CN203684666U - Reinforcing tool of cornice gutter formwork - Google Patents

Reinforcing tool of cornice gutter formwork Download PDF

Info

Publication number
CN203684666U
CN203684666U CN201420043615.8U CN201420043615U CN203684666U CN 203684666 U CN203684666 U CN 203684666U CN 201420043615 U CN201420043615 U CN 201420043615U CN 203684666 U CN203684666 U CN 203684666U
Authority
CN
China
Prior art keywords
muscle
laminating
gutter
cornicing
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420043615.8U
Other languages
Chinese (zh)
Inventor
崔尔迁
谢海波
雷少华
李晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201420043615.8U priority Critical patent/CN203684666U/en
Application granted granted Critical
Publication of CN203684666U publication Critical patent/CN203684666U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Greenhouses (AREA)

Abstract

The utility model discloses a reinforcing tool of a cornice gutter formwork. The reinforcing tool comprises a top rib and a plurality of attaching ribs which are fixedly connected with the top rib, wherein the first attaching rib can be attached to one side, far away from a cornice gutter, of the outer wall of the cornice gutter formwork; the second attaching rib can be attached to the inner side of the first wall of the cornice gutter formwork; the third attaching rib can be attached to the inner side of the second wall of the cornice gutter formwork. When the reinforcing tool of the cornice gutter formwork is used, the first attaching rib, the second attaching rib and the third attaching rib are attached to the cornice gutter formwork, and the top rib is fixed; it is unnecessary that a plurality of steel pipes and opposite-pull screws are fixed one by one, only the top rib is disassembled during disassembly, namely, assembly and disassembly are relatively convenient, and time and labor are saved.

