CN203535074U - Insulating bracket device for withstand voltage test on parallel cables - Google Patents
Insulating bracket device for withstand voltage test on parallel cables Download PDFInfo
- Publication number
- CN203535074U CN203535074U CN201320432919.9U CN201320432919U CN203535074U CN 203535074 U CN203535074 U CN 203535074U CN 201320432919 U CN201320432919 U CN 201320432919U CN 203535074 U CN203535074 U CN 203535074U
- Authority
- CN
- China
- Prior art keywords
- insulating
- insulating support
- withstand voltage
- voltage test
- brackets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 27
- 238000009413 insulation Methods 0.000 claims description 2
- 238000001514 detection method Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 3
- 238000004804 winding Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
The utility model provides an insulating bracket device for the withstand voltage test on parallel cables and mainly applied to the high-voltage test on transformer stations, which comprises at least two insulating brackets. The insulating brackets are connected together by means of connection wires. Each insulating bracket comprises a base, an upright bracket fixed on the base, and a clamping unit arranged at the top of the upright bracket. The upright brackets are high-voltage resistant and insulated and each clamping unit is composed of a fixed arm fixed onto the upright bracket, and a wire clamp arranged at one end of the fixed arm. The connection wires are connected with corresponding insulating brackets by means of the wire clamps. The wire clamps are also connected with test connection wires connected with to-be-tested phase wires. According to the technical scheme of the utility model, a plurality of insulating brackets are connected in series as a whole by means of connection wires, so that a plurality of identical phase wires can be simultaneously tested. That is, through the primary boosting process, a plurality of identical phase wires can be simultaneously tested. Therefore, the detection time is saved and the working efficiency is improved.
Description
Technical field
The utility model relates to a kind of transmission facility and power cable checkout equipment, is specially a kind of cable voltage insulator rack for experiment device of detection streamer resistance to pressure.
Background technology
At present in the operation process such as Electric Power Line Overhaul, station, for cable voltage, testing a normally minute phase line tests separately, if carry out upkeep operation in the transformer station more than 110KV, because number of cable is more, wherein 10KV or 35KV power cable outlet number accounted for the overwhelming majority, by 20 minutes every cable testing time, article 10, cable just takies 200 minutes, add and disconnect test the end of a thread, mobile device equal time, all needs about 4-5 hour conventionally.And take more manually, work efficiency is not high and can extend power off time.
Summary of the invention
For above-mentioned deficiency, designed a kind of cable withstand voltage test insulating support device in parallel, having solved once boosts detects the problem of many circuits simultaneously.
A cable withstand voltage test insulating support device in parallel, comprises insulating support, it is characterized in that having at least two insulating supports to form, and between each insulating support, by wire connecting line, is connected.
Described cable withstand voltage test insulating support device in parallel, it is characterized in that described insulating support comprises base, be fixed on the staking on base and be arranged at the clamp device at staking top, described staking is high pressure resistant insulation support, and described clamp device comprises the fixed arm being fixed on staking and is placed in the wire clamp of fixed arm one end.
Described cable withstand voltage test insulating support device in parallel, is characterized in that described connecting line connects each insulating support by wire clamp, is also connected to and the test connection that detects phase line and be connected on described wire clamp.
Cable of the present utility model withstand voltage test insulating support device in parallel by several insulating supports are integrated by wire series winding, can detect several phase isopens simultaneously, by once boosting, detects several phase isopens simultaneously.Save detection time, improved work efficiency.
Accompanying drawing explanation
Fig. 1 is high pressure Test Field schematic diagram;
Fig. 2 is insulating support structural representation.
In figure, 1-fixed arm, 2-wire clamp, 3-staking, 4-base, 5-test instrument, 6-connecting line, 7-test connection, 8-insulating support.
Embodiment
With reference to accompanying drawing 1, cable of the present utility model withstand voltage test insulating support device in parallel, include branched insulating support 8, between each insulating support, by wire connecting line 6 series windings, connect, each insulating support is connected with the tested phase line of homophase by a test connection 7 respectively, and the end points of connecting line is connected with detection test instrument 5.Shown in figure, five switch cubicles of one-time detection in the present embodiment, adopt five insulating supports 8, the test connection 7 on each insulating support 8 are connected respectively to the A phase of corresponding switch cubicle, and test connection being connected on connecting line 6.Power-on makes test instrument 5 boost to predetermined value, detects the withstand voltage qualified situation of each switch cubicle wiring.When there is exceptional value, then detect respectively the A phase line of each switch cubicle, determine it is which bar circuit goes wrong.And change.So carry out three processes of boosting and can detect all phase lines of five switch cubicles.Saved for 80% detection time.
