CN203684179U - Hidden drainage system in pipe network of power station stilling pool - Google Patents
Hidden drainage system in pipe network of power station stilling pool Download PDFInfo
- Publication number
- CN203684179U CN203684179U CN201420013659.6U CN201420013659U CN203684179U CN 203684179 U CN203684179 U CN 203684179U CN 201420013659 U CN201420013659 U CN 201420013659U CN 203684179 U CN203684179 U CN 203684179U
- Authority
- CN
- China
- Prior art keywords
- power station
- drainage
- pipe network
- transverse drain
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011435 rock Substances 0.000 claims abstract description 4
- 238000010521 absorption reaction Methods 0.000 claims description 26
- 238000010276 construction Methods 0.000 abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 4
- 230000008901 benefit Effects 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010410 layer Substances 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 229920003023 plastic Polymers 0.000 description 5
- 239000004033 plastic Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000007789 sealing Methods 0.000 description 4
- 230000008595 infiltration Effects 0.000 description 3
- 238000001764 infiltration Methods 0.000 description 3
- 230000006378 damage Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007667 floating Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000035699 permeability Effects 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000009189 diving Effects 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model provides a hidden drainage system in a pipe network of a power station stilling pool. The hidden drainage pipe network is arranged between first-stage concrete and second-stage concrete of the power station stilling pool. The hidden drainage pipe network is composed of a plurality of longitudinal blind ditch pipes and multiple transverse drain pipes. The longitudinal blind ditch pipes are perpendicular to the transverse drain pipes and connected with the transverse drain pipes. Each longitudinal blind ditch pipe is evenly provided with a plurality of vertical drain holes which extend into bed rock. The transverse drain pipes are guided to a foundation drainage gallery and a leaked water collection well for pump drainage. The hidden drainage system in the pipe network of the power station stilling pool well solves the problems encountered when a traditional power station stilling pool drainage scheme is adopted, can also reduce investment and shorten the construction period, and has the advantages of being novel and simple in structure and reliable in use.
Description
technical field
The utility model relates to water conservancy, power technology field, specifically the buried drainage system of a kind of power station absorption basin pipe network.
Background technology
Power station is because the energy major part that high-velocity flow produces all will disappear and stop in the absorption basin of power station, and in pond, change of flow state is larger, the strong turbulent fluctuation of current, and operation condition complexity, requires the stability against floating of each operation condition lower shoe to meet the demands.In recent years, the domestic part power station absorption basin of building all in various degree meet with destruction.The absorption basin of part engineering destroy be because of between layer of concrete in conjunction with bad, drainage system is unobstructed not or because of reasons such as the latent ends of larger pressure fluctuation meter.Think having analyzed after similar engineering absorption basin failure mechanism, in absorption basin structure design, should guarantee the permeability of foundation grouting quality, drain hole, prevent that again the pressure fluctuation meter end of diving from entering plane of weakness.The drainage system of tradition absorption basin is divided into two kinds: one is gallery sealing draining form, and another kind is bright draining form.In gallery sealing draining form base plate, be distributed with the gallery of longitudinal and transverse direction, structural shape complexity; Gallery adopts half embedded to arrange, the thickness of base plate is not fully used, and invests larger.And bright draining form exists pressure fluctuation meter easily along altering under drain hole, cause the problems such as base plate unstability.For this reason, the utility model changes absorption basin foundation drainage into novel block pipe network from the sealing draining of traditional gallery or bright draining form and secretly buries drainage system, at present, there is no application at home on the absorption basin of other power station or hydraulic engineering.
Summary of the invention
The purpose of this utility model is to provide the buried drainage system of a kind of power station absorption basin pipe network, has not only solved well the problem that traditional power station absorption basin drainaging scheme runs into, and can also reduce investment outlay, and the reduction of erection time, uses reliable.
