CN203086060U - Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension - Google Patents

Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension Download PDF

Info

Publication number
CN203086060U
CN203086060U CN 201320124699 CN201320124699U CN203086060U CN 203086060 U CN203086060 U CN 203086060U CN 201320124699 CN201320124699 CN 201320124699 CN 201320124699 U CN201320124699 U CN 201320124699U CN 203086060 U CN203086060 U CN 203086060U
Authority
CN
China
Prior art keywords
ppr
power transmission
overhead ground
pipe
ground wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320124699
Other languages
Chinese (zh)
Inventor
张啸
许超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIHE ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Original Assignee
BEIHE ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIHE ELECTRIC POWER BUREAU, State Grid Corp of China SGCC filed Critical BEIHE ELECTRIC POWER BUREAU
Priority to CN 201320124699 priority Critical patent/CN203086060U/en
Application granted granted Critical
Publication of CN203086060U publication Critical patent/CN203086060U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model provides a device for replacing overhead ground wires of a high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension and relates to a device for replacing overhead ground wires of a high-voltage overhead power transmission line, in particular to the device for replacing overhead ground wires of the high-voltage overhead power transmission line by using PPR pipe suspension. The device aims at solving the problems that in the wire changing construction of the existing overhead ground wire replacement, the construction time is long, the required personnel are many, and the investment is high. The device comprises two PPR pipes, two insulation ropes and four steel chisel ground anchors, wherein the middle part of each insulation rope is respectively sheathed with one PPR pipe, and one end of each insulation rope is respectively connected with one steel chisel ground anchor. The device is used for replacing overhead ground wires.

Description

Utilize PPR pipe hanging carrying out high voltage overhead power transmission sequence to change the overhead ground wire device
Technical field
The utility model relates to the high voltage overhead power transmission sequence and changes the overhead ground wire device, is specifically related to utilize PPR pipe hanging carrying out high voltage overhead power transmission sequence to change the overhead ground wire device.
Background technology
Along with the lifting of china's overall national strength and the development of power network, especially after the principles and policies of the pulling domestic demand of stabilizing the economy are put into effect, drop into huge fund aspect the infrastructure construction of railway, high-grade highway and power circuit, radiating surface spreads all over all parts of the country.High voltage circuit overhead ground wire replacing rebuilding construction often runs into the problem with railway, highway and power circuit scissors crossing.Usually change in the overhead ground wire thread-changing construction methods of taking crossing frame or using crane colligation goat's horn bar and tension force to put stringing that adopt more.The weak point of taking the method for crossing frame is to prepare material complexity, length consuming time, and required personnel are many, transportation difficulty, time and effort consuming; Use the method for crane colligation goat's horn bar, though easy, also exist and be subjected to the influence of topography big, meet that crossover point is many, construction time, crane used platform, machine-team excessive cost fund to pay too high shortcoming when longer; Tension force is put stringing requirement plant equipment advanced person, invests hugely, and landform also will be fit to the expansion of plant equipment.When running into special location leap railway, highway, power line, crossed over by crane that landform limits and to use and can not set up fully crossing frame and use tension force to put line tightening method leap construction.And railway transportation is frequent, can not stop transport because of crossing over construction; The highway car flow is big, seals road construction infection traffic and is difficult to and realize; Striden power circuit and had a power failure, directly influenced user's productive life, also reduced the reliability of power supply simultaneously, influenced the economic benefit of power supply enterprise.
The utility model content
The utility model is changed the problem that the engineering time is long, required personnel are many, investment is huge in the overhead ground wire thread-changing construction for solving to have now, and then proposition utilizes PPR pipe hanging carrying out high voltage overhead power transmission sequence to change the overhead ground wire device.
The utility model is to address the above problem the technical scheme of taking to be: device described in the utility model comprises that two PPR pipes, two thoroughly do away with edge rope and four drill rod earth anchors, the middle part of every eradication edge rope is PPR pipe of each suit respectively, and whenever each is connected with a drill rod earth anchor end of restricting with insulation respectively.
The invention has the beneficial effects as follows: using the present invention to change overhead ground wire only needs two people to get final product, and has reduced labour's input, has saved the engineering time, and the present invention is simple in structure, and is easy to operate, and fund input is few, has saved a large amount of costs; It is constant to have reduced the resident living that causes because of long-time power failure, and factory and enterprise etc. is with the economic loss of electric unit, can also improve the power supply reliability of power supply enterprise, when also having reduced simultaneously because of construction to the appearance and the security implication of traffic routes such as highway, railway.
Description of drawings
Fig. 1 is a work schematic diagram of the present utility model.
Embodiment
Embodiment one: present embodiment is described in conjunction with Fig. 1, the described PPR of the utilization pipe of present embodiment hanging carrying out high voltage overhead power transmission sequence is changed the overhead ground wire device and is comprised that two PPR pipes 1, two thoroughly do away with edge rope 2 and four drill rod earth anchors 3, the middle part of every eradication edge rope 2 PPR of each suit respectively manages 1, and whenever the end with insulation rope 2 respectively is connected with a drill rod earth anchor 3 respectively.
Embodiment two: in conjunction with Fig. 1 present embodiment is described, respectively is provided with a knot 2-1 respectively on the insulation rope 2 at the two ends of each PPR pipe 1 of the described PPR of the utilization pipe of present embodiment hanging carrying out high voltage overhead power transmission sequence replacing overhead ground wire device.
The technique effect of present embodiment is: the knot 2-1 that each PPR manages on the 1 two ends insulation rope 2 can prevent PPR pipe 1 play on insulation rope 2, avoids changing ground wire takes place in the overhead ground wire process coming off and injuring the staff.
Other composition and annexation are identical with embodiment one.
Embodiment three: in conjunction with Fig. 1 present embodiment is described, each drill rod earth anchor 3 that the described PPR of the utilization pipe of present embodiment hanging carrying out high voltage overhead power transmission sequence is changed the overhead ground wire device is drill rod earth anchors 3 that diameter is made for the screw thread drill rod of 22mm.Other composition and annexation are identical with embodiment one.
Embodiment four: combination Fig. 1 illustrates present embodiment, and the diameter that the described PPR of the utilization pipe of present embodiment hanging carrying out high voltage overhead power transmission sequence is changed every eradication edge rope 2 of overhead ground wire device is 16mm~20mm.Other composition and annexation are identical with embodiment one.
Embodiment five: in conjunction with Fig. 1 present embodiment is described, the wall thickness that the described PPR of the utilization pipe of present embodiment hanging carrying out high voltage overhead power transmission sequence is changed each PPR pipe 1 of overhead ground wire device is 10mm~14mm.Other composition and annexation are identical with embodiment one.
Operation principle
Use the utility model change overhead ground wire concrete steps as follows:
Step 1, crossed over the thing both sides above parallel wire on respectively hang a PPR pipe 1 respectively;
It is 1 parallel that the two ends of step 2, the every eradication edge rope 2 of traction are managed two PPR;
Step 3, with 2 tensions of every eradication edge rope, and the drill rod earth anchor 3 at every eradication edge rope 2 two ends rammed ground, the distance that each drill rod earth anchor 3 distance is crossed over things is 10 meters;
The replacing of promptly finishing overhead ground wire after thing both sides shaft tower wire clamp installs is crossed in step 4, the unwrapping wire that carries out overhead ground wire on two PPR pipe 1 and stringing operation;
Step 5, will change the overhead ground wire device and remove.

Claims (5)

1. utilize PPR pipe hanging carrying out high voltage overhead power transmission sequence to change the overhead ground wire device: it is characterized in that: the described PPR of utilization pipe hanging carrying out high voltage overhead power transmission sequence is changed the overhead ground wire device and is comprised that two PPR pipes (1), two thoroughly do away with edge rope (2) and four drill rod earth anchors (3), the middle part of every eradication edge rope (2) is a PPR pipe of each suit (1) respectively, and each is connected with a drill rod earth anchor (3) end of whenever restrict with insulating (2) respectively.
2. change the overhead ground wire device according to the described PPR of the utilization pipe of claim 1 hanging carrying out high voltage overhead power transmission sequence, it is characterized in that: respectively be provided with a knot (2-1) respectively on the insulation rope (2) at the two ends of each PPR pipe (1).
3. change the overhead ground wire device according to the described PPR of the utilization pipe of claim 1 hanging carrying out high voltage overhead power transmission sequence, it is characterized in that: each drill rod earth anchor (3) is that diameter is the drill rod earth anchor (3) of the screw thread drill rod making of 22mm.
4. change the overhead ground wire device according to the described PPR of the utilization pipe of claim 1 hanging carrying out high voltage overhead power transmission sequence, it is characterized in that: the diameter of every eradication edge rope (2) is 16mm~20mm.
5. change the overhead ground wire device according to the described PPR of the utilization pipe of claim 1 hanging carrying out high voltage overhead power transmission sequence, it is characterized in that: the wall thickness of each PPR pipe (1) is 10mm~14mm.
CN 201320124699 2013-03-19 2013-03-19 Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension Expired - Fee Related CN203086060U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320124699 CN203086060U (en) 2013-03-19 2013-03-19 Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320124699 CN203086060U (en) 2013-03-19 2013-03-19 Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension

Publications (1)

Publication Number Publication Date
CN203086060U true CN203086060U (en) 2013-07-24

Family

ID=48831865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320124699 Expired - Fee Related CN203086060U (en) 2013-03-19 2013-03-19 Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension

Country Status (1)

Country Link
CN (1) CN203086060U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103138206A (en) * 2013-03-19 2013-06-05 黑河电业局 Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes
CN111355187A (en) * 2020-04-10 2020-06-30 浙江省送变电工程有限公司 Method for replacing ground wire by crossing high-speed rail by using old lead net sealing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103138206A (en) * 2013-03-19 2013-06-05 黑河电业局 Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes
CN111355187A (en) * 2020-04-10 2020-06-30 浙江省送变电工程有限公司 Method for replacing ground wire by crossing high-speed rail by using old lead net sealing

Similar Documents

Publication Publication Date Title
CN207098456U (en) A kind of crossover tower auxiliary cross-arm block component for being used to live across operation
CN103138206A (en) Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes
CN102324712A (en) Method for electrified spanning construction of high-voltage power transmission and transformation line
CN101442194A (en) Spanning method for ultra, extra high voltage line construction without crossover frame
CN102290742A (en) Tension stringing construction technology
CN203367865U (en) Auxiliary bracket for maintaining power transmission line
CN203086060U (en) Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension
CN207079477U (en) A kind of mobile formwork bottom web reinforcement skeleton pricks hanging apparatus in advance
CN104577875A (en) Construction method of block crossover frame cable of power circuit
CN203445520U (en) Live spanning device
CN106532557B (en) Across 10KV line construction platform tools devices
CN201252365Y (en) Construction charged crossover device of ultra-high and special-high voltage transmission line
CN105470862B (en) High ferro of not stopping transport crossing construction equipment
CN107100168A (en) A kind of High Slope Protection concrete delivery device
CN205265148U (en) Construction equipment is crossed over to high -speed railway of not stopping transport
CN203347324U (en) Holding pole wall attached matched hoop
CN105552776A (en) Novel construction method crossing high-speed rail without interruption
CN203411901U (en) Anchorage structure of horizontal drawing rope bridge
CN104377591A (en) Method for replacing overhead wire of crossing electrified railway without building crossing frame
CN102277999B (en) Large-section portal steel structure holding pole
CN205088576U (en) Flexible span wire suspends pump line construction equipment in midair
CN201222628Y (en) Hack lever tool for distribution circuit spanning highway
CN203939245U (en) A kind of string girder tensioning frock
CN206506249U (en) Outdoor track movable hoisting equipment power line wire tensioning device
CN206396757U (en) New Anchor Cable removes machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130724