CN203475467U - Base plate concrete bottom sealing structure - Google Patents

Base plate concrete bottom sealing structure Download PDF

Info

Publication number
CN203475467U
CN203475467U CN201320528796.9U CN201320528796U CN203475467U CN 203475467 U CN203475467 U CN 203475467U CN 201320528796 U CN201320528796 U CN 201320528796U CN 203475467 U CN203475467 U CN 203475467U
Authority
CN
China
Prior art keywords
flange cylinder
flange
bottom board
concrete
board concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320528796.9U
Other languages
Chinese (zh)
Inventor
王海鱼
苏和
徐书龙
蒋华胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN201320528796.9U priority Critical patent/CN203475467U/en
Application granted granted Critical
Publication of CN203475467U publication Critical patent/CN203475467U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The utility model discloses a base plate concrete bottom sealing structure. A flange cylinder is arranged in the middle of base plate concrete. The bottom part of the flange cylinder penetrates through the bottom face of the base plate concrete and extends to be located in a foundation pit of a soil foundation layer. A crushed rock layer is pre-laid in the foundation pit. The bottom part of the flange cylinder is arranged on the crushed rock layer. The top part of the flange cylinder is lower than the upper surface of the base plate concrete. The top part of the flange cylinder is connected with a flange plate, and concrete is poured on the flange plate. The structure further comprises a water guide pipe. The water guide pipe extends into the interior of the flange cylinder and goes deep into the crushed rock layer. The depth of the foundation pit is 50 to 80 cm. The diameter of the foundation pit is larger than that of the flange cylinder by 30 to 50 cm. Crushed rocks with diameters ranging from 4 cm to 6 cm are filled in the lower layer of the crushed rock layer while crushed rocks with diameters ranging from 1 cm to 3 cm are filled in the upper layer of the crushed rock layer, and the upper layer is leveled to the surface of the soil foundation layer. According to the utility model, the underground water seepage problem is solved by arranging the flange cylinder during the base plate concrete construction; the structure is simple and the construction is easy; not only is the quality guaranteed, but also the cost is reduced; and the efficacy is saved while the construction period is shortened.

Description

A kind of bottom board concrete back cover structure
Technical field
The utility model relates to a kind of bottom board concrete back cover structure.
Background technology
Along with city constantly expands, Sewage Plant, water works, basement and pump station engineering are increasing, and the waterproof construction of underplate concrete requires increasingly strict.Back cover is the key link of high water level area underground structure, architecture construction.From play the effects such as sealing, load distribution, weightening finish with function back cover; From structure design back cover, be subject to the effects such as subgrade reaction, buoyancy force of underground water, pit shaft adhesion stress, working load; From construction technology, back cover is the position, deep at structure, is subject to that quicksand, pipe are readed aloud, carries out under mud scum, boulder impact.So back cover is one of major subjects that in high water level area underground structure, architecture construction, difficulty is larger.
Constructed in the past and laid concrete according to pouring order of concrete, or in concrete the method such as insert row water pipe, but all can not fundamentally solve the problem of underground infiltration, the method in past can not solve capillary channel infiltration in concrete, causes base plate face surface moisture, infiltration or the seeping phenomenons such as basement, Sewage Plant, water works and pumping plant.
Sealing collecting well with the method construction bottom board concrete that stays collecting well and dewatering well in the middle of the base plate in the past compares with dewatering well again, expense is too high, back cover poor effect, and time-consuming taking a lot of work, the concrete in well if just had no idea to construct when collecting well and the dewatering well sealing water yield is large, force construction and will cause concrete segregation phenomenon, water shutoff steel plate also cannot weld, and does not reach water sealing effect.
Bottom board concrete feature is:
(1) base plate is blocked up, leaks and is not easy to repair, if repaired from table, cures the symptoms, not the disease.
(2) condition is harsh.Have as site tissue and operating difficultiess such as Sewage Plant open caisson, pumping plants.
(3) operating difficulties.Excessive at some regional hydraulic pressure, directly pour concrete is difficult.
(4) second-rate.While using tremie method in the past, have conduit blow-by, pipe internal and external pressure balance, conduit such as move at the multiple channeling water factor to be difficult to overcome one by one, causes coagulation scholar to be washed in pouring, causes back cover to leak.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of bottom board concrete back cover structure that can solve underground seepage problem.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of bottom board concrete back cover structure arranges flange cylinder in the middle of bottom board concrete; The bottom of flange cylinder is also deeply positioned at the foundation ditch of soil matrix layer through bottom board concrete bottom surface, and foundation ditch is laid macadam in advance; Flange cylinder bottom is placed in above macadam; Flange cylinder top is lower than bottom board concrete upper surface; Flange cylinder top is connected with flange and above flange, builds concrete.
As preferably, also comprise aqueduct; Aqueduct stretches into flange cylinder inside and gos deep into macadam.
As preferably, foundation depth is 50~80cm; Foundation ditch diameter is than large 30~50 cm of flange cylinder diameter.
As preferably, the rubble that straightens footpath 4~6 cm is filled out by macadam lower floor, and upper strata is filled out and put 1~3 cm rubble and mutually concordant with soil matrix surface layer.
As preferably, flange cylinder inside fills out that to put 6~8 cm rubbles mutually concordant to soil matrix surface layer.
As preferably, the top of flange cylinder is than low 20~25 cm of bottom board concrete upper surface.
The beneficial effects of the utility model are:
Flange cylinder is set in bottom board concrete and solves underground seepage problem, simple in structure, construction easily, was both ensured the quality of products, and also can reduce costs, and saved effect, saved the duration.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is the structural representation of the utility model bottom board concrete back cover structure embodiment.
In figure, 1-bottom board concrete, 2-foundation ditch, 3-flange cylinder, 4-rubble, 5-drainage duct, 6-flange, concrete on 7-dish.
The specific embodiment
Fig. 1 is a kind of bottom board concrete back cover structure, by following construction method, constructs and forms:
(1) in building or structure the position of rich groundwater or near soil matrix face on dig a foundation ditch 2, the bottom of foundation ditch 2 than the dark 50~80cm of soil matrix surface layer, diameter than large 30~50 cm of the diameter of flange cylinder;
(2) 2 li of the foundation ditches digging, fill out and put 4~6 cm rubbles formation macadams again, on macadam, place flange cylinder 3, but the tip position of flange cylinder 3 is than low approximately 20~25 cm of plate upper surface;
(3) then in the lower floor of the peripheral foundation ditch of flange cylinder 3, fill out and put 4~6 cm rubbles, upper strata and fill out that to put 1~3 cm rubble mutually concordant with soil matrix surface layer, then in flange cylinder 3 inside, fill out and put 6~8 cm rubbles 4 to soil matrix surface layer, finally at the interior placement pumping for water pump of flange cylinder 3, can build bottom board concrete 1;
Etc. (4) bottom board concrete 1 reached after certain length of time, withdrew water pump, drainage duct 5(conduit is installed and is stretched into macadam), then build concrete in flange cylinder, with flexible pipe, connect drainage duct 7 simultaneously water in conduit is discharged.
Etc. (5) the interior concrete of flange concrete 3 reached after certain length of time, drainage duct 7 is exceeded to concrete partly amputate, then with stopper by conduit 7 sealings, first-class sealing ring covers flange 6 subsequently, then tighten the screws is built concrete 7(concrete on flange and is added expansion agent).
From construction technology, the method is to have simplified the construction technology of collecting well in the past or dewatering well sealing.
Above-described the utility model embodiment, does not form the restriction to the utility model protection domain.Any modification of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in claim protection domain of the present utility model.

