CN203086488U - 基于北斗时钟的电力时间同步*** - Google Patents
基于北斗时钟的电力时间同步*** Download PDFInfo
- Publication number
- CN203086488U CN203086488U CN 201220713956 CN201220713956U CN203086488U CN 203086488 U CN203086488 U CN 203086488U CN 201220713956 CN201220713956 CN 201220713956 CN 201220713956 U CN201220713956 U CN 201220713956U CN 203086488 U CN203086488 U CN 203086488U
- Authority
- CN
- China
- Prior art keywords
- time
- clock
- time synchronized
- main frame
- electric power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Clocks (AREA)
- Synchronisation In Digital Transmission Systems (AREA)
Abstract
本实用新型公开了一种基于北斗时钟的电力时间同步***,它由时间/频率同步网络和电力时间同步网管***构成;所述的时间/频率同步网络包含一级时间同步主机、二级时间同步主机和三级时间同步主机,其中,二级时间同步主机分别独立接收北斗卫星无线时间信号和一级时间同步主机发布的PTP有线时间信号,并向外发出时间信息;三级时钟主机分别独立接收北斗卫星无线时间信号和二级时钟主机发布的时间信息,得到高精度的本地时间,为厂站内二次***设备提供统一的时间基准信号;所述的电力时间同步网管***包括设置在每级、且负责监控各级时间同步主机的时钟网管;采用上述技术方案的本实用新型,保证整个电网的时间同步。
Description
技术领域
本实用新型涉及到一种电力时间同步组网方案,即应用于智能电网的基于北斗时钟的可实时监测的电力时间同步组网方案。
背景技术
电力时间同步网络是电网中调度自动化***、变电站计算机监控***、火电厂机组自动控制***、继电保护装置、电力故障录波、同步相量测量等装置时间基准的来源。目前各级调度中心、变电站、电厂虽建有时间同步装置,但大多采用单一的GPS卫星时间基准,各厂站端的时间同步装置形成时间孤岛,全网授时精度无法统一。电网正常运行情况下,无法对装置进行监测和管理;发生故障时,不能正确判断事故时序,影响电力调度做出最佳的选择和应对。
发明内容
本实用新型提供了一种基于北斗卫星时钟、可实现实时监测的、适于智能电网的时间同步组网方案。
为实现上述目的,本实用新型采用以下技术方案:
一种基于北斗时钟的电力时间同步***,其特征在于:它由时间/频率同步网络和电力时间同步网管***构成;所述的时间/频率同步网络包含一级时间同步主机、二级时间同步主机和三级时间同步主机,其中,
二级时间同步主机分别独立接收北斗卫星无线时间信号和一级时间同步主机发布的PTP有线时间信号,并向外发出时间信息;
三级时钟主机分别独立接收北斗卫星无线时间信号和二级时钟主机发布的时间信息,得到高精度的本地时间,为厂站内二次***设备提供统一的时间基准信号;
所述的电力时间同步网管***包括设置在每级、且负责监控各级时间同步主机的时钟网管。
所述的一级时间同步主机设置在省级调度中心,二级时间同步主机设置在地市调度中心,三级时间同步主机设置在各个厂站中;相对应地,省级调度中心中还设有一级时钟网管;地市调度中心中还设有二级时钟网管。
在省级调度中心设置两台一级时间同步主机;在地市调度中心设置两台二级时间同步主机。
采用上述技术方案的本实用新型,各级时钟主机通过通信SDH设备2M链路接收上一级时间主机发布的时间基准信号,同时接受北斗卫星时间基准信号,且各个调度端通过网管***对厂站端的时间主机进行实时监测,由此保证整个电网的时间同步。
附图说明
图1为本实用新型电力时间同步组网原理框图。
图2为本实用新型电力时间同步网管***拓扑图。
具体实施方式
如图1所示,一种基于北斗时钟的电力时间同步***,它由时间/频率同步网络和电力时间同步网管***构成。
上述的时间/频率同步网络包含一级时间同步主机、二级时间同步主机和三级时间同步主机,其中,二级时间同步主机分别独立接收北斗卫星无线时间信号和一级时间同步主机发布的PTP有线时间信号,并向外发出时间信息;三级时钟主机分别独立接收北斗卫星无线时间信号和二级时钟主机发布的时间信息,得到高精度的本地时间,为厂站内二次***设备提供统一的时间基准信号。
