CN202544925U - One-hole dual-purpose tunnel drain hole structure - Google Patents
One-hole dual-purpose tunnel drain hole structure Download PDFInfo
- Publication number
- CN202544925U CN202544925U CN 201220155802 CN201220155802U CN202544925U CN 202544925 U CN202544925 U CN 202544925U CN 201220155802 CN201220155802 CN 201220155802 CN 201220155802 U CN201220155802 U CN 201220155802U CN 202544925 U CN202544925 U CN 202544925U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- hole
- dual
- drain hole
- structural concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220155802 CN202544925U (en) | 2012-04-13 | 2012-04-13 | One-hole dual-purpose tunnel drain hole structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220155802 CN202544925U (en) | 2012-04-13 | 2012-04-13 | One-hole dual-purpose tunnel drain hole structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202544925U true CN202544925U (en) | 2012-11-21 |
Family
ID=47165576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220155802 Expired - Lifetime CN202544925U (en) | 2012-04-13 | 2012-04-13 | One-hole dual-purpose tunnel drain hole structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202544925U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102979535A (en) * | 2012-12-27 | 2013-03-20 | 西南交通大学 | Drain-type pipe piece for tunnel lining |
CN103388489A (en) * | 2013-08-05 | 2013-11-13 | 中国水电顾问集团贵阳勘测设计研究院 | Strong karst tunnel permanent draining structure and construction method thereof |
CN104929089A (en) * | 2015-06-10 | 2015-09-23 | 中国电建集团贵阳勘测设计研究院有限公司 | Small-section construction adit plugging structure and construction method thereof |
CN105484791A (en) * | 2016-01-16 | 2016-04-13 | 中铁十九局集团第二工程有限公司 | Comprehensive tunnel drainage, precipitation and pressure reduction construction method |
CN107013243A (en) * | 2017-05-05 | 2017-08-04 | 白银有色集团股份有限公司 | A kind of underground concrete supporting sluicing hole construction method |
CN108661674A (en) * | 2018-07-19 | 2018-10-16 | 中国铁路设计集团有限公司 | A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device |
CN111441775A (en) * | 2019-11-12 | 2020-07-24 | 中国水利水电科学研究院 | Rapid grouting arching reinforcement method before excavation of tunnel in stratum with poor groutability and difficult self-stability |
CN111577383A (en) * | 2020-05-11 | 2020-08-25 | 中铁一局集团有限公司 | Method for treating tunnel leakage water in alpine region |
CN113818407A (en) * | 2021-09-30 | 2021-12-21 | 中国电建集团华东勘测设计研究院有限公司 | Multi-curved-edge prefabricated lining hydraulic tunnel adapting to poor surrounding rock conditions |
-
2012
- 2012-04-13 CN CN 201220155802 patent/CN202544925U/en not_active Expired - Lifetime
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102979535A (en) * | 2012-12-27 | 2013-03-20 | 西南交通大学 | Drain-type pipe piece for tunnel lining |
CN102979535B (en) * | 2012-12-27 | 2015-12-02 | 西南交通大学 | Draining type section of jurisdiction is used in a kind of tunnel lining |
CN103388489A (en) * | 2013-08-05 | 2013-11-13 | 中国水电顾问集团贵阳勘测设计研究院 | Strong karst tunnel permanent draining structure and construction method thereof |
CN104929089A (en) * | 2015-06-10 | 2015-09-23 | 中国电建集团贵阳勘测设计研究院有限公司 | Small-section construction adit plugging structure and construction method thereof |
CN105484791A (en) * | 2016-01-16 | 2016-04-13 | 中铁十九局集团第二工程有限公司 | Comprehensive tunnel drainage, precipitation and pressure reduction construction method |
CN105484791B (en) * | 2016-01-16 | 2018-08-21 | 中铁十九局集团第二工程有限公司 | A kind of synthesis sluicings of tunnel, depressurizes construction method at precipitation |
CN107013243A (en) * | 2017-05-05 | 2017-08-04 | 白银有色集团股份有限公司 | A kind of underground concrete supporting sluicing hole construction method |
CN108661674A (en) * | 2018-07-19 | 2018-10-16 | 中国铁路设计集团有限公司 | A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device |
CN111441775A (en) * | 2019-11-12 | 2020-07-24 | 中国水利水电科学研究院 | Rapid grouting arching reinforcement method before excavation of tunnel in stratum with poor groutability and difficult self-stability |
CN111577383A (en) * | 2020-05-11 | 2020-08-25 | 中铁一局集团有限公司 | Method for treating tunnel leakage water in alpine region |
CN111577383B (en) * | 2020-05-11 | 2021-04-09 | 中铁一局集团有限公司 | Method for treating tunnel leakage water in alpine region |
CN113818407A (en) * | 2021-09-30 | 2021-12-21 | 中国电建集团华东勘测设计研究院有限公司 | Multi-curved-edge prefabricated lining hydraulic tunnel adapting to poor surrounding rock conditions |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202544925U (en) | One-hole dual-purpose tunnel drain hole structure | |
CN104074529B (en) | A kind of cave continuous bivalve, lane, deep reinforcement means | |
CN103628894B (en) | Method is repaiied in a kind of rich water fault belt based on angle umbrella pre-grouting lane, tunnel of collapsing | |
CN104389628B (en) | Landslide location tunnel reinforcement device and reinforced construction method | |
CN104405399A (en) | Construction method for excavating support body in tunnel by crossing quicksand stratum | |
CN104533446A (en) | Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel | |
CN108547639B (en) | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings | |
CN203487528U (en) | Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area | |
CN105298507A (en) | Underground pipe gallery construction method of machine performing open excavation on upper portion and tunneling on lower portion | |
CN201412163Y (en) | Circular tunnel lining structure for construction of open-type tunnel boring machine | |
CN102660955B (en) | Quick construction method for foundation pit slope support | |
CN102493821A (en) | Support method for high stress roadway coal-rock mass | |
CN105240024A (en) | Parallel shield tunneling method for extended construction of subway station | |
WO2016107435A1 (en) | Method operating outside of passageway for optimizing passageway regional stress field | |
CN103485808A (en) | Electro-osmosis home position modified roadway anchoring method of underground swelling soft rock | |
CN102777185A (en) | Inclined well shaft construction technology | |
CN110761811A (en) | Layered soft rock tunnel asymmetric supporting structure and construction method | |
CN103290850A (en) | Arch combination foundation pit retaining and protection system and construction method thereof | |
CN103382850B (en) | Roof crack water guiding device and method | |
CN102155249A (en) | Method for supporting tunnel roof below mined-out area | |
CN204002832U (en) | A kind of shield tunnel portal structure | |
CN1982651A (en) | Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well | |
CN103422813B (en) | Individual well eye multi-lateral horizontal well system for coal bed gas and boring method | |
CN109184752B (en) | Supporting structure for coal mine to penetrate through old kiln goaf and supporting method thereof | |
CN204311456U (en) | Foundation ditch strengthening structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA POWER GROUP EAST CHINA INVESTIGATION AND DES Free format text: FORMER NAME: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INVESTIGATION AND DESIGN INSTITUTE CO., LTD. Owner name: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INV Free format text: FORMER NAME: EAST CHINA SURVEY AND DESIGN INST., CHINA HYDROPOWER CONSULTING GROUP |
|
CP01 | Change in the name or title of a patent holder |
Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22 Patentee after: POWERCHINA HUADONG ENGINEERING Corp.,Ltd. Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22 Patentee before: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd. Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22 Patentee after: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd. Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22 Patentee before: Hydrochina Hangzhou Engineering Corp. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20121121 |