CN203431321U - Adjustable combined pipe support - Google Patents

Adjustable combined pipe support Download PDF

Info

Publication number
CN203431321U
CN203431321U CN201320568229.6U CN201320568229U CN203431321U CN 203431321 U CN203431321 U CN 203431321U CN 201320568229 U CN201320568229 U CN 201320568229U CN 203431321 U CN203431321 U CN 203431321U
Authority
CN
China
Prior art keywords
anchor ear
screw rod
strut
rod
supporting base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320568229.6U
Other languages
Chinese (zh)
Inventor
朱国平
经志昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN201320568229.6U priority Critical patent/CN203431321U/en
Application granted granted Critical
Publication of CN203431321U publication Critical patent/CN203431321U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an adjustable combined pipe support, which belongs to pipe construction devices, and solves the problem of elevation positive errors or elevation negative errors of a common pipeline support. The main technical scheme of the adjustable combined pipe support comprises a base, a support rod, a bracket and a pipe hoop; one end of the support rod is connected with the base while the other end of the support rod is connected with the bracket; screw rods are arranged on the bracket and positioned by the pipe hoop via adjustable nuts; the adjustable nuts axially move relative to the screw rods so as to adjust relative distance from the pipe hoop to the support base. The adjustable combined pipe support is used for pipe construction support and pipe positioning.

