CN203684179U CN201420013659.6U CN201420013659U CN203684179U CN 203684179 U CN203684179 U CN 203684179U CN 201420013659 U CN201420013659 U CN 201420013659U CN 203684179 U CN203684179 U CN 203684179U
Authority
CN
China
Prior art keywords
power station
drainage
pipe network
transverse drain
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420013659.6U
Other languages
English (en)
Inventor
李立年
何兆升
张�杰
程鹏
毕静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Kunming Engineering Corp Ltd
Original Assignee
Co Ltd Of Kunming Hydroelectric Investigation & Design Institute Of China Hydropower Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Kunming Hydroelectric Investigation & Design Institute Of China Hydropower Consulting Group filed Critical Co Ltd Of Kunming Hydroelectric Investigation & Design Institute Of China Hydropower Consulting Group
Priority to CN201420013659.6U priority Critical patent/CN203684179U/zh
Application granted granted Critical
Publication of CN203684179U publication Critical patent/CN203684179U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

本实用新型是一种电站消力池管网暗埋式排水***。在电站消力池一期混凝土和二期混凝土间设置暗埋式排水管网,由若干个纵向盲沟管和多个横向排水管构成,纵向盲沟管与横向排水管互为垂直布置,纵向盲沟管连接横向排水管,纵向盲沟管上均匀设置若干伸入基岩的竖向排水孔,横向排水管引至基础排水廊道和渗漏集水井抽排。本实用新型不仅很好地解决了传统电站消力池排水方案遇到的问题,而且还能节省投资,缩短工期,具有构造新颖、结构简单、使用可靠的特点。

Description

一种电站消力池管网暗埋式排水***
技术领域   
    本实用新型涉及水利、电力技术领域,具体是一种电站消力池管网暗埋式排水***。
背景技术
