CN203044492U - 一种穿孔机顶杆立体循环装置 - Google Patents
一种穿孔机顶杆立体循环装置 Download PDFInfo
- Publication number
- CN203044492U CN203044492U CN 201220718484 CN201220718484U CN203044492U CN 203044492 U CN203044492 U CN 203044492U CN 201220718484 CN201220718484 CN 201220718484 CN 201220718484 U CN201220718484 U CN 201220718484U CN 203044492 U CN203044492 U CN 203044492U
- Authority
- CN
- China
- Prior art keywords
- push rod
- dimensional
- egr
- perforating machine
- punch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forging (AREA)
Abstract
一种穿孔机顶杆立体循环装置,包括穿孔机和顶杆立体循环装置,所述穿孔机包括穿孔机主传动装置,所述顶杆立体循环装置包括脱顶杆辊道,其特征在于:所述穿孔机主传动装置设置在穿孔机的后台即出口侧,所述脱顶杆辊道侧设有毛管快速横移装置。本实用新型穿孔机主传动装置位于后台,并在脱顶杆辊道侧设有毛管快速横移装置,可实现较大的辗轧角,生产工艺流程紧凑,轧制成品质量高,可广泛应用在热轧无缝钢管生产中。
Description
技术领域
本实用新型涉及一种穿孔机顶杆立体循环装置,特别涉及一种无缝钢管生产中的穿孔机顶杆立体循环装置。
背景技术
穿孔机是无缝钢管生产不可缺少的设备,目前广泛采用的穿孔机的顶头自动更换装置故障率高,辅助工作时间较长,制约着穿孔机的生产效率。顶杆循环***由于减少了顶头更换的辅助工作时间,可大大提高穿孔机的生产节奏。现有的穿孔机顶杆立体循环装置中,穿孔机主传动装置设置在前台,顶杆循环装置布置在穿孔机出口。轧制好的毛管与顶杆分离后,毛管通过辊道纵向运输后,横移至连轧管机进行轧制。由于穿孔机主传动装置设置在穿孔机前台,造成辗轧角很小,导致穿孔机的延伸率低。毛管从穿孔机至连轧管机的运输时间较长,毛管温降大,穿孔质量差。
实用新型内容
本实用新型的目的在于提供一种穿孔质量高的穿孔机顶杆立体循环装置。
本实用新型的目的是这样实现的,一种穿孔机顶杆立体循环装置,包括穿孔机和顶杆立体循环装置,所述穿孔机包括穿孔机主传动装置,所述顶杆立体循环装置包括脱顶杆辊道,其特征在于:所述穿孔机主传动装置设置在穿孔机的后台即出口侧,所述脱顶杆辊道侧设有毛管快速横移装置。
上述顶杆立体循环装置包括上下两层,下层包括脱顶杆辊道、顶杆脱出装置及顶杆输送辊道,上层包括顶杆返回辊道,拨料装置及给料装置。
上述顶杆立体循环装置还包括同步移送机构,所述同步移送机构为一台电机驱动两个偏心的曲轴,同时带动两套四连杆机构。
同步移送机构的送料臂将穿孔机轧制中心线已经轧制好的毛管和旧顶杆从抱辊装置移出的同时,放料臂将新顶杆放入轧制中心线上待用。在脱顶杆辊道通过顶杆脱出装置将移出的旧顶杆拖出,留下的毛管通过毛管快速横移装置运输至连轧管机进行轧制。旧顶杆通过下层辊道纵向运输到顶杆冷却装置,旧顶杆被拨入水槽冷却的同时,冷却好的新顶杆从水槽上方拨出。新顶杆通过上层顶杆返回辊道纵向运输至给料位,通过拨料装置和给料装置,新顶杆被放到同步移送机构的放料臂上,完成一次循环。
本实用新型具有如下有益效果:
1、本实用新型穿孔机主传动装置位于穿孔机后台,轧辊的传动轴位于出口侧,可实现较大的辗轧角(≥15°),不仅增大了穿孔机的延伸率,提高了产品质量,而且占地面积小,节约厂房空间。
2、本实用新型用于生产时,工艺流程紧凑,顶杆进料与出料无间隙时间,穿孔机的辅助工作时间短,毛管温降小,轧制成品质量高。
3、本实用新型可广泛应用在热轧无缝钢管生产中。
附图说明
图1为本实用新型实施例结构示意图;
图2为本实用新型实施例下层平面示意图;
图3为本实用新型实施例上层平面示意图;
图4为本实用新型实施例剖面示意图;
图5为本实用新型实施例同步移送机构运行轨迹图。
具体实施方式
实施例,一种穿孔机顶杆立体循环装置,参见图1-4,包括穿孔机和顶杆立体循环装置,所述穿孔机包括穿孔机主传动装置5和顶杆止推装置2,所述顶杆立体循环装置包括脱顶杆辊道3、顶杆冷却装置4、顶杆脱出装置11、顶杆输送辊道12、顶杆返回辊道13、拨料装置14、给料装置15及同步移送机构10,穿孔机主传动装置5设置在穿孔机的后台即出口侧,脱顶杆辊道3侧设有毛管快速横移装置6。顶杆立体循环装置包括上下两层,下层包括脱顶杆辊道3、顶杆脱出装置11及顶杆输送辊道12,上层包括顶杆返回辊道13,拨料装置14及给料装置15。同步移送机构10为一台电机驱动两个偏心的曲轴且同时带动两套四连杆机构。
参见图2、图4,同步移送机构10的送料臂将穿孔机轧制中心线上已经轧制好的毛管7和旧顶杆8从穿孔机抱辊装置1移出的同时,放料臂将新顶杆9放入轧制中心线上待用。移出的毛管7和旧顶杆8在脱顶杆辊道3通过顶杆脱出装置11将旧顶杆8拖出,留下的毛管7由毛管快速横移装置6横向快速运输至连轧管机进行轧制。旧顶杆8通过下层顶杆输送辊道12纵向运输到顶杆冷却装置4进行冷却。
参见图3、图4,旧顶杆8被拨入水槽冷却的同时,冷却好的新顶杆9从水槽上方拨出,新顶杆9通过上层顶杆返回辊道13纵向运输至给料位,通过拨料装置14和给料装置15,新顶杆9被放到同步移送机构10的放料臂上,等待下一个循环。
参见图5,同步移送机构10为一台电机驱动带两个偏心的曲轴,同时驱动两套四连杆机构,放料和送料同步进行,无间隙时间。同步移送机构10的送料臂将穿孔机轧制中心线上已经轧制好的毛管7和旧顶杆8从位置A移出的同时,放料臂将新顶杆9从位置D放入位置A待用。移出的毛管7和旧顶杆8滚动到位置B,然后被放到脱顶杆辊道3上。新顶杆9通过给料装置15从位置C放到位置D。
Claims (3)