Shown in Fig. 2, insulating support has a base 4, is fixed with staking 3 on base, on staking top, there is a fixed arm 1, on described fixed arm, be shaped with screw thread, two nuts that are socketed on fixed arm form wire clamp 2, and connecting line 6 is fixed on wire clamp with test connection 7.
Above-mentioned staking and fixed arm, wire clamp all adopt high pressure resistant material to make.
Claims (1)
1. cable withstand voltage test insulating support device in parallel, comprise insulating support (8), it is characterized in that having at least two insulating supports to form, between each insulating support, by wire connecting line (6), connected, described insulating support comprises base (4), be fixed on the staking (3) on base and be arranged at the clamp device at staking top, described staking is high pressure resistant insulation support, described clamp device comprises the fixed arm (1) being fixed on staking and the wire clamp (2) that is placed in fixed arm one end, described connecting line (6) connects each insulating support (8) by wire clamp (2), on described wire clamp (2), be also connected to and the test connection (7) that detects phase line and be connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320432919.9U CN203535074U (en) | 2013-07-21 | 2013-07-21 | Insulating bracket device for withstand voltage test on parallel cables |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320432919.9U CN203535074U (en) | 2013-07-21 | 2013-07-21 | Insulating bracket device for withstand voltage test on parallel cables |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203535074U true CN203535074U (en) | 2014-04-09 |
Family
ID=50421268
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320432919.9U Expired - Fee Related CN203535074U (en) | 2013-07-21 | 2013-07-21 | Insulating bracket device for withstand voltage test on parallel cables |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203535074U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103954805A (en) * | 2014-04-15 | 2014-07-30 | 国家电网公司 | Connecting rack for high-voltage holding test |
-
2013
- 2013-07-21 CN CN201320432919.9U patent/CN203535074U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103954805A (en) * | 2014-04-15 | 2014-07-30 | 国家电网公司 | Connecting rack for high-voltage holding test |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204989239U (en) | Transformer test multipurpose plant of working a telephone switchboard | |
CN104880652A (en) | Electrified partial discharge test system of switch cabinet and voltage signal extraction device thereof | |
CN104991095A (en) | Transformer test wiring general apparatus | |
CN111123047B (en) | Integrated automatic detection system for wire and cable voltage and insulation resistance tests | |
CN203849288U (en) | Wiring conversion device for electrical routine tests of transformer | |
CN113162040B (en) | System and method for power supply non-voltage nuclear phase for high-voltage plant of power plant | |
CN207833325U (en) | The test device and mast switch controller of mast switch controller | |
CN203535074U (en) | Insulating bracket device for withstand voltage test on parallel cables | |
CN218896185U (en) | Auxiliary device for voltage transformer test | |
CN202770867U (en) | Electric energy meter test wiring device | |
CN202956482U (en) | Small current system single-phase grounding fault detection verifying device | |
CN108037365B (en) | Parallel reactor test board | |
CN204832265U (en) | Following circuit breaker of 35KV and generating line loop resistance rapid survey termination | |
CN203224526U (en) | A high-voltage wire connector used for AC withstanding voltage | |
CN204789879U (en) | Electrified partial discharge test system of switch cabinet and voltage signal extraction device thereof | |
CN102262203B (en) | Device for monitoring insulating state of capacitor sleeve online and method thereof | |
CN210005629U (en) | Withstand voltage test device for extra-high voltage GIS | |
CN207215872U (en) | A kind of switch cubicle tests bench control system | |
CN203365548U (en) | Transformer DC resistance tester | |
CN206594286U (en) | A kind of device of quick lookup failure electric energy meter | |
CN108549044B (en) | Insulation line selection tester for direct current system of transformer substation | |
CN203054008U (en) | Special-purpose voltage transformer test wiring device | |
CN104897999A (en) | Comprehensive tester for electric appliance safety performance | |
CN205301435U (en) | Online insulating detecting system of high -tension apparatus | |
CN205246705U (en) | A separated time anchor clamps for power transformer is automatic to be detected |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140409 Termination date: 20150721 |
|
EXPY | Termination of patent right or utility model |