engineering method station, it is characterized in that: above-mentioned bowl fastening type scaffold hack lever length is 90cm, hack lever is φ 48 scaffolds, scaffold horizontal spacing 900mm, and lay at longitudinal pitch 900mm interval.
4. plate construction template device in Fu Shui according to claim 1 stratum PBA engineering method station, it is characterized in that: above-mentioned bowl fastening type scaffold hack lever length is 60cm, hack lever is φ 48 scaffolds, scaffold horizontal spacing 900mm, and lay at longitudinal pitch 600mm interval.
CN201320809186.6U 2013-12-09 2013-12-09 Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum Expired - Fee Related CN203701143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320809186.6U CN203701143U (en) 2013-12-09 2013-12-09 Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320809186.6U CN203701143U (en) 2013-12-09 2013-12-09 Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum

Publications (1)

Publication Number Publication Date
CN203701143U true CN203701143U (en) 2014-07-09

Family

ID=51051599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320809186.6U Expired - Fee Related CN203701143U (en) 2013-12-09 2013-12-09 Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum

Country Status (1)

Country Link
CN (1) CN203701143U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437770A (en) * 2016-11-09 2017-02-22 湖南五新模板有限公司 Hydraulic formwork trolley for rail top air duct post-pouring construction
CN108316344A (en) * 2018-02-02 2018-07-24 北京市政建设集团有限责任公司 A kind of construction method of subway station hall layer

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437770A (en) * 2016-11-09 2017-02-22 湖南五新模板有限公司 Hydraulic formwork trolley for rail top air duct post-pouring construction
CN106437770B (en) * 2016-11-09 2018-11-09 湖南五新模板有限公司 A kind of hydraulic template trolley for pouring construction after rail against the wind road
CN108316344A (en) * 2018-02-02 2018-07-24 北京市政建设集团有限责任公司 A kind of construction method of subway station hall layer
CN108316344B (en) * 2018-02-02 2020-01-07 北京市政建设集团有限责任公司 Construction method of subway station hall layer

Similar Documents

Publication Publication Date Title
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN101864963B (en) Large-section loess tunnel construction method
CN105256812B (en) Foundation ditch prefabricated assembled concrete supporting construction and its construction method
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN202544925U (en) One-hole dual-purpose tunnel drain hole structure
CN102650212B (en) Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN103437348A (en) Construction device and method of pile peripheral cemented soil cast-in-place stiffness core pile
CN102691302A (en) Concrete structure for supporting deep foundation pit
CN102660955A (en) Quick construction method for foundation pit slope support
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN105089693A (en) Goaf-side-roadway-retaining wall roof-contact improving method
CN104563126B (en) A kind of churning driven bored pile construction method
CN203701143U (en) Template device for constructing medium plate in PBA (Pile-Beam-Arc) construction method station in water-rich stratum
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN102852532A (en) Grouting method for preventing rib walk caving
CN102493819B (en) Method for controlling stability of surrounding rocks of laneway in coal seam
CN205188936U (en) Novel manual work of combination formula is dug hole rectangle friction pile and is protected concrete wall
CN104832202A (en) Hydraulic telescopic movable lining trolley for one-time lining
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN102619248B (en) Rock trenching machine and trenching method
CN204080820U (en) A kind of concrete structure foundation ditch support replacement device
CN204080821U (en) A kind of steel work foundation ditch support replacement device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli

Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd.

Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli

Patentee before: China thirteen Railway Construction Bureau Group Co.,Ltd.

Address after: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli

Patentee after: China thirteen Railway Construction Bureau Group Co.,Ltd.

Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli

Patentee before: CHINA RAILWAY 13TH BUREAU GROUP Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20161024

Address after: Residential building No. nine in Yantian District of Shenzhen city in Guangdong province 518000 3 floor

Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP 2ND ENGINEERING Co.,Ltd.

Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli

Patentee before: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

CF01 Termination of patent right due to non-payment of annual fee