上述的电力时间同步网管***包括设置在每级、且负责监控各级时间同步主机的时钟网管。
实施时,一级时间同步主机设置在省级调度中心,二级时间同步主机设置在地市调度中心,三级时间同步主机设置在各个厂站中;相对应地,省级调度中心中还设有一级时钟网管;地市调度中心中还设有二级时钟网管。
需要说明的是,时间同步主机硬件设计了时间标准模块、频率标准模块、时间测量模块、频率测量模块、多源比对模块、时间输出模块等,其工作原理如下。
a)时间标准模块为***提供标准时间。本***时间来源由两个构成,分别为北斗卫星信号以及上一级调度中心通过PTP(IEEE 1588精确时钟同步协议)提供的时间基准信号。
b)频率标准模块为***提供标准频率。其中,一级时钟主机频率来源包括本地铷钟、本地铯钟、上一级调度提供的PRC/LPR(全国基准时钟信号/区域基准时钟信号);二级时钟主机频率来源包括两台本地铷钟。
c)时间测量模块通过对每一路时间标准源的测量,为校准频率和修正内部时间提供基础数据。
d)频率测量模块通过对每一路频率标准源的测量,调整频率源的频率准确度。
e)多源比对模块针对时钟主机均的多路时间和频率基准输入进行比对,确保时间和频率的精确性和各级时钟的同步性。
f)时间输出模块通过PTP协议向下一级时钟提供时间基准信号,采用E1口输出时间基准信号至通信SDH设备。
其工作方式如下:二级时钟主机分别独立接收北斗卫星无线时间信号和一级时钟主机通过SDH设备发布的PTP有线时间信号,当某一主时钟的时间接收模块发生故障时,能自动切换到另一台主时钟,实现时间基准互为备用。三级时钟主机分别独立接收北斗卫星和二级时钟主机发布的时间信号,得到高精度的本地时间(高精度UTC时间信息),为厂站内二次***设备提供统一的时间基准信号。
时间同步网络网管***,可以实现对时间同步组网设备的运行监控和远程维护控制。网管***在省级调度中心设置一级时钟网管,负责管理省调度中心、地市调度中心、省调直属厂站的时钟主机;在各地市调度中心设置二级时钟网管,负责管理地市调度中心和直属厂站的时钟主机。其工作原理如下:将各级时钟主机和各级网管***均接入电力调度数据网安全II区,为每一台时钟主机分配1个IP地址,这样调度人员通过网管***可以访问到每台时钟主机,对各级时钟主机可进行参数设置、运行管理和远程维护。网管***通过电力调度数据网采集各级时钟主机的时间信息和设备运行状态信息,上传至各级调度中心的时钟网管***,并存储在IP磁盘阵列中。时间同步网管***的搭建解决了调度端无法实时监测厂站端时间主机的的现况。
如图2所示,网络搭建在省调度中心配置两台时间同步主机(1+1备用)和一套时装网管硬件***,地市调度中心配置两台时间同步主机(1+1备用)和一套时装网管硬件***,在变电站及电厂端配置两台时间同步主机。每套时钟网管***包含一台服务器、一台工作站和1套磁盘阵列。各级时钟主机通过通信SDH设备2M链路接收上一级时间主机发布的时间基准信号,同时接受北斗卫星时间基准信号。调度端通过网管***对厂站端的时间主机进行实时监测。
Claims (3)
1.一种基于北斗时钟的电力时间同步***,其特征在于:它由时间/频率同步网络和电力时间同步网管***构成;所述的时间/频率同步网络包含一级时间同步主机、二级时间同步主机和三级时间同步主机,其中,二级时间同步主机分别独立接收北斗卫星无线时间信号和一级时间同步主机发布的PTP有线时间信号,并向外发出时间信息;三级时钟主机分别独立接收北斗卫星无线时间信号和二级时钟主机发布的时间信息,得到高精度的本地时间,为厂站内二次***设备提供统一的时间基准信号;所述的电力时间同步网管***包括设置在每级、且负责监控各级时间同步主机的时钟网管。
2.根据权利要求1所述的基于北斗时钟的电力时间同步***,其特征在于:所述的一级时间同步主机设置在省级调度中心,二级时间同步主机设置在地市调度中心,三级时间同步主机设置在各个厂站中;相对应地,省级调度中心中还设有一级时钟网管;地市调度中心中还设有二级时钟网管。
