CN203475791U - Scaffold erecting device for cornice in platform area - Google Patents

Scaffold erecting device for cornice in platform area Download PDF

Info

Publication number
CN203475791U
CN203475791U CN201320593254.XU CN201320593254U CN203475791U CN 203475791 U CN203475791 U CN 203475791U CN 201320593254 U CN201320593254 U CN 201320593254U CN 203475791 U CN203475791 U CN 203475791U
Authority
CN
China
Prior art keywords
fish belly
cornice
platform
belly sill
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320593254.XU
Other languages
Chinese (zh)
Inventor
戴维
杨俊�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN201320593254.XU priority Critical patent/CN203475791U/en
Application granted granted Critical
Publication of CN203475791U publication Critical patent/CN203475791U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a scaffold erecting device for a cornice in a platform area. The scaffold erecting device for the cornice in the platform area comprises a fish belly beam (1) and combination beams (3) of the cornice in the platform area. The two sides of the fish belly beam (1) are respectively provided with a square tube (2), and the two ends of the square tubes (2) are respectively placed on the combination beams (3). The two square tubes (2) are both parallel to the fish belly beam (1) and are in symmetry with respect to the fish belly beam (1). A lifting rod (9) is parallel to the combination beams (3) and is placed in the middle position of the two combination beams (3). The two ends of the lifting rod (9) are placed on the square tubes (2), and the lifting rod (9) is connected with two electric blocks (5) which are placed on the two sides of the fish belly beam (1) respectively. Compared with the prior art, the erecting efficiency of scaffolds can be improved, the erecting device is simple in structure, and construction is convenient.

Description

A kind of scaffold building device for platform district cornice
Technical field
The utility model relate to Railway Passenger Stations platform district cornice aluminum facade installation scaffold, particularly scaffold set up device.
Background technology
At present, the aluminum facade of Railway Passenger Stations platform district cornice is installed, generally by setting up scaffold, complete, but in setting up process, run into following problem: when the height of setting up scaffold is during higher than 10 meters, the workload of setting up of scaffold significantly increases (must consider stability and the safety of structure, the handling of steel pipe and quantity also will be included limit of consideration in), and the process of ground handling of having set up process influence of scaffold, the progress that has finally affected whole engineering, has extended the construction period.For this reason, need to simplify the work of setting up of scaffold.The common scaffold method of setting up is from the bottom up, can consider so to utilize the structure of platform station itself directly at cornice, to set up, avoid this road bank of 10 meters of height, and fish belly sill and compound beam on platform station is more satisfactory structure, the enough support scaffoldings of its Rigidity and strength are set up.
Summary of the invention
The technical problems to be solved in the utility model is: a kind of scaffold building device for platform district cornice is provided, reduces the workload of setting up of scaffold, shorten construction period, safe, fast, effectively to complete aluminum facade installation.
The technical solution of the utility model is: a kind of scaffold building device for platform district cornice, the fish belly sill and the compound beam that comprise platform district cornice, respectively there is a square tube fish belly sill both sides, square tube two ends are placed in respectively on compound beam, two square tubes are all parallel to fish belly sill and symmetrical about fish belly sill, are parallel to compound beam and are positioned at two compound beam interpositions to be equipped with a vertical loading board, and vertical loading board two ends are placed on square tube, on vertical loading board, be connected with two electric blocks, lay respectively at fish belly sill both sides.
Described scaffold building device makes full use of fish belly sill and the compound beam of Railway Passenger Stations platform district cornice, using this as the basis of setting up device, by symmetry, set up two square tubes and a vertical loading board, coordinate electric block to realize the lifting of scaffolding platform and set up, simple in structure, efficiency of construction is high.
On vertical loading board, there is a pair of locating fastener.Locating fastener is laterally fixing on fish belly sill for vertical loading board, prevents skew.
On fish belly sill, there is a pair of protection buckle, between protection buckle, also have two second protection wire rope that are wrapped on fish belly sill.In order to ensure the safety of setting up of scaffolding platform, by protection buckle, limit wire rope, then by wire rope, scaffolding platform and fish belly sill are linked together, form second protection.
During practice of construction, first adopt fastener, steel pipe to set up operating platform, after single platform is set up, adopt electric block to lift, each platform coordinates two electric blocks on vertical loading board to carry out parallel lifting, for platform held stationary level, between vertical two steel pipes, set up little cross bar, maintenance level is unified, and platform hangs and is raised to after certain height, while being little cross bar and fish belly sill bottom close contact, podium level is in place.Two steel pipes are hugged to fish belly sill, and horizontal direction connects and tightens with two horizon bars.In order to guarantee platform both sides steadily and secondary protection platform safety, adopt 4 of wire rope to hold fish belly sill tightly as second protection wire rope, and diagonal member reinforce, prevent that platform from rocking, strengthen secondary protection simultaneously.After each platform is in place, then with little cross bar, single independent platform is connected, completely spread steel pin hand sheet and complete and set up.
Use the utility model setting up scaffold, when particularly scaffolding height surpasses 10m, can improve the efficiency of setting up of scaffold, set up apparatus structure simple, easy construction.The scaffold that coordinates the utility model to set up, can complete the installation of aluminum facade safely, fast, effectively.
Accompanying drawing explanation
Fig. 1 is scaffold building device front view;
Fig. 2 is scaffold building device top view (not drawing square tube);
Fig. 3 is scaffold building device top view (not drawing compound beam);
Fig. 4 is operating platform schematic diagram (the latticed scaffold operating platform unit for being set up by steel pipe in figure).
The specific embodiment
As shown in Fig. 1 to 3, a kind of scaffold building device for platform district cornice, the fish belly sill 1 and the compound beam 3 that comprise platform district cornice, respectively there is a square tube 2 fish belly sill 1 both sides, square tube 2 two ends are placed in respectively on compound beam 3, two square tubes 2 are all parallel to fish belly sill 1 and about fish belly sill 1 symmetry, be parallel to compound beam 3 and be positioned at two compound beam 3 interpositions and be equipped with a vertical loading board 9, vertical loading board 9 two ends are placed on square tube 2, on vertical loading board 9, be connected with two electric blocks 10, lay respectively at fish belly sill 1 both sides.On vertical loading board 9, there is a pair of locating fastener 4.On fish belly sill 1, there is a pair of protection buckle 7, between protection buckle 7, also have two second protection wire rope 11 that are wrapped on fish belly sill 1.
During practice of construction, on ground, first adopt fastener, steel pipe to set up the operating platform of 6000mm * 6000mm, after single platform is set up, adopt electric block 5 to lift, each platform coordinates two electric blocks 5 on vertical loading board to carry out parallel lifting, for platform held stationary level, as Fig. 4, between vertical two steel pipes 8, set up little cross bar 10, maintenance level is unified, platform hangs and is raised to after certain height, and during little cross bar 10 and fish belly sill 1 bottom close contact, podium level is in place.Two steel pipes 8 are hugged to fish belly sill 1, and horizontal direction connects and tightens with two horizon bars 12.In order to guarantee platform both sides steadily and secondary protection platform safety, adopt 4 of wire rope to hold fish belly sill 1 tightly, and diagonal member reinforce, prevent that platform from rocking, strengthen secondary protection simultaneously, increase the devices such as guardrail and skid-prevention button.After each platform is in place, then with little cross bar 10, single independent platform is connected, completely spread steel pin hand sheet 6 and complete and set up.

