CN108590679A - Utilize the construction method for walking support truck jumbo overlapping tunnel - Google Patents

Utilize the construction method for walking support truck jumbo overlapping tunnel Download PDF

Info

Publication number
CN108590679A
CN108590679A CN201810346393.XA CN201810346393A CN108590679A CN 108590679 A CN108590679 A CN 108590679A CN 201810346393 A CN201810346393 A CN 201810346393A CN 108590679 A CN108590679 A CN 108590679A
Authority
CN
China
Prior art keywords
tunnel
support
group
shuttering
body frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810346393.XA
Other languages
Chinese (zh)
Inventor
傅小平
邓世猛
刘东双
路雨明
曾维勇
周杰
贾森
汤迪
刘大正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group No7 Construction Engineering Co Ltd
Original Assignee
Chongqing Construction Engineering Group No7 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group No7 Construction Engineering Co Ltd filed Critical Chongqing Construction Engineering Group No7 Construction Engineering Co Ltd
Priority to CN201810346393.XA priority Critical patent/CN108590679A/en
Publication of CN108590679A publication Critical patent/CN108590679A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • E21D15/44Hydraulic, pneumatic, or hydraulic-pneumatic props
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/08Advancing mechanisms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Being related to field using the construction method for walking support truck jumbo overlapping tunnel the invention discloses a kind of, it is main to utilize the construction method for walking support truck jumbo overlapping tunnel, which is characterized in that including having the following steps:The first step, lower part tunnel piercing;Second step, the secondary supplement slip casting of lower part tunnel;Third walks, the assembling of lower part support of tunnel trolley;4th step, lower part tunnel monitoring measurement;5th step, top tunnel piercing;6th step, support trolley change step Forward with top tunnel piercing, support trolley fast in the assembling of lower part tunnel to realize to walk, easy to operate, and do not influence the horizontal transport of battery locomotive, realize tunnel synchronous construction up and down, the faster function of construction speed.

