CN201425704Y - 卫星同步主时钟装置 - Google Patents
卫星同步主时钟装置 Download PDFInfo
- Publication number
- CN201425704Y CN201425704Y CN200920071890XU CN200920071890U CN201425704Y CN 201425704 Y CN201425704 Y CN 201425704Y CN 200920071890X U CN200920071890X U CN 200920071890XU CN 200920071890 U CN200920071890 U CN 200920071890U CN 201425704 Y CN201425704 Y CN 201425704Y
- Authority
- CN
- China
- Prior art keywords
- module
- time
- time source
- satellite
- control module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Electric Clocks (AREA)
Abstract
本实用新型公开了一种卫星同步主时钟装置,其包括卫星时间源模块、时间源控制模块、中心控制模块、显控模块、输出模块、时间源检测模块和扩展装置模块,卫星时间源模块、时间源控制模块、输出模块、扩展装置模块、时间源检测模块、显控模块与中心控制模块之间通过母板总线连接,卫星时间源模块、输出模块与时间源控制模块通过母板总线连接。本实用新型通过获取卫星标准时间信号,然后调整本地时钟使时差控制在一定的精度范围内,给外设提供标准时间源。另外,本实用新型还为电力***的各级单位提供一套独立、可靠和准确的时间统一、分配和控制***。
Description
技术领域
本实用新型涉及一种时间同步技术,特别是涉及一种卫星同步主时钟装置。
背景技术
目前电力***内部各输送端、接收端的分布广泛而分散,自动化装置内部都带有实时时钟,或者站内有以GPS(全球定位导航***)为主的授时装置,其固有误差难以避免,随着运行时间的增加,积累误差会越来越大,会失去正确的时间计量作用。
随着电网运行技术水平的提高,大部分变电站采用综合自动化方案,远方集中控制和操作,既提高了劳动生产率,又减少了认为误操作的可能。因此,自动化***实时时钟的时间同步要求是变电站自动化***的最基本要求。为了保证电网安全以及经济运行,各种以计算机技术和通信技术为基础的自动化装置广泛应用,这些装置的正常工作和作用的发挥,同样离不开统一的全网时间基准。如果时间不一致会直接导致电力一些基本运营***时间不一致,导致数据统计出现误差,分析结果没有意义,故障分析设备无法定位,更为严重得会给电力带来一些安全事故。
目前电力90%以上的电网都是采用GPS***授时,同时也有少量的GPS与北斗无源授时。目前授时设备无法知道随着时间的推移而获取自身的运行状态与授时的精度,时钟一旦出错会带来重大的安全隐患。
实用新型内容
本实用新型要解决的技术问题是为了克服现有技术的缺陷,提供一种卫星同步主时钟装置,其是以北斗一号卫星***与全球定位导航***(GPS)为基础进行双模设计,获取卫星标准时间信号,然后调整本地时钟使时差控制在一定的精度范围内(纳秒级),给外设提供标准时间源的时钟装置。
本实用新型是通过下述技术方案来解决上述技术问题的:一种卫星同步主时钟装置,其特征在于,其包括卫星时间源模块、时间源控制模块、中心控制模块、显控模块、输出模块、时间源检测模块和扩展装置模块,卫星时间源模块、时间源控制模块、输出模块、扩展装置模块、时间源检测模块、显控模块与中心控制模块之间通过母板总线连接,卫星时间源模块、输出模块与时间源控制模块通过母板总线连接。
本实用新型的积极进步效果在于:
(1)本实用新型能同时接入四路时间源(北斗、GPS和外输入B码),通过高效的时间源控制算法,实现多时间源的智能切换技术,确保了***输出时间的高精度、高可靠性要求。
(2)本实用新型配置了双向北斗接收模块,通过应用北斗双向对时功能,从而实现了所有卫星同步主时钟的时差测量,保证了全网时间的准确同步和时间统一。
(3)本实用新型卫星同步主时钟可以检测外接时间源的信号,并将检测到的信息和自身运行的状态信息通过北斗卫星通讯功能传输到远端监控***,实现不同地方的卫星同步主时钟的状态监测和远程控制。
(4)本实用新型采用北斗双向通信功能的优势,将设备授时精度误差值、设备内部各模块的状态信息以及设备的告警信息通过北斗卫星实时地汇报到中心站,同时中心站可以根据中心原子钟或铷钟的情况进行比对,发出告警信息,自动/手动进行设备的时间源控制,时间精度的漂移补偿、模块状态信息的采集等操作,达到全网设备时间完全同步、运行状态实时监管。同时本实用新型为各种时间源输入模块提供了延时补偿功能,使各时间源能够达到良好同步。
