CN203603519U - Anti-seismic reinforcing structure with core column arranged later in brickwork wall - Google Patents

Anti-seismic reinforcing structure with core column arranged later in brickwork wall Download PDF

Info

Publication number
CN203603519U
CN203603519U CN201320630798.9U CN201320630798U CN203603519U CN 203603519 U CN203603519 U CN 203603519U CN 201320630798 U CN201320630798 U CN 201320630798U CN 203603519 U CN203603519 U CN 203603519U
Authority
CN
China
Prior art keywords
wall
stem
reinforcing structure
seismic reinforcing
seismic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320630798.9U
Other languages
Chinese (zh)
Inventor
董有
甄进平
谢建明
王建红
吴保光
郑方昊遐
李薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201320630798.9U priority Critical patent/CN203603519U/en
Application granted granted Critical
Publication of CN203603519U publication Critical patent/CN203603519U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to an anti-seismic reinforcing structure with a core column arranged later in a brickwork wall and belongs to the field of anti-seismic reinforcing technology. The anti-seismic reinforcing structure with the core column arranged later in the brickwork wall comprises the original brickwork wall of a building. The vertical wall core column arranged later is arranged in the original brickwork wall. The core column arranged later in the brickwork wall comprises a pass length vertical drill hole formed in the vertical middle position of the original brickwork wall, a reinforcing steel bar or a steel strand penetrating through the drill hole and polymer mortar poured into the drill hole. When an earthquake occurs, a wall restraint crack is expanded, so that the integrity of the wall is enhanced, and damage caused by earthquake force to the upper structure is reduced. The anti-seismic reinforcing structure with the core column arranged later in the brickwork wall is not installed in a house, the anti-seismic property of the brickwork wall is greatly improved, construction is simple, the manufacturing cost is low, the application range is wide, and the anti-seismic reinforcing structure is suitable for a solid brick wall, a solid or hollow building block, a rowlock brick wall and a boulder strip masonry wall.

