CN203145061U - Compound-type water-proof structure of winter construction pile head - Google Patents

Compound-type water-proof structure of winter construction pile head Download PDF

Info

Publication number
CN203145061U
CN203145061U CN 201320158757 CN201320158757U CN203145061U CN 203145061 U CN203145061 U CN 203145061U CN 201320158757 CN201320158757 CN 201320158757 CN 201320158757 U CN201320158757 U CN 201320158757U CN 203145061 U CN203145061 U CN 203145061U
Authority
CN
China
Prior art keywords
waterproof
pile crown
layer
polymer cement
compound
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320158757
Other languages
Chinese (zh)
Inventor
熊启东
胡奇有
孙维东
谢凯强
裴亚涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN 201320158757 priority Critical patent/CN203145061U/en
Application granted granted Critical
Publication of CN203145061U publication Critical patent/CN203145061U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a compound-type water-proof structure of a winter construction pile head. The compound-type water-proof structure of the winter construction pile head comprises a cast-in-place concrete pile head and exposed reinforced bars. The compound-type water-proof structure of the winter construction pile head is characterized in that a rubber water sealing strip is installed on the root of the exposed reinforced bars of the pile head, a polymer cement waterproof mortar layer covers the rubber water sealing strip, a cement-based capillary crystalline waterproof coating layer is painted on the polymer cement waterproof mortar layer, a JS polymer cement waterproof coating layer is painted on the upper surface of the cement-based capillary crystalline waterproof coating layer, a polyurethane waterproof coating layer is painted on the surface and the side surface of the JS polymer cement waterproof coating layer respectively, and a waterproof protective layer is arranged on the upper surface of the polyurethane waterproof coating layer. By the adoption of the compound-type water-proof structure of the winter construction pile head, multilayer protection can be achieved, and the waterproof effect on the winter construction pile head is achieved.