Description

Adjustable combined pipeline support
Technical field
The utility model relates to pipeline construction device, particularly a kind of support of pipelines.
Background technique
Support of pipelines is made and is installed mainly with reference to NBS < < piping support and hanger > > GB/T17116.1-1997 at present, GB/T17116.2-1997, GB/T17116.3-1997 and state architectural design standard < < water supply and drainage standard collective drawings-interior conduit support and suspension bracket > > 03S402, due to job site circumstance complication, for example ground level deviation is large, pipeline is many, adding the technological requirement absolute altitude of pipeline own changes greatly, often there is absolute altitude positive error or negative error in the support of pipelines by above standard processing, cause support that difficulty is installed, so that affect the installation quality of pipeline.
Summary of the invention
The object that the utility model will reach is just to provide a kind of adjustable combined pipeline support, eliminates absolute altitude positive error or the negative error of general support of pipelines, thereby guarantees the accuracy of location of pipeline and the validity of support.
In order to achieve the above object, the utility model adopts following technological scheme: adjustable combined pipeline support, comprise base, strut, supporting base and pipeline hoop, one end of described strut is connected with base, the other end is connected with supporting base, described supporting base is provided with screw rod, described pipeline hoop is positioned screw rod by adjusting nut, and described adjusting nut moves to regulate the distance of the relative supporting base of pipeline hoop relative to screw axial.
Further, described pipeline hoop comprises anchor ear and lower anchor ear, after described upper anchor ear and lower anchor ear obvolvent, pipeline hoop can be lived, the two ends that are positioned at pipeline hoop are respectively provided to a few screw rod, screw rod is through upper anchor ear and lower anchor ear, the below that the top that every screw rod is equipped with at least two adjusting nuts and is positioned at anchor ear has an adjusting nut at least and is positioned at lower anchor ear has an adjusting nut at least, the adjusting nut that is positioned at anchor ear top and the adjusting nut that is positioned at lower anchor ear below mutually near after make anchor ear and the mutual obvolvent of lower anchor ear.
Further, described supporting base is channel-section steel, and described screw rod passes successively two wing plates of channel-section steel and is fixed on wing plate by tightening nut.
Further, described pipeline hoop is positioned at the top of supporting base, and described supporting base is located at the upper end of strut, and described base is located at the lower end of strut, every screw rod is provided with at least two tightening nuts, and the upper surface of two wing plates is at least positioned with a tightening nut.
Further, described pipeline hoop is positioned at the below of supporting base, and described supporting base is located at the lower end of strut, and described base is located at the upper end of strut, every screw rod is provided with at least two tightening nuts, and the upper surface of two wing plates is at least positioned with a tightening nut.
Further, every screw rod is provided with four tightening nuts, and the upper and lower surface of each wing plate is equipped with a tightening nut.
Further, described strut is provided with one and be connected in the middle part of channel-section steel.
Further, described strut is provided with two and be connected to the two ends of channel-section steel.
Further, described strut comprises first body of rod being connected with supporting base and second body of rod being connected with base, described first body of rod be connected with second body of rod or described first body of rod and second body of rod between by least one intermediate bar, be connected.
Adopt after technique scheme, the utlity model has following advantage: the distance that changes the relative supporting base of pipeline hoop by adjusting nut, the parts such as screw rod, adjusting nut, pipeline hoop all can adopt prefabrication processing, during on-the-spot installation by adjusting nut position on screw rod, eliminate absolute altitude positive error or the negative error of support of pipelines, thereby guarantee the accuracy of location of pipeline and the validity of support.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is the utility model the first embodiment's structural representation;
Fig. 2 is the utility model the second embodiment's structural representation;
Fig. 3 is the third embodiment's of the utility model structural representation;
Fig. 4 is the 4th kind of embodiment's of the utility model structural representation.
Embodiment
Embodiment one:
Be illustrated in figure 1 the utility model the first embodiment.
Adjustable combined pipeline support, comprise base 1, strut 2, supporting base 3 and pipeline hoop 4, strut comprises first body of rod 21 and second body of rod 22, first body of rod is connected with supporting base, as welding, second body of rod is connected with base, as first body of rod of pegging graft can directly be connected with second body of rod, or in the present embodiment, between first body of rod and second body of rod, by an intermediate bar 23, be connected, intermediate bar is the body of rod of gage length, and the actual height in the time of like this can be according to supporting pipeline need to increase intermediate bar.First body of rod is connected with second body of rod or first body of rod is connected with intermediate bar, and second the body of rod be connected with intermediate bar, all by the connection tube coupling 20 of easy accessibility, realize and connecting, supporting base is provided with screw rod 5, pipeline hoop is positioned screw rod by adjusting nut 51, and adjusting nut moves to regulate the distance of the relative supporting base of pipeline hoop relative to screw axial.Pipeline hoop comprises anchor ear 41 and lower anchor ear 42, after upper anchor ear and lower anchor ear obvolvent, pipeline 8 can be held, the two ends that are positioned at pipeline hoop arrange respectively a screw rod, screw rod is through upper anchor ear and lower anchor ear, every screw rod is equipped with two adjusting nuts, one of them adjusting nut is assemblied in the below of lower anchor ear, and another adjusting nut is assemblied in the top of anchor ear, turn two nuts mutually near after make anchor ear and the mutual obvolvent of lower anchor ear.Consider fastening stability, also can adopt double nut, descend the below of anchor ear that two adjusting nuts are set, the top of upper anchor ear also arranges two adjusting nuts.In the present embodiment, strut has only been established one and be connected in the middle part of channel-section steel, meets in the situation of requirement of strength and saves cost.
Preferably supporting base is channel-section steel, and cost is low, meets requirement of strength, and screw rod passes successively two wing plates 31 of channel-section steel and is fixed on wing plate by tightening nut 52.In the present embodiment, pipeline hoop is positioned at the top of supporting base, and supporting base is located at the upper end of strut, and the Ke Yu ground, lower end that base is located at strut connects, and every screw rod is provided with two tightening nuts, and two tightening nuts are positioned respectively the upper surface of two wing plates.
First, calculate the vertical load of support according to the bore of pipeline, material, medium, set spacing, horizontal loading is pressed 0.3 times of calculating of vertical load, thereby calculates the concrete specification of each parts, carries out factory prefabricating processing and fabricating.According to drawing, determine that pipeline additionally arranges path, again according to pipeline path, set spacing mounting bracket base on the ground, according to the absolute altitude of pipeline in drawing, strut is installed again, is noted: guarantee that the top end of first body of rod is lower than the absolute altitude on pipeline base, then pipe laying.After pipeline installs, the upper anchor ear of fixing tube, lower anchor ear, regulating nut on adjusting screw rod makes the height of pipeline reach designing requirement again, eliminates absolute altitude positive error or the negative error of general support of pipelines, thereby guarantees the accuracy of location of pipeline and the validity of support.By tightening nut, also can realize the adjusting on certain altitude in addition.
Embodiment two:
Be illustrated in figure 2 the utility model the second embodiment.
The present embodiment is strengthened being fixedly connected with of screw rod 5 and wing plate 31 on embodiment one basis,, for each wing plate, two tightening nuts 52 are set on screw rod, two tightening nuts lay respectively at upper surface and the lower surface of wing plate, make the fixed relationship of screw rod and wing plate more firm, because every screw rod is through two wing plates, so be provided with four tightening nuts on a screw rod, and only realize the adjusting of pipeline 8 positioning heights by adjusting nut 51.
Embodiment three:
Be illustrated in figure 3 the third embodiment of the utility model.
In embodiment one and embodiment two, 2 of struts have been established one and be connected in the middle part of channel-section steel 3, and as required, two struts also can be set and be connected to the two ends of channel-section steel, form like this support of planer-type, and reliability is higher.The present embodiment is improved on embodiment two basis, can certainly on embodiment one basis, improve.
Embodiment four:
Be illustrated in figure 4 the 4th kind of embodiment of the utility model.
In above-mentioned three embodiments, all adopt the mode supporting to carry out targeted duct 8, and in the present embodiment, adopt suspension type, pipeline hoop 4 is positioned at the below of supporting base 3, supporting base is located at the lower end of strut 2, base 1 is located at the upper end of strut, base is connected with other bearing structure, and two tightening nuts 52 on every screw rod 5 are positioned respectively the upper surface of two wing plates 31.Strut has only been established one and be connected in the middle part of channel-section steel, and also can, as adopted two struts in embodiment three, form the support of " Qian " shape as required.Although the title of strut does not change in the present embodiment, its supporting effect in embodiment one to three of effect becomes suspension effect.
The utility model also has other mode of execution, and those skilled in the art can make various changes and distortion according to the utility model, only otherwise depart from spirit of the present utility model, all should belong to the defined scope of the utility model claims.

