CN203097399U - Combined type double-column repairing tower for high-voltage line tower - Google Patents

Combined type double-column repairing tower for high-voltage line tower Download PDF

Info

Publication number
CN203097399U
CN203097399U CN 201320148680 CN201320148680U CN203097399U CN 203097399 U CN203097399 U CN 203097399U CN 201320148680 CN201320148680 CN 201320148680 CN 201320148680 U CN201320148680 U CN 201320148680U CN 203097399 U CN203097399 U CN 203097399U
Authority
CN
China
Prior art keywords
tower
column
emergent repairing
repairing
voltage line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320148680
Other languages
Chinese (zh)
Inventor
杨庆华
龚景阳
刘新平
鲍晓华
石亮
励勋芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN 201320148680 priority Critical patent/CN203097399U/en
Application granted granted Critical
Publication of CN203097399U publication Critical patent/CN203097399U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

A combined type double-column repairing tower for high-voltage line tower comprises two columns (1) which form a repairing tower. The combined type double-column repairing tower for the high-voltage line tower is characterized in that: each column is formed through vertically stacking and connecting a plurality of repairing tower units (3); and each repairing tower unit (3) is a frame type cuboid. The outside of each repairing tower unit (3) is provided with a multifunctional frame component which has reinforcing and wire hanging functions and has same size. According to the combined type double-column repairing tower for the high-voltage line tower, the assemblies of the repairing tower can be used repeatedly, thereby greatly reducing cost. The repairing on the tower and power transmission line can be finished in time for removing the effect of disaster in time. Production and safety can be recovered in time, thereby reducing delay and loss.