Claims (3)

1. the scaffold building device for platform district cornice, the fish belly sill (1) and the compound beam (3) that comprise platform district cornice, it is characterized in that: respectively there is a square tube (2) fish belly sill (1) both sides, square tube (2) two ends are placed in respectively on compound beam (3), two square tubes (2) are all parallel to fish belly sill (1) and about fish belly sill (1) symmetry, be parallel to compound beam (3) and be positioned at two compound beams (3) interposition and be equipped with a vertical loading board (9), vertical loading board (9) two ends are placed on square tube (2), on vertical loading board (9), be connected with two electric blocks (5), lay respectively at fish belly sill (1) both sides.
2. a kind of scaffold building device for platform district cornice according to claim 1, is characterized in that: on vertical loading board (9), have a pair of locating fastener (4).
3. a kind of scaffold building device for platform district cornice according to claim 1 and 2; it is characterized in that: on fish belly sill (1), have a pair of protection buckle (7), between protection buckle (7), also have two second protection wire rope (11) that are wrapped on fish belly sill (1).
CN201320593254.XU 2013-09-25 2013-09-25 Scaffold erecting device for cornice in platform area Expired - Lifetime CN203475791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320593254.XU CN203475791U (en) 2013-09-25 2013-09-25 Scaffold erecting device for cornice in platform area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320593254.XU CN203475791U (en) 2013-09-25 2013-09-25 Scaffold erecting device for cornice in platform area

Publications (1)

Publication Number Publication Date
CN203475791U true CN203475791U (en) 2014-03-12

Family

ID=50224145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320593254.XU Expired - Lifetime CN203475791U (en) 2013-09-25 2013-09-25 Scaffold erecting device for cornice in platform area

Country Status (1)

Country Link
CN (1) CN203475791U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952130A (en) * 2016-06-24 2016-09-21 中国建筑第六工程局有限公司 Suspension platform for constructing eave part of building and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952130A (en) * 2016-06-24 2016-09-21 中国建筑第六工程局有限公司 Suspension platform for constructing eave part of building and installation method thereof

Similar Documents

Publication Publication Date Title
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN204040439U (en) A kind of reducing operation platform installed for steel rectangle column
CN205501837U (en) Steel case roof beam becomes bridge welding simple platform
CN206768611U (en) Bridge pier hanging basket mounting operation platform
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN202227701U (en) Spliced type horizontal channel device
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN105019664A (en) High-altitude sliding installation method for box room type electric room
KR20110014341A (en) Tower ctane wall bracing with a safety fence
CN212866793U (en) Assembled construction elevator stops layer platform
CN203475791U (en) Scaffold erecting device for cornice in platform area
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN203097253U (en) Elevator shaft triangular support type formwork platform
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN203462736U (en) Operating platform for lift shaft structural steel construction
CN204000620U (en) Bridge girder erection machine carrying device
CN107795133B (en) Integral protective frame platform and construction method thereof
CN203430009U (en) Construction hanging basket
CN202718375U (en) Installation and operation platform of high-altitude cantilever structure
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN103711147B (en) The mounting method of ballast water tank water in immersed tube
CN203822340U (en) Gate-type support frame equipment
CN204326490U (en) A kind of construction of lift well operating platform
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN203699828U (en) Simple tool-type lifting frame for mounting of steel reinforcement cages

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140312

CX01 Expiry of patent term