CN203094369U - Folded structure of cargo hold C section general assembly - Google Patents
Folded structure of cargo hold C section general assembly Download PDFInfo
- Publication number
- CN203094369U CN203094369U CN 201220726739 CN201220726739U CN203094369U CN 203094369 U CN203094369 U CN 203094369U CN 201220726739 CN201220726739 CN 201220726739 CN 201220726739 U CN201220726739 U CN 201220726739U CN 203094369 U CN203094369 U CN 203094369U
- Authority
- CN
- China
- Prior art keywords
- cargo hold
- section
- improved
- general assembly
- bottoms
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Provided is a folded structure of cargo hold C section general assembly. A cargo hold C section is arranged according to the fact that two cargo hold walls (1), two cargo hold bottoms (4) and a folded bottom (6) on the bottom are further sectioned, wherein the bottom faces of the cargo hold walls (1) and the top faces of the outer side edges of the cargo hold bottoms (4) are provided with connecting seats (3), the bottom faces of the cargo hold walls (1) and the top faces of the outer side edges of the cargo hold bottoms (4) are welded and fixed through the connecting seats (3), and the fixed folded bottom (6) is welded between the cargo hold bottoms (4) on two sides. The cargo hold C section is arranged according to the fact that the two cargo hold walls, the two cargo hold bottoms and the folded bottom of the bottom are further sectioned, welded and folded, energy consumption is lowered, assembling efficiency is improved, a large quantity of jig frame materials are saved, general assembly area turnover efficiency is improved, the working environment of constructors is improved, welding posts are well improved, welding quality is guaranteed, the construction schedule is accelerated, working efficiency is improved, and meanwhile the safety coefficient is also greatly improved.
Description
Technical field
The utility model relates to International Classification of Patents B63B boats and ships or other waterborne vessel, and marine equipment device technique field, belongs to the technical field of auxiliary facilities in ship building or the repairing construction, and especially structure is closed up in the general assembly of cargo hold C section.
Background technology
Characteristics such as at present, as the important component part of ship building, it is the freak oil of whole ship building that body section is built, but because of its structure more complicated, exists and build the degree-of-difficulty factor height, and production cycle is long.The method of construction of existing head section is normally made platen earlier, then will indulge floor and platen location is welded, earlier the bow framework is put up the back and refilled on platen, because bow is very high, in order to indulge bone T row's plate and bow framework assembly welding, need earlier with several perpendicular high-altitudes that winches to of vertical bone T row plate, be dragged to by the bow framework by manpower then, dress weldering in firmly flat again each layer that inserts the bow framework is assemblied in middle stringers then and indulges on the floor, at last other other vertical bone and T row plate are loose one by one and hang and be assemblied on the bow framework, adopt this method, hoisting difficulty is big, length consuming time, and assembly precision is poor, operation also is absolutely unsafe, for stem, the baroque like this part of ship stern, perhaps this is a helpless and moderate selection, but for the cargo hold C section of hull, effect is very low undoubtedly to adopt above method.The improvement technology is less in the prior art.
Total group of methods of Chinese patent application number 200,710,045,710 1 kinds of boats and ships bow side of a ship segment sections, the problem with low precision of being awkward that occurs when solving a plurality of segmented general group, this method comprises the steps: 1. earlier to regard a plurality of segmentations as a whole segmentation, cuts sth. askew in length and breadth with this integral body segmentation and obtains the moulding bed plane; 2. in whole segmentation, get some key point, and find out each key point three-dimensional coordinate size, calculate the vertical distance of each key point apart from the moulding bed plane; 3. with ground as the moulding bed plane, the corresponding pillar stiffener of placing below each key; 4. with a plurality of segmentations respectively correspondence winch on the pillar stiffener, location, dress weldering are also stood up, finish a plurality of segmentations total group.
200910056071 bow assembly assembling and welding process, it comprises: S1, on platen be welded a stringers and a vertical floor in of location respectively, and make in this stringers and should become the T-shaped shape to dock by vertical floor; S2, then with the weldering of a bow framework and this platen dress; S3, at last with the assembling of the vertical bone T row of this bow framework and several piece plate; Wherein, this bow framework is at least by a stringer board, once the dividing plate that is disposed on this time floor of floor and several piece is formed, and this stringer board is provided with this time floor is vertical, and this stringer board is inserted between this dividing plate, before step S1, earlier with this platen horizontal on the ground.
Summary of the invention
Goal of the invention of the present utility model is to provide the general assembly of a kind of cargo hold C section to close up structure.