电站由于高速水流产生的能量大部分都要在电站消力池内消刹,池内流态变化较大,水流强烈紊动,运行工况复杂,要求各运行工况下底板的抗浮稳定能满足要求。近年来,国内修建的部分电站消力池均不同程度的遭到过破坏。部分工程的消力池破坏是因混凝土层间结合不好、排水***不够通畅、或因较大的脉动压力潜底等原因。在分析了类似工程消力池破坏机理后认为,消力池结构设计中既要保证基础灌浆质量、排水孔的通透性,又要防止脉动压力潜底进入弱面。传统消力池的排水***分为两种:一种是廊道封闭排水形式,另一种是明排水形式。廊道封闭排水形式底板内分布有纵、横方向的廊道,结构型式复杂;廊道采用半嵌式布置,底板的厚度没有得到充分利用,投资较大。而明排水形式存在脉动压力易沿排水孔下窜,造成底板失稳等问题。为此,本实用新型将消力池基础排水从传统的廊道封闭排水或明排水形式改为新型封闭管网暗埋排水***,目前,在国内其它电站或水利工程的消力池上尚无应用。
发明内容
本实用新型的目的是提供一种电站消力池管网暗埋式排水***,不仅很好地解决了传统电站消力池排水方案遇到的问题,而且还能节省投资,缩短工期,使用可靠。
本实用新型的电站消力池结构设计中既要保证基础灌浆质量、排水孔的通透性,又要防止脉动压力潜底进入弱面。在分析了类似工程消力池破坏机理后(初步分析,部分工程的消力池破坏是因抗冲磨层与下层混凝土层间结合不好、或因较大的脉动压力潜底等原因,造成消力池底板破坏),综合考虑,将电站消力池排水***按管网以暗埋式设计。
根据抗浮稳定分析,底板厚度为4m,在满足温控要求和浇筑能力的情况下,需要分两层混凝土施工;第一层混凝土厚为2.0m,在有盖重条件下完成基础固结灌浆和帷幕灌浆,完成基础排水孔、锚筋桩的施工后,沿排水孔、上层混凝土施工缝布置纵横相连的排水管网、形成多回路连通管路,将基础渗水及缝面漏水引入消力池外的排水廊道内,再统一排入大坝集水井。相对于传统的廊道封闭抽排形式和明排水形式,这种排水结构形式简称为管网暗埋式排水形式。
本实用新型的技术方案为:在电站消力池一期混凝土和二期混凝土间设置暗埋式排水管网,由若干个纵向盲沟管和多个横向排水管构成,纵向盲沟管与横向排水管垂直布置并相互连通,纵向盲沟管上均匀设置若干伸入基岩的竖向排水孔,横向排水管通至基础排水廊道,基础排水廊道通至渗漏集水井。将渗漏水引至渗漏集水井抽排。
本实用新型的电站消力池管网暗埋式排水***的优点如下:
① 在有盖重条件下保证了基础灌浆质量;② 排水孔仅打穿底板下层基础混凝土,脉动压力不会通过排水孔传递至底板基面或混凝土层面,避免脉动压力对底板基面或混凝土层面的破坏;③ 能及时排走基础渗水和缝面漏水,减小基底扬压力。
本实用新型不仅很好地解决了传统电站消力池排水方案遇到的问题,而且还能节省投资,缩短工期,具有构造新颖、结构简单、使用可靠的特点。
附图说明
图1:本实用新型的排水***平面布置示意图。
图2:本实用新型的纵向盲沟管与排水管连接示意图。
图3:图2中的A-A剖视图。 
图4:本实用新型的盲沟管与竖向排水管连接示意图。
图5:本实用新型的横向排水管接入廊道示意图。
    图中:1-纵向(塑料)盲沟管,2-底板纵缝,3―底板横缝,4―横向排水(钢)管,5―竖向排水孔,6―基础排水廊道,7-一期混凝土顶面,8―一期混凝土,9―二期混凝土,10-基岩面,11-控制阀门。
具体实施方式
如图1所示,在电站消力池一期混凝土8和二期混凝土9间设置暗埋式排水管网,由若干个纵向(塑料)盲沟管1和多个横向排水(钢)管4构成,纵向(塑料)盲沟管与横向排水(钢)管互为垂直布置,纵向(塑料)盲沟管连接横向排水(钢)管,如图2、图3所示;纵向(塑料)盲沟管上均匀设置若干伸入基岩的竖向排水孔5,排水孔仅打穿底板下层一期混凝土,如图4所示;横向排水(钢)管引至基础排水廊道6进入渗漏集水井抽排。在每根横向排水(钢)管的未端,均设有控制阀门11,如图5所示,为防止极端情况下消力池内的水大量进入排水廊道内,可将此分区的阀门关闭。
基础渗水通过竖向排水孔进入纵横相连的排水管网、形成多回路连通管路,通过排水管网收集后进入排水廊道,再统一排入集水井进行抽排,以降低底板基础扬压力。

