CN101442194A - Spanning method for ultra, extra high voltage line construction without crossover frame - Google Patents

Spanning method for ultra, extra high voltage line construction without crossover frame Download PDF

Info

Publication number
CN101442194A
CN101442194A CNA2008100793879A CN200810079387A CN101442194A CN 101442194 A CN101442194 A CN 101442194A CN A2008100793879 A CNA2008100793879 A CN A2008100793879A CN 200810079387 A CN200810079387 A CN 200810079387A CN 101442194 A CN101442194 A CN 101442194A
Authority
CN
China
Prior art keywords
rope
ropeway carrying
spanning
construction
high voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100793879A
Other languages
Chinese (zh)
Inventor
常敏
胡延军
翟依学
***
朱凤一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Transmission & Transformation Engineering Co Of Shanxi Electric Power Co
Original Assignee
Electric Power Transmission & Transformation Engineering Co Of Shanxi Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Transmission & Transformation Engineering Co Of Shanxi Electric Power Co filed Critical Electric Power Transmission & Transformation Engineering Co Of Shanxi Electric Power Co
Priority to CNA2008100793879A priority Critical patent/CN101442194A/en
Publication of CN101442194A publication Critical patent/CN101442194A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention provides a method for spanning without spanning frames in super/ultra-high voltage line construction. The method comprises the steps of adopting a newly-built line steel tower (1) as a terminal spanning frame body, installing an auxiliary beam (2) on the newly-built line spanning-crosspiece steel tower (1) as a terminal connecting facility of a network closing device (7) and a connecting device of a carrying rope (6), installing the network closing device (7) within a safe distance above a spanned object (11) and erecting a power line on the network closing device (7) so as to perform spanning construction. The method is applicable to not only the live spanning power-line construction of super/ultra-high voltage lines, but also the construction of spanning communication lines, railways, highways, freeways, viaducts, rivers and other projects, thereby well solving the technical problems of power transmission line spanning construction. The method is substituted for the prior method of setting up spanning frames for spanning construction, achieves the aim of not affecting the operation of the spanned object, improves construction efficiency, and particularly improves construction safety, thereby having remarkable economic and social benefit.