Description

The reinforcement tools of the gutter template of cornicing
Technical field
The utility model relates to building implements technical field, more particularly, relates to a kind of reinforcement tools of the gutter template of cornicing.
Background technology
In order to prevent that rainwater from watering on metope, generally can the gutter that cornice be set in the lower end of pitched roof, as shown in Figure 1, Fig. 1 is the sectional view of gutter 01 of cornicing, and it comprises two relative sidewalls and diapire, and one of them sidewall is connected with pitched roof.In the time that cornicing gutter 01, processing and fabricating need to first reinforce the gutter template 02 of cornicing, as shown in Figure 3, the gutter template 02 of cornicing comprises the first wall 021, the second wall 022 and outer wall 023, wherein the first wall 021 and the second wall 022 two side inner side laminating relative with two of the gutter 01 that cornices respectively, fits outside the sidewall that outer wall 023 is connected with non-and the pitched roof of the gutter that cornices.
In prior art, general use steel pipe 03 and Screw arbor with nut at both-ends 04 coordinate realizes the fixing of the gutter template 02 of cornicing, first side laminating steel pipe 03 being contacted with the gutter that cornices with the non-of gutter template 02 of cornicing, then utilizes Screw arbor with nut at both-ends 04 by fixing two relative steel pipes 03.But so arrange, need to expend a large amount of steel pipe 03 and Screw arbor with nut at both-ends 04, waste material, improve processing cost.In addition, when the gutter template of cornicing is reinforced, need to install steel pipe and Screw arbor with nut at both-ends one by one, the gutter that cornices also needs to dismantle one by one after making, and wastes time and energy.
In sum, how effectively solving the problem that the gutter formwork reinforcement that cornices is wasted time and energy, is current those skilled in the art's urgent problem.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of reinforcement tools of the gutter template of cornicing, and the structure design of the reinforcement tools of this gutter template of cornicing can solve the problem that the gutter formwork reinforcement that cornices is wasted time and energy effectively.
In order to achieve the above object, the utility model provides following technical scheme:
A reinforcement tools for the gutter template of cornicing, comprising:
Top muscle;
Many laminating muscle that are fixedly connected with described top muscle, wherein the first laminating muscle can be fitted with the side away from the gutter that cornices of the outer wall of the gutter template of cornicing; The second laminating muscle can be fitted with the first wall inner side of the gutter template of cornicing; The 3rd laminating muscle can be fitted with the second wall inner side of the gutter template of cornicing.
Preferably, in the reinforcement tools of the above-mentioned gutter template of cornicing, also comprise the 4th laminating muscle that can fit with the side near the gutter that cornices of the outer wall of the gutter template of cornicing.
Preferably, in the reinforcement tools of the above-mentioned gutter template of cornicing, described the first laminating muscle and the 4th laminating muscle all arrange perpendicular to described top muscle.
Preferably, in the reinforcement tools of the above-mentioned gutter template of cornicing, described the second laminating muscle comprises tilting section and vertical section, and described vertical section arrange perpendicular to described top muscle, between described tilting section and described top muscle, has angle.
Preferably, in the reinforcement tools of the above-mentioned gutter template of cornicing, described the second laminating muscle comprises and the vertical vertical bar that arranges and be fixedly connected with of described top muscle and the tilted ribs being all fixedly connected with top muscle with described vertical bar.
Preferably, in the reinforcement tools of the above-mentioned gutter template of cornicing, also comprise and described vertical bar and the 3rd reinforcing rib that be all fixedly connected with of laminating muscle, and described reinforcing rib and tilted ribs lay respectively at the both sides of described vertical bar.
Preferably, in the reinforcement tools of the above-mentioned gutter template of cornicing, also comprise can with the 5th laminating muscle of the outside laminating of the second wall of the gutter template of cornicing, and described the 3rd laminating muscle and the 5th laminating muscle all arrange perpendicular to described top muscle.
Preferably, in the reinforcement tools of the above-mentioned gutter template of cornicing, described reinforcement tools is formed by multistage reinforcement fabrication, and is fixedly connected with by the mode of welding between interconnective reinforcing bar.
The reinforcement tools of gutter template that what the utility model provided cornice comprises top muscle and many laminating muscle that are fixedly connected with top muscle, wherein many laminating muscle comprise the first laminating muscle, the second laminating muscle and the 3rd laminating muscle etc., wherein the first laminating muscle can be fitted with the side away from the gutter that cornices of the outer wall of the gutter template of cornicing, the first laminating muscle is fitted or all laminatings with the side part away from the gutter that cornices of the outer wall of the gutter template of cornicing, in addition, outer wall is the wall of the sidewall contact gutter template of cornicing and roof, the disconnected inclined-plane gutter that cornices.The second laminating muscle can with the first wall inner side laminating of the gutter template of cornicing, the second laminating muscle can with local or all laminatings of the first wall inner side of the gutter template of cornicing, the first wall inner side is the side near the gutter middle part of cornicing of the first wall.The 3rd laminating muscle can with the second wall inner side laminating of the gutter template of cornicing, the 3rd laminating muscle can with local or all laminatings of the second wall inner side of the gutter template of cornicing, the second wall inner side is the side near the gutter middle part of cornicing of the second wall.Wherein the first wall and the second wall are respectively two relative sidewalls of the gutter template of cornicing.
