CN203594445U - Drilling orbit measuring instrument - Google Patents

Drilling orbit measuring instrument Download PDF

Info

Publication number
CN203594445U
CN203594445U CN201320802433.XU CN201320802433U CN203594445U CN 203594445 U CN203594445 U CN 203594445U CN 201320802433 U CN201320802433 U CN 201320802433U CN 203594445 U CN203594445 U CN 203594445U
Authority
CN
China
Prior art keywords
drilling
measuring instrument
tube
battery
inserting tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320802433.XU
Other languages
Chinese (zh)
Inventor
景伟涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING KELIAN AUTOMATION TECHNOLOGY Co Ltd
Original Assignee
BEIJING KELIAN AUTOMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING KELIAN AUTOMATION TECHNOLOGY Co Ltd filed Critical BEIJING KELIAN AUTOMATION TECHNOLOGY Co Ltd
Priority to CN201320802433.XU priority Critical patent/CN203594445U/en
Application granted granted Critical
Publication of CN203594445U publication Critical patent/CN203594445U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a drilling orbit measuring instrument which is formed by sequentially connecting an exploring tube, a data collecting tube and a battery tube. The exploring tube is internally provided with an acceleration sensor and a magnetic resistance sensor. The data collecting tube is internally provided with an AD converting processing and storing module. A battery is arranged in the battery tube and the acceleration sensor, the magnetic resistance sensor and the battery are electrically connected with the AD converting processing and storing module. According to the drilling orbit measuring instrument, when drilling according to the normal rotation drilling technology is carried out, the drilling orbit and the spatial position are measured. The drilling orbit measuring instrument has the advantages of being simple in structure and accurate in measuring.