附图说明
图1为本实用新型卫星同步主时钟的实施连接图。
图2为本实用新型卫星同步主时钟装置的模块框图。
图3为本实用新型中的卫星同步主时钟授时原理框图(北斗单/双向授时与GPS授时)。
具体实施方式
下面结合附图给出本实用新型较佳实施例,以详细说明本实用新型的技术方案。
如图1所示,电力同步***整体包括主时钟、备时钟、多个从时钟,主时钟和备时钟通过GPS天线或北斗天线接收GPS卫星或北斗卫星时间信号,产生标准的时间信号输出,并通过北斗卫星***实现无线通讯。主时钟和备时钟通过光纤光缆以IRIG-B码(一种时间码)相连,主时钟和备时钟为整个运动环境提供标准时间信号,从时钟无需再接入天线,它们通过信号电缆以IRIG-B码(一种时间码)B码与主时钟和备时钟相连,并从主时钟和备时钟获取标准时间信号,从时钟通过各类时间信号接口将标准时间信号输出至各时间接点和外设,外设为运动主机、主变保护、主变测控和主变高压侧;主时钟、备时钟和多个从时钟可以通过串口与计算机连接,进行调试和设置。
如图2所示,本实用新型卫星同步主时钟装置包括卫星时间源模块、时间源控制模块、中心控制模块、显控模块、输出模块、时间源检测模块和扩展装置模块,卫星时间源模块、时间源控制模块、输出模块、扩展装置模块、时间源检测模块、显控模块与中心控制模块之间通过母板总线连接来实现数据通讯和控制信号的传输。卫星时间源模块、输出模块与时间源控制模块通过母板总线连接来实现1PPS(秒脉冲信号)的传输。
如图3所示,本实用新型主时钟授时(北斗单/双向授时与GPS授时)的工作原理是:授时通过卫星时间源模块、中心控制模块、时间源检测模块、时间源控制模块和IRIG-B码时间报文生成电路等完成,卫星时间源模块与北斗天线、GPS天线连接并可以接收有线基准,并定时发送双向授时申请和时间源对比,卫星时间源模块和中心控制模块之间相互发送状态信息,时间源检测模块向中心控制模块发送检测信息,中心控制模块和时间源控制模块之间相互发送状态信息,IRIG-B码时间报文生成电路通过光电隔离向被授时装置发送B码和时间报文等信息。
其中卫星时间源模块包括GPS接收部分、北斗接收部分、有线B码时间源输入部分这三大部分功能。GPS接收部分接收GPS卫星广播信号,根据卫星信息解算出准确的时间信息输出。北斗接收部分接收北斗卫星广播信号,根据卫星信息解算出准确的时间信息输出。有线B码时间源输入部分接入有线的时间B码信号,提供给时间源控制模块选择输出。
本实用新型卫星同步主时钟装置具有以下功能:
A.全网远程监控管理功能
本实用新型采用北斗双向通信功能的优势,将设备授时精度误差值、设备内部各模块的状态信息以及设备的告警信息通过北斗卫星实时地汇报到中心站,同时中心站可以根据中心原子钟或铷钟的情况进行比对,发出告警信息,自动/手动进行设备的时间源控制,时间精度的漂移补偿、模块状态信息的采集等操作。达到全网设备时间完全同步、运行状态实时监管。
B.北斗双向授时功能
定时给北斗大***发送双向授时申请,北斗大***给解算出本地时钟延时补偿值,从而修正本地时间精度,提高时钟绝对准确精度。
C.时间源计算比对功能
守时电路为***提供了一个内部振荡器,这使设备同时可以对时间源的精度进行测量。卫星信号与内部晶体相互结合互为补充,可滤去卫星信号的抖动,保证设备稳定的输出。同时保证时间信息的发送不会出现中断和缺秒现象。同时根据装置所有的时间源信号进行比对,实时给相应的差值,报告给中心***。
D.控制管理功能
控制管理功能主要有两方面的功能:一方面各模块的状态实时报告给控制管理模块,同时根据设定的频度报告给中心监控管理平台或设备监控管理***;另一方面完成分发中心监控管理平台或直接连接设备的监控管理***所下达的指令。
E.时间源检测功能
时间源检测主要分为两个方面:一是对秒脉冲的收敛程度进行检测,即测试1PPS(秒脉冲信号)的抖动,这能反映出一个卫星时钟的质量。另一方面是绝对误差的测试,即使用本装置为标准时间源与被测时间源进行对比,主要检测时钟的精度与故障。
F.时间源控制功能
根据时间所设置的时间源优先级顺序进行判断与选择输出时间信号。
G..高精度授时、守时功能
本实用新型同步主时钟采用先进的技术算法,配合创新的思维方式,使其授时的精度更高,GPS授时精度优于100ns,北斗双向授时精度优于100ns,北斗单向授时精度优于200ns。
虽然以上描述了本实用新型的具体实施方式,但是本领域的技术人员应当理解,这些仅是举例说明,在不背离本实用新型的原理和实质的前提下,可以对这些实施方式做出多种变更或修改。因此,本实用新型的保护范围由所附权利要求书限定。
Claims (1)