Description

Compound winter construction pile crown waterproof construction
Technical field
The utility model relates to the pile crown waterproof construction in the deposited reinforced concrete pile construction, is specifically related to a kind of compound winter construction pile crown waterproof construction.
Background technology
Design of basement is paid attention to water resistance, the waterproof that the pile crown waterproof of pile crown waterproof, particularly winter construction and pile crown stretch into base plate, normally difficult point and the weak link of basement waterproofing construction.In recent years, because of weather reason in winter, the pile crown waterproof construction is dealt with improperly, causes that the situation of engineering base plate leakage water happens occasionally.The traditional method of pile crown waterproof construction is that stake is squeezed in the concrete cushion at present, the top laying water-proof coiled material of concrete cushion and above waterproof roll, lay the pea gravel concreten layer again, adopt this kind structure, partly there is the risk of infiltration in pile crown, steam may enter into basement from the stake position, influences the waterproof effect of basement.
The utility model content
Technical problem to be solved in the utility model provides the protection effect a kind of compound winter construction pile crown waterproof construction preferably at pile crown waterproof construction in winter.
For solving the problems of the technologies described above, technical solution adopted in the utility model is:
A kind of compound winter construction pile crown waterproof construction; comprise the deposited reinforced concrete pile pile crown; exposed steel bar; root at the pile crown exposed steel bar is installed rubber fastening band; be coated with the polymer cement waterproof screed at rubber fastening band; be coated with at described polymer cement waterproof screed upper surface and be brushed with cement-base infiltration crystallization water-repellent paint layer; at the upper surface brushing JS of described cement-base infiltration crystallization water-repellent paint layer polymer cement waterproof paint layer; surface and side brushing polyurethane water-proof paint layer at described JS polymer cement waterproof paint layer arrange fish tail and waterproof layer at described polyurethane water-proof paint layer upper surface.
Preferably; described polymer cement waterproof screed thickness is 20mm; the 100mm scope arranges the thick concrete cushion of 50mm around the described pile crown; grading is little circular-arc and pile body and combines closely; the waterproof roll layer of laying around the described pile crown extends to the pile crown root; described JS polymer cement waterproof paint layer; and extend to around the pile crown above the waterproof roll layer in the 200mm scope; described polyurethane water-proof paint layer extends to around the pile crown in the 200mm scope; malthoid is laid in polyurethane water-proof paint layer top around the described pile crown; the malthoid top arranges the thick pea gravel concreten topping of 50mm, and described waterproofing protection layer thickness is 20mm.
Preferably, be the arc transition structure between described pile crown upper surface and side.
The beneficial effect that adopts technique scheme to produce is: adopt compound winter construction pile crown waterproof construction can play the multilayer proofing effect, even one waterproofing course imperfection or destroyed in work progress wherein, the phenomenon that pile crown leaks can not take place, reached the effect of winter construction pile crown multilayer flashing yet.
Description of drawings
Fig. 1 is the structural representation of an embodiment of compound winter construction pile crown waterproof construction;
Fig. 2 is the connection detail of compound winter construction pile crown waterproof construction.
Among the figure: the 1-pile crown; the 2-reinforcing bar, 3-rubber fastening band, 4-polymer cement waterproof screed; 5-cement-base infiltration crystallization water-repellent paint layer; 6-JS polymer cement waterproof paint layer, 7-polyurethane water-proof paint layer, 8-fish tail and waterproof layer; 9-waterproof roll layer; the 10-concrete cushion, 11-pea gravel concreten topping, 12-malthoid.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
The structural representation of an embodiment of compound winter construction pile crown waterproof construction shown in Figure 1; comprise deposited reinforced concrete pile pile crown 1; exposed steel bar 2; and the root structure of pile crown 1; shown in Figure 2 is the connection detail of compound winter construction pile crown waterproof construction; root at pile crown 1 exposed steel bar 2 is installed rubber fastening band 3; must guard against chance water before rubber fastening band 3 uses makes moist; in order to avoid the material premature expansion influences result of use; all cover with polymer cement waterproof screed 4 repairing pile crowns 1 and with rubber fastening band 3; be coated with at described polymer cement waterproof screed 4 upper surfaces and be brushed with cement-base infiltration crystallization water-repellent paint layer 5; at the upper surface brushing JS of described cement-base infiltration crystallization water-repellent paint layer 5 polymer cement waterproof paint layer 6; surface and side brushing polyurethane water-proof paint layer 7 at described JS polymer cement waterproof paint layer 6 arrange fish tail and waterproof layer 8 at described polyurethane water-proof paint layer 7 upper surface.
Preferably, described polymer cement waterproof screed 4 thickness are 20mm, and the 100mm scope arranges the thick concrete cushion of 50mm 10 around the described pile crown 1, and grading is little and circular-arcly combines closely with pile body; The waterproof roll layer 9 of sole plate began construction when described cement-base infiltration crystallization water-repellent paint layer 5 was brushed, before 9 construction of waterproof roll layer, at first at oiliness adhesive bitument primer of leveling layer brushing, and then large tracts of land paving waterproof roll layer 9, waterproof roll layer 9 extends to the pile crown root during paving, then the hot melt edge sealing; Described JS polymer cement waterproof paint layer 6 extends to around the pile crown above the waterproof roll layer 9 in the 200mm scope; described polyurethane water-proof paint layer 7 extends to around the pile crown in the 200mm scope; malthoid 12 is laid in polyurethane water-proof paint layer 7 top around the described pile crown, and malthoid 12 tops arrange the thick pea gravel concreten topping 11 of 50mm.
Preferably, be the arc transition structure between described pile crown upper surface and side, to be convenient to brush and prevented that effectively polymer cement waterproof screed 4 from vertically trickling in the pile crown side, lateral thickness is difficult to guarantee.
At last on the surface of pile crown 1 and thickness is set is that the polymer cement waterproof mortar of 20mm is done fish tail and waterproof layer 8 in the side, fish tail and waterproof layer 8 completion backs are covered with plastic film and woven straw or cotton-wadded quilt in time.
The beneficial effect that adopts technique scheme to produce is: adopt compound winter construction pile crown waterproof construction can play the multilayer proofing effect, even one waterproofing course imperfection or destroyed in work progress wherein, the phenomenon that pile crown leaks can not take place, reached the effect of winter construction pile crown multilayer flashing yet.

Claims (3)

1. compound winter construction pile crown waterproof construction; comprise deposited reinforced concrete pile pile crown (1); exposed steel bar (2); it is characterized in that: the root at pile crown exposed steel bar (2) is installed rubber fastening band (3); be coated with polymer cement waterproof screed (4) at rubber fastening band (3); be coated with at described polymer cement waterproof screed (4) upper surface and be brushed with cement-base infiltration crystallization water-repellent paint layer (5); upper surface brushing JS polymer cement waterproof paint layer (6) at described cement-base infiltration crystallization water-repellent paint layer (5); surface and side brushing polyurethane water-proof paint (7) layer at described JS polymer cement waterproof paint (6) layer arrange fish tail and waterproof layer (8) at described polyurethane water-proof paint layer (7) upper surface.
2. compound winter construction pile crown waterproof construction according to claim 1; it is characterized in that: described polymer cement waterproof screed (4) thickness is 20mm; described pile crown (1) 100mm scope all around arranges the thick concrete cushion of 50mm (10); grading is little circular-arc and pile body and combines closely; the waterproof roll layer (9) that described pile crown (1) is laid all around extends to pile crown (1) root; described JS polymer cement waterproof paint layer (6) extends to around the pile crown above the waterproof roll layer (9) in the 200mm scope; described polyurethane water-proof paint layer (7) extends to around the pile crown in the 200mm scope; malthoid (12) is laid in described pile crown (1) polyurethane water-proof paint layer (7) top all around; malthoid (12) top arranges the thick pea gravel concreten topping of 50mm (11), and described fish tail and waterproof layer (8) thickness is 20mm.
3. compound winter construction pile crown waterproof construction according to claim 1 is characterized in that: be the arc transition structure between described pile crown (1) upper surface and side.
CN 201320158757 2013-04-02 2013-04-02 Compound-type water-proof structure of winter construction pile head Expired - Fee Related CN203145061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320158757 CN203145061U (en) 2013-04-02 2013-04-02 Compound-type water-proof structure of winter construction pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320158757 CN203145061U (en) 2013-04-02 2013-04-02 Compound-type water-proof structure of winter construction pile head