Description

After in masonry panel, increase stem stem seismic reinforcing structure
Technical field
The utility model increases stem stem seismic reinforcing structure after relating in a kind of masonry panel, belongs to seismic hardening technical field.
Background technology
At present, the existing house of China, the seismic hardening of agriculture residence start to start, before the eighties in last century, existing house and a large amount of masonry structures of agriculture residence before 2000 are built without ring beam and construction column, have a strong impact on the required ductile performance of its masonry panel antidetonation, there is following problem in additional constructional column: difficulty of construction is large, concrete material loading difficulty, shuttering supporting difficulty, effectively strengthening construction output capacity is low---and pillar structure expense is well below external scaffolding expense, and building peripheral operation construction is dangerous large; Existing balcony exterior window need be torn down and reconstructed; Large on impacts such as existing building exterior tubing, guardrail, air-conditionings; Affect the outer facade effect of original building; Constructional column is difficult to vertical until top; Additional constructional column cannot be enhanced for inner side wall ductility, improves overall ductility DeGrain for wider, long building.
Utility model content
In order to address the above problem, the utility model proposes the rear stem stem seismic reinforcing structure that increases in a kind of masonry panel.It is without destroying appearance and interior decoration, and all external procedure forms new antidetonation rod member, strengthens existing building wall ductility, can significantly improve and solve the anti-seismic performance of existing building.
The technical solution of the utility model is as follows:
After in a kind of masonry panel, increase stem stem seismic reinforcing structure, comprise the former masonry panel of existing building, be provided with vertical body of wall in former masonry panel after, increase stem stem, after described body of wall, increase the polymer mortar that stem stem comprises perfusion in the reinforcing bar that wears in the elongated vertical boring, boring that is arranged on the vertical middle position of former masonry panel or steel strand and boring.
Further, described bore diameter is 40mm-150mm.
Further, described elongated vertical boring is positioned at former masonry panel width middle position.
Further, described reinforcing bar or steel strand are positioned at boring cross section center.
Further, described reinforcing bar adopts overlap joint or is welded to connect form.
Further, described reinforcing bar adopts HRB335 reinforcing bar.
Beneficial effect:
The utility model sets up rig and is intending increasing stem stem position by the vertical boring of long distance in body of wall on existing building roof, then in hole, wear reinforcing bar or steel strand, then in hole, the stem stem constraining member of polymer injection mortar formation like configurations post strengthens existing building wall ductility technology.When earthquake, will retrain wall body slit and carry out, strengthen body of wall globality.Reduce the destruction that seismic forces causes superstructure.
The utility model strengthens existing building wall ductility technology, will retrain wall body slit and carry out when earthquake, strengthens body of wall globality, reduces the destruction that seismic forces causes superstructure.The utility model is not registered one's residence and is realized soon to the larger raising of Seismic Behavior of Masonry and speed of application, and construction is simple, and cost is low.The utility model range of application is applicable to solid brick wall, porous brick wall, hollow block wall, empty bucket brick wall, rectangular slab of stone masonry wall, rubble masonry.The utility model implements to have higher economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 is the rear stem stem plane of arrangement figure that increases in masonry panel;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the A place enlarged drawing of Fig. 1;
Fig. 4 is the B place enlarged drawing of Fig. 1;
Fig. 5 is the C place enlarged drawing of Fig. 1;
Fig. 6 is the D place enlarged drawing of Fig. 1;
Fig. 7 is the E place enlarged drawing of Fig. 1.
In figure, 1, increase stem stem after body of wall; 2, polymer mortar; 3, reinforcing bar or steel strand; 4, former masonry panel; 5, floor; 6, basis; 7, soil.
The specific embodiment
After in a kind of masonry panel, increase stem stem seismic reinforcing structure, comprise former masonry panel 4, be provided with vertical body of wall in former masonry panel 4 after, increase stem stem 1, after described body of wall, increase stem stem 1 and comprise the elongated vertical boring that is arranged on former masonry panel 4 vertical middle positions, the polymer mortar 2 of perfusion in the reinforcing bar wearing in boring or steel strand 3 and boring, wherein, set up rig on existing building roof by vertically holing in the interior long distance of former masonry panel 4, then in hole, wear reinforcing bar or steel strand 3, then in hole, polymer injection mortar 2 forms the rear constraining member that increases stem stem 1 and strengthens existing masonry panel 4 ductility technology.Vertical boring adopts special equipment, and bore position is placed in the middle on masonry panel 4 widths, and boring size need be determined according to design, between 40mm to 150mm.In hole, wear reinforcing bar or steel strand 3, if use reinforcing bar to adopt the multiple reinforcing bar connected modes such as colligation overlap joint or welding, length is identical with hole longitudinal length, and reinforcing bar or steel strand 3 are positioned at boring cross section center.Polymer injection mortar 2 in hole, polymer mortar 2 adopts high-pressure injection pump to inject, and needs fullly in the hole in, and polymer mortar 2 intensity are chosen according to design, and finally rear increasing stem stem 1 constraining member of formation has strengthened masonry panel 4 ductility.
The former masonry panel of existing building 4 internal drilling positions are roughly selected referring to Fig. 1.
Design bore position, aperture and on-the-spot boring are noted destroying original structure precast floor slab 5, referring to Fig. 2.
Reinforcing step is as follows:
Step 1: select rig according to the aperture and the hole spacing that increase stem stem 1 after construction drawing design body of wall, carry out reconnaissance trip, unwrapping wire location, sets up scaffold, and erection construction platform sets up rig boring on existing building roof; Boring should vertically penetrate the former masonry panel 4, floor 5 of existing building and basis 6 until the soil 7 of foundation bottom, and position, hole, aperture and the hole spacing of rear increasing stem stem 1 all should be determined according to Practical Project situation.
Step 2: hole and complete hole is cleaned out and penetrated reinforcing bar or steel strand 3, the model of reinforcing bar or steel strand 3, as used reinforcing bar, reinforcing bar model is preferably HRB335.
Step 3: by vertical placed in the middle to reinforcing bar or 3 of steel strand.
Step 4: upper end closure, adopts grouting equipment polymer injection mortar 2 in hole, applying high voltage slip casting method.
Step 5: construction content is carried out an acceptance inspection.
Be more than an exemplary embodiment of the present utility model, concrete enforcement of the present utility model is not limited to this.