Claims (2)

1.一种电站消力池管网暗埋式排水***,其特征在于在电站消力池一期混凝土和二期混凝土间设置暗埋式排水管网,由若干个纵向盲沟管和多个横向排水管构成,纵向盲沟管与横向排水管互为垂直布置,纵向盲沟管连接横向排水管,纵向盲沟管上均匀设置若干伸入基岩的竖向排水孔,横向排水管引至基础排水廊道。
2.根据权利要求1所述的电站消力池管网暗埋式排水***,其特征在于在每根横向排水管的未端,均设有控制阀门。
CN201420013659.6U 2014-01-10 2014-01-10 一种电站消力池管网暗埋式排水*** Expired - Lifetime CN203684179U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420013659.6U CN203684179U (zh) 2014-01-10 2014-01-10 一种电站消力池管网暗埋式排水***

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420013659.6U CN203684179U (zh) 2014-01-10 2014-01-10 一种电站消力池管网暗埋式排水***

Publications (1)

Publication Number Publication Date
CN203684179U true CN203684179U (zh) 2014-07-02

Family

ID=51006102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420013659.6U Expired - Lifetime CN203684179U (zh) 2014-01-10 2014-01-10 一种电站消力池管网暗埋式排水***

Country Status (1)

Country Link
CN (1) CN203684179U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594307A (zh) * 2014-11-25 2015-05-06 中国电建集团贵阳勘测设计研究院有限公司 一种消力池底板水压平衡结构及其施工方法
CN104878772A (zh) * 2015-05-26 2015-09-02 江苏省建筑科学研究院有限公司 一种深基坑基础底板渗漏处理方法
CN106498910A (zh) * 2015-07-07 2017-03-15 苏州汇诚智造工业设计有限公司 一种消力池底板建设或加固施工用自动排水***
CN107268515A (zh) * 2015-07-07 2017-10-20 苏州汇诚智造工业设计有限公司 水利工程施工用自动排水***的使用方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594307A (zh) * 2014-11-25 2015-05-06 中国电建集团贵阳勘测设计研究院有限公司 一种消力池底板水压平衡结构及其施工方法
CN104878772A (zh) * 2015-05-26 2015-09-02 江苏省建筑科学研究院有限公司 一种深基坑基础底板渗漏处理方法
CN106498910A (zh) * 2015-07-07 2017-03-15 苏州汇诚智造工业设计有限公司 一种消力池底板建设或加固施工用自动排水***
CN106759160A (zh) * 2015-07-07 2017-05-31 苏州汇诚智造工业设计有限公司 消力池底板建设或加固施工用自动排水***的使用方法
CN106759159A (zh) * 2015-07-07 2017-05-31 苏州汇诚智造工业设计有限公司 一种消力池底板建设或加固施工用自动排水***的制造方法
CN106759158A (zh) * 2015-07-07 2017-05-31 苏州汇诚智造工业设计有限公司 一种消力池底板建设或加固施工用自动排水***的使用方法
CN107268515A (zh) * 2015-07-07 2017-10-20 苏州汇诚智造工业设计有限公司 水利工程施工用自动排水***的使用方法
CN107460856A (zh) * 2015-07-07 2017-12-12 苏州汇诚智造工业设计有限公司 一种水利工程施工用自动排水***的制造方法
CN106498910B (zh) * 2015-07-07 2018-05-11 苏州汇诚智造工业设计有限公司 一种消力池底板建设或加固施工用自动排水***
CN106759160B (zh) * 2015-07-07 2018-06-08 蚌埠市江河水利工程建设有限责任公司 消力池底板建设或加固施工用自动排水***的使用方法
CN106759158B (zh) * 2015-07-07 2018-08-10 宿迁峰驰安防有限公司 一种消力池底板建设或加固施工用自动排水***的使用方法
CN107268515B (zh) * 2015-07-07 2018-08-24 宿迁峰驰安防有限公司 水利工程施工用自动排水***的使用方法
CN106759159B (zh) * 2015-07-07 2018-11-06 泗洪仁益自来水有限公司 一种消力池底板建设或加固施工用自动排水***的制造方法

Similar Documents

Publication Publication Date Title
CN203684179U (zh) 一种电站消力池管网暗埋式排水***
CN201650362U (zh) 可维护式隧道排水***
CN201125391Y (zh) 一种地下室防水疏水结构
CN105625483B (zh) 一种地下工程用水压控制方法
CN203530996U (zh) 多井点组合降水设施
CN104234089B (zh) 一种地下室防排水结合的施工方法
CN101871348B (zh) 导水卸压式立井复合井壁施工方法
CN104790435A (zh) 沉降后浇带超前止水抗渗混凝土结构及其施工工艺
CN109667586B (zh) 一种双层井壁注浆***的注浆方法
CN105780792B (zh) 一种基坑高水头减压降水井封井方法及封井结构
CN105672370B (zh) 一种地下工程用水压控制***
CN205530388U (zh) 一种地下工程用压力感应水压控制***
CN103061351B (zh) 防止地下室底板***、渗水的装置
CN104196046A (zh) 降低地下抗浮水位的隔水排水***
CN104120696B (zh) 环保型贴坡式拦污栅结构及其建造方法
WO2023173569A1 (zh) 一种弱渗透土层边坡地下水灾害治理方法
CN103669302B (zh) 一种电站消力池管网暗埋式排水***
CN204023593U (zh) 降低地下抗浮水位的隔水排水***
CN208996003U (zh) 带有排水结构的水电站出线竖井
CN114808864A (zh) 水闸翼墙墙后排水失效的解决方法
CN208235463U (zh) 一种新型溢洪道排水结构
CN204780964U (zh) 止水帷幕装置
CN104895099B (zh) 止水帷幕装置
CN110332011A (zh) 一种基于接缝泄水降压的管片结构及隧道衬砌
CN205296084U (zh) 水利水电工程的水坝

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINESE ELECTRIC POWER CONSTRUCTION GROUP KUNMING

Free format text: FORMER NAME: HYDROCHINA KUNMING ENGINEERING CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 650051 No. 115 East Renmin Road, Yunnan, Kunming

Patentee after: POWERCHINA KUNMING ENGINEERING Corp.,Ltd.

Address before: 650051 No. 115 East Renmin Road, Yunnan, Kunming

Patentee before: HYDROCHINA KUNMING ENGINEERING Corp.

CX01 Expiry of patent term

Granted publication date: 20140702

CX01 Expiry of patent term