Description

Utilize the construction method for walking support truck jumbo overlapping tunnel
Technical field
The present invention relates to a kind of using the construction method for walking support truck jumbo overlapping tunnel, relates generally to overlapping tunnel Construction method field.
Background technology
With the needs of increasing and city traffic congestion objective situation that country puts into infrastructure, China tunnel and Underground engineering construction is in the ascendant.Especially subway is limited by surrounding enviroment, the increase of urban mass transit network, changes to vehicle That stands increases, and the application example of overlapping tunnel is more and more.The successful example of the existing part shield overlapping tunnel construction in the country, such as Shenzhen Subway Line 1, No. 3 lines, No. 5 lines etc. that the tunnels Zhong Tie group completes, basically form the working procedure of " getting on, get off ", build Correlative study method and conclusion are found.Because of different geology, the hydrology and overlap mode, construction mechanics behavior, to surrounding enviroment It influences deformation rule and there is larger difference, research is still in from case and rises to the system of systems stage.Such as Chongqing City's track Clear spacing is minimum up and down for 5104 bid section overlapping tunnel of No. five lines of traffic, and construction mechanics behavior is indefinite, either geological conditions, week The difficulty of design and construction of surrounding environment complex condition shield overlapping tunnel reaches higher level.
The construction equipment that trolley is common is supported in work progress at present, supporting table car owner will be by body frame, support shuttering, liquid The part such as pressure system, running gear, lower part template Lift-on/Lift-off System forms, but different construction technologies is for supporting trolley wherein The effect of a performance has a larger gap, how by its it is significantly more efficient with it in the construction process, realize that support is more preferable Stressed effect, improve construction efficiency be current urgent problem.
Invention content
For the above the deficiencies in the prior art, the present invention proposes that a kind of utilize walks applying for support truck jumbo overlapping tunnel Work method is walked support trolley and is assembled soon in lower part tunnel, easy to operate, and does not influence the horizontal transport of battery locomotive, realizes Upper and lower tunnel synchronous construction, construction speed are very fast.
In order to achieve the above objectives, the technical scheme is that:Utilize the construction for walking support truck jumbo overlapping tunnel Method, which is characterized in that including having the following steps:The first step, lower part tunnel piercing;Second step, lower part tunnel secondary supplement note Slurry;Third walks, the assembling of lower part support of tunnel trolley;4th step, lower part tunnel monitoring measurement;5th step, top tunnel piercing;The Six steps, support trolley change step Forward with top tunnel piercing.
Further, lower part tunnel piercing carries out secondary supplement slip casting, every 5 ring in final section trailer to tunnel top simultaneously In section of jurisdiction behind, pressure injection dual slurry forms closing reinforcing ring, and lower part tunnel-liner is made to form segment, and secondary grouting is net using cement Slurry, the ratio of mud 0.6:1, grouting pressure controls within 1Mpa.
Further, tunnel monitoring measurement project in lower part is:Tunnel horizontal clearance convergence, tunnel deformation measurement, ground settlement And axial force of the supports.
Further, after the completion of waiting for that lower part tunnel surmounts twice of top tunnel shield machine length and supplement slip casting and monitoring measurement Start top set of tunneling construction, mileage up and down is carried out in excavation work and is confirmed, it is ensured that top tunneling shield host is in supporting table Vehicle supports in range, establishes perfect communication system, shield host driving is by time moving forward support after first group of support, really Top tunnel is protected continuously to tunnel.
Further, after the completion of first group of five rings support shuttering assembling, debugging, body frame and first group of support shuttering separation, by Body frame running gear drives, and body frame is moved to next group of shuttering supporting position, is operated with second step, allows second group of five rings branch hold mode Plate, a closed domain is formed per ring support shuttering with bottom sleeper itself, and third group branch hold mode is debugged according to same scheme Plate.
Further, when top tunneling shield is tunneled to second group of template top position, hydraulic system is operated, by body frame and the Three groups of support shuttering separation, are driven, body frame is moved to first group of shuttering supporting position to tunnel rear end, tears open by body frame running gear Except first group of support shuttering upper screw rod, using body frame lifting cylinder, side mould oil cylinder, the electric block the effects that under by first group of mould Plate demoulds, and minimum state is retracted to tunnel centerline direction.
Further, after the completion of first group of template receives mould, sleeper and rail are laid in advance in third group template front end, are operated Body frame running gear drives body frame and first group of template that second and third group of template, body frame is passed through to be moved to the 4th group of template position, First group of template installed using lifting cylinder, side mould oil cylinder, bed die oil cylinder allow in place support shuttering and concrete pipe sheet as possible Fitting, and the certain external force of pre-add, ensure this group of five rings support shuttering, form an envelope with bottom sleeper itself per ring support shuttering The domain closed, when shield continue driving recycle to next support when, repeatedly second and third, four steps, allow support shuttering replace forward.
The present invention technical principle and have the beneficial effect that:Design support trolley supports ranging from 3 times of shield host length (being divided into 3 groups of support shutterings), trolley itself configuration motor, hydraulic system, the achievable automatic moving such as walk track walk support Trolley is fast in the assembling of lower part tunnel, easy to operate, and does not influence the horizontal transport of battery locomotive, realizes tunnel up and down and synchronizes and applies Work, construction speed is very fast, and lower part support of tunnel trolley is to carry out auxiliary stress to tunnel segment structure, reduces top constructing tunnel under Portion has been molded the influence of Structural Test of Tunnel Segments.And section of jurisdiction stress is easily deformed position and is predominantly bolted place, for connection Realize that synchronous support trolley is gamut support, and passes through support shuttering, support telescopic system using synchronous support trolley in position System, support and control system realize itself walking and persistently provide support force forward.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, embodiment will be described below Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention wherein Two width for those of ordinary skill in the art without having to pay creative labor, can also be attached according to these Figure obtains other attached drawings.