When the reinforcement tools of the gutter template of cornicing that provides of application the utility model, utilize the first laminating muscle and the side away from the gutter that cornices of the outer wall of the gutter template of cornicing to fit, the wall of the first laminating muscle like this and the gutter that cornices respectively with the both sides laminating of the outer wall of the gutter template of cornicing, can be fixed outer wall by the first laminating muscle and the acting in conjunction of day furrow bank that cornices.Simultaneously, utilize the second laminating muscle and the first wall inner side of the gutter template of cornicing to fit, the sidewall of the second laminating muscle like this and the gutter that cornices respectively with the both sides laminating of the first wall of the gutter template of cornicing, can be fixed the first wall by the second laminating muscle and the acting in conjunction of the gutter sidewall that cornices.Same, utilize the 3rd laminating muscle and the second wall inner side of the gutter template of cornicing to fit, another sidewall of the 3rd laminating muscle like this and the gutter that cornices respectively with the both sides laminating of the second wall of the gutter template of cornicing, can be fixed the second wall with the acting in conjunction of another sidewall of gutter that cornices by the 3rd laminating muscle.The reinforcing of outer wall, the first wall and the second wall by above-mentioned realization to the gutter template of cornicing.While using the reinforcement tools of the gutter template of cornicing that this utility model provides, after only the first laminating muscle, the second laminating muscle and the 3rd laminating muscle need to being fitted with the gutter template of cornicing, top muscle is fixing, and needn't fix one by one many steel pipes and Screw arbor with nut at both-ends, when dismounting, also only dismantle top muscle, be installing/dismounting more for convenience, more time saving and energy saving.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the sectional view of gutter of cornicing;
Fig. 2 is the schematic diagram of the gutter formwork reinforcement that cornices of the prior art;
Fig. 3 is the assembling schematic diagram of cornice gutter template and the gutter that cornices of the prior art;
The assembling schematic diagram of the gutter moldboard reinforcing tool that cornices that Fig. 4 provides for the utility model embodiment;
The structural representation of the gutter moldboard reinforcing tool that cornices that Fig. 5 provides for the utility model embodiment.
In accompanying drawing, mark is as follows:
01-cornice gutter, 02-cornice gutter template, 021-the first wall, 022-the second wall, 023-outer wall, 03-steel pipe, 04-Screw arbor with nut at both-ends;
1-cornice gutter moldboard reinforcing tool, 11-first fit muscle, 12-the 4th laminating muscle, 13-top muscle, 14-second fit muscle, 141-tilted ribs, 142-vertical bar, 15-reinforcing rib, 16-the 3rd laminating muscle, 17-the 5th laminating muscle, 2-cornice gutter template, 21-outer wall, 22-the first wall, 23-the second wall.
The specific embodiment
The purpose of this utility model is to provide a kind of reinforcement tools of the gutter template of cornicing, and the structure design of the reinforcement tools of this gutter template of cornicing can solve the problem that the gutter formwork reinforcement that cornices is wasted time and energy effectively.
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 3-Fig. 4, what the utility model embodiment provided cornice, and gutter moldboard reinforcing tool comprises top muscle 13 and many laminating muscle that are fixedly connected with top muscle 13, wherein many laminating muscle comprise the first laminating muscle 11, the second laminating muscle 14 and the 3rd laminating muscle 16 etc., wherein the first laminating muscle 11 can be fitted with the side away from the gutter that cornices of the outer wall 21 of the gutter template 2 of cornicing, the first laminating muscle 11 is fitted or all laminatings with the side part away from the gutter that cornices of the outer wall 21 of the gutter template 2 of cornicing, in addition, outer wall 21 is the wall of the sidewall contact gutter template 2 of cornicing and roof, the disconnected inclined-plane gutter that cornices.The second laminating muscle 14 can be fitted with the first wall 22 inner sides of the gutter template 2 of cornicing, the second laminating muscle 14 can or all be fitted with the local of the first wall 22 inner sides of the gutter template 2 of cornicing, and the first wall 22 inner sides are the side near the gutter middle part of cornicing of the first wall 22.The 3rd laminating muscle 16 can with the second wall inner side laminating of the gutter template 2 of cornicing, the 3rd laminating muscle 16 can with local or all laminatings of the second wall inner side of the gutter template 2 of cornicing, the second wall inner side is the side near the gutter middle part of cornicing of the second wall.Wherein the first wall 22 and the second wall are respectively two relative sidewalls of the gutter template 2 of cornicing.
When what application the utility model embodiment provided cornices gutter moldboard reinforcing tool, utilize the first laminating muscle 11 and the side away from the gutter that cornices of the outer wall 21 of the gutter template 2 of cornicing to fit, the wall of the first laminating muscle 11 like this and the gutter that cornices respectively with the both sides laminating of the outer wall 21 of the gutter template 2 of cornicing, can be fixed outer wall 21 by the first laminating muscle 11 and the acting in conjunction of day furrow bank that cornices.Simultaneously, utilize the second laminating muscle 14 and the first wall 22 inner sides of the gutter template 2 of cornicing to fit, the sidewall of the second laminating muscle 14 like this and the gutter that cornices respectively with the both sides laminating of the first wall 22 of the gutter template 2 of cornicing, can be fixed the first wall 22 by the second laminating muscle 14 and the acting in conjunction of the gutter sidewall that cornices.Same, utilize the 3rd laminating muscle 16 and the second wall inner side of the gutter template 2 of cornicing to fit, another sidewall of the 3rd laminating muscle 16 like this and the gutter that cornices respectively with the both sides laminating of the second wall of the gutter template 2 of cornicing, can be fixed the second wall with the acting in conjunction of another sidewall of gutter that cornices by the 3rd laminating muscle 16.The reinforcing of outer wall 21, the first wall 22 and the second wall by above-mentioned realization to the gutter template 2 of cornicing.While using the reinforcement tools of the gutter template 2 of cornicing that this utility model provides, after only the first laminating muscle 11, the second laminating muscle 14 and the 3rd laminating muscle 16 need to being fitted with the gutter template 2 of cornicing, by fixing top muscle 13, and needn't fix one by one many steel pipes and Screw arbor with nut at both-ends, when dismounting, also only dismantle top muscle 13, be installing/dismounting more for convenience, more time saving and energy saving.
Wherein, can the multiple above-mentioned gutter moldboard reinforcing tools 1 that cornice of disposable processing, when use along the length direction of the gutter that cornices, every one meter of reinforcement tools that an above-mentioned gutter template of cornicing is set.
In order further to optimize technique scheme, wherein in the above-mentioned gutter moldboard reinforcing tool 1 that cornices, can also comprise the 4th laminating muscle 12 that can fit with the side near the gutter that cornices of the outer wall 21 of the gutter template of cornicing, the 4th laminating muscle 12 and the first laminating muscle 11 are oppositely arranged, the first side laminating near the gutter that cornices of the 4th laminating muscle 12 and the outer wall 21 of the gutter template of cornicing simultaneously of the side laminating away from the gutter that cornices of fitting muscle 11 and the outer wall 21 of the gutter template of cornicing when use, the first laminating muscle 11 and the 4th laminating muscle 12 are realized the reinforcing to outer wall 21 with the both sides laminating of outer wall 21 with this respectively.Further, the first laminating muscle 11 and the 4th laminating muscle 12 can all arrange perpendicular to top muscle 13, and the first laminating muscle 11 is parallel to each other with the 4th laminating muscle 12 and is all vertical with top muscle 13.The reinforcing that is so arranged so that outer wall 21 is more stable.
In addition, the length of the first laminating muscle 11 and the 4th laminating muscle 12 can be less than the height of outer wall 21, and the first laminating muscle 11 and the 4th laminating muscle 12 can only be fitted with the part of outer wall 21.
In addition, because the first wall 22 inner sides of the gutter template of cornicing comprise inclined plane and vertical plane, the second relative laminating muscle 14 can comprise tilting section and vertical section, and vertically section arranges perpendicular to top muscle 13, between tilting section and top muscle 13, there is angle, so arrange and can utilize the vertical section of inclined plane laminating while of tilting section and the first wall 22 inner sides and the vertical plane laminating of the first wall 22 inner sides, so that the second laminating muscle 14 can be fitted with inclined plane and the vertical plane of the first wall 22 inner sides simultaneously simultaneously, the reinforcing of gutter template the first wall 22 that makes to cornice is more stable.
Further, the second laminating muscle 14 can comprise and the vertical vertical bar that arranges and be fixedly connected with 142 of top muscle 13 and the tilted ribs 141 being all fixedly connected with top muscle 13 with vertical bar 142, it is vertical section that vertical bar 142 forms the second laminating muscle 14, tilted ribs 141 forms the tilting section of the second laminating muscle 14, and vertical bar 142 one end are fixedly connected with top muscle 13.Tilted ribs 141 one end are fixedly connected with top muscle 13, and the other end is fixedly connected with vertical bar 142.Processing is so set simple, and has the setting of tilted ribs 141, make this reinforcement tools more stable.
Certainly this second laminating muscle 14 also can only comprise tilting section or vertical section, in this no limit.And this second laminating muscle 14 can be also holistic curved muscle, in this no limit.
Further, in order further to guarantee the stability of this gutter moldboard reinforcing tool 1 that cornices, can also comprise the reinforcing rib 15 being all fixedly connected with the 3rd laminating muscle 16 with vertical bar 142, and reinforcing rib 15 and tilted ribs 141 lay respectively at the both sides of vertical bar 142, be reinforcing rib 15 one end be fixedly connected with vertical bar 142 other end and the 3rd laminating muscle 16 be fixedly connected with, further, between reinforcing rib 15 and vertical bar 142 and the 3rd laminating muscle 16, should there is certain angle.So there is the support of reinforcing rib 15 to vertical bar 142 and the 3rd laminating muscle 16, the stability of this gutter moldboard reinforcing tool 1 that cornices is strengthened.
Wherein, the above-mentioned gutter moldboard reinforcing tool 1 that cornices can also comprise can with the 5th laminating muscle 17 of the outside laminating of the second wall of the gutter template of cornicing, and the 3rd laminating muscle 16 and the 5th laminating muscle 17 all arrange perpendicular to top muscle 13.The 5th laminating muscle 17 and the 3rd muscle 16 of fitting is relative and be arranged in parallel, when use, the inner side laminating of the 3rd laminating muscle 16 and the second wall is fitted in the 5th outside of fitting muscle 17 and the second wall simultaneously, wherein the outside of the second wall is its side near the gutter sidewall that cornices, and the 3rd laminating muscle 16 and the 5th laminating muscle 17 are realized the reinforcing to the second wall with the both sides laminating of the second wall with this respectively.Make the reinforcing of the second wall more stable.
In addition, reinforcement tools can be formed by multistage reinforcement fabrication, and be fixedly connected with by the mode of welding between interconnective reinforcing bar, the first laminating muscle 11, the second laminating muscle 14, the 3rd laminating muscle 16, the 4th laminating muscle 12, the 5th laminating muscle 17, top muscle 13 and reinforcing rib 15 can be reinforcing bar, are fixedly connected with each other by the mode of welding.So arrange, the waste steel bar can use building time, comparatively saves raw material, and then has reduced cost of manufacture.Certain the first laminating muscle 11, the second laminating muscle 14, the 3rd laminating muscle 16, the 4th laminating muscle 12, the 5th laminating muscle 17, top muscle 13 and reinforcing rib 15 can also be steel pipe, in this no limit.
In this manual, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is and the difference of other embodiment, between each embodiment identical similar part mutually referring to.
To the above-mentioned explanation of the disclosed embodiments, make professional and technical personnel in the field can realize or use the utility model.To be apparent for those skilled in the art to the multiple modification of these embodiment, General Principle as defined herein can, in the situation that not departing from spirit or scope of the present utility model, realize in other embodiments.Therefore, the utility model will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (8)