1.一种穿孔机顶杆立体循环装置,包括穿孔机和顶杆立体循环装置,所述穿孔机包括穿孔机主传动装置(5),所述顶杆立体循环装置包括脱顶杆辊道(3),其特征在于:所述穿孔机主传动装置(5)设置在穿孔机的后台即出口侧,所述脱顶杆辊道(3)侧设有毛管快速横移装置(6)。
2.如权利要求1所述的穿孔机顶杆立体循环装置,其特征在于:所述顶杆立体循环装置包括上下两层,下层包括脱顶杆辊道(3)、顶杆脱出装置(11)及顶杆输送辊道(12),上层包括顶杆返回辊道(13),拨料装置(14)及给料装置(15)。
3.如权利要求1所述的穿孔机顶杆立体循环装置,其特征在于:所述顶杆立体循环装置还包括同步移送机构(10),所述同步移送机构(10)为一台电机驱动两个偏心的曲轴,同时带动两套四连杆机构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220718484 CN203044492U (zh) | 2011-12-30 | 2012-12-24 | 一种穿孔机顶杆立体循环装置 |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120566955 | 2011-12-30 | ||
CN201120566955.5 | 2011-12-30 | ||
CN 201220718484 CN203044492U (zh) | 2011-12-30 | 2012-12-24 | 一种穿孔机顶杆立体循环装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203044492U true CN203044492U (zh) | 2013-07-10 |
Family
ID=48727490
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220718484 Expired - Fee Related CN203044492U (zh) | 2011-12-30 | 2012-12-24 | 一种穿孔机顶杆立体循环装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203044492U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103624082A (zh) * | 2013-12-03 | 2014-03-12 | 中冶东方工程技术有限公司 | 一种无缝钢管穿孔脱顶杆装置 |
CN107716555A (zh) * | 2017-09-22 | 2018-02-23 | 常州常宝精特钢管有限公司 | 一种穿孔机芯杆自动循环设备及方法 |
-
2012
- 2012-12-24 CN CN 201220718484 patent/CN203044492U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103624082A (zh) * | 2013-12-03 | 2014-03-12 | 中冶东方工程技术有限公司 | 一种无缝钢管穿孔脱顶杆装置 |
CN107716555A (zh) * | 2017-09-22 | 2018-02-23 | 常州常宝精特钢管有限公司 | 一种穿孔机芯杆自动循环设备及方法 |
CN107716555B (zh) * | 2017-09-22 | 2020-04-17 | 常州常宝精特钢管有限公司 | 一种穿孔机芯杆自动循环设备及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203227664U (zh) | 冷轧线材生产线 | |
CN110052847B (zh) | 一种铝型材挤压生产线 | |
CN203508848U (zh) | 一种自动卷管机的下料装置 | |
CN203044492U (zh) | 一种穿孔机顶杆立体循环装置 | |
CN102755993B (zh) | 穿孔机的顶杆循环装置 | |
CN202052874U (zh) | 一种无缝钢管热扩管机 | |
CN105234199B (zh) | 一种适合轧制中小规格钢板的试验装置及方法 | |
CN202070578U (zh) | 一种中间坯冷却装置 | |
CN103785686B (zh) | 一种二辊四机架连轧机组 | |
CN106001107A (zh) | 一种高延性冷轧带肋钢筋生产线 | |
CN206334959U (zh) | 一种可以提高可逆式冷轧机成材率的*** | |
CN205110352U (zh) | 一种全连续式中宽带钢生产装置 | |
CN106734212A (zh) | 一种连轧管机的双芯棒冷却、润滑装置 | |
CN202570736U (zh) | 热连轧生产线上的钢板切割回收装置 | |
CN110843187A (zh) | 一种宽幅聚合物铺网自动收拢喂料装置 | |
CN104203444B (zh) | 酸洗生产线的进入段、连续连续串列式冷轧机(tcm)的进入段或耦接至串列式冷轧机的酸洗生产线(pl/tcm)设备的进入段 | |
CN206262977U (zh) | 一种连轧管机的双芯棒冷却、润滑装置 | |
CN201735600U (zh) | 一种无缝钢管三辊式斜轧机的出口台装置 | |
CN203750992U (zh) | 二辊四机架连轧机组 | |
CN201970071U (zh) | 一种螺旋管生产机 | |
CN213793456U (zh) | 用于冷轧带肋钢筋生产线的立式下料装置 | |
CN210816896U (zh) | 一种顶盖面板生产装置 | |
CN210916199U (zh) | 轻量化装出钢杆装置 | |
CN204294627U (zh) | 拉管机 | |
CN210411916U (zh) | 方便操作的行星轧机出料*** |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130710 Termination date: 20201224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |