CN202544925U - One-hole dual-purpose tunnel drain hole structure - Google Patents

One-hole dual-purpose tunnel drain hole structure Download PDF

Info

Publication number
CN202544925U
CN202544925U CN 201220155802 CN201220155802U CN202544925U CN 202544925 U CN202544925 U CN 202544925U CN 201220155802 CN201220155802 CN 201220155802 CN 201220155802 U CN201220155802 U CN 201220155802U CN 202544925 U CN202544925 U CN 202544925U
Authority
CN
China
Prior art keywords
tunnel
hole
dual
drain hole
structural concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220155802
Other languages
Chinese (zh)
Inventor
贺元鑫
王凤军
任金明
陈永红
钟伟斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN 201220155802 priority Critical patent/CN202544925U/en
Application granted granted Critical
Publication of CN202544925U publication Critical patent/CN202544925U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a one-hole dual-purpose tunnel drain hole structure. The utility model aims at providing a one-hole dual-purpose tunnel drain hole structure which has the advantages that the cost is saved, the construction is convenient and the damage to the concrete structure is reduced. The technical scheme provided by the utility model is as follows: the one-hole dual-purpose tunnel drain hole structure is provided with an arched tunnel, wherein a layer of structural concrete is built on the inner wall of the tunnel; consolidation grouting holes are uniformly arranged on the top part, the bottom part and the two sides of the structural concrete; and the consolidation grouting holes comprise embedded pipes embedded in the structural concrete and drilling holes drilled in the rock body in the coaxial line with the embedded pipes. The one-hole dual-purpose tunnel drain hole structure is characterized in that: drain pipes are arranged in the drilling holes and communicated with the embedded pipes in a butt joint manner. The one-hole dual-purpose tunnel drain hole structure is applicable to tunnel design and construction according to drainage request in engineering construction.

Description

The tunnel drainage hole structure that an a kind of hole is dual-purpose
Technical field
The utility model relates to a kind of tunnel drainage hole structure, the tunnel drainage hole structure that an especially a kind of hole is dual-purpose.Be applicable to tunnel design, construction that drainage requirement is arranged in the engineering construction.
Background technology
In the tunnel that drainage requirement is arranged was built, drain hole often was provided with separately, also often is drilled with or arranges pre-buried pipe during construction separately; And this type of tunnel all need carry out backfill grouting, consolidation grouting etc. in order to guarantee Stability Analysis of Structures; Therefore, different types of repeatedly pipe laying, boring need be carried out in the barrel position, and pipe laying and borehole engineering amount are very big; Not only influence construction speed, and the integrality of concrete structure is had influence in various degree.
Summary of the invention
The technical problem that the utility model will solve is: the problem to above-mentioned existence, and provide a hole dual-purpose tunnel drainage hole structure, practice thrift cost, make construction convenient more, reduce destruction to concrete structure.
The technical scheme that the utility model adopted is: the tunnel drainage hole structure that an a kind of hole is dual-purpose; Tunnel with arched door type; The tunnel inwall is built has one deck structural concrete; Top, bottom and both sides at structural concrete all are provided with the consolidation grouting hole, said consolidation grouting hole comprise pre-buried in structural concrete pre-buried pipe and with the boring of injection in rock mass of pre-buried pipe coaxial line, it is characterized in that: in boring, fix a drainpipe and be docked and connected with pre-buried pipe.
Said consolidation grouting hole comprises that one group is positioned at dome portions and is radial arrangement, one group and is positioned at the vertical downward layout of tunnel floor and two groups and is positioned at the tunnel both sides respectively and is horizontal arrangement.
The beneficial effect of the utility model is: the position of drain hole is identical with the position in consolidation grouting hole in the utility model; The degree of depth of drain hole can be provided with according to design demand, adopts can to reduce the construction works amount behind this programme and to the influence of the integrality of concrete structure.In the tunnel of structural reinforcement complicacy, this programme has significantly reduced the pre-buried pipe of drain hole, has reduced and repeated the damage of different parts boring to structural concrete, for the setting of tunnel drain hole provides a kind of new thinking.
Description of drawings
Fig. 1 is the structural representation of the utility model.
The specific embodiment
As shown in Figure 1, present embodiment comprises arched door type tunnel, and one deck structural concrete 1 of tunnel inwall lining cutting, wherein is embedded with some pre-buried pipe 2-1 in the structural concrete 1.The deployment scenarios of pre-buried pipe 2-1 in structural concrete 1 is following in this example: the arch crown part at structural concrete 1 is radial arrangement, and left and right both sides are horizontal arrangement, and is then vertical downwards at tunnel floor.Injection has the boring with pre-buried pipe 2-1 coaxial line on the rock mass of tunnel, boring with constituted consolidation grouting hole 2 after corresponding pre-buried pipe 2-1 docks.After the said structure construction is accomplished, carry out the consolidation grouting construction.Be full of grouting agent in the consolidation grouting hole 2 behind the grouting construction; Can not serve as drain hole uses; Select part or all of consolidation grouting hole 2 (selecting) that it is carried out cleaning bottom of hole operation (degree of depth should satisfy the designing and arranging water hole and require) according to actual requirement of engineering; And the gutter 2-2 that installation is communicated with pre-buried pipe 2-1 at former boring position, pre-buried pipe 2-1 and gutter 2-2 have constituted the drain hole of tunnel jointly.The main feature of present embodiment is that drain hole is consistent with position, 2 hole, consolidation grouting hole, does not need other injection drain hole.
The main construction method of present embodiment is following: at first carry out the construction of the structural concrete 1 of tunnel inwall, carry out the pre-buried pipe 2-1 construction (being part within the structural concrete 1) in consolidation grouting hole 2 simultaneously; After structural concrete 1 construction is accomplished and reached certain length of time, carry out the drilling construction (being part outside the structural concrete 1) and the consolidation grouting construction in consolidation grouting hole 2 at pre-buried pipe correspondence position; The position of drain hole is consistent with position, 2 hole, consolidation grouting hole, after consolidation grouting construction is accomplished and reached certain length of time, cleaning bottom of hole to the designing and arranging water hole degree of depth is carried out in consolidation grouting hole 2, the 2-2 that fixes a drainpipe, and with it as drain hole.

Claims (2)

1. tunnel drainage hole structure that the hole is dual-purpose; Tunnel with arched door type; The tunnel inwall is built has one deck structural concrete (1); In top, bottom and the both sides of structural concrete consolidation grouting hole (2) is set all, said consolidation grouting hole (2) comprise pre-buried in structural concrete (1) pre-buried pipe (2-1) and with the boring of injection in rock mass of pre-buried pipe coaxial line, it is characterized in that: in boring, fix a drainpipe (2-2) and be docked and connected with pre-buried pipe (2-1).
2. the tunnel drainage hole structure that a hole according to claim 1 is dual-purpose is characterized in that: said consolidation grouting hole (2) comprises that one group is positioned at dome portions and is radial arrangement, one group and is positioned at the vertical downward layout of tunnel floor and two groups and is positioned at the tunnel both sides respectively and is horizontal arrangement.
CN 201220155802 2012-04-13 2012-04-13 One-hole dual-purpose tunnel drain hole structure Expired - Lifetime CN202544925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220155802 CN202544925U (en) 2012-04-13 2012-04-13 One-hole dual-purpose tunnel drain hole structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220155802 CN202544925U (en) 2012-04-13 2012-04-13 One-hole dual-purpose tunnel drain hole structure

Publications (1)

Publication Number Publication Date
CN202544925U true CN202544925U (en) 2012-11-21

Family

ID=47165576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220155802 Expired - Lifetime CN202544925U (en) 2012-04-13 2012-04-13 One-hole dual-purpose tunnel drain hole structure

Country Status (1)

Country Link
CN (1) CN202544925U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979535A (en) * 2012-12-27 2013-03-20 西南交通大学 Drain-type pipe piece for tunnel lining
CN103388489A (en) * 2013-08-05 2013-11-13 中国水电顾问集团贵阳勘测设计研究院 Strong karst tunnel permanent draining structure and construction method thereof
CN104929089A (en) * 2015-06-10 2015-09-23 中国电建集团贵阳勘测设计研究院有限公司 Small-section construction adit plugging structure and construction method thereof
CN105484791A (en) * 2016-01-16 2016-04-13 中铁十九局集团第二工程有限公司 Comprehensive tunnel drainage, precipitation and pressure reduction construction method
CN107013243A (en) * 2017-05-05 2017-08-04 白银有色集团股份有限公司 A kind of underground concrete supporting sluicing hole construction method
CN108661674A (en) * 2018-07-19 2018-10-16 中国铁路设计集团有限公司 A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device
CN111441775A (en) * 2019-11-12 2020-07-24 中国水利水电科学研究院 Rapid grouting arching reinforcement method before excavation of tunnel in stratum with poor groutability and difficult self-stability
CN111577383A (en) * 2020-05-11 2020-08-25 中铁一局集团有限公司 Method for treating tunnel leakage water in alpine region
CN113818407A (en) * 2021-09-30 2021-12-21 中国电建集团华东勘测设计研究院有限公司 Multi-curved-edge prefabricated lining hydraulic tunnel adapting to poor surrounding rock conditions

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979535A (en) * 2012-12-27 2013-03-20 西南交通大学 Drain-type pipe piece for tunnel lining
CN102979535B (en) * 2012-12-27 2015-12-02 西南交通大学 Draining type section of jurisdiction is used in a kind of tunnel lining
CN103388489A (en) * 2013-08-05 2013-11-13 中国水电顾问集团贵阳勘测设计研究院 Strong karst tunnel permanent draining structure and construction method thereof
CN104929089A (en) * 2015-06-10 2015-09-23 中国电建集团贵阳勘测设计研究院有限公司 Small-section construction adit plugging structure and construction method thereof
CN105484791A (en) * 2016-01-16 2016-04-13 中铁十九局集团第二工程有限公司 Comprehensive tunnel drainage, precipitation and pressure reduction construction method
CN105484791B (en) * 2016-01-16 2018-08-21 中铁十九局集团第二工程有限公司 A kind of synthesis sluicings of tunnel, depressurizes construction method at precipitation
CN107013243A (en) * 2017-05-05 2017-08-04 白银有色集团股份有限公司 A kind of underground concrete supporting sluicing hole construction method
CN108661674A (en) * 2018-07-19 2018-10-16 中国铁路设计集团有限公司 A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device
CN111441775A (en) * 2019-11-12 2020-07-24 中国水利水电科学研究院 Rapid grouting arching reinforcement method before excavation of tunnel in stratum with poor groutability and difficult self-stability
CN111577383A (en) * 2020-05-11 2020-08-25 中铁一局集团有限公司 Method for treating tunnel leakage water in alpine region
CN111577383B (en) * 2020-05-11 2021-04-09 中铁一局集团有限公司 Method for treating tunnel leakage water in alpine region
CN113818407A (en) * 2021-09-30 2021-12-21 中国电建集团华东勘测设计研究院有限公司 Multi-curved-edge prefabricated lining hydraulic tunnel adapting to poor surrounding rock conditions

Similar Documents

Publication Publication Date Title
CN202544925U (en) One-hole dual-purpose tunnel drain hole structure
CN104074529B (en) A kind of cave continuous bivalve, lane, deep reinforcement means
CN103628894B (en) Method is repaiied in a kind of rich water fault belt based on angle umbrella pre-grouting lane, tunnel of collapsing
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN104405399A (en) Construction method for excavating support body in tunnel by crossing quicksand stratum
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN203487528U (en) Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area
CN105298507A (en) Underground pipe gallery construction method of machine performing open excavation on upper portion and tunneling on lower portion
CN201412163Y (en) Circular tunnel lining structure for construction of open-type tunnel boring machine
CN102660955B (en) Quick construction method for foundation pit slope support
CN102493821A (en) Support method for high stress roadway coal-rock mass
CN105240024A (en) Parallel shield tunneling method for extended construction of subway station
WO2016107435A1 (en) Method operating outside of passageway for optimizing passageway regional stress field
CN103485808A (en) Electro-osmosis home position modified roadway anchoring method of underground swelling soft rock
CN102777185A (en) Inclined well shaft construction technology
CN110761811A (en) Layered soft rock tunnel asymmetric supporting structure and construction method
CN103290850A (en) Arch combination foundation pit retaining and protection system and construction method thereof
CN103382850B (en) Roof crack water guiding device and method
CN102155249A (en) Method for supporting tunnel roof below mined-out area
CN204002832U (en) A kind of shield tunnel portal structure
CN1982651A (en) Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well
CN103422813B (en) Individual well eye multi-lateral horizontal well system for coal bed gas and boring method
CN109184752B (en) Supporting structure for coal mine to penetrate through old kiln goaf and supporting method thereof
CN204311456U (en) Foundation ditch strengthening structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP EAST CHINA INVESTIGATION AND DES

Free format text: FORMER NAME: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INVESTIGATION AND DESIGN INSTITUTE CO., LTD.

Owner name: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INV

Free format text: FORMER NAME: EAST CHINA SURVEY AND DESIGN INST., CHINA HYDROPOWER CONSULTING GROUP

CP01 Change in the name or title of a patent holder

Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee after: POWERCHINA HUADONG ENGINEERING Corp.,Ltd.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd.

Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee after: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: Hydrochina Hangzhou Engineering Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121121