1. a reinforcement tools for the gutter template of cornicing, is characterized in that, comprising:
Top muscle (13);
Many laminating muscle that are fixedly connected with described top muscle (13), wherein the first laminating muscle (11) can be fitted with the side away from the gutter that cornices of the outer wall (21) of the gutter template of cornicing; The second laminating muscle (14) can be fitted with the first wall (22) inner side of the gutter template of cornicing; The 3rd laminating muscle (16) can be fitted with the second wall inner side of the gutter template of cornicing.
2. the reinforcement tools of the gutter template of cornicing according to claim 1, is characterized in that, also comprises the 4th laminating muscle (12) that can fit with the side near the gutter that cornices of the outer wall (21) of the gutter template of cornicing.
3. the reinforcement tools of the gutter template of cornicing according to claim 2, is characterized in that, described the first laminating muscle (11) all arranges perpendicular to described top muscle (13) with the 4th laminating muscle (12).
4. the reinforcement tools of the gutter template of cornicing according to claim 1, it is characterized in that, described the second laminating muscle (14) comprises tilting section and vertical section, and described vertical section arrange perpendicular to described top muscle (13), between described tilting section and described top muscle (13), has angle.
5. the reinforcement tools of the gutter template of cornicing according to claim 4, it is characterized in that, described the second laminating muscle (14) comprises and the vertical vertical bar that arranges and be fixedly connected with of described top muscle (13) (142) and the tilted ribs (141) being all fixedly connected with top muscle (13) with described vertical bar (142).
6. the reinforcement tools of the gutter template of cornicing according to claim 5, it is characterized in that, also comprise and described vertical bar (142) and the 3rd reinforcing rib (15) that be all fixedly connected with of laminating muscle (16), and described reinforcing rib (15) and tilted ribs (141) lay respectively at the both sides of described vertical bar (142).
7. the reinforcement tools of the gutter template of cornicing according to claim 1, it is characterized in that, also comprise can with the 5th laminating muscle (17) of the outside laminating of the second wall of the gutter template of cornicing, and described the 3rd laminating muscle (16) and the 5th muscle (17) of fitting all arranges perpendicular to described top muscle (13).
8. the reinforcement tools of the gutter template of cornicing according to claim 1, is characterized in that, described reinforcement tools is formed by multistage reinforcement fabrication, and is fixedly connected with by the mode of welding between interconnective reinforcing bar.
CN201420043615.8U 2014-01-23 2014-01-23 Reinforcing tool of cornice gutter formwork Expired - Fee Related CN203684666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420043615.8U CN203684666U (en) 2014-01-23 2014-01-23 Reinforcing tool of cornice gutter formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420043615.8U CN203684666U (en) 2014-01-23 2014-01-23 Reinforcing tool of cornice gutter formwork