Description

Drilling track measuring instrument
Technical field
The utility model belongs to coal mine drilling technical field, relates in particular to a kind of instrument that the track of coal mine drilling is measured.
Background technology
China is the country of an oil starvation, weak breath, rich coal, and coal has important strategic position in national economy and social development.China can not change quite over a long time in future take coal as main energy resource structure, and coal will be the main body energy of China.In recent years, safe coal production situation is very severe, and particularly serious accident happens occasionally.National security agency pays much attention to gas drainage under suction work, essential technique using gas drainage under suction as control of coalmine gas, " first take out afterwards and adopt " one of 12 word policies of being listed in by national Coal Mine Safety Supervision Bureau gas control, China's gas drainage technique has had and has developed rapidly.But, China's gas drainage technique is still relatively backward with equipment, the firedamp taking-out discharging drilling although constructed in some region, but because existing conventional art cannot effectively be measured the actual path of common firedamp taking-out discharging drilling, cause actual drilling track and design drilling track to occur relatively large deviation, firedamp taking-out discharging drilling is constructed less than precalculated position, and gas drainage under suction blind area appears in coal seam, and gas burst accident still happens occasionally.Equally, in the middle of spy discharges water the construction works of holing, the most of collieries of China still cannot be measured space tracking and the position of boring, lack basis for estimation effective, science, cause Underwell permeable accident to happen occasionally.
In recent years, along with km directional drilling machine in Shanxi, the success in Shaanxi, Ningxia, Deng Di colliery, Inner Mongol applies, the transmission of coal mining drilling signal and measurement-while-drilling system have also progressively obtained application, the application of measurement-while-drilling system makes boring play the multiple actions such as gas pumping, geological structure location, the permeable structure detection of artesian water region, has played positive effect in mine safety production.Be proven, directional drilling technique is mainly adapted in the stable coal seam of geological conditions, in the bad ground of growing at the structure such as broken coal seam or the weak seam coal of complex geologic conditions, because drilling rod in directional drilling work progress does not rotate, the more common drilling process of deslagging situation is poor, very easily there is bit freezing, the accidents such as bury drills, even can there is drilling rod locking and cannot move back the situations such as brill, can not make measurement-while-drilling system Safe withdrawing, cause huge economic loss, one-tenth porosity and the pore-forming efficiency of directional drilling are significantly reduced, in this case, adopt common rig to carry out the boring of rotary drilling construction technology and have more advantage.But, while adopting common rotary drilling technological borehole, traditional construction technology cannot be measured accurately to drilling track, locus, and then cannot effectively eliminate gas drainage under suction blind area.
Utility model content
For this reason, technical problem to be solved in the utility model is to provide a kind of in the time that common rotary drilling technique is holed, and can carry out the drilling track measuring instrument of accurately measuring, the deficiency existing to overcome prior art to drilling track, locus.
For solving the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of drilling track measuring instrument, it is characterized in that: be linked in sequence and form by inserting tube, data acquisition collector and cell tube, in described inserting tube, be provided with acceleration transducer, magnetoresistive transducer, AD conversion be set in described data acquisition collector and process memory module, in described cell tube, be provided with battery; Described acceleration transducer, described magnetoresistive transducer connect and described battery is all electrically connected described AD conversion and processes memory module.
In order to facilitate the derivation of data, be also provided with data-interface at the front end of inserting tube, described data-interface is electrically connected described AD conversion and processes memory module.
For in the time holing, inserting tube is played a protective role, on described inserting tube, also cover has inserting tube end cap.
For realize can synchronized time synthetic, in described data acquisition collector, be also provided with described AD conversion and process the timer that memory module is connected.
Adopt technique scheme, drilling track measuring instrument of the present utility model is arranged on without in magnetic drilling rod while use, the X-axis in the earth's magnetic field of each survey mark of Real-time Collection drilling track, Y-axis, the X-axis of Z axis component and acceleration of gravity, Y-axis, the component of Z axis, carry out data transaction and be stored in AD changing and processing on the storage chip of memory module at interval of the set time (>=10s), by the processing to data, can obtain on computers the azimuth of different measuring points in its corresponding measurement moment, inclination angle, these azimuths, inclination angle marks out and just can obtain drilling track.
Therefore, drilling track measuring instrument of the present utility model has been realized the measurement to drilling track, locus in the time that common rotary drilling technique is holed, and has simple in structurely, measures accurate advantage.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is component electrical connection schematic diagram of the present utility model.
In figure:
100-inserting tube, 101-acceleration transducer, 102-magnetoresistive transducer, 103-data-interface, 104-end cap, 200-data acquisition collector, 201-AD conversion and processing memory module, 202-timer, 300-cell tube, 301-battery.
The specific embodiment
As described in Figure 1, drilling track measuring instrument of the present utility model, is linked in sequence and is formed by inserting tube 100, data acquisition collector 200 and cell tube 300.
Wherein, in inserting tube 100, be provided with acceleration transducer 101, magnetoresistive transducer 102.Data acquisition collector 200 is interior to be arranged AD conversion and processes memory module 201 and timer 202.In cell tube 300, be provided with battery 301.
Shown in Fig. 2, acceleration transducer 101, described magnetoresistive transducer 102 and timer 301 and battery 301 are all electrically connected with AD conversion and processing memory module 301.
In order to facilitate the derivation of data, be also provided with data-interface 103 at the front end of inserting tube 100, this data-interface 103 is electrically connected AD conversion and processes memory module 301.
For in the time holing, inserting tube 100 is played a protective role, on inserting tube 100, also cover has inserting tube end cap 104.
It is exactly more than drilling track measuring instrument of the present utility model, when use, be arranged on without in magnetic drilling rod, the X-axis in the earth's magnetic field of each survey mark of Real-time Collection drilling track, Y-axis, the X-axis of Z axis component and acceleration of gravity, Y-axis, the component of Z axis, carry out data transaction and be stored in AD changing and processing on the storage chip of memory module at interval of the set time (>=10s), by the processing to data, can obtain on computers the azimuth of different measuring points in its corresponding measurement moment, inclination angle, these azimuths, inclination angle marks out and just can obtain drilling track.
Can find out by foregoing detailed description, drilling track measuring instrument of the present utility model has been realized the measurement to drilling track, locus in the time that common rotary drilling technique is holed, and has simple in structurely, measures accurate advantage.

Claims (4)

1. a drilling track measuring instrument, it is characterized in that: be linked in sequence and form by inserting tube, data acquisition collector and cell tube, in described inserting tube, be provided with acceleration transducer, magnetoresistive transducer, AD conversion be set in described data acquisition collector and process memory module, in described cell tube, be provided with battery; Described acceleration transducer, described magnetoresistive transducer connect and described battery is all electrically connected described AD conversion and processes memory module.
2. drilling track measuring instrument according to claim 1, is characterized in that: the front end of described inserting tube is also provided with data-interface, and described data-interface is electrically connected described AD conversion and processes memory module.
3. drilling track measuring instrument according to claim 1 and 2, is characterized in that: on described inserting tube, also cover has inserting tube end cap.
4. drilling track measuring instrument according to claim 1, is characterized in that: in described data acquisition collector, be also provided with described AD conversion and process the timer that memory module is connected.
CN201320802433.XU 2013-12-08 2013-12-08 Drilling orbit measuring instrument Expired - Fee Related CN203594445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320802433.XU CN203594445U (en) 2013-12-08 2013-12-08 Drilling orbit measuring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320802433.XU CN203594445U (en) 2013-12-08 2013-12-08 Drilling orbit measuring instrument

