CN202990112U - Plate and beam reserved joint bar structure of hydropower house - Google Patents

Plate and beam reserved joint bar structure of hydropower house Download PDF

Info

Publication number
CN202990112U
CN202990112U CN 201220697471 CN201220697471U CN202990112U CN 202990112 U CN202990112 U CN 202990112U CN 201220697471 CN201220697471 CN 201220697471 CN 201220697471 U CN201220697471 U CN 201220697471U CN 202990112 U CN202990112 U CN 202990112U
Authority
CN
China
Prior art keywords
joint bar
plate
wall
bar groove
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220697471
Other languages
Chinese (zh)
Inventor
陈仁宏
后开祥
覃丽钠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN 201220697471 priority Critical patent/CN202990112U/en
Application granted granted Critical
Publication of CN202990112U publication Critical patent/CN202990112U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a plate and beam reserved joint bar structure of a hydropower house, which comprises an earlier pouring concrete wall (1), a later pouring beam (2) and a later pouring plate (3), wherein a beam joint bar groove (4) and a plate joint bar groove (5) are formed in the earlier pouring concrete wall (1), and joint bars that are anchored into the earlier pouring concrete wall (1) and poured with the later pouring beam (2) and the later pouring plate (3) integrally are arranged in the beam joint bar groove (4) and the plate joint bar groove (5) respectively. According to the structure, the joint bars are connected with the wall, the plate and the beam that are poured by stages, so that the structure is high in integrity; wall construction gap positions are moved into the wall by the joint bar grooves, so that the construction gap positions are optimized, and the reliability of the structure is improved; the top surfaces of the joint bar grooves are in an expanded fracture surface state from inside out, so later pouring concrete can be densified conveniently; a dismounting-free formwork serves as a shaping formwork of the joint bar grooves, the difficulty that the formwork cannot be mounted or dismounted easily due to the fact that the joint bars penetrate through the formwork is overcome; and chiseling treatment on earlier pouring wall surfaces of the joint bar grooves is omitted.