Description

Super, extra high voltage line construction does not have the crossing frame crossing method
Technical field
The present invention relates to a kind of transmission line and cross over construction method, particularly a kind of super, extra high voltage line construction does not have the crossing frame crossing method.
Background technology
The power grid construction speed of China over nearly 20 years develops very fast, and now having formed with 500kV is the supergrid system of key north and south in length and breadth, connection thing.Along with the 1000kV UHV transmission line implement in full and ± construction of 800kV direct current UHV transmission line, the electrical network dilatation is quite rapid.Increasing scissors crossing problem mutually when carrying out power line construction, occurred, formed large tracts of land multiple spot leap order wire, railway, highway, highway, overpass and crossed over the supertension line phenomenon that has put into operation.And, might occur with a plurality of different thing or more than the many times grade of situations that the direct current extra high voltage network is backcrossed in continuous leap more of being crossed over of the interior leap of shelves in order to utilize limited crossover point to greatest extent.Thereby the leap problem, particularly crossed over the normal operation of thing and be the leap problem of prerequisite not influencing, in the transmission line erection construction, seemed quite outstanding and important.
It is various that the current power transmission industry is crossed over construction plan, sets up crossing frame construct as the mode that the terminal of block device connects facility in crossing over shelves but all adopt substantially.Promptly adopt steel pipe, cedar or two kinds of combinations of materials of bamboo bar to set up crossing frame or employing almag or steel structure formula crossing frame, utilize then to be crossed over the of short duration time that stops to run of thing or do not stop operation fully and carry out block; Row is opened up the method for putting multistage guiding rope, pull rope and lead wire and earth wire optical cable again.Said method not only manpower, material and Work tool input is bigger, and sets up support body and need the workmen to carry out work high above the ground, and hazards such as personal safety and the injury of getting an electric shock strengthen, and the personal safety problem under the complicated construction state is just outstanding more more to cross over thing.Moreover, because the possessory power of produce has been strengthened in the promulgation of " law of property ", this makes the relevant co-ordination of crossing over construction become difficult more, the difficulty that stops to run is increasing, especially crosses over the extra-high voltage line of force, the leap operation of can not implementing again to have a power failure.
Summary of the invention
Task of the present invention provides a kind of super, extra high voltage line construction does not have the crossing frame crossing method.This method adopts newly-built line steel tower as the terminal cross support body, is aided with the terminal connection facility of gate beam as the block device, makes full use of newly-built line steel tower and realizes crossing in the shelves purpose of constructing.This method is not only applicable to ultra high voltage, the construction of supertension line live across power line, also is applicable to engineering constructions such as crossing over order wire, railway, highway, highway, overpass, river, has solved transmission line well and has crossed over the technical barrier of construction.
The technical scheme of finishing task of the present invention is: adopt newly-built line steel tower as the terminal cross support body, cross at newly-built circuit gate beam connects facility and ropeway carrying-rope as the terminal of block device jockey is installed on the shelves iron tower; Cross at quilt again the block device is installed in the safe distance above the thing; The leap construction that the way of erecting power lines carries out being crossed over thing above the block device then.Concrete steps are:
(1) according to crossing over shelves and the design parameter of iron tower and the configured length that the site contour condition is determined ropeway carrying-rope, block device, gate beam pattern, length and ropeway carrying-rope.
(2) carry out simulation modeling, by calculating lead impact coefficient and the lead parameters such as unbalance factor of being caught, determine ropeway carrying-rope sag and specification in the state of accident under the corresponding span condition, and calculate the sag of ropeway carrying-rope under zero load and unwrapping wire state and carry out Construction control, and definite ropeway carrying-rope and the safe distance of being crossed over thing.
(3) determine that gate beam is provided with the position.
(4) complete unit is installed, is comprised gate beam, ropeway carrying-rope, block device, carry out circuit and cross over construction.
Use super, extra high voltage line construction provided by the present invention not have the crossing frame crossing method, from current energy-conserving and environment-protective, improve efficiency of construction, guarantee that iron tower structure and accident condition crossed over the security standpoint of power circuit down, not only realized not influencing the purpose of being crossed over the thing operation, and the hazards of setting up support body in the past and being produced have been eliminated, the working security height, drop into for a short time, economic benefit and social benefit are very remarkable.
Description of drawings
Fig. 1 is newly-built line steel tower and gate beam scheme of installation
Fig. 2 is the method for the invention construction schematic diagram.
Among the figure: the newly-built line steel tower of 1-; The 2-gate beam; The 3-suspension cable; 4,5-pulley; 6-ropeway carrying-rope 7-block device; The 8-net-supporting rod that insulate; The 9-adjusting device; 10,14-anchor point; 11-is crossed over thing (being striden power line); 12,13-backguy;