Publications (1)

Publication Number Publication Date
CN203594445U true CN203594445U (en) 2014-05-14

Family

ID=50675340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320802433.XU Expired - Fee Related CN203594445U (en) 2013-12-08 2013-12-08 Drilling orbit measuring instrument

Country Status (1)

Country Link
CN (1) CN203594445U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088625A (en) * 2014-05-21 2014-10-08 武汉长盛煤安科技有限公司 Underground coal mine drilling wireless while drilling rail and hole depth measurement device
CN109723428A (en) * 2019-02-08 2019-05-07 中国矿业大学(北京) A kind of underground coal mine routine drilling track curvature measuring device and method
CN109882072A (en) * 2019-04-09 2019-06-14 石家庄泽林煤矿机械制造有限公司 A kind of Pneumatic crawler drilling machine showing drilling track
CN114427443A (en) * 2022-01-21 2022-05-03 渭南陕煤启辰科技有限公司 Detachable drill hole track measurement while drilling probe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088625A (en) * 2014-05-21 2014-10-08 武汉长盛煤安科技有限公司 Underground coal mine drilling wireless while drilling rail and hole depth measurement device
CN109723428A (en) * 2019-02-08 2019-05-07 中国矿业大学(北京) A kind of underground coal mine routine drilling track curvature measuring device and method
CN109882072A (en) * 2019-04-09 2019-06-14 石家庄泽林煤矿机械制造有限公司 A kind of Pneumatic crawler drilling machine showing drilling track
CN114427443A (en) * 2022-01-21 2022-05-03 渭南陕煤启辰科技有限公司 Detachable drill hole track measurement while drilling probe

Similar Documents

Publication Publication Date Title
CN203594445U (en) Drilling orbit measuring instrument
CN102419455B (en) Interwell parallel resistivity CT (computed tomography) testing method
CN205353041U (en) Shallow layer underground carbon dioxide gas concentration monitoring system
CN106285776B (en) A kind of unrestrained method of roof water based on Technology of Directional Drilling
CN105804763B (en) Across the hole CT boulders detection system of advanced 3 D resistivity and detection method that shield excavation machine is carried
CN204027551U (en) A kind of dynamic rotary attitude measuring for drilling well
CN206177406U (en) Real -time tracking measurement device of ground water level
CN103742143B (en) Mining overburden destroys the dual probe detection method of horizontal distortion
CN104453849A (en) Shale gas reservoir three-dimensional geological stress predication evaluation method
CN105180889B (en) A kind of dynamic rotary attitude measuring and method for drilling well
CN103605168B (en) The quick method of prospecting of a kind of seabed Polymetallic sulphide integrated information
CN104695944B (en) It is a kind of mining with brill trajectory measurement inserting tube control system
CN208568822U (en) More drilling water-bearing layer water flow flow rate and directions measure system
CN103670374B (en) Rotary drilling drilling track measuring system
CN201322806Y (en) Automatic monitor for acceleration of sliding posture of sliding body
CN105203071B (en) A kind of direction-finding device and direction-finding method for geostress survey
CN206942752U (en) Water prospection of mine rig precise positioning instrument
CN203201549U (en) Drill collar type gamma gauge
CN202645539U (en) Borehole clinometer without cable based on synchronous technology
CN105443112A (en) Whole-space error compensation method of mining inclinometer
CN203729978U (en) Control system for mining logging-while-drilling track measuring probe
CN114384603A (en) Drilling-based geophysical prospecting method in hydrothermal uranium mine
CN202500550U (en) Electronic multishot inclinometer for coal mine
CN206928970U (en) A kind of real time gas concentration monitoring system for the different depth that drills
CN202676168U (en) Underground hand-held drilling laser orientation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140514

Termination date: 20171208

CF01 Termination of patent right due to non-payment of annual fee