1、一种卫星同步主时钟装置,其特征在于,其包括卫星时间源模块、时间源控制模块、中心控制模块、显控模块、输出模块、时间源检测模块和扩展装置模块,卫星时间源模块、时间源控制模块、输出模块、扩展装置模块、时间源检测模块、显控模块与中心控制模块之间通过母板总线连接,卫星时间源模块、输出模块与时间源控制模块通过母板总线连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920071890XU CN201425704Y (zh) | 2009-05-08 | 2009-05-08 | 卫星同步主时钟装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920071890XU CN201425704Y (zh) | 2009-05-08 | 2009-05-08 | 卫星同步主时钟装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201425704Y true CN201425704Y (zh) | 2010-03-17 |
Family
ID=42025159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920071890XU Expired - Lifetime CN201425704Y (zh) | 2009-05-08 | 2009-05-08 | 卫星同步主时钟装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201425704Y (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101867432A (zh) * | 2010-05-25 | 2010-10-20 | 中国电力科学研究院 | 主基准时钟匹配氢钟的电力通信同步网全同步演进方法 |
CN101873188A (zh) * | 2010-05-25 | 2010-10-27 | 中国电力科学研究院 | 基于共模共视测量技术的电力通信同步网全同步演进方法 |
CN102455656A (zh) * | 2010-10-22 | 2012-05-16 | 比亚迪股份有限公司 | 汽车时钟校准***及校准方法 |
CN102809926A (zh) * | 2012-07-31 | 2012-12-05 | 中国科学院紫金山天文台 | 天文望远镜多通道定时装置 |
CN103324080A (zh) * | 2012-03-19 | 2013-09-25 | 北京泛华恒兴科技有限公司 | 卫星驯服铷钟卡 |
CN103401630A (zh) * | 2013-07-30 | 2013-11-20 | 西南大学 | 一种工业控制网络中的冗余校时***及方法 |
CN103513569A (zh) * | 2013-09-17 | 2014-01-15 | 国家电网公司 | 一种智能变电站冗余时间同步方法 |
CN105527833A (zh) * | 2016-01-28 | 2016-04-27 | 安徽四创电子股份有限公司 | 一种北斗gps双模电力时间同步装置 |
CN108762056A (zh) * | 2018-08-20 | 2018-11-06 | 梁国立 | 一种三联智能时钟***及其控制方法 |
-
2009
- 2009-05-08 CN CN200920071890XU patent/CN201425704Y/zh not_active Expired - Lifetime
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101873188B (zh) * | 2010-05-25 | 2014-03-19 | 中国电力科学研究院 | 基于共模共视测量技术的电力通信同步网全同步演进方法 |
CN101873188A (zh) * | 2010-05-25 | 2010-10-27 | 中国电力科学研究院 | 基于共模共视测量技术的电力通信同步网全同步演进方法 |
CN101867432A (zh) * | 2010-05-25 | 2010-10-20 | 中国电力科学研究院 | 主基准时钟匹配氢钟的电力通信同步网全同步演进方法 |
CN101867432B (zh) * | 2010-05-25 | 2015-05-13 | 中国电力科学研究院 | 主基准时钟匹配氢钟的电力通信同步网全同步演进方法 |
CN102455656A (zh) * | 2010-10-22 | 2012-05-16 | 比亚迪股份有限公司 | 汽车时钟校准***及校准方法 |