Description

The two column emergent repairing towers of a kind of combined high-voltage line steel tower
Technical field
The utility model relates to a kind of maintenance construction field of transmission line of electricity, and more specifically, the utility model relates to a kind of two column emergent repairing towers of high-voltage transmission line towers repairing usefulness.
Background technology
At transmission line of electricity, when for example 220kV or above extra high voltage network etc. were met the exceedingly odious natural calamity of disaster caused by a windstorm, rain calamity, snow disaster, earthquakes etc. such as violent storm, earthquake, regular meeting caused collapsing of extra high voltage network iron tower.Thus, can cause the high voltage transmission line highway section of the iron tower that collapses and support thereof to jeopardize near it means of transportation again, for example, facilities such as speedway, railway, and various civilian installations and industrial enterprise's production equipment, cause the serious production and the generation of security incident.As the collapsing of the extra high voltage network iron tower that is positioned at the urban area, then its harm is more serious.
In the past, ran into described extra high voltage network iron tower, normally promptly speedily carried out rescue work, and set up the extra high voltage network support temporarily and use iron tower in the scene of the accident, simultaneously, newly-built again new extra high voltage network iron tower.After treating that described new iron tower is finished, removing this extra high voltage network of temporarily building support iron tower.
Perhaps, at this moment, cause near the high voltage transmission line highway section of the iron tower that collapses and support thereof means of transportation being arranged, for example, facilities such as speedway, railway, described transmission line of electricity maintenance, that working crossing frame is generally many meters of 30-40 is high.For power line need be crossed in the top in some special means of transportation highway section, erect respectively in described leap highway section two sides usually again, the special-purpose column of crossing frame is installed, so that crossing frame is supported.The special-purpose column of described crossing frame is connected one with this crossing frame usually, and therefore, its weight is very big, and its setting, lifting, spreading and reinforcing bother very much, effort.
In addition, as mentioned above, because the iron tower that collapses and the high voltage transmission line highway section of support thereof are extra-high pressure, the iron tower height is very big, and column weight is very big, and its setting, lifting, spreading and reinforcing bother very much, effort.Therefore, the construction itself that the extra high voltage network of in the past temporarily building supports with iron tower also bothers very much, time-consuming, effort, thus, the repairing of the ultra-high-tension power transmission line of feasible iron tower that collapses and support thereof also bothers very much, and is time-consuming, effort brings delay and loss for the repairing of iron tower and transmission line of electricity thereof, timely releasing and production, the safe timely answer of disaster.
The utility model content
For addressing the above problem, one of the purpose of this utility model is: the emergent repairing tower that a kind of high-voltage transmission line towers repairing usefulness is provided.Particularly, provide a kind of combined high-voltage line steel tower two column emergent repairing towers.Two column emergent repairing towers of described pressure transmission line iron tower repairing usefulness can be finished in the extremely short time, help again newly-built new extra high voltage network iron tower greatly.After treating that described new iron tower is finished, can conveniently remove this extra high voltage network of temporarily building support iron tower.Thus, the repairing of the ultra-high-tension power transmission line of feasible iron tower that collapses and support thereof is also convenient, and is quick.The emergent repairing tower assembly is reusable, raises the cost greatly, makes the repairing of iron tower and transmission line of electricity thereof in time finish, and in time removes the disaster influence, makes and produces, can in time recover safely, incurs loss through delay and loss to reduce.
For addressing the above problem, the technical scheme of the two column emergent repairing towers of combined high-voltage line steel tower of the present utility model is as follows:
The two column emergent repairing towers of a kind of combined high-voltage line steel tower, comprise the column 1 that constitutes emergent repairing tower, it is characterized in that: described emergent repairing tower is made of two root posts 1, and described column is by a plurality of emergent repairing tower cell cubes stacked connecting and composing about in the of 3, and described emergent repairing tower cell cube 3 is frame type side's body.
According to the two column emergent repairing towers of a kind of combined high-voltage line steel tower described in the utility model, it is characterized in that: described a plurality of emergent repairing tower cell cubes connect with bolt stacked back about in the of 3.
According to the two column emergent repairing towers of a kind of combined high-voltage line steel tower described in the utility model, it is characterized in that: described emergent repairing tower cell cube 3 constitutes the cuboid side column by rod member 4.
According to the two column emergent repairing towers of a kind of combined high-voltage line steel tower described in the utility model, it is characterized in that: the angle of each crossing side column of described emergent repairing tower cell cube 3 is provided with the reinforced company's fishplate bar 5 that connects described crossing side column.
According to the two column emergent repairing towers of a kind of combined high-voltage line steel tower described in the utility model, it is characterized in that described reinforced company fishplate bar 5 is fan-shaped junction plate.
According to the two column emergent repairing towers of a kind of combined high-voltage line steel tower described in the utility model, it is characterized in that: the two column emergent repairing towers of described combined high-voltage line steel tower also comprise the horizontally disposed horizon bar 2 that is arranged at described column 1 upper end, is used to articulate lead.
According to the two column emergent repairing towers of a kind of combined high-voltage line steel tower described in the utility model, it is characterized in that: described horizon bar 2 is connected and composed by emergent repairing tower cell cube 3.
According to the two column emergent repairing towers of a kind of combined high-voltage line steel tower described in the utility model, the quantity of described horizon bar 2 is the 2-5 root.
Thus, the mounting method of the two column emergent repairing towers of combined high-voltage line steel tower of the present utility model is simple, easy to operate, laborsaving, and good stability puts in place accurately.
Description of drawings
Fig. 1 is the two column emergent repairing tower schematic diagrames of combined high-voltage line steel tower of the present utility model.
Fig. 2 is an emergent repairing tower cell cube vertical view.
Fig. 3 A, B are respectively multifunctional frame frame member schematic diagram and mid section figure.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the two column emergent repairing towers of combined high-voltage line steel tower of the present utility model are described further.
Embodiment 1
The two column emergent repairing towers of a kind of combined high-voltage line steel tower comprise the column 1 that constitutes emergent repairing tower, and described emergent repairing tower is made of two root posts, and described column is by a plurality of emergent repairing tower cell cubes stacked connecting and composing about in the of 3.Described emergent repairing tower cell cube 3 is the frame type cuboid.By stacked connecting and composing about a plurality of column emergent repairing tower cell cubes, the stacked up and down back of described a plurality of column emergent repairing tower cell cubes bolt connects.
The about 45m of described combined high-voltage line steel tower list column repairing tower height.
Described pair of column emergent repairing tower unit tower body is square, the high 300mm rectangular frame of 240mm formula tower body, and described rectangular frame formula tower body constitutes tower body outer Saturday of face pillar by the rod member of aluminium alloys system.Constitute and be provided with reinforcement between each face pillar of tower body periphery of described rectangular frame formula tower body and connect rod member with aluminium alloys system.
In addition, constitute and be provided with reinforcement between each face pillar angle of tower body periphery of described rectangular frame formula tower body with aluminium alloys system junction plate 5.Junction plate is provided with installing hole 6.Described reinforcement is fan-shaped with aluminium alloys system junction plate.
In addition, described emergent repairing tower cell cube 3 outsides can be provided with have enhancing, the multifunctional frame frame member 7 of the same size of hanging wire function.
The mounting method of the two column emergent repairing towers of combined high-voltage line steel tower of the present utility model is simple, easy to operate, laborsaving, and good stability puts in place accurately.
Two column emergent repairing towers of described pressure transmission line iron tower repairing usefulness of the present utility model can be finished in the extreme time, help again newly-built new extra high voltage network iron tower greatly.After treating that described new iron tower is finished, can conveniently remove this extra high voltage network of temporarily building support iron tower.Thus, the repairing of the ultra-high-tension power transmission line of feasible iron tower that collapses and support thereof is also convenient, fast, the emergent repairing tower assembly is reusable, raise the cost greatly, make the repairing of iron tower and transmission line of electricity thereof in time finish, in time remove the disaster influence, make and produce, can in time recover safely, incur loss through delay and loss to reduce.Installation of the present utility model, hold up easy to operately, laborsaving, the upright post of spanning frame vertical position is accurate, steady, safe and reliable.Transmission line of electricity maintenance, the degeneration of construction high and medium power line be can effectively prevent, described maintenance, construction safety guaranteed, reliable.