In the absorption basin structure design of power station of the present utility model, should guarantee the permeability of foundation grouting quality, drain hole, prevent that again the latent end of pressure fluctuation meter from entering plane of weakness.Analyzing (initial analysis after similar engineering absorption basin failure mechanism, it is to be combined bad or because of reasons such as the latent ends of larger pressure fluctuation meter with lower-layer concrete interlayer because of anti-impact mill layer that the absorption basin of part engineering destroys, cause absorption basin coal seam floor failure), consider, power station absorption basin drainage system is pressed to pipe network with buried design.
According to stability against floating analysis, base plate thickness is 4m, in the situation that meeting temperature requirements and building ability, need to divide two-layer concrete construction; First floor Concrete Thick is 2.0m, there iing lid heavily under condition, to complete Foundation Consolidation Grouting and curtain grouting, complete after the construction of foundation drain hole, anchor pile, arrange connected in length and breadth drainage pipeline networks, form multiloop connecting pipeline along drain hole, upper strata concrete construction joint, basis infiltration and seam face are leaked and introduced in the collector drain outside absorption basin, the more unified dam collecting well that enters.With respect to traditional gallery sealing pump drainage form and bright draining form, this discharge structure form is referred to as the buried draining form of pipe network.
The technical solution of the utility model is: between power station absorption basin fist stage concrete and second stage concrete, buried drainage pipeline networks is set, formed by several longitudinal blind-ditch pipes and multiple transverse drain, longitudinally blind-ditch pipe and transverse drain are arranged vertically and are interconnected, longitudinally on blind-ditch pipe, some vertical drainage holes of stretching into basement rock are evenly set, transverse drain passes to foundation drainage gallery, and foundation drainage gallery passes to seepage collecting well.Percolating water is caused to seepage collecting well pump drainage.
The advantage of the buried drainage system of power station absorption basin pipe network of the present utility model is as follows:
1. there iing lid heavily under condition, to guarantee foundation grouting quality; 2. drain hole is only punched base plate subfoundation concrete, and pressure fluctuation meter can not be passed to base plate basal plane or concrete layer by drain hole, avoids the destruction of pressure fluctuation meter to base plate basal plane or concrete layer; 3. can drain in time basis infiltration and seam face and leak, reduce substrate uplift pressure.
The utility model has not only solved the problem that traditional power station absorption basin drainaging scheme runs into well, and can also reduce investment outlay, and the reduction of erection time, has novel, simple in structure, the service-strong feature of structure.
Accompanying drawing explanation
Fig. 1: drainage system layout schematic diagram of the present utility model.
Fig. 2: longitudinal blind-ditch pipe of the present utility model and gutter connection diagram.
Fig. 3: the A-A sectional view in Fig. 2.
Fig. 4: blind-ditch pipe of the present utility model and vertical drainage pipe connection diagram.
Fig. 5: transverse drain access gallery schematic diagram of the present utility model.
in figure: 1-is (plastics) blind-ditch pipe longitudinally, 2-base plate longitudinal joint, 3-base plate transverse joint, 4-transverse drainage (steel) pipe, 5-vertical drainage hole, 6-foundation drainage gallery, 7-fist stage concrete end face, 8-fist stage concrete, 9-second stage concrete, 10-bedrock surface, 11-by-pass valve control.
The specific embodiment
As shown in Figure 1, between power station absorption basin fist stage concrete 8 and second stage concrete 9, buried drainage pipeline networks is set, formed by several longitudinal (plastics) blind-ditch pipes 1 and multiple transverse drainage (steel) pipe 4, longitudinally (plastics) blind-ditch pipe and transverse drainage (steel) pipe is arranged vertically each other, longitudinally (plastics) blind-ditch pipe connects transverse drainage (steel) pipe, as shown in Figure 2 and Figure 3; Some vertical drainage holes 5 of stretching into basement rock are longitudinally evenly set on (plastics) blind-ditch pipe, and drain hole is only punched base plate lower floor fist stage concrete, as shown in Figure 4; Transverse drainage (steel) pipe causes foundation drainage gallery 6 and enters seepage collecting well pump drainage.In the end of every transverse drainage (steel) pipe, be equipped with by-pass valve control 11, as shown in Figure 5, and for preventing that under extreme case, the water in absorption basin enters in collector drain in a large number, can be by the valve closing of this subregion.