CN102455656B (zh) * | 2010-10-22 | 2014-03-19 | 比亚迪股份有限公司 | 汽车时钟校准***及校准方法 |
CN103324080A (zh) * | 2012-03-19 | 2013-09-25 | 北京泛华恒兴科技有限公司 | 卫星驯服铷钟卡 |
CN103324080B (zh) * | 2012-03-19 | 2016-03-30 | 北京泛华恒兴科技有限公司 | 卫星驯服铷钟卡 |
CN102809926A (zh) * | 2012-07-31 | 2012-12-05 | 中国科学院紫金山天文台 | 天文望远镜多通道定时装置 |
CN102809926B (zh) * | 2012-07-31 | 2017-07-04 | 中国科学院紫金山天文台 | 天文望远镜多通道定时装置 |
CN103401630A (zh) * | 2013-07-30 | 2013-11-20 | 西南大学 | 一种工业控制网络中的冗余校时***及方法 |
CN103401630B (zh) * | 2013-07-30 | 2016-08-10 | 西南大学 | 一种工业控制网络中的冗余校时***及方法 |
CN103513569A (zh) * | 2013-09-17 | 2014-01-15 | 国家电网公司 | 一种智能变电站冗余时间同步方法 |
CN105527833A (zh) * | 2016-01-28 | 2016-04-27 | 安徽四创电子股份有限公司 | 一种北斗gps双模电力时间同步装置 |
CN108762056A (zh) * | 2018-08-20 | 2018-11-06 | 梁国立 | 一种三联智能时钟***及其控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201425704Y (zh) | 卫星同步主时钟装置 | |
CN101881938A (zh) | 卫星同步主时钟装置 | |
CN201425705Y (zh) | 电力***时间同步装置 | |
US20200309829A1 (en) | On-line monitoring system for the performance of the measurement equipment in the entire power grid based on wide-area synchronous measurement | |
CN103368259A (zh) | 一种利用变电所测控装置遥信量测试***对时间准确度的测试方法 | |
CN103605023A (zh) | 一种合并单元时间特性测量方法及测量装置 | |
CN101951024B (zh) | 一种数字化数据采集装置 | |
CN203086488U (zh) | 基于北斗时钟的电力时间同步*** | |
CN203259610U (zh) | 基于模拟量数字化传递的合并单元精确时间测试仪 | |
CN203465541U (zh) | 一种基于北斗/gps双授时源的故障时间记录装置 | |
CN110943881B (zh) | 一种基于就地化保护工厂化调试的测试***及方法 | |
CN102593955B (zh) | 一种综合性智能化时间频率测试***与测试方法 | |
CN203455626U (zh) | 保障电网全网时间同步的授时*** | |
CN103647631A (zh) | 一种智能化变电站用时钟同步检测装置及检测方法 | |
CN102591195A (zh) | 一种互备双时钟的互检方法及一种对时装置 | |
CN109283829B (zh) | 一种区域时钟***的控制方法 | |
CN201812155U (zh) | 卫星同步从时钟装置 | |
CN102608910B (zh) | 一种时间同步设备时间基准冗余信号智能测试***与方法 | |
CN101881939A (zh) | 电力***时间同步装置 | |
CN103812731A (zh) | 一种数字化采样延时变频测量方法及测量*** | |
CN106849346B (zh) | 一种测试配电自动化设备对时功能与守时性能的*** | |
CN103873178A (zh) | 广域时间同步***授时误差的集中巡检方法 | |
CN203799000U (zh) | 一种电能质量监测终端对时与时钟精度测试*** | |
CN202615137U (zh) | 电力***的统一授时装置 | |
CN202353575U (zh) | 一种时间同步实时监测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20100317 |