3.根据权利要求2所述的基于北斗时钟的电力时间同步***,其特征在于:在省级调度中心设置两台一级时间同步主机;在地市调度中心设置两台二级时间同步主机。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220713956 CN203086488U (zh) | 2012-12-21 | 2012-12-21 | 基于北斗时钟的电力时间同步*** |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220713956 CN203086488U (zh) | 2012-12-21 | 2012-12-21 | 基于北斗时钟的电力时间同步*** |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203086488U true CN203086488U (zh) | 2013-07-24 |
Family
ID=48832290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220713956 Expired - Fee Related CN203086488U (zh) | 2012-12-21 | 2012-12-21 | 基于北斗时钟的电力时间同步*** |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203086488U (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103744284A (zh) * | 2014-01-08 | 2014-04-23 | 国家电网公司 | 一种用于输电线参数测量的两端时间同步触发***及方法 |
CN104202214A (zh) * | 2014-09-10 | 2014-12-10 | 广西电网公司电力科学研究院 | 配电自动化无线通信终端与配电主站通信通道延时测试方法 |
CN104199281A (zh) * | 2014-09-04 | 2014-12-10 | 首钢京唐钢铁联合有限责任公司 | 一种基于gps和北斗***的能源对时*** |
CN105068418A (zh) * | 2015-08-27 | 2015-11-18 | 保定维特瑞交通设施工程有限责任公司 | 交通管理***的时间同步控制*** |
CN106249584A (zh) * | 2016-09-30 | 2016-12-21 | 四川九洲电器集团有限责任公司 | 一种时间同步方法 |
CN107179681A (zh) * | 2017-07-13 | 2017-09-19 | 云南电网有限责任公司电力科学研究院 | 一种检定线时间基准*** |
CN112260892A (zh) * | 2020-10-14 | 2021-01-22 | 国网山东省电力公司临朐县供电公司 | 配电***调度节点的管理方法、***、终端及存储介质 |
CN112327598A (zh) * | 2020-11-06 | 2021-02-05 | 国网山东省电力公司信息通信公司 | 基于irig-b码的时间同步装置地面链路授时测试***及方法 |
CN115347970A (zh) * | 2022-08-17 | 2022-11-15 | 南方电网科学研究院有限责任公司 | 电力实时仿真***的时钟同步方法、装置及设备 |
-
2012
- 2012-12-21 CN CN 201220713956 patent/CN203086488U/zh not_active Expired - Fee Related
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103744284A (zh) * | 2014-01-08 | 2014-04-23 | 国家电网公司 | 一种用于输电线参数测量的两端时间同步触发***及方法 |
CN103744284B (zh) * | 2014-01-08 | 2016-04-06 | 国家电网公司 | 一种用于输电线参数测量的两端时间同步触发***及方法 |
CN104199281B (zh) * | 2014-09-04 | 2017-06-16 | 首钢京唐钢铁联合有限责任公司 | 一种基于gps和北斗***的能源对时*** |
CN104199281A (zh) * | 2014-09-04 | 2014-12-10 | 首钢京唐钢铁联合有限责任公司 | 一种基于gps和北斗***的能源对时*** |
CN104202214A (zh) * | 2014-09-10 | 2014-12-10 | 广西电网公司电力科学研究院 | 配电自动化无线通信终端与配电主站通信通道延时测试方法 |
CN105068418A (zh) * | 2015-08-27 | 2015-11-18 | 保定维特瑞交通设施工程有限责任公司 | 交通管理***的时间同步控制*** |