Fig. 1 is the buttress and track installation figure of the embodiment of the present invention;
Fig. 2 is that the rack of the embodiment of the present invention supports positioning states and first group of shuttering supporting figure;
Fig. 3 is the support shuttering retracted state figure of the embodiment of the present invention;
Fig. 4 is that the support shuttering of the embodiment of the present invention walks state;
Fig. 5 is the support shuttering holding state figure of the embodiment of the present invention.
Specific implementation mode
Below in conjunction with attached drawing, the technical solution in the present invention is clearly and completely described, it is clear that described Embodiment is only presently preferred embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field The every other embodiment that those of ordinary skill is obtained without making creative work, belongs to protection of the present invention Range.
Embodiment
1 lower part tunnel piercing and the secondary supplement slip casting of section of jurisdiction behind
Lower part tunnel piercing is carried out first, while secondary supplement slip casting is carried out to tunnel top in final section trailer.Two Secondary slip casting puts into 1 slip casting machine, assists moving with trailer, slip casting uses common slip casting machine, to its tunnel segment structure during slip casting It is monitored, to ensure that grouting quality, every 5 ring form closing reinforcing ring in section of jurisdiction behind pressure injection dual slurry, lower part tunnel made to serve as a contrast Block forms segment.Secondary grouting uses cement paste, the ratio of mud 0.6:1, grouting pressure controls within 1Mpa.
2 lower part support of tunnel trolley assemblings
2.1 lower part support of tunnel construction technologies
Lower part support of tunnel trolley is to carry out auxiliary stress to tunnel segment structure, reduce top constructing tunnel to lower part at The influence of type Structural Test of Tunnel Segments.And section of jurisdiction stress is easily deformed position and is predominantly bolted place, for link position, uses Synchronous support trolley realizes that synchronous support trolley is gamut support, and is controlled by support shuttering, support telescopic system, support System processed realizes itself walking and persistently provides support force forward.
2.2 walk support trolley Construction of Supporting
Supporting table car owner will be by parts such as body frame, support shuttering, hydraulic system, running gear, lower part template Lift-on/Lift-off Systems Composition.
2.3 supporting trolley assembling
2.3.1 sleeper is arranged in tunnel both rail both sides longitudinal pitch 1500mm, and install according to trolley rail away from 2400mm 43 rail ensure that walking rails center line should be overlapped with tunnel center line, are laid with error and are not greater than 30mm, rail 10m as possible Straight line error is no more than 15mm in range, is then supported sleeper with lead screw, such as Fig. 1.
2.3.2 synchronous support main bogie frame installation is ready, recycles lifting cylinder, side mould oil cylinder, bed die oil cylinder by first Group template installation is in place, then utilizes lead screw to support shuttering progress local directed complete set, allow support shuttering and concrete pipe sheet as possible Fitting, and the certain external force of pre-add, ensure this group of five rings support shuttering, every ring support shuttering (5 pieces) and bottom sleeper (2 pieces) itself A closed domain is formed, to be protected to concrete pipe sheet, as shown in Figure 2.
2.3.3 after the completion of first group of five rings support shuttering assembling, debugging, body frame and first group of support shuttering separation, by leading Frame running gear drives, and body frame is moved to next group of shuttering supporting position, is operated with second step, allows second group of five rings branch hold mode Plate forms a closed domain per ring support shuttering (5 pieces) and bottom sleeper (2 pieces) itself, according to same scheme debugging the Three groups of support shutterings.
3 lower part tunnel monitoring measurements
Overlapping tunnel construction monitoring project is:Tunnel horizontal clearance convergence, tunnel deformation measure, earth's surface (ground) settles, Axial force of the supports.
Monitoring project and requirement are as follows:
4 top tunnel piercings
Wait for lower part tunnel surmount twice of top tunnel shield machine length and supplement slip casting and monitoring measurement after the completion of start on Portion's set of tunneling construction.It carries out mileage up and down in excavation work to confirm, it is ensured that top tunneling shield host is in support trolley support In range.Perfect communication system is established, shield host driving is by time moving forward support after first group of support, it is ensured that top Tunnel continuously tunnels.
5 support trolleys change step Forward with top tunnel piercing
When 5.1 top tunneling shields are tunneled to second group of template top position, hydraulic system is operated, by body frame and third group Support shuttering detaches, and is driven by body frame running gear, and body frame is moved to first group of shuttering supporting position to tunnel rear end, removes the One group of support shuttering upper screw rod, using body frame lifting cylinder, side mould oil cylinder, the electric block the effects that under first group of template is taken off Mould is retracted to minimum state, as shown in Figure 3 to tunnel centerline direction.
After the completion of 5.2 first groups of templates receive mould, sleeper and rail are laid in advance in third group template front end, operates body frame Running gear drives body frame and first group of template that second and third group of template, body frame is passed through to be moved to the 4th group of template position, utilizes First group of template installation is allowed support shuttering and concrete pipe sheet to be bonded as possible by lifting cylinder, side mould oil cylinder, bed die oil cylinder in place, And the certain external force of pre-add, ensure this group of five rings support shuttering, is formed with bottom sleeper (2 pieces) itself per ring support shuttering (5 pieces) One closed domain.As shown in Figure 4 and Figure 5.
5.3 when shield continue driving recycle to next support when, repeatedly second and third, four steps, allow support shuttering replace to Before.
5.4 support shuttering trolley control measure
5.4.1 use supporting table Chinese herbaceous peony, go through whether each section bolt has screwed, fluid pressure line whether oil leak, liquid Press each functional component whether working properly, whether each relative movement part has the problems such as stuck phenomenon, and is handled in time;Shield While structure excavation operation, support shuttering is allowed alternately to be carried forward support.
5.4.2 support shuttering and concrete pipe sheet are bonded as possible, and the certain external force of pre-add, ensure per ring support shuttering with Bottom sleeper itself forms a closed domain, is protected to concrete pipe sheet;Meanwhile in tunneling process, to supporting table Vehicle stress is monitored at any time.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (7)