Embodiment
Fig. 1, shown in Figure 2 as the terminal cross support body, installs gate beam 2 connects facility and ropeway carrying-rope 6 as the terminal of block device 7 jockey with newly-built line steel tower 1 on newly-built circuit leap shelves iron tower 1.Gate beam 2 is divided into elongated or two types of phase-splitting segmenteds, determines according to tower.Cross at quilt again block device 7 is installed in the safe distance above the thing 11.Erecting power lines is crossed over construction above block device 7 then.
Concrete steps are as follows:
(1) determines ropeway carrying-rope 6, block device 7, the length of gate beam 2 patterns, length and ropeway carrying-rope 6 according to the design parameter and the site contour condition of crossing over shelves and newly-built line steel tower 1.
Gate beam 2 is divided into elongated or two types of phase-splitting segmenteds.The long through type gate beam is applicable to single loop compact line tangent tower, single loop cat head type tower, and single loop is done font strain tower and double.And phase-splitting segmented gate beam is applicable to single loop wineglass type tower.
Ropeway carrying-rope 6 connects, support block device 7, and by being anchored in ground anchor point 10 after pulley 4,5 tensions.
(2) carry out simulation modeling.By calculating lead impact coefficient and the lead parameters such as unbalance factor of being caught, determine ropeway carrying-rope 6 sag and specification in the state of accident under the corresponding span condition, and calculate the sag of ropeway carrying-rope 6 under zero load and unwrapping wire state and carry out Construction control, to guarantee ropeway carrying-rope 6 and the safe distance of being crossed over thing 11.
Ropeway carrying-rope 6 with crossed over thing 11 safe distances definite method be: the state equation of joining rack ceases to be busy rope, by finding the solution simple cubic equation, calculate the sag of ropeway carrying-rope 6 under various states, control the home of ropeway carrying-rope 6 simultaneously with ropeway carrying-rope 6 sags with to the setting numerical value that the clear distance of object being spanned 11 requires, this is an important way of guaranteeing ropeway carrying-rope 6 safety under each state of payingoff construction process.
Drawing ropeway carrying-rope 6 according to formula is 7.5-15 rice with the safe distance of being crossed over thing 11.
Impact coefficient calculates:
( k d ) max = 1 + 1 + 2 Δf ‾ Δ f 0 ‾
The equivalent average distance m of lead and ropeway carrying-rope block device during Δ f-----unwrapping wire operating mode;
Figure A200810079387D00072
-----lead static load equivalent average distance m of ropeway carrying-rope during with the unwrapping wire operating mode behind ropeway carrying-rope block device;
The impact coefficient that lead is caught is generally got (k d) Max=1.67.
The calculating of unbalance factor:
Ropeway carrying-rope 6 is connected with block device 7 and can equivalence carries out force analysis for simply supported beam.Equal lead line of fall point and (along line direction) selvage along the peaked 2 times of ratios with the net width of distance according to the formula unbalance factor.Ropeway carrying-rope 6 stressed unbalance factors generally get 1.2.
(3) determine that gate beam 2 is provided with the position.
Analysis-by-synthesis ropeway carrying-rope 6 is suspended from the lead design attitude with gate beam 2 and selects 4-6 rice, below in the clearance requirement of installing additional under block device 7 backs and the lead unwrapping wire state.
(4) complete unit is installed, is comprised terminal jockey, ropeway carrying-rope, block device, carry out circuit and cross over construction.
A, gate beam 2 are installed
Gate beam 2 is hung on iron tower 1 by suspension cable 3 at newly-built line steel tower 1, and on gate beam 2, pulley 4,5 is installed.
B ropeway carrying-rope 6 and the exhibition of danish seine rope are put
1. making preliminary leading rope with the small dimension high-strength insulation rope of configuration on helicopter or the light showing and placing of the tension ropeway carrying-rope 6 of propeller-parachuting uses.
2. utilizing the middle size high-tensile insulation rope that disposes on the preliminary leading rope traction ropeway carrying-rope 6 to make endless rope uses.
3. utilize endless rope that a ropeway carrying-rope 6 is drawn to opposite side ropeway carrying-rope ground anchor point 14 and is tightened up anchoring by a side ropeway carrying-rope ground anchor point 10.Apply tail tension force for ropeway carrying-rope 6 with braking system during traction, avoid ropeway carrying-rope 6 to drop on and crossed on the ground wire of thing 11.
The ropeway carrying-rope 6 of every phase and danish seine Rope Shop establish finish after, at newly-built line steel tower block device 7 assembling places are set for 1 time.After ground assembles block device 7, by the ground staff block device 7 has been divided into groups to winch to the below of gate beam 2, block device 7 is installed on the ropeway carrying-rope 6.Be connected with block device 7 head ends with the danish seine rope, progressively connect progressively traction.Simultaneously the danish seine rope of block device 7 afterbodys should be suitably tension force in addition.On the ground of crossing over another newly-built line steel tower of shelves end, start pull rope, block device 7 is launched above being crossed over thing 11.When block device 7 evenly covered by leap thing 11 tops, manpower tightened up two ends danish seine rope, and it is anchored at ground anchor point 10,14 places.Can carry out follow-up line construction then.
The present invention has substituted the method that crossing frame is crossed over construction of in the past setting up, and has solved transmission line well and has crossed over the technical barrier of construction.Not only improved efficiency of construction, the more important thing is and improved safety of construction.Economic and social benefit is very remarkable.