Realize that goal of the invention measure of the present utility model is: cargo hold C section is set closes up the end further segmentation of totally 5 parts according to 2 bulkheads, 2 bilge and bottom one one, wherein, bulkhead bottom surface and bilge lateral border end face have Connection Block, bulkhead bottom surface and bilge lateral border end face are fixing by the Connection Block welding, and welding is fixedly closed up at the end between the bilge of both sides.
Advantage of the present utility model is, close up the further segmentation welding of the ends 5 part according to 2 bulkheads, 2 bilge and bottom one one and close up by cargo hold C section is set, cut down the consumption of energy with this, improve packaging efficiency and saved a large amount of moulding bed materials, improve total group place week transfer efficient, improve workmen's operating environment, welding post has had good improvement, has guaranteed the quality of welding, has accelerated the construction progress, improved work efficiency, safety factor also is greatly improved simultaneously.
Description of drawings
Fig. 1 is structure of the present utility model and scheme of installation
Reference numeral comprises:
The specific embodiment
Further specify below in conjunction with drawings and Examples.
As shown in Figure 1, cargo hold C section is set closes up the end 6 further segmentation of totally 5 parts according to 1,2 bilge 4 of 2 bulkheads and bottom one one, wherein, bulkhead 1 bottom surface and the bilge 4 lateral border end faces have Connection Block 3, bulkhead 1 bottom surface and the bilge 4 lateral border end faces are fixing by Connection Block 3 welding, and 4 welding of the bilge of both sides are fixedly closed up at the end 6.
In aforementioned, 1 connecting-reinforcing beams 2 of two wing bulkheads.Closing up after operation finishes, remove strength beam 2 as required.
In aforementioned, bulkhead 1, the bilge 4 and close up the inner strengthening rib 5 of installing in the ends 6.Especially, at bulkhead 1, the bilge 4 with close up the end 6 and interconnect the inner strengthening rib 5 of installing in position, to strengthen connection structure intensity.
In the utility model, freighter is repaired when renewing operation, require the above certain altitude integral body of cargo area hull structure baseline to renew, and the bow stern keeps, renew structure and comprise bottom plating, outside plate, floor, stringers, vertical bone, tank top plate, these structures need fabricate block, and transcerse bulkhead, longitudinal bulkhead, longitudinal wall renew the part, bottom according to circumstances.At this moment, segmentation is adopted and is just being made the method making, and CO is adopted in bottom plating, tank top plate splicing
2The semi-automatic gas shielded arc welding welding, other members adopt CO
2Semi-automatic gas shielded arc welding welding or manual welding welding.Between the bow stuffing bulkhead, with laser transit or draw steel wire to make the ship center line, be convenient to split fix.
In above embodiment, do not reach the employing prior aries such as other necessary technologies that relate to enforcement of narration, enumerate detailed description no longer successively.
Claims (3)
1. structure is closed up in the general assembly of cargo hold C section, it is characterized in that: cargo hold C section is set closes up at the end (6) further segmentation of totally 5 parts according to 2 bulkheads (1), 2 bilge (4) and bottom one one, wherein, bulkhead (1) bottom surface and the bilge (4) lateral border end face have Connection Block (3), bulkhead (1) bottom surface and the bilge (4) lateral border end face are fixing by Connection Block (3) welding, weld between the bilge of both sides (4) and fixedly close up at the end (6).
2. structure is closed up in cargo hold C section as claimed in claim 1 general assembly, it is characterized in that connecting-reinforcing beams (2) between two wing bulkheads (1).