CN106249584A (zh) * | 2016-09-30 | 2016-12-21 | 四川九洲电器集团有限责任公司 | 一种时间同步方法 |
CN106249584B (zh) * | 2016-09-30 | 2019-10-01 | 四川九洲电器集团有限责任公司 | 一种时间同步方法 |
CN107179681A (zh) * | 2017-07-13 | 2017-09-19 | 云南电网有限责任公司电力科学研究院 | 一种检定线时间基准*** |
CN107179681B (zh) * | 2017-07-13 | 2019-10-15 | 云南电网有限责任公司电力科学研究院 | 一种检定线时间基准*** |
CN112260892A (zh) * | 2020-10-14 | 2021-01-22 | 国网山东省电力公司临朐县供电公司 | 配电***调度节点的管理方法、***、终端及存储介质 |
CN112327598A (zh) * | 2020-11-06 | 2021-02-05 | 国网山东省电力公司信息通信公司 | 基于irig-b码的时间同步装置地面链路授时测试***及方法 |
CN112327598B (zh) * | 2020-11-06 | 2022-03-04 | 国网山东省电力公司信息通信公司 | 基于irig-b码的时间同步装置地面链路授时测试***及方法 |
CN115347970A (zh) * | 2022-08-17 | 2022-11-15 | 南方电网科学研究院有限责任公司 | 电力实时仿真***的时钟同步方法、装置及设备 |
CN115347970B (zh) * | 2022-08-17 | 2023-12-01 | 南方电网科学研究院有限责任公司 | 电力实时仿真***的时钟同步方法、装置及设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203086488U (zh) | 基于北斗时钟的电力时间同步*** | |
CN102361356B (zh) | 一种变电所测控装置遥信量测试***及其测试方法 | |
CN102916407A (zh) | 一种地区电网继电保护及故障信息管理*** | |
CN201425705Y (zh) | 电力***时间同步装置 | |
CN201425704Y (zh) | 卫星同步主时钟装置 | |
CN101881938A (zh) | 卫星同步主时钟装置 | |
CN103412477A (zh) | 保障电网全网时间同步的授时*** | |
CN203101856U (zh) | 一种用于电力通信的时间同步*** | |
CN102593955B (zh) | 一种综合性智能化时间频率测试***与测试方法 | |
CN110768372A (zh) | 基于iec61850标准的保护信息***源端建模方法 | |
CN203455626U (zh) | 保障电网全网时间同步的授时*** | |
CN111061147A (zh) | 一种基于无线网络的区域智能变电站授时***及方法 | |
CN204906004U (zh) | 一种网络分层分布式的智能区域电网 | |
CN202615137U (zh) | 电力***的统一授时装置 | |
CN107046439B (zh) | 北斗配网自动化*** | |
CN109474364A (zh) | 互隔离的网络时间同步*** | |
CN103576014A (zh) | 变电站的时钟监测装置和监测方法 | |
CN202353575U (zh) | 一种时间同步实时监测装置 | |
CN106849346B (zh) | 一种测试配电自动化设备对时功能与守时性能的*** | |
CN202340147U (zh) | 一种变电所测控装置遥信量测试*** | |
CN204859190U (zh) | 智能电网时间同步监测*** | |
CN103645417A (zh) | 一种公网前置数据采集方法 | |
CN101881939A (zh) | 电力***时间同步装置 | |
CN201812155U (zh) | 卫星同步从时钟装置 | |
CN202748611U (zh) | 电网时间的同步*** |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130724 Termination date: 20161221 |