Claims (6)

1. super a, extra high voltage line construction does not have the crossing frame crossing method, it is characterized in that: adopt newly-built line steel tower (1) as the terminal cross support body, cross over shelves iron towers (1) at newly-built circuit and go up installation gate beam (2) connects facility and ropeway carrying-rope (6) as the terminal of block device (7) jockey; In being crossed over thing (11) top safe distance, block device (7) is installed again; Cross over construction in block device (7) top erecting power lines then;
Concrete steps are:
(1) according to crossing over shelves and the design parameter of newly-built line steel tower (1) and the configured length that the site contour condition is determined pattern, length and the ropeway carrying-rope (6) of ropeway carrying-rope (6), block device (7), gate beam (2);
(2) carry out simulation modeling, calculate ropeway carrying-rope (6) sag and specification and the sag of ropeway carrying-rope (6) under zero load and unwrapping wire state in the state of accident under the corresponding span condition, determine ropeway carrying-rope (6) and the safe distance of being crossed over thing (11);
(3) determine the position that is provided with of gate beam (2);
(4) complete unit is installed, is comprised gate beam (2), ropeway carrying-rope (6), block device (7), carry out circuit and cross over construction.
2. super, extra high voltage line construction according to claim 1 does not have the crossing frame crossing method, it is characterized in that: in step (1), and ropeway carrying-rope (6) support block device (7), and be anchored in ground anchor point (10,14) after straining by pulley (4,5).
3. super, extra high voltage line construction according to claim 1 does not have the crossing frame crossing method, it is characterized in that: in step (2), ropeway carrying-rope (6) with crossed over thing (11) safe distance definite method be: the state equation of joining rack ceases to be busy rope, find the solution simple cubic equation, calculate the sag of ropeway carrying-rope (6) under various states, determine ropeway carrying-rope (6) and the safe distance of being crossed over thing (11) with ropeway carrying-rope (6) sag with to the setting numerical value that the clear distance of being crossed over thing (11) requires.
4. super, extra high voltage line construction according to claim 1 does not have the crossing frame crossing method, it is characterized in that: in step (3), gate beam (2) be suspended from the lead design attitude select below 4-6 rice.
5. super, extra high voltage line construction according to claim 1 does not have the crossing frame crossing method, and it is characterized in that: in step (4), gate beam (2) is hung on iron tower (1) by suspension cable (3), goes up installation pulley (4,5) at gate beam (2).
6. super, extra high voltage line construction according to claim 1 does not have the crossing frame crossing method, it is characterized in that: in step (4), the below of block device (7) having been divided into groups to winch to gate beam (2), be installed on the ropeway carrying-rope (6), start the danish seine rope, block device (7) is launched being crossed over thing (11) top, tighten up two ends danish seine rope, and it is anchored at ground anchor point (10,14) locates.
CNA2008100793879A 2008-09-11 2008-09-11 Spanning method for ultra, extra high voltage line construction without crossover frame Pending CN101442194A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100793879A CN101442194A (en) 2008-09-11 2008-09-11 Spanning method for ultra, extra high voltage line construction without crossover frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100793879A CN101442194A (en) 2008-09-11 2008-09-11 Spanning method for ultra, extra high voltage line construction without crossover frame

Publications (1)

Publication Number Publication Date
CN101442194A true CN101442194A (en) 2009-05-27

Family

ID=40726500

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100793879A Pending CN101442194A (en) 2008-09-11 2008-09-11 Spanning method for ultra, extra high voltage line construction without crossover frame

Country Status (1)