Claims (9)

1. adjustable combined pipeline support, comprise base (1), strut (2), supporting base (3) and pipeline hoop (4), one end of described strut is connected with base, the other end is connected with supporting base, it is characterized in that: described supporting base is provided with screw rod (5), described pipeline hoop is positioned screw rod by adjusting nut (51), and described adjusting nut moves to regulate the distance of the relative supporting base of pipeline hoop relative to screw axial.
2. adjustable combined pipeline support according to claim 1, it is characterized in that: described pipeline hoop comprises anchor ear (41) and lower anchor ear (42), after described upper anchor ear and lower anchor ear obvolvent, pipeline (8) can be held, the two ends that are positioned at pipeline hoop are respectively provided to a few screw rod, screw rod is through upper anchor ear and lower anchor ear, the below that the top that every screw rod is equipped with at least two adjusting nuts and is positioned at anchor ear has an adjusting nut at least and is positioned at lower anchor ear has an adjusting nut at least, the adjusting nut that is positioned at anchor ear top and the adjusting nut that is positioned at lower anchor ear below mutually near after make anchor ear and the mutual obvolvent of lower anchor ear.
3. adjustable combined pipeline support according to claim 2, is characterized in that: described supporting base is channel-section steel, and described screw rod is also fixed on wing plate by tightening nut (52) through two wing plates (31) of channel-section steel successively.
4. adjustable combined pipeline support according to claim 3, it is characterized in that: described pipeline hoop is positioned at the top of supporting base, described supporting base is located at the upper end of strut, described base is located at the lower end of strut, every screw rod is provided with at least two tightening nuts, and the upper surface of two wing plates is at least positioned with a tightening nut.
5. adjustable combined pipeline support according to claim 3, it is characterized in that: described pipeline hoop is positioned at the below of supporting base, described supporting base is located at the lower end of strut, described base is located at the upper end of strut, every screw rod is provided with at least two tightening nuts, and the upper surface of two wing plates is at least positioned with a tightening nut.
6. according to the adjustable combined pipeline support described in claim 4 or 5, it is characterized in that: every screw rod is provided with four tightening nuts, and the upper and lower surface of each wing plate is equipped with a tightening nut.
7. adjustable combined pipeline support according to claim 3, is characterized in that: described strut is provided with one and be connected in the middle part of channel-section steel.
8. adjustable combined pipeline support according to claim 3, is characterized in that: described strut is provided with two and be connected to the two ends of channel-section steel.
9. according to the adjustable combined pipeline support described in claim 7 or 8, it is characterized in that: described strut comprises first body of rod (21) being connected with supporting base and second body of rod (22) being connected with base, described first body of rod be connected with second body of rod or described first body of rod and second body of rod between by least one intermediate bar (23), be connected.
CN201320568229.6U 2013-09-12 2013-09-12 Adjustable combined pipe support Expired - Fee Related CN203431321U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320568229.6U CN203431321U (en) 2013-09-12 2013-09-12 Adjustable combined pipe support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320568229.6U CN203431321U (en) 2013-09-12 2013-09-12 Adjustable combined pipe support

Publications (1)

Publication Number Publication Date
CN203431321U true CN203431321U (en) 2014-02-12

Family

ID=50060358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320568229.6U Expired - Fee Related CN203431321U (en) 2013-09-12 2013-09-12 Adjustable combined pipe support

Country Status (1)