Basis infiltration is entered connected in length and breadth drainage pipeline networks, is formed multiloop connecting pipeline by vertical drainage hole, after collecting, enters collector drain by drainage pipeline networks, then unifies to enter collecting well and carry out pump drainage, to reduce mat foundation uplift pressure.
Claims (2)
1. the buried drainage system of power station absorption basin pipe network, it is characterized in that, between power station absorption basin fist stage concrete and second stage concrete, buried drainage pipeline networks is set, formed by several longitudinal blind-ditch pipes and multiple transverse drain, longitudinally blind-ditch pipe and transverse drain are arranged vertically each other, longitudinally blind-ditch pipe connects transverse drain, longitudinally on blind-ditch pipe, some vertical drainage holes of stretching into basement rock are evenly set, transverse drain causes foundation drainage gallery.
2. the buried drainage system of power station absorption basin pipe network according to claim 1, is characterized in that the end at every transverse drain, is equipped with by-pass valve control.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420013659.6U CN203684179U (en) | 2014-01-10 | 2014-01-10 | Hidden drainage system in pipe network of power station stilling pool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420013659.6U CN203684179U (en) | 2014-01-10 | 2014-01-10 | Hidden drainage system in pipe network of power station stilling pool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203684179U true CN203684179U (en) | 2014-07-02 |
Family
ID=51006102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420013659.6U Expired - Lifetime CN203684179U (en) | 2014-01-10 | 2014-01-10 | Hidden drainage system in pipe network of power station stilling pool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203684179U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594307A (en) * | 2014-11-25 | 2015-05-06 | 中国电建集团贵阳勘测设计研究院有限公司 | Stilling pool base plate hydraulic pressure balance structure and construction method thereof |
CN104878772A (en) * | 2015-05-26 | 2015-09-02 | 江苏省建筑科学研究院有限公司 | Treating method for foundation slab leakage of deep foundation pit |
CN106498910A (en) * | 2015-07-07 | 2017-03-15 | 苏州汇诚智造工业设计有限公司 | A kind of force reduction pool bottom construction or strengthening construction automatic drain system |
CN107268515A (en) * | 2015-07-07 | 2017-10-20 | 苏州汇诚智造工业设计有限公司 | The application method of construction of hydro project automatic drain system |
-
2014
- 2014-01-10 CN CN201420013659.6U patent/CN203684179U/en not_active Expired - Lifetime
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594307A (en) * | 2014-11-25 | 2015-05-06 | 中国电建集团贵阳勘测设计研究院有限公司 | Stilling pool base plate hydraulic pressure balance structure and construction method thereof |
CN104878772A (en) * | 2015-05-26 | 2015-09-02 | 江苏省建筑科学研究院有限公司 | Treating method for foundation slab leakage of deep foundation pit |
CN106498910A (en) * | 2015-07-07 | 2017-03-15 | 苏州汇诚智造工业设计有限公司 | A kind of force reduction pool bottom construction or strengthening construction automatic drain system |
CN106759160A (en) * | 2015-07-07 | 2017-05-31 | 苏州汇诚智造工业设计有限公司 | Force reduction pool bottom construction or the application method of strengthening construction automatic drain system |
CN106759159A (en) * | 2015-07-07 | 2017-05-31 | 苏州汇诚智造工业设计有限公司 | A kind of force reduction pool bottom construction or the manufacture method of strengthening construction automatic drain system |
CN106759158A (en) * | 2015-07-07 | 2017-05-31 | 苏州汇诚智造工业设计有限公司 | A kind of force reduction pool bottom construction or the application method of strengthening construction automatic drain system |
CN107268515A (en) * | 2015-07-07 | 2017-10-20 | 苏州汇诚智造工业设计有限公司 | The application method of construction of hydro project automatic drain system |