Country Link
CN (1) CN101442194A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101697403B (en) * 2009-10-23 2011-07-20 江苏省电力公司句容市供电公司 Construction method for spreading lead wire and earth wire in transmission line
CN102412527A (en) * 2011-12-02 2012-04-11 河南省电力公司南阳供电公司 Controllable lifting live crossover device and construction method thereof
CN101728801B (en) * 2009-12-15 2012-06-27 湖北省输变电工程公司 Lead unfolding process
CN102611057A (en) * 2012-03-16 2012-07-25 山东电力集团公司枣庄供电公司 Crossing mesh
CN102738732A (en) * 2011-04-08 2012-10-17 上海市电力公司 Construction method for 500kV line to span highly intensive high-voltage live lines
CN102738729A (en) * 2011-04-08 2012-10-17 上海市电力公司 Application method for spanning frame to simultaneously span highly intensive high-voltage transmission lines
CN103944105A (en) * 2014-05-06 2014-07-23 国网上海市电力公司 Pulley hanging point spanning frame with four circuits on same tower
CN104393524A (en) * 2014-09-16 2015-03-04 国家电网公司 Construction method for preventing erection of crossing frame by using overhead ground wire to perform pulley block hanging operation
CN104909312A (en) * 2015-06-02 2015-09-16 三一汽车起重机械有限公司 Electric operating vehicle
CN105790156A (en) * 2016-04-11 2016-07-20 天津送变电工程公司 Transmission line construction new net-blocking construction method
CN102412527B (en) * 2011-12-02 2016-11-30 国网河南省电力公司南阳供电公司 Controllable lifting live crossover device and construction method thereof
CN108736377A (en) * 2018-08-16 2018-11-02 国网湖南省电力有限公司 A kind of payingoff construction spanning the transmission line road lives across system and its application process
CN109145488A (en) * 2018-09-07 2019-01-04 四川电力设计咨询有限责任公司 Carrying Suo Shouli and sag computing method for line level crossing construction
CN109494621A (en) * 2018-12-29 2019-03-19 国家电网有限公司 Transmission line of electricity block device
CN111145349A (en) * 2019-12-23 2020-05-12 国网陕西省电力公司建设分公司 Power transmission line crossing construction scheme checking and visualization method based on three-dimensional GIS
CN111682479A (en) * 2020-07-02 2020-09-18 国核电力规划设计研究院有限公司 Single-loop power transmission line iron tower and power transmission line tower system
CN111682483A (en) * 2020-07-02 2020-09-18 国核电力规划设计研究院有限公司 Transmission line drilling tower and transmission line tower system
CN113131402A (en) * 2021-05-26 2021-07-16 内蒙古送变电有限责任公司 No-crossing-frame uninterrupted stringing construction method
CN113594966A (en) * 2021-07-19 2021-11-02 广东电网能源发展有限公司 Overhead transmission line tightening construction design method and device, terminal and storage medium