3. structure is closed up in cargo hold C section as claimed in claim 1 general assembly, it is characterized in that bulkhead (1), the bilge (4) and close up at the end (6) inner strengthening rib (5) of installing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220726739 CN203094369U (en) | 2012-12-25 | 2012-12-25 | Folded structure of cargo hold C section general assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220726739 CN203094369U (en) | 2012-12-25 | 2012-12-25 | Folded structure of cargo hold C section general assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203094369U true CN203094369U (en) | 2013-07-31 |
Family
ID=48845796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220726739 Expired - Lifetime CN203094369U (en) | 2012-12-25 | 2012-12-25 | Folded structure of cargo hold C section general assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203094369U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103507913A (en) * | 2013-09-12 | 2014-01-15 | 南通明德重工有限公司 | Design method for subsection division of chemical carrier |
CN103640669A (en) * | 2013-12-05 | 2014-03-19 | 江苏新时代造船有限公司 | Method for manufacturing bulk cargo ship |
CN106240741A (en) * | 2016-08-25 | 2016-12-21 | 山海关船舶重工有限责任公司 | The construction method that a kind of bulk freighter top cabinet deck longitudinal renews |
CN106428420A (en) * | 2016-10-17 | 2017-02-22 | 上海江南长兴造船有限责任公司 | Method for mounting ultra-large container ship crack arrest steel hatch coaming |
CN110254623A (en) * | 2019-06-28 | 2019-09-20 | 中船黄埔文冲船舶有限公司 | A kind of production method of submerged body segmentation |
-
2012
- 2012-12-25 CN CN 201220726739 patent/CN203094369U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103507913A (en) * | 2013-09-12 | 2014-01-15 | 南通明德重工有限公司 | Design method for subsection division of chemical carrier |
CN103640669A (en) * | 2013-12-05 | 2014-03-19 | 江苏新时代造船有限公司 | Method for manufacturing bulk cargo ship |
CN103640669B (en) * | 2013-12-05 | 2017-02-08 | 江苏新时代造船有限公司 | Method for manufacturing bulk cargo ship |
CN106240741A (en) * | 2016-08-25 | 2016-12-21 | 山海关船舶重工有限责任公司 | The construction method that a kind of bulk freighter top cabinet deck longitudinal renews |
CN106240741B (en) * | 2016-08-25 | 2018-01-19 | 山海关船舶重工有限责任公司 | The construction method that a kind of bulk freighter top cabinet deck longitudinal renews |
CN106428420A (en) * | 2016-10-17 | 2017-02-22 | 上海江南长兴造船有限责任公司 | Method for mounting ultra-large container ship crack arrest steel hatch coaming |
CN110254623A (en) * | 2019-06-28 | 2019-09-20 | 中船黄埔文冲船舶有限公司 | A kind of production method of submerged body segmentation |
CN110254623B (en) * | 2019-06-28 | 2021-08-20 | 中船黄埔文冲船舶有限公司 | Manufacturing method of submerged body segment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203094369U (en) | Folded structure of cargo hold C section general assembly | |
CN108928432B (en) | A kind of installation method in ultra large crude carrier energy-conservation conduit segmentation stage | |
CN101544268B (en) | Method for half-breadth double-span total assembling and building in shipbuilding | |
CN104875847B (en) | A kind of Quick carrying method of container ship centre transverse bulkhead | |
CN103057663B (en) | Underwater installation process of removable deck of million-ton roll-on-roll-off ship | |
CN101804849B (en) | Construction program of semi-submersible platform for offshore oil and gas development | |
CN104760662B (en) | Process for manufacturing ice zone bulbous bow reinforcing structure by sections | |
CN110182313B (en) | 30-ten-thousand-ton floating production oil storage tanker bow cargo hold side general section different-place general assembly process | |
CN109319045B (en) | Construction method of duplex stainless steel chemical tanker bulkhead intermediate product | |
CN204775829U (en) | A protect apart from roof beam for container ship transverse bulkhead carries on fast | |
CN105539769A (en) | Method for building scaffolds in closing stage of bottom side tank of bulk cargo ship cargo hold | |
CN109080765B (en) | A kind of installation method in ultra large crude carrier energy-conservation conduit dock stage | |
CN104554649B (en) | Ocean-crossing transportation method for binding overall structure broken-up modules of ultra-large type oceanographic engineering | |
CN104691704B (en) | A kind of method of construction of inland navigation craft | |
CN111661274A (en) | Large container ship lashing bridge refitting process | |
CN105109617B (en) | A kind of Ship Structure for the large-scale A cabinet frames of reassembling type | |
CN202115677U (en) | 10000dwt chemicals ship segment with technical passage holes | |
CN205440808U (en) | Multi -functional detachable tail lamp platform | |
CN105947108A (en) | Portal frame used for shelving and transporting super-large ship body cabin | |
CN104029789A (en) | Offshore platform construction and implementation method | |
CN111975025B (en) | Sectional stage installation method for unloading plate of trough type bulkhead of bulk carrier | |
CN114802586A (en) | Three-body ship | |
CN110979595B (en) | Sea damage ship repairing method | |
KR20060096761A (en) | Ship-building method in a inclined building berth by mounting super block on platform car | |
CN100354179C (en) | Transverse haif island type shipbuilding practices |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130731 |
|
CX01 | Expiry of patent term |