CN203395375U - Installation wagon group for tunnel-passing pre-stressed reinforced concrete pipe in tunnel boring machine (TBM) construction - Google Patents

Installation wagon group for tunnel-passing pre-stressed reinforced concrete pipe in tunnel boring machine (TBM) construction Download PDF

Info

Publication number
CN203395375U
CN203395375U CN201320219120.1U CN201320219120U CN203395375U CN 203395375 U CN203395375 U CN 203395375U CN 201320219120 U CN201320219120 U CN 201320219120U CN 203395375 U CN203395375 U CN 203395375U
Authority
CN
China
Prior art keywords
installation
tunnel
construction
carrying
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320219120.1U
Other languages
Chinese (zh)
Inventor
张羽
王彦武
谢建武
傅建生
何冰峰
薛秀清
王芳
郭利军
张薇
刘文彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU
Original Assignee
SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU filed Critical SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU
Priority to CN201320219120.1U priority Critical patent/CN203395375U/en
Application granted granted Critical
Publication of CN203395375U publication Critical patent/CN203395375U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model concretely relates to an installation wagon group for tunnel-passing pre-stressed reinforced concrete pipes in tunnel boring machine (TBM) construction, and aims to solve the problem of time and labor consumption, low efficiency and high cost when the conventional pipe carrying machines are used for carrying concrete pipes. The installation wagon group comprises a pipe carrying machine, one end of the pipe carrying machine is connected with a platform truck, an electric generator and backfill concrete are arranged on the platform truck, and the other end of the platform truck is connected with a locomotive. The installation wagon group provided by the utility model is reasonable and reliable in structure and design, is suitable for harsh requirements under specific construction environment, and helps to greatly improve the installation efficiency of the tunnel-passing PCCP pipes; with adoption of a mini-train carrying system, no electric carrying facilities are needed to be configured, thereby reducing overall electric power configuration input of tunnel-passing pipe installation facilities, overcoming weakness that construction electric-power supply is hard to realize in long tunnels, greatly raising installation progress and effectively reducing construction costs; and the installation wagon group has the advantages of being simple to operate, reliable in transport capacity and improved in transport speed.

Description

TBM construction tunnel is worn prestressed reinforced concrete pipe installation car group
Technical field
The utility model relates to concrete pipe erecting device, is specially a kind of TBM construction tunnel and wears prestressed reinforced concrete pipe installation car group.
Background technique
Prestressed reinforced concrete pipe (hereinafter to be referred as PCCP pipe) is as a kind of new material pipeline, because it has, intensity is high, impermeability is good, durability by force, does not need the remarkable advantages such as anticorrosion, obtains wideling popularize application in recent years in the big-and-middle-sized water delivery engineering of China.The problem that traditional water-conveyance tunnel concrete liner exists that difficulty of construction is large in order to avoid, long construction period and lining quality should not guarantee, recent years, the Novel engineering way of directly piercing PCCP pipeline in water-conveyance tunnel is ripe gradually, but PCCP pipeline pierces construction at TBM tunnel, still there are the following problems: in work progress, electric drive is carried pipe machine delivery PCCP pipeline on the back, exist delivery slowly, inefficient problem, and pierce construction site and all need to configure electric power delivery facility, cost is higher, and wastes time and energy.
Summary of the invention
The utility model for solve existing carry on the back pipe machine delivery concrete pipe exist waste time and energy, inefficiency and the higher problem of cost, provide a kind of TBM construction tunnel to wear prestressed reinforced concrete pipe installation car group.
The utility model is to adopt following technological scheme to realize: TBM construction tunnel is worn prestressed reinforced concrete pipe installation car group, comprise the pipe machine of carrying on the back, Tuo Guanji one end is connected with flat bed trailer, is provided with generator and fill concrete on flat bed trailer, and the other end of flat bed trailer is connected with locomotive engine.
First at hole external application QUY-150 type crawler crane, PCCP pipe lifting to be installed is unloaded to be placed on and carry on the back on pipe machine, recycling is positioned at lifting hydraulic cylinder and the sidesway oil hydraulic cylinder of carrying pipe dolly on the back of carrying on the back on beam, pipeline is given rise to suitable height and fixes, carry pipe machine on the back by being configured in the rail wheel of its front end and the conversion that rises, falls that pneumatic tyre is taken turns two groups of wheels, track wheels are precisely landed in orbit; Then start the mini train that is positioned at Tuo Guanji rear portion, the pipe machine of carrying on the back that promotion is loaded with PCCP pipeline moves ahead, and pipeline is transported to position to be installed; The head that is transported to installation exercise face saves PCCP pipeline, according to installation mileage, the longitudinal gradient of designing requirement, controls pipeline in place by measurement, utilizes the intense adjustment of carrying pipe machine middle part and the afterbody two first pipe joint of cover jack pair roads enforcement elevations and axis on the back to complete location; Next saves pipeline to be installed and is introduced in mounted last joint PCCP pipeline after also load-bearing by the pneumatic tyre wheel of carrying pipe car front end on the back, mention rail wheel, then limit slowly moves ahead, limit folding and unfolding is carried the jack at pipe machine middle part on the back and is adjusted pipeline attitude, itself and last pipe joint road are aligned, by that analogy, complete the installation that respectively saves PCCP pipeline of TBM hole section, overcome existing carry on the back pipe machine delivery concrete pipe exist waste time and energy, inefficiency and the higher problem of cost.
The utility model reasonable in design is reliable, fundamentally changed the obvious not enough defect of transportation PCCP pipeline dynamic in conventional electronic delivery facility hole, made up the conventional electronic monotony that pipe machine can only deliver heavy caliber PCCP pipeline slowly of carrying on the back, adapt to the harsh requirement under specific construction environment, improved greatly the installation efficiency that pierces PCCP pipeline; Carry after mini train delivery system, without configuration electric power delivery facility, reduced and pierced the total electrical arrangement input of pipe installation, the short slab of having evaded long tunnel in-cavity construction power supply difficulty, improved greatly installation progress, effectively reduce construction cost, have advantages of that simple to operate, transport power is reliable, running speed is greatly taken on a new look.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-carries pipe machine on the back, 2-flat bed trailer, 3-generator, 4-fill concrete, 5-locomotive engine.
Embodiment
TBM construction tunnel is worn prestressed reinforced concrete pipe installation car group, comprises and carries pipe machine 1 on the back, and the one end of carrying pipe machine 1 on the back is connected with flat bed trailer 2, is provided with generator 3 and fill concrete 4 on flat bed trailer 2, and the other end of flat bed trailer 2 is connected with locomotive engine 5.