Country Link
CN (1) CN203431321U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060653A (en) * 2014-06-27 2014-09-24 温州科逸卫浴设备有限公司 Integrated bathroom with same-floor drainage device
CN105155485A (en) * 2015-08-18 2015-12-16 中国电建集团贵阳勘测设计研究院有限公司 Gate pier pre-stressed anchor cable sleeve installation device and construction method thereof
CN105291073A (en) * 2015-11-15 2016-02-03 内蒙古北方重工业集团有限公司 Floating supporting device for shaft and pipe parts
CN105570538A (en) * 2014-11-06 2016-05-11 中国石油天然气股份有限公司 Pipeline support
CN106049535A (en) * 2016-07-29 2016-10-26 中冶华天工程技术有限公司 Adjusting device for internal pipeline of comprehensive pipe gallery
CN106224650A (en) * 2016-08-22 2016-12-14 常州市海盈五金科技有限公司 Scalable pipe clamp
CN108302101A (en) * 2018-03-15 2018-07-20 广东电网有限责任公司江门供电局 A kind of adjustable casing tube fixing mechanism
CN109347000A (en) * 2018-12-03 2019-02-15 中建八局第建设有限公司 A kind of dedicated adjustable support of brickwork electric piping
CN113293778A (en) * 2021-06-16 2021-08-24 泰安市岱宗机电科技开发有限公司 Recoverable steel crown beam

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060653A (en) * 2014-06-27 2014-09-24 温州科逸卫浴设备有限公司 Integrated bathroom with same-floor drainage device
CN105570538A (en) * 2014-11-06 2016-05-11 中国石油天然气股份有限公司 Pipeline support
CN105155485A (en) * 2015-08-18 2015-12-16 中国电建集团贵阳勘测设计研究院有限公司 Gate pier pre-stressed anchor cable sleeve installation device and construction method thereof
CN105155485B (en) * 2015-08-18 2017-05-17 中国电建集团贵阳勘测设计研究院有限公司 Gate pier pre-stressed anchor cable sleeve installation device and construction method thereof
CN105291073A (en) * 2015-11-15 2016-02-03 内蒙古北方重工业集团有限公司 Floating supporting device for shaft and pipe parts
CN105291073B (en) * 2015-11-15 2018-01-30 内蒙古北方重工业集团有限公司 Axle, pipe part floating support device
CN106049535A (en) * 2016-07-29 2016-10-26 中冶华天工程技术有限公司 Adjusting device for internal pipeline of comprehensive pipe gallery
CN106224650A (en) * 2016-08-22 2016-12-14 常州市海盈五金科技有限公司 Scalable pipe clamp
CN108302101A (en) * 2018-03-15 2018-07-20 广东电网有限责任公司江门供电局 A kind of adjustable casing tube fixing mechanism
CN109347000A (en) * 2018-12-03 2019-02-15 中建八局第建设有限公司 A kind of dedicated adjustable support of brickwork electric piping
CN113293778A (en) * 2021-06-16 2021-08-24 泰安市岱宗机电科技开发有限公司 Recoverable steel crown beam

Similar Documents

Publication Publication Date Title
CN203431321U (en) Adjustable combined pipe support
CN201851785U (en) Adjustable support device
CN206458918U (en) A kind of adjustable subway suspension and support
CN204298825U (en) Foundation ditch builds elephant trunk supporting and regulating device
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN204358258U (en) Airduct water pipe shares suspension bracket
CN204627001U (en) PC structure floor assembled prefabricated post diagonal brace support system
CN204573343U (en) A kind of Liftable double-layer pipeline elevator
CN104696658A (en) Stress-free pipeline corridor system
CN204691237U (en) A kind of fixed support of adjustable Bars In Poured Concrete Slab mould
CN204645706U (en) Super large Steel Cantilever Truss installs supporting apparatus
CN204112729U (en) Pipe well inner sleeve reserves fixed support
CN107255208A (en) Damping base
CN202769052U (en) Pipeline movable cradle
CN203847836U (en) Pipeline mounting bracket
CN204922239U (en) Large -scale multilayer pipeline bracket
CN204187217U (en) A kind of annular bolt collar group integral built-in and positioning tool
CN102632471A (en) Adjustable pipeline processing pipe erecting device
CN207814655U (en) A kind of high efficient protected combined type suspension and support
CN102777701A (en) Bidirectional adjustable hinge type pipeline support frame
CN207452734U (en) Large-scale steel pipe encircles adjusting device
CN207568205U (en) The moulding bed quickly positioned for truss assembly rod piece
CN219268440U (en) Pipeline mounting rack
CN203240097U (en) Height-adjustable support for installing pipeline support
CN202082565U (en) Adjustable segment shoring device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310052 Shuangcheng International Building, 1785 Jianghan Road, Binjiang District, Hangzhou City, Zhejiang Province

Patentee after: CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP Co.,Ltd.

Address before: 310052 Shuangcheng International Building, 1785 Jianghan Road, Binjiang District, Hangzhou City, Zhejiang Province

Patentee before: China Construction Installation Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20210912