1. utilizing the construction method for walking support truck jumbo overlapping tunnel, which is characterized in that including having the following steps:
The first step, lower part tunnel piercing;
Second step, the secondary supplement slip casting of lower part tunnel;
Third walks, the assembling of lower part support of tunnel trolley;
4th step, lower part tunnel monitoring measurement;
5th step, top tunnel piercing;
6th step, support trolley change step Forward with top tunnel piercing.
2. according to claim 1 utilize the construction method for walking support truck jumbo overlapping tunnel, it is characterised in that:Under Portion's tunnel piercing carries out secondary supplement slip casting in final section trailer to tunnel top simultaneously, and every 5 ring is double in section of jurisdiction behind pressure injection Slurry forms closing reinforcing ring, and lower part tunnel-liner is made to form segment, and secondary grouting uses cement paste, the ratio of mud 0.6:1, note Pressure control is starched within 1Mpa.
3. according to claim 1 utilize the construction method for walking support truck jumbo overlapping tunnel, it is characterised in that:Under Portion's tunnel monitoring measurement project is:Tunnel horizontal clearance convergence, tunnel deformation measurement, ground settlement and axial force of the supports.
4. according to claim 1 utilize the construction method for walking support truck jumbo overlapping tunnel, it is characterised in that:It waits for Lower part tunnel starts top tunnel piercing after the completion of surmounting twice of top tunnel shield machine length and supplement slip casting and monitoring measurement It constructs, mileage up and down is carried out in excavation work and is confirmed, it is ensured that top tunneling shield host is in support trolley support range, foundation Perfect communication system, shield host driving is by time moving forward support after first group of support, it is ensured that top tunnel is continuously dug Into.
5. according to claim 1 utilize the construction method for walking support truck jumbo overlapping tunnel, it is characterised in that:The After the completion of one group of five rings support shuttering assembling, debugging, body frame and first group of support shuttering separation are driven by body frame running gear, Body frame is moved to next group of shuttering supporting position, is operated with second step, allows second group of five rings support shuttering, per ring support shuttering with Bottom sleeper itself forms a closed domain, and third group support shuttering is debugged according to same scheme.
6. according to claim 1 utilize the construction method for walking support truck jumbo overlapping tunnel, it is characterised in that:On When portion's tunneling shield is tunneled to second group of template top position, hydraulic system is operated, body frame and third group support shuttering are detached, It is driven by body frame running gear, body frame is moved to first group of shuttering supporting position to tunnel rear end, removes first group of support shuttering Upper screw rod, using body frame lifting cylinder, side mould oil cylinder, the electric block the effects that under first group of template is demoulded, into tunnel Heart line direction is retracted to minimum state.
7. according to claim 1 utilize the construction method for walking support truck jumbo overlapping tunnel, it is characterised in that:The After the completion of one group of template receives mould, sleeper and rail are laid in advance in third group template front end, operates body frame running gear, driving Body frame and first group of template pass through second and third group of template, body frame to be moved to the 4th group of template position, utilize lifting cylinder, Bian Mo First group of template installation is allowed support shuttering and concrete pipe sheet to be bonded as possible by oil cylinder, bed die oil cylinder in place, and pre-add is centainly outer Power ensures this group of five rings support shuttering, and a closed domain is formed per ring support shuttering and bottom sleeper itself, wait for shield after When continuous driving recycle to next support, repeat second and third, four steps, allow support shuttering to replace forward.
CN201810346393.XA 2018-04-18 2018-04-18 Utilize the construction method for walking support truck jumbo overlapping tunnel Pending CN108590679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810346393.XA CN108590679A (en) 2018-04-18 2018-04-18 Utilize the construction method for walking support truck jumbo overlapping tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810346393.XA CN108590679A (en) 2018-04-18 2018-04-18 Utilize the construction method for walking support truck jumbo overlapping tunnel