CN107460856A (en) * | 2015-07-07 | 2017-12-12 | 苏州汇诚智造工业设计有限公司 | A kind of manufacture method of construction of hydro project automatic drain system |
CN106498910B (en) * | 2015-07-07 | 2018-05-11 | 苏州汇诚智造工业设计有限公司 | A kind of force reduction pool bottom construction or strengthening construction automatic drain system |
CN106759160B (en) * | 2015-07-07 | 2018-06-08 | 蚌埠市江河水利工程建设有限责任公司 | Force reduction pool bottom construction or the application method of strengthening construction automatic drain system |
CN106759158B (en) * | 2015-07-07 | 2018-08-10 | 宿迁峰驰安防有限公司 | A kind of application method of force reduction pool bottom construction or strengthening construction automatic drain system |
CN107268515B (en) * | 2015-07-07 | 2018-08-24 | 宿迁峰驰安防有限公司 | The application method of construction of hydro project automatic drain system |
CN106759159B (en) * | 2015-07-07 | 2018-11-06 | 泗洪仁益自来水有限公司 | A kind of manufacturing method of force reduction pool bottom construction or strengthening construction automatic drain system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203684179U (en) | Hidden drainage system in pipe network of power station stilling pool | |
CN204023501U (en) | A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam | |
CN201650362U (en) | Maintainable tunnel drainage system | |
CN201125391Y (en) | Basement waterproofing drainage structure | |
CN105625483B (en) | A kind of underground engineering hydraulic pressure control method | |
CN203530996U (en) | Multi-well-point combined type precipitation facility | |
CN104499463A (en) | Multi-stage telescopic type steel dam | |
CN104234089B (en) | The construction method that a kind of basement guarded drainage combines | |
CN101871348B (en) | Water-conducting and pressure-releasing type composite well wall of vertical shaft and construction method thereof | |
CN104790435A (en) | Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof | |
CN105780792B (en) | A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well | |
CN105672370B (en) | A kind of underground engineering water pressure control system | |
CN103061351B (en) | Prevent the device that basement bottom board swells, seeps water | |
CN109667586B (en) | Grouting method of double-layer well wall grouting system | |
CN205530388U (en) | Forced induction water pressure control system for underground works | |
CN104196046A (en) | Water resisting and draining system for lowering underground anti-floating water level | |
CN104120696B (en) | Environment-friendly type slope sticking type trashrack structure and construction method thereof | |
WO2023173569A1 (en) | Method for treating underground water disaster of weak-permeability soil layer slope | |
CN103669302B (en) | The buried drainage system of a kind of power station absorption basin pipe network | |
CN204023593U (en) | Reduce the water proof drainage system of underground hydrostatic water table | |
CN114808864A (en) | Method for solving rear drainage failure of water gate wing wall | |
CN204780964U (en) | Stagnant water curtain device | |
CN104895099B (en) | Water-stop curtain device | |
CN110332011A (en) | A kind of tunnel segment structure and tunnel-liner based on seam sluicing decompression | |
CN205296084U (en) | Hydraulic and hydroelectric engineering's dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINESE ELECTRIC POWER CONSTRUCTION GROUP KUNMING Free format text: FORMER NAME: HYDROCHINA KUNMING ENGINEERING CORPORATION |
|
CP01 | Change in the name or title of a patent holder |
Address after: 650051 No. 115 East Renmin Road, Yunnan, Kunming Patentee after: POWER CHINA KUNMING ENGINEERING Corp.,Ltd. Address before: 650051 No. 115 East Renmin Road, Yunnan, Kunming Patentee before: HYDROCHINA KUNMING ENGINEERING Corp. |
|
CX01 | Expiry of patent term |
Granted publication date: 20140702 |
|
CX01 | Expiry of patent term |