Claims (1)

1. a TBM construction tunnel is worn prestressed reinforced concrete pipe installation car group, comprise the pipe machine (1) of carrying on the back, it is characterized in that: the one end of carrying pipe machine (1) on the back is connected with flat bed trailer (2), on flat bed trailer (2), be provided with generator (3) and fill concrete (4), the other end of flat bed trailer (2) is connected with locomotive engine (5).
CN201320219120.1U 2013-04-26 2013-04-26 Installation wagon group for tunnel-passing pre-stressed reinforced concrete pipe in tunnel boring machine (TBM) construction Expired - Fee Related CN203395375U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320219120.1U CN203395375U (en) 2013-04-26 2013-04-26 Installation wagon group for tunnel-passing pre-stressed reinforced concrete pipe in tunnel boring machine (TBM) construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320219120.1U CN203395375U (en) 2013-04-26 2013-04-26 Installation wagon group for tunnel-passing pre-stressed reinforced concrete pipe in tunnel boring machine (TBM) construction

Publications (1)

Publication Number Publication Date
CN203395375U true CN203395375U (en) 2014-01-15

Family

ID=49906908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320219120.1U Expired - Fee Related CN203395375U (en) 2013-04-26 2013-04-26 Installation wagon group for tunnel-passing pre-stressed reinforced concrete pipe in tunnel boring machine (TBM) construction

Country Status (1)

Country Link
CN (1) CN203395375U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839664A (en) * 2016-05-10 2016-08-10 大连景瑞科技有限公司 Multifunctional full-hydraulic square-shaped culvert installing cart
CN111648797A (en) * 2020-04-21 2020-09-11 中铁七局集团第三工程有限公司 Hydraulic tunnel pipeline installation trolley, installation system and installation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839664A (en) * 2016-05-10 2016-08-10 大连景瑞科技有限公司 Multifunctional full-hydraulic square-shaped culvert installing cart
CN105839664B (en) * 2016-05-10 2018-01-19 大连景瑞科技有限公司 Multifunctional all-hydraulic Fang Han installs car
CN111648797A (en) * 2020-04-21 2020-09-11 中铁七局集团第三工程有限公司 Hydraulic tunnel pipeline installation trolley, installation system and installation method

Similar Documents

Publication Publication Date Title
CN102094611B (en) Coal mine under-well fracturing complete equipment
CN104033157B (en) For the packaged type counter-force equipment of launching shaft
CN103711499A (en) Shield tunneling machine split starting construction method
CN204899942U (en) Formworking jumbo is used in multibreak face construction in tunnel
CN105626089A (en) Method and device for in-tunnel demounting of master drive of shield tunneling machine
CN201953368U (en) Coal mine underground unitized fracturing device
CN107255188A (en) A kind of lifting pipeline method suitable at pipe gallery intersection node
CN108590679A (en) Utilize the construction method for walking support truck jumbo overlapping tunnel
CN107905807A (en) A kind of future small coal pillar comprehensive mechanical coal mining supporting construction and construction method
CN204548259U (en) A kind of can split transport trolley fast with the mining of quick change bindiny mechanism
CN203395375U (en) Installation wagon group for tunnel-passing pre-stressed reinforced concrete pipe in tunnel boring machine (TBM) construction
CN203795312U (en) Flow type bridge erecting machine
CN201427577Y (en) Bottom-dump tramcar
CN209908511U (en) Multifunctional bridge type vehicle for tunnel
CN205990914U (en) A kind of Open TBM composite slide-plate formula stepping mechanism
CN213063860U (en) Hydraulic drive well cementation vehicle
CN201300845Y (en) Novel mining rest-transport flat car capable of bearing 30T
CN203005461U (en) Underground mine car shunting plate device
CN203655349U (en) Walking-pedrail pushing vehicle for shield tunneling machine
CN102061713A (en) Coal charging machine for blasting driving face of coal mine
CN203248163U (en) Assembled type shield operating system
CN201963352U (en) Transport vehicle for shearer
CN109989765A (en) A kind of tunnel multifunctional bridge type vehicle
CN216785117U (en) Underground waste bin
CN109458190A (en) It is a kind of to turn over slag construction method and its application in TBM construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140115

Termination date: 20200426

CF01 Termination of patent right due to non-payment of annual fee