Description

Powerhouse of hydropower station plate-girder reserved joint bar structure
Technical field
The utility model relates to a kind of powerhouse of hydropower station plate-girder reserved joint bar structure, belongs to the concrete construction technical field.
Background technology
Powerhouse of hydropower station all needs to build reinforced concrete wall (wall under water) dash, gear soil in following position, ground below flood level or outside factory, with safety and the normal operation that guarantees factory building.Wall is important flood control and side direction retaining structure under water, is again the vertical supporting member of factory building inner panel girder construction simultaneously.In powerhouse of hydropower station concrete pouring construction process, flood control is passed the flood period or the needs of construction speed in order to satisfy, and generally builds in advance wall under water, after-pouring inner panel girder construction, therefore, how reliably to connect the body of wall of substage construction and slab and girder and just become an important problem.The general body of wall that adopts is connected by freely-supported with the plate-girder disengagement at present, perhaps reserves the plate-girder joint bar in body of wall, and body of wall is connected by vertical construction joints with the plate-girder bonding surface.But the freely-supported connection can not utilize body of wall to the fixed end effect of contraction of slab and girder, and structural integrity is poor, is unfavorable for antidetonation, can increase simultaneously the mid span moment of slab and girder, and material can not take full advantage of.And in " joint bar+vertical construction joints " connection, constuction joint is retained in body of wall and plate-girder bonding surface, this place's shearing is maximum, do not satisfy the principle (keeping somewhere the position unreasonable) of " constuction joint should be arranged on structure and be subjected to the shearing smaller part ", the plate-girder joint bar will pass wall form and cause damaged template and construction inconvenience, constuction joint seam face Disposal quality is wayward, New-old concrete joint surface easily forms plane of weakness, affects reliability of structure.Therefore, the technical scheme of the body of wall of existing connection substage construction and slab and girder or undesirable.
Summary of the invention
The purpose of this utility model is, a kind of body of wall for the connection substage construction and the powerhouse of hydropower station plate-girder reserved joint bar structure of slab and girder are provided, this structural integrity is strong, connection is reliable, and this structure can utilize body of wall to the fixed end effect of contraction of plate-girder, can overcome again existing constuction joint and keep somewhere the deficiencies in the prior art such as the position is unreasonable.
For realizing the purpose of this utility model, a kind of powerhouse of hydropower station plate-girder reserved joint bar structure of the present utility model, comprise first pouring concrete body of wall, after water Liang Hehou and water plate, wherein, beam joint bar groove and plate joint bar groove are set on described first pouring concrete body of wall, be respectively equipped with in beam joint bar groove and plate joint bar groove anchor in described first pouring concrete body of wall and with described after water Liang Hehou and water plate and build and become whole joint bar structure.
Further, beam joint bar groove and plate joint bar groove end face from inside to outside are the expansion section
Further, be provided with between described beam joint bar groove and plate joint bar groove and described first pouring concrete body of wall for form the non-dismantling formwork of beam joint bar groove and plate joint bar groove when building first pouring concrete body of wall.
Further, described joint bar comprises beam reserved joint bar and plate reserved joint bar.The beam reserved joint bar is provided with the beam joint bar that is no less than three roads and locates stirrup.
Compared with prior art, the utility model adopts joint bar to connect body of wall and the plate-girder of substage construction, and structural integrity is strong.By the joint bar groove, wall constuction joint position is moved on to body of wall inside, optimized the constuction joint position, stressed more reasonable, improved reliability of structure.Joint bar groove end face from inside to outside is the expansion section, is beneficial to rear pouring concrete and builds closely knit.Adopt non-dismantling formwork both to solve " joint bar is worn mould " as the typified form of joint bar groove, cause the difficulty of template installing/dismounting, save again the dabbing processing of the joint bar groove first being watered metope.Therefore, the utility model reached that globality is strong, simple in structure, easy construction, the reliable purpose of connection.
Description of drawings
Fig. 1 is beam reserved joint bar structure schematic diagram of the present utility model.
Fig. 2 is plate reserved joint bar structure schematic diagram of the present utility model.
Fig. 3 is joint bar groove elevation of the present utility model.
Water after the first pouring concrete body of wall of being labeled as in accompanying drawing: 1-, 2-and water plate, 4-beam joint bar groove, 5-plate joint bar groove, 6-non-dismantling formwork, 7-beam reserved joint bar, 8-beam joint bar location stirrup, 9-plate reserved joint bar after beam, 3-.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples, but not as to any restriction of the present utility model.
A kind of powerhouse of hydropower station plate-girder reserved joint bar structure of the present utility model, as Fig. 1, Fig. 2 and shown in Figure 3, beam joint bar groove 4 and plate joint bar groove 5 formerly are set on pouring concrete body of wall 1, beam joint bar groove 4 and plate joint bar groove 5 embeds and forms the groove shape in first pouring concrete bodies of wall 1, with this, constuction joint between plate-girder and body of wall moved to body of wall inside.Be respectively equipped with in beam joint bar groove 4 and plate joint bar groove 5 from after water beam 2 and after water plate 3 anchor into first pouring concrete body of wall 1 and with after water beam 2 and after water plate 3 and build and become whole joint bar, and be provided with the non-dismantling formwork 6 for formation beam joint bar groove 4 and plate joint bar groove 5 when building first pouring concrete body of wall 1 between beam joint bar groove 4 and plate joint bar groove 5 and first pouring concrete body of wall 1.Joint bar comprises beam reserved joint bar 7 and plate reserved joint bar 9, and beam reserved joint bar 7 is provided with the beam joint bar and locates stirrup 8.
First pouring concrete body of wall 1 of the present utility model water after being beam 2 and after water vertical supporting member, body of wall and the slab and girder substage construction of plate 3.Beam reserved joint bar 7 and the 9 length interval indwellings of plate reserved joint bar, the spacing between joint bar joint location and adjacent joint is carried out by designing requirement.Beam reserved joint bar 7 and plate reserved joint bar 9 pass non-dismantling formwork 6 and anchor into first pouring concrete body of wall 1, and anchorage length is carried out by designing requirement.Beam reserved joint bar 7 arranges at least the anchoring section planted agent and is no less than 3 beam joint bar location, road stirrups 8, is used for joint bar and locates.See Fig. 1 and Fig. 2, beam joint bar groove 4 and plate joint bar groove 5 end faces from inside to outside are the expansion section, form the opening shape, and beam joint bar groove 4 and plate joint bar groove 5 end faces from inside to outside by 45 ° of expansions, are beneficial to rear pouring concrete and build closely knit.Beam joint bar groove 4 gos deep into body of wall at least 0.4~0.5m, and its sectional dimension is than the wide 0.1m of beam section; Plate joint bar groove 5 gos deep into body of wall 0.1m at least, the same plate hight of its depth of section.Non-dismantling formwork 6 is the typified form of beam joint bar groove 4 and plate joint bar groove 5, can form the desirable seam face of constuction joint, saves the dabbing of joint bar groove is processed and the template dismounting.
During the utility model construction, when at first formerly pouring concrete body of wall 1 template is installed according to beam joint bar groove 4 and plate joint bar groove 5 positions and size, profile with non-dismantling formwork 6 fabrication and installation beam joint bar grooves 4 and plate joint bar groove 5, beam reserved joint bar 7 and plate reserved joint bar 9 are passed non-dismantling formwork 6, anchor in first pouring concrete body of wall 1 and fix, building the concrete of first pouring concrete body of wall 1, should strengthen vibrating in the joint bar position, the joint bar of building rear formation joint bar groove and exposing.After water beam 2, after also should strengthen vibrating in the joint bar groove location when watering plate 3 concreting, guarantee the constuction joint quality.