Publications (1)

Publication Number Publication Date
CN203145061U true CN203145061U (en) 2013-08-21

Family

ID=48972602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320158757 Expired - Fee Related CN203145061U (en) 2013-04-02 2013-04-02 Compound-type water-proof structure of winter construction pile head

Country Status (1)

Country Link
CN (1) CN203145061U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572786A (en) * 2013-11-19 2014-02-12 中铁十六局集团北京工程有限公司 Pile head joint waterproof processing device and construction method thereof
CN104234091A (en) * 2014-08-25 2014-12-24 四川金锋建设有限公司 Application method used for cement-based seepage-proof and waterproof structure
CN104975617A (en) * 2015-07-15 2015-10-14 郑贤方 Waterproof construction method of basement foundation cast-in-place pile head
CN109083204A (en) * 2018-09-27 2018-12-25 大连美宸特环保节能产品有限公司 Rapid hardening liquid rubber spray-coating construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572786A (en) * 2013-11-19 2014-02-12 中铁十六局集团北京工程有限公司 Pile head joint waterproof processing device and construction method thereof
CN103572786B (en) * 2013-11-19 2015-12-16 中铁城建集团北京工程有限公司 A kind of pile crown node waterproof treating apparatus and construction method thereof
CN104234091A (en) * 2014-08-25 2014-12-24 四川金锋建设有限公司 Application method used for cement-based seepage-proof and waterproof structure
CN104975617A (en) * 2015-07-15 2015-10-14 郑贤方 Waterproof construction method of basement foundation cast-in-place pile head
CN104975617B (en) * 2015-07-15 2017-01-25 郑贤方 Waterproof construction method of basement foundation cast-in-place pile head
CN109083204A (en) * 2018-09-27 2018-12-25 大连美宸特环保节能产品有限公司 Rapid hardening liquid rubber spray-coating construction method

Similar Documents

Publication Publication Date Title
CN203145061U (en) Compound-type water-proof structure of winter construction pile head
CN202788022U (en) Wall crack combined type repair structure
CN102003190B (en) Construction method for pre-laying tunnel waterproof coiled material
CN202809660U (en) Waterproof structure for pile head of engineering pile
CN202577372U (en) Waterproof structure of pile head of basement
CN203256816U (en) Pile foundation bottom plate pile head waterproof structure
CN105201025B (en) Basement waterproofing construction and its construction method
CN205077694U (en) Waterproof roof is planted to underground garage
CN107190783A (en) Basement waterproof structure and construction method of basement outer wall waterproof structure
CN109184253A (en) A kind of method for repairing and mending of exterior wall leakage
CN102031834A (en) Compound waterproof system and construction technology thereof
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN106869169A (en) Three-dimensional interval construction method for underground comprehensive pipe gallery cabin body
CN205990705U (en) Inversion type water-proof roofing
CN205653784U (en) Novel anti-floating anchor rod node waterproof construction structure
CN101761194B (en) Roof waterproof structure and manufacture method thereof
CN201826858U (en) Reaction bonding type sealing waterproof roll material for tunnel pre-paving
CN211395218U (en) Cold regeneration basic unit road surface structure of emulsified asphalt plantmix
CN205637360U (en) Waterproof roof is planted to underground garage
CN205617555U (en) Roof root resistance waterproof construction is planted to basement
CN207260455U (en) A kind of anti-aging roof structure of waterproof heat insulation
CN202148539U (en) Composite waterproof structure using underground engineering waterproof leaking stoppage treatment and construction method
CN204626470U (en) A kind of winter construction pile crown water-tight device
CN202483092U (en) Vapor-proof thermal insulation walkable roof
CN205077740U (en) Oblique roof waterproof roof boarding

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20140402