Publications (1)

Publication Number Publication Date
CN203684666U true CN203684666U (en) 2014-07-02

Family

ID=51006588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420043615.8U Expired - Fee Related CN203684666U (en) 2014-01-23 2014-01-23 Reinforcing tool of cornice gutter formwork

Country Status (1)

Country Link
CN (1) CN203684666U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760511A (en) * 2016-12-16 2017-05-31 中国建筑第八工程局有限公司 Drip system and its construction method on a kind of clear water building cornice template
CN107700840A (en) * 2017-09-30 2018-02-16 上海宝冶集团有限公司 Formwork structure
CN112196260A (en) * 2020-09-02 2021-01-08 中冶天工集团有限公司 Assembly type template of foreign-style house outer eave concrete structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760511A (en) * 2016-12-16 2017-05-31 中国建筑第八工程局有限公司 Drip system and its construction method on a kind of clear water building cornice template
CN107700840A (en) * 2017-09-30 2018-02-16 上海宝冶集团有限公司 Formwork structure
CN112196260A (en) * 2020-09-02 2021-01-08 中冶天工集团有限公司 Assembly type template of foreign-style house outer eave concrete structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN203684027U (en) Prefabricated assembled temporary road for building operations
CN203684666U (en) Reinforcing tool of cornice gutter formwork
CN204645024U (en) Pile foundation steel bar cage skeleton processing moulding bed
CN204225475U (en) Fast Installation template and syndeton
CN204402039U (en) A kind of aluminum alloy mould plate system exterior wall straightening board member
CN206267522U (en) The buttress template support system of shock isolating pedestal
CN202866275U (en) Formwork system used for building
CN202299396U (en) Composite building template
CN202004008U (en) Connection bracket
CN204402014U (en) A kind of aluminum alloy mould plate system back cord
CN203390128U (en) Moulding bed of concrete pipe sheet steel reinforcement cage
CN203145444U (en) Novel three-layer composite hollow plastic building template
CN203097290U (en) Assembled type split bolt
CN205633573U (en) Special rack of building site pipeline
CN203320941U (en) Grid type scaffold board
CN204418670U (en) The sealing concrete pad used in a kind of building operations
CN204163361U (en) A kind of building implements scaffold
CN203308088U (en) Floor bottom surface aluminum template for building
CN202139835U (en) Portable temporary ladder for construction
CN204780973U (en) Concrete chamfer construction tool
CN206173817U (en) Ally oneself with and arrange bailey frame crowd fastener -style pergola fixing system
CN204715740U (en) Spill wall form reinforces mould
CN203066465U (en) Small fillet mould
CN202509767U (en) Retaining purlin special for water stop piece
CN207959947U (en) A kind of aluminum alloy mould plate leftover bits and pieces proximate matter that band tiltedly props up

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20180123