Claims (5)

1. powerhouse of hydropower station plate-girder reserved joint bar structure, comprise first pouring concrete body of wall (1), after water beam (2) and after water plate (3), it is characterized in that: beam joint bar groove (4) and plate joint bar groove (5) are set on described first pouring concrete body of wall (1), be respectively equipped with in beam joint bar groove (4) and plate joint bar groove (5) in anchoring into described first pouring concrete body of wall (1) and with described after water beam (2) and after water plate (3) and build and become whole joint bar.
2. powerhouse of hydropower station plate-girder reserved joint bar structure according to claim 1, it is characterized in that: described beam joint bar groove (4) and plate joint bar groove (5) end face from inside to outside are the expansion section.
3. powerhouse of hydropower station plate-girder reserved joint bar structure according to claim 1, is characterized in that: be provided with between described beam joint bar groove (4) and plate joint bar groove (5) and described first pouring concrete body of wall (1) for form the non-dismantling formwork (6) of beam joint bar groove (4) and plate joint bar groove (5) when building first pouring concrete body of wall (1).
4. according to claim 2 or 3 described powerhouse of hydropower station plate-girder reserved joint bar structures, it is characterized in that: described joint bar comprises beam reserved joint bar (7) and plate reserved joint bar (9).
5. powerhouse of hydropower station plate-girder reserved joint bar structure according to claim 4 is characterized in that: described beam reserved joint bar (7) is provided with the beam joint bar location stirrup (8) that is no less than three roads.
CN 201220697471 2012-12-17 2012-12-17 Plate and beam reserved joint bar structure of hydropower house Expired - Lifetime CN202990112U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220697471 CN202990112U (en) 2012-12-17 2012-12-17 Plate and beam reserved joint bar structure of hydropower house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220697471 CN202990112U (en) 2012-12-17 2012-12-17 Plate and beam reserved joint bar structure of hydropower house

Publications (1)

Publication Number Publication Date
CN202990112U true CN202990112U (en) 2013-06-12

Family

ID=48561305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220697471 Expired - Lifetime CN202990112U (en) 2012-12-17 2012-12-17 Plate and beam reserved joint bar structure of hydropower house

Country Status (1)

Country Link
CN (1) CN202990112U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995613A (en) * 2012-12-17 2013-03-27 中国水电顾问集团贵阳勘测设计研究院 Connection method and structure for casting wall body and plate girder of powerhouse of hydropower station by stages
CN104975714A (en) * 2015-07-08 2015-10-14 中国葛洲坝集团第六工程有限公司 Factory building concrete floor reserved hidden bracket template device and construction method
CN113719022A (en) * 2021-09-23 2021-11-30 中印恒盛(北京)贸易有限公司 Splicing type building module applied to underwater building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995613A (en) * 2012-12-17 2013-03-27 中国水电顾问集团贵阳勘测设计研究院 Connection method and structure for casting wall body and plate girder of powerhouse of hydropower station by stages
CN104975714A (en) * 2015-07-08 2015-10-14 中国葛洲坝集团第六工程有限公司 Factory building concrete floor reserved hidden bracket template device and construction method
CN113719022A (en) * 2021-09-23 2021-11-30 中印恒盛(北京)贸易有限公司 Splicing type building module applied to underwater building

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN202099816U (en) Prefabricated waterproof and soil-blocking plate for later poured band of outer wall of basement
CN202441391U (en) End template device for mounting waterstop in tunnel secondary lining concrete
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
CN201687125U (en) Precast concrete wallboard
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN104405041B (en) The prefabricated floor connector of steel building and mounting method thereof
CN101831985A (en) Precast concrete wallboard and preparation method thereof
CN208363127U (en) A kind of retaining wall structure of combined type high-speed rail platform
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN101818541A (en) Precast composite wallboard with door/window holes and manufacturing method thereof
CN201588207U (en) Concreting device at construction joints
CN101831986A (en) Precast composite outer insulated wall plate and manufacturing method thereof
CN201687127U (en) Prefabricated composite outer heat preservation wallboard
CN204225277U (en) The prefabricated floor connector of steel building
CN202990112U (en) Plate and beam reserved joint bar structure of hydropower house
CN204040078U (en) A kind of alter-pouring strips mould plate installs structure
CN102995613B (en) Connection method and structure for casting wall body and plate girder of powerhouse of hydropower station by stages
CN103568109A (en) Hole forming method of precast concrete hollow component
CN112502030A (en) Prefabricated assembled bridge substructure slot-in type and socket joint formula built-up connection structure
CN203129839U (en) Gypsum hollow block internal parting wall hole structure for door and window
CN102767378B (en) Method for constructing distyle tunnel portal by framed bent
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN204658661U (en) A kind of production concrete waveform sheet pile mould
CN204212181U (en) A kind of plugging structure of open caisson reserved opening

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

Free format text: FORMER NAME: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUP

Owner name: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + R

Free format text: FORMER NAME: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

CP01 Change in the name or title of a patent holder

Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee after: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee before: HydroChina Guiyang Engineering Corp.

Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee after: POWERCHINA GUIYANG ENGINEERING CORPORATION LIMITED

Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee before: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130612