Publications (1)

Publication Number Publication Date
CN108590679A true CN108590679A (en) 2018-09-28

Family

ID=63613604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810346393.XA Pending CN108590679A (en) 2018-04-18 2018-04-18 Utilize the construction method for walking support truck jumbo overlapping tunnel

Country Status (1)

Country Link
CN (1) CN108590679A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240226A (en) * 2018-02-11 2018-07-03 济南轨道交通集团有限公司 Closely overlapping subway tunnel synchronized construction reserves shield sky and pushes away condition construction method
CN109322688A (en) * 2018-10-26 2019-02-12 林翠英 Soft rock tunnel, which is got out of a predicament or an embarrassing situation, excavates the hydraulic collateral support arrangement of anti-settling convergence
CN109519199A (en) * 2018-12-12 2019-03-26 中铁十四局集团有限公司 A kind of duct pieces of shield tunnel support trolley
CN109611156A (en) * 2018-12-28 2019-04-12 中铁隧道集团三处有限公司 A kind of monitoring method of overlapping tunnel information-aided construction
CN115773137A (en) * 2023-01-29 2023-03-10 北京建工土木工程有限公司 Tunnel stress compensation device for small-clear-distance shield tunnel construction and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103277110A (en) * 2013-05-13 2013-09-04 中铁十四局集团有限公司 Construction method of overlapped shield tunnel
CN104612718A (en) * 2015-02-12 2015-05-13 中国水利水电第十四工程局有限公司 Supporting trolley for overlapped shield tunnel construction and supporting trolley system
CN104612711A (en) * 2015-02-09 2015-05-13 浙江省交通规划设计研究院 Lining segment structure of city subway up-down section overlapping shield tunnels
CN104790974A (en) * 2015-04-29 2015-07-22 浙江省交通规划设计研究院 City subway overlapped shield tunnel segment structure adopting special longitudinal connecting pieces
CN204591302U (en) * 2015-02-12 2015-08-26 中国水利水电第十四工程局有限公司 A kind of support chassis for overlapping shield tunnel construction and brace table truck system
CN204877520U (en) * 2015-07-07 2015-12-16 中铁隧道股份有限公司 Subway overlaps synchronous strutting arrangement in tunnel
CN106223969A (en) * 2016-08-30 2016-12-14 中铁隧道勘测设计院有限公司 One closely upper and lower overlap or shield tunnel construction method of closely intersecting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103277110A (en) * 2013-05-13 2013-09-04 中铁十四局集团有限公司 Construction method of overlapped shield tunnel
CN104612711A (en) * 2015-02-09 2015-05-13 浙江省交通规划设计研究院 Lining segment structure of city subway up-down section overlapping shield tunnels
CN104612718A (en) * 2015-02-12 2015-05-13 中国水利水电第十四工程局有限公司 Supporting trolley for overlapped shield tunnel construction and supporting trolley system
CN204591302U (en) * 2015-02-12 2015-08-26 中国水利水电第十四工程局有限公司 A kind of support chassis for overlapping shield tunnel construction and brace table truck system
CN104790974A (en) * 2015-04-29 2015-07-22 浙江省交通规划设计研究院 City subway overlapped shield tunnel segment structure adopting special longitudinal connecting pieces
CN204877520U (en) * 2015-07-07 2015-12-16 中铁隧道股份有限公司 Subway overlaps synchronous strutting arrangement in tunnel
CN106223969A (en) * 2016-08-30 2016-12-14 中铁隧道勘测设计院有限公司 One closely upper and lower overlap or shield tunnel construction method of closely intersecting

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240226A (en) * 2018-02-11 2018-07-03 济南轨道交通集团有限公司 Closely overlapping subway tunnel synchronized construction reserves shield sky and pushes away condition construction method
CN108240226B (en) * 2018-02-11 2019-08-13 济南轨道交通集团有限公司 It closely overlaps the reserved shield sky of subway tunnel synchronized construction and pushes away condition construction method
CN109322688A (en) * 2018-10-26 2019-02-12 林翠英 Soft rock tunnel, which is got out of a predicament or an embarrassing situation, excavates the hydraulic collateral support arrangement of anti-settling convergence
CN109519199A (en) * 2018-12-12 2019-03-26 中铁十四局集团有限公司 A kind of duct pieces of shield tunnel support trolley
CN109519199B (en) * 2018-12-12 2024-05-31 中铁十四局集团有限公司 Shield tunnel segment supporting trolley
CN109611156A (en) * 2018-12-28 2019-04-12 中铁隧道集团三处有限公司 A kind of monitoring method of overlapping tunnel information-aided construction
CN115773137A (en) * 2023-01-29 2023-03-10 北京建工土木工程有限公司 Tunnel stress compensation device for small-clear-distance shield tunnel construction and construction method

Similar Documents

Publication Publication Date Title
CN108590679A (en) Utilize the construction method for walking support truck jumbo overlapping tunnel
CN103032078B (en) Parallel construction method for shield arrival tunnel portal ring beam and shield crossing station
CN201246169Y (en) Tunnel development synchronous lining formwork trolley
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN103032081B (en) Cross-river large-diameter slurry shield excavation and double-lining parallel construction method
CN105626088B (en) T-shaped bored tunnel shield machine is gone into the well shift method
CN107882064A (en) A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN103277110A (en) Construction method of overlapped shield tunnel
CN108442948B (en) Double-lane inverted arch trestle and construction method
CN109458185B (en) Construction method for vertically overlapped crossed parallel tunnel shield
CN103133012A (en) Open type tunnel boring machine (TBM) on-site concrete inverted arch synchronous lining trolley
CN106193117B (en) A kind of assembling and construction method of the prefabricated pipe gallery in underground
CN104329096A (en) Shield station-crossing launching translation construction process
CN103899335A (en) Inverted arch lining trolley, synchronous tunnel operating system and inverted arch synchronous lining method
CN103924985A (en) Cast-in-situ inverted arch lining trolley and concrete curing system in synchronous construction with TBM (tunnel boring machine) tunneling
CN107191210A (en) Shield tunnel anti-floating system and its construction method based on prestress anchorage cable
CN104564102A (en) Tunnel lining concrete grouting device
CN109518544A (en) A kind of subway precast track plate railway roadbed laying method
CN207812487U (en) A kind of full assembled subway station twin columns agent structure
CN203847130U (en) Cast-in-situ inverted arch lining trolley and concrete curing system capable of being synchronously constructed along with boring of TMB (tunnel boring machine)
CN103437772A (en) Pipe-jacking construction method of underground passage and tunnel structure
CN203499697U (en) Trolley used for concrete construction of various cross sections through mining method
CN204662270U (en) A kind of case girder transferring system
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN207569332U (en) Mud tube take over auxiliary device after a kind of slurry shield trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928

RJ01 Rejection of invention patent application after publication