Claims (6)

1. a bottom board concrete back cover structure, is characterized in that: flange cylinder is set in the middle of bottom board concrete; The bottom of described flange cylinder is also deeply positioned at the foundation ditch of soil matrix layer through bottom board concrete bottom surface, and described foundation ditch is laid macadam in advance; Described flange cylinder bottom is placed in above macadam; Flange cylinder top is lower than bottom board concrete upper surface; Flange cylinder top is connected with flange and above flange, builds concrete.
2. bottom board concrete back cover structure according to claim 1, is characterized in that: also comprise aqueduct; Described aqueduct stretches into flange cylinder inside and gos deep into macadam.
3. bottom board concrete back cover structure according to claim 1, is characterized in that: described foundation depth is 50~80cm; Foundation ditch diameter is than large 30~50 cm of flange cylinder diameter.
4. bottom board concrete back cover structure according to claim 1, is characterized in that: the rubble that straightens footpath 4~6 cm is filled out by described macadam lower floor, and upper strata is filled out and put 1~3 cm rubble and mutually concordant with soil matrix surface layer.
5. bottom board concrete back cover structure according to claim 1, is characterized in that: described flange cylinder inside fills out that to put 6~8 cm rubbles mutually concordant to soil matrix surface layer.
6. bottom board concrete back cover structure according to claim 1, is characterized in that: the top of described flange cylinder is than low 20~25 cm of bottom board concrete upper surface.
CN201320528796.9U 2013-08-28 2013-08-28 Base plate concrete bottom sealing structure Expired - Fee Related CN203475467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320528796.9U CN203475467U (en) 2013-08-28 2013-08-28 Base plate concrete bottom sealing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320528796.9U CN203475467U (en) 2013-08-28 2013-08-28 Base plate concrete bottom sealing structure

Publications (1)

Publication Number Publication Date
CN203475467U true CN203475467U (en) 2014-03-12

Family

ID=50223823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320528796.9U Expired - Fee Related CN203475467U (en) 2013-08-28 2013-08-28 Base plate concrete bottom sealing structure

Country Status (1)

Country Link
CN (1) CN203475467U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113527A (en) * 2015-07-03 2015-12-02 中国十七冶集团有限公司 Deep caisson underwater concrete back cover local water burst control method
CN105155562A (en) * 2015-08-06 2015-12-16 河北二十冶建设有限公司 Construction method for bottom sealing treatment of spring openings of deep foundation pit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113527A (en) * 2015-07-03 2015-12-02 中国十七冶集团有限公司 Deep caisson underwater concrete back cover local water burst control method
CN105155562A (en) * 2015-08-06 2015-12-16 河北二十冶建设有限公司 Construction method for bottom sealing treatment of spring openings of deep foundation pit

Similar Documents

Publication Publication Date Title
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN103343543B (en) Foundation pit dewatering well pressure-reduction-type plugging method
CN103510528B (en) For the blind drainage structure of underground structure anti-floating
CN101096852B (en) Method for anti-floating of underground building
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN100373013C (en) Treatment method for thick collapsed loess foundation
CN105544576A (en) Foundation ditch dewatering and drainage excavation structure and application method
CN104947649A (en) Control method for open caisson back soil deformation caused by pipe-jacking construction
CN103741715A (en) Novel waterproof hydrophobic construction method for basement
CN102383408B (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN203475467U (en) Base plate concrete bottom sealing structure
CN103967015A (en) Water-stopping deep foundation pit excavation method and structure thereof
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN203768925U (en) Seal device for dewatering well in foundation pit
CN103343534A (en) Closed precipitation method for foundation pit construction
CN104060622B (en) Steel drum Yield rainfall relation method is cheated in a kind of hole
CN209482261U (en) With the dam structure faced forever in conjunction with multi-functional drainage box culvert
CN207727514U (en) A kind of library basin antiseepage is anti-to lift structure
CN110080234A (en) A method of it is excavated in the secondary central island of deep foundation pit of soft soil foundation
CN105421498A (en) Foundation pit anti-seepage and settlement control method based on stereoscopic curtain-well group system
CN110185051A (en) Deep narrow excavation water discharge method
CN101603299B (en) Broken line type dam joint structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20140828

EXPY Termination of patent right or utility model