Claims (6)

1. after in a masonry panel, increase stem stem seismic reinforcing structure, comprise the former masonry panel of existing building (4), it is characterized in that: be provided with vertical body of wall in former masonry panel (4) after, increase stem stem (1), after described body of wall, increase the polymer mortar (2) that stem stem (1) comprises perfusion in the reinforcing bar that wears in the elongated vertical boring, boring that is arranged on the vertical middle position of former masonry panel (4) or steel strand (3) and boring.
2. after in masonry panel according to claim 1, increase stem stem seismic reinforcing structure, it is characterized in that: described bore diameter is 40mm-150mm.
3. after in masonry panel according to claim 2, increase stem stem seismic reinforcing structure, it is characterized in that: described elongated vertical boring is positioned at former masonry panel (4) width middle position.
4. after in masonry panel according to claim 3, increase stem stem seismic reinforcing structure, it is characterized in that: described reinforcing bar or steel strand (3) are positioned at boring cross section center.
5. after in masonry panel according to claim 4, increase stem stem seismic reinforcing structure, it is characterized in that: described reinforcing bar adopts overlap joint or is welded to connect form.
6. after in masonry panel according to claim 5, increase stem stem seismic reinforcing structure, it is characterized in that: described reinforcing bar adopts HRB335 reinforcing bar.
CN201320630798.9U 2013-10-12 2013-10-12 Anti-seismic reinforcing structure with core column arranged later in brickwork wall Expired - Fee Related CN203603519U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320630798.9U CN203603519U (en) 2013-10-12 2013-10-12 Anti-seismic reinforcing structure with core column arranged later in brickwork wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320630798.9U CN203603519U (en) 2013-10-12 2013-10-12 Anti-seismic reinforcing structure with core column arranged later in brickwork wall

Publications (1)

Publication Number Publication Date
CN203603519U true CN203603519U (en) 2014-05-21

Family

ID=50716199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320630798.9U Expired - Fee Related CN203603519U (en) 2013-10-12 2013-10-12 Anti-seismic reinforcing structure with core column arranged later in brickwork wall

Country Status (1)

Country Link
CN (1) CN203603519U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107923189A (en) * 2015-04-20 2018-04-17 希尔特克集团有限公司 The masonry wall of reinforcing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107923189A (en) * 2015-04-20 2018-04-17 希尔特克集团有限公司 The masonry wall of reinforcing

Similar Documents

Publication Publication Date Title
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN103469814A (en) Novel barricade supporting structure for road or river bank dam and construction method thereof
CN103498574B (en) After in masonry panel, increase stem stem Shockproof reinforcing method
CN102518453A (en) Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels
CN103758362B (en) After existing masonry building, increase the Shockproof reinforcing method of collar tie beam, constructional column and reinforcing pull rod
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN103352582B (en) The method of inner prestressed reinforcement bolt anchorage Concrete Hollow Block Masonry Structures
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN104563147B (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN204662494U (en) A kind of Road Retaining Walls ruggedized construction
CN103498567B (en) Dark collar tie beam Shockproof reinforcing method and ruggedized construction thereof is increased after in masonry panel
CN102220764B (en) Construction method of deep foundation pit bracing system
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN203603519U (en) Anti-seismic reinforcing structure with core column arranged later in brickwork wall
CN103758361B (en) The seismic hardening construction method of short-limb wall and reinforcing pull rod is increased after existing building
CN203394092U (en) Concrete hollow block masonry structure reinforced by adopting internal prestressing force
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN109972852A (en) It is a kind of that building-block structure and its construction method are reinforced using vertical through holes merging prestressed anchor pressure grouting
CN207003470U (en) A kind of pin-connected panel ecological anchor rod retaining wall structure
CN103741961A (en) Aseismic strengthening method for adding pin key and hidden beam for prefabricated round hole plate of existing building
CN104018496A (en) Round-section slide-resistant pile with pile body provided with horizontal haunched beam and construction method of round-section slide-resistant pile
CN105239575B (en) One kind drilling base expanding and base expanding grouting Static Pipe Pile Construction device and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140521

Termination date: 20171012

CF01 Termination of patent right due to non-payment of annual fee