Claims (6)

1. two column emergent repairing towers of a combined high-voltage line steel tower, comprise the column (1) that constitutes emergent repairing tower, it is characterized in that: described emergent repairing tower is made of two root posts (1), described column connects and composes by a plurality of emergent repairing tower cell cubes (3) are stacked up and down, and described emergent repairing tower cell cube (3) is frame type side's body.
2. the two column emergent repairing towers of a kind of combined high-voltage line steel tower according to claim 1 is characterized in that: the stacked up and down back of described a plurality of emergent repairing tower cell cubes (3) connects with bolt.
3. the two column emergent repairing towers of a kind of combined high-voltage line steel tower according to claim 1 is characterized in that: described emergent repairing tower cell cube (3) by rod member (4) constitute that 240mm is square, high 300mm rectangular-shaped.
4. the two column emergent repairing towers of a kind of combined high-voltage line steel tower according to claim 1, it is characterized in that: the angle of each crossing side column of described emergent repairing tower cell cube (3) is provided with the reinforced company's fishplate bar (5) that connects described crossing side column.
5. the two column emergent repairing towers of a kind of combined high-voltage line steel tower according to claim 4 is characterized in that described reinforced company fishplate bar (5) is fan-shaped junction plate.
6. the two column emergent repairing towers of a kind of combined high-voltage line steel tower according to claim 1 is characterized in that: the two column emergent repairing towers of described combined high-voltage line steel tower also comprise the horizontally disposed horizon bar (2) that is arranged at described column (1) upper end, is used to articulate lead.
CN 201320148680 2013-03-28 2013-03-28 Combined type double-column repairing tower for high-voltage line tower Expired - Lifetime CN203097399U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320148680 CN203097399U (en) 2013-03-28 2013-03-28 Combined type double-column repairing tower for high-voltage line tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320148680 CN203097399U (en) 2013-03-28 2013-03-28 Combined type double-column repairing tower for high-voltage line tower

Publications (1)

Publication Number Publication Date
CN203097399U true CN203097399U (en) 2013-07-31

Family

ID=48848811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320148680 Expired - Lifetime CN203097399U (en) 2013-03-28 2013-03-28 Combined type double-column repairing tower for high-voltage line tower

Country Status (1)

Country Link
CN (1) CN203097399U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014153962A1 (en) * 2013-03-28 2014-10-02 国家电网公司 Upright-column type rush-repair tower for combined type high-voltage line iron tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014153962A1 (en) * 2013-03-28 2014-10-02 国家电网公司 Upright-column type rush-repair tower for combined type high-voltage line iron tower

Similar Documents

Publication Publication Date Title
CN203223035U (en) Unit body for combined type urgent repair tower for high voltage lines
CN203361393U (en) Automatic reset device of steel framework structure
CN201665992U (en) Whole lifting platform of large steel net frame
CN102980553B (en) A kind of arch attached-greenhouse skeleton structure deformation monitoring method and device
CN104213707B (en) All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure
CN202785351U (en) Tower cranes attached operating platform
CN203097399U (en) Combined type double-column repairing tower for high-voltage line tower
CN104074388A (en) Element for combined type high-voltage line rush repair tower
CN203145547U (en) Combined type four-stand-column rush-repair tower of high-voltage line iron tower
CN203097390U (en) Combined-type single-column emergency repair tower for high-voltage line iron tower
CN104074389A (en) Combined high-voltage line iron power upright post type rush repair tower
CN205025154U (en) 330kVGIS distribution device place rigid connection sail formula framework
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN204609345U (en) A kind of full dismounting bean column node temporary support lattice column device
CN206110793U (en) Do not take framework of ground area
CN106121341B (en) Extra high voltage network emergency first-aid repair strain rod tower
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN103982076A (en) Single cycle 110 kV/35 stay wire type aluminum alloy urgent repair tower
CN203367853U (en) Leaning tower structure for high voltage capacitor device
CN202990386U (en) Externally-suspended scaffold
CN207568333U (en) A kind of economic and environment-friendly, repeatable assembled steel enclosing and enclosing component
CN106150176B (en) Extra high voltage network emergency first-aid repair strain rod tower column module
CN103453219B (en) Cable crosses the river crane span structure
CN204531232U (en) Prefabricated reinforced concrete quakeproof stair