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101697403B (en) * 2009-10-23 2011-07-20 江苏省电力公司句容市供电公司 Construction method for spreading lead wire and earth wire in transmission line
CN101728801B (en) * 2009-12-15 2012-06-27 湖北省输变电工程公司 Lead unfolding process
CN102738732A (en) * 2011-04-08 2012-10-17 上海市电力公司 Construction method for 500kV line to span highly intensive high-voltage live lines
CN102738729A (en) * 2011-04-08 2012-10-17 上海市电力公司 Application method for spanning frame to simultaneously span highly intensive high-voltage transmission lines
CN102412527A (en) * 2011-12-02 2012-04-11 河南省电力公司南阳供电公司 Controllable lifting live crossover device and construction method thereof
CN102412527B (en) * 2011-12-02 2016-11-30 国网河南省电力公司南阳供电公司 Controllable lifting live crossover device and construction method thereof
CN102611057A (en) * 2012-03-16 2012-07-25 山东电力集团公司枣庄供电公司 Crossing mesh
CN103944105A (en) * 2014-05-06 2014-07-23 国网上海市电力公司 Pulley hanging point spanning frame with four circuits on same tower
CN104393524A (en) * 2014-09-16 2015-03-04 国家电网公司 Construction method for preventing erection of crossing frame by using overhead ground wire to perform pulley block hanging operation
CN104393524B (en) * 2014-09-16 2017-03-15 国家电网公司 Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method
CN104909312A (en) * 2015-06-02 2015-09-16 三一汽车起重机械有限公司 Electric operating vehicle
CN105790156A (en) * 2016-04-11 2016-07-20 天津送变电工程公司 Transmission line construction new net-blocking construction method
CN108736377A (en) * 2018-08-16 2018-11-02 国网湖南省电力有限公司 A kind of payingoff construction spanning the transmission line road lives across system and its application process
CN109145488A (en) * 2018-09-07 2019-01-04 四川电力设计咨询有限责任公司 Carrying Suo Shouli and sag computing method for line level crossing construction
CN109145488B (en) * 2018-09-07 2022-07-15 四川电力设计咨询有限责任公司 Bearing cable stress and sag calculation method for crossing stringing construction
CN109494621A (en) * 2018-12-29 2019-03-19 国家电网有限公司 Transmission line of electricity block device
CN109494621B (en) * 2018-12-29 2020-05-15 国家电网有限公司 Power transmission line blocking device
CN111145349A (en) * 2019-12-23 2020-05-12 国网陕西省电力公司建设分公司 Power transmission line crossing construction scheme checking and visualization method based on three-dimensional GIS
CN111145349B (en) * 2019-12-23 2023-03-24 国网陕西省电力公司建设分公司 Power transmission line crossing construction scheme checking and visualization method based on three-dimensional GIS
CN111682479A (en) * 2020-07-02 2020-09-18 国核电力规划设计研究院有限公司 Single-loop power transmission line iron tower and power transmission line tower system
CN111682483A (en) * 2020-07-02 2020-09-18 国核电力规划设计研究院有限公司 Transmission line drilling tower and transmission line tower system
CN113131402A (en) * 2021-05-26 2021-07-16 内蒙古送变电有限责任公司 No-crossing-frame uninterrupted stringing construction method
CN113131402B (en) * 2021-05-26 2022-04-08 内蒙古送变电有限责任公司 No-crossing-frame uninterrupted stringing construction method
CN113594966A (en) * 2021-07-19 2021-11-02 广东电网能源发展有限公司 Overhead transmission line tightening construction design method and device, terminal and storage medium

Similar Documents

Publication Publication Date Title
CN101442194A (en) Spanning method for ultra, extra high voltage line construction without crossover frame
CN204316006U (en) A kind of electric transmission line hot-line crosses over block device
CN103437296B (en) Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method
CN203377546U (en) High speed railway spanning construction apparatus
CN102290742B (en) Tension stringing construction technology
CN102324712A (en) Method for electrified spanning construction of high-voltage power transmission and transformation line
CN102354926A (en) Large-section conductor tension stringing construction method
CN110804952B (en) Suspension bridge beam prefabrication and assembly construction process
CN103821075B (en) Long span oblique pull assembly type steel bridge on highway
CN105780658B (en) A kind of Spatial Cable face structural cables system is laterally to pulling method
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN204316007U (en) A kind of transmission line crossing construction device
CN105113414A (en) Method for quickly setting up main ropes of suspension bridge
CN106836000B (en) Curve via holes Summarized Account of Bridge Erection Construction method based on DJ series Bridge Erectors
CN104060545A (en) Overwater suspension cable trestle capable of being used for pumping concrete and construction method and application thereof
CN105484165B (en) Integrated prestress tensioning frame structure and manufacturing and using methods thereof
CN205205685U (en) Span wire pier is function portal device at most
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN103138206A (en) Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes
CN205355673U (en) High -speed railway of not stopping transport across device's span beam rotary mechanism
CN201252365Y (en) Construction charged crossover device of ultra-high and special-high voltage transmission line
CN204039898U (en) Can be used for the suspension trestle waterborne of pumping of concrete
CN205369044U (en) Integration prestressing force stretch -draw frame construction
CN102776841A (en) Long-span steel truss suspension bridge jointing method and device
CN203445520U (en) Live spanning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090527