CN202969278U - Molding frame for assembling of bridge frameworks - Google Patents

Molding frame for assembling of bridge frameworks Download PDF

Info

Publication number
CN202969278U
CN202969278U CN2012206891608U CN201220689160U CN202969278U CN 202969278 U CN202969278 U CN 202969278U CN 2012206891608 U CN2012206891608 U CN 2012206891608U CN 201220689160 U CN201220689160 U CN 201220689160U CN 202969278 U CN202969278 U CN 202969278U
Authority
CN
China
Prior art keywords
bridge
shellfish thunder
assembly unit
assembling
moulding bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012206891608U
Other languages
Chinese (zh)
Inventor
刘为
李士济
吴曙光
欧阳石
耿庆祥
童建军
高锦胜
贾阿龙
查浩杰
王雪能
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of CTCE Group
Original Assignee
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of CTCE Group filed Critical Second Engineering Co Ltd of CTCE Group
Priority to CN2012206891608U priority Critical patent/CN202969278U/en
Application granted granted Critical
Publication of CN202969278U publication Critical patent/CN202969278U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a molding frame for assembling of bridge frameworks. The molding frame for the assembling of the bridge frameworks comprises concrete blocks arranged on ground and a plurality of rows of Bailey truss sheets vertically arranged above the concrete blocks, the concrete blocks are cuboid-shaped preformed units, and connection sheets connecting the Bailey truss sheets are arranged in each row of Bailey truss sheets, and the molding frame for the assembling of the bridge frameworks belongs to the technical field of bridge construction. The molding frame for the assembling of the bridge frameworks is stable in support, and convenient to construct, and can effectively guarantee the assembling precision of the bridge frameworks.

Description

Bridge skeleton assembly unit moulding bed
Technical field
The utility model relates to a kind of support for assembly unit bridge skeleton, belongs to technical field of bridge construction.
Background technology
At present, China just actively implements cruiseway upgrading training works, carries forward vigorously the construction of high-grade waterway net.Bridge construction on water transport busy river course, construction period must not stop navigation for a long time, so must select in construction the minimum constructure scheme of navigation channel impact.According to the maritime sector requirement, if support is set in the navigation channel, its net span must not be less than 40m, the navigation limit for height must not be less than 7m, if adopt the construction of limited bracket method, the support that arranges in the navigation channel is subject to the passing ships collision unavoidably, jeopardize the boats and ships shipping safety, the potential safety hazard of support self is very large simultaneously.More appropriate constructure scheme be first with the bridge skeleton in bank assembly unit moulding, then lift.Because the terrain environment complexity on bank is various, how to guarantee that bridge skeleton precision in bank assembly unit process is higher and it is convenient to construct, be the problem that those skilled in the art need to solve.
The utility model content
The technical problem that the utility model solves is, proposes a kind of supporting ﹠ stablizing, and constructability can effectively guarantee the bridge skeleton assembly unit moulding bed of bridge skeleton splicing accuracy.
In order to solve the problems of the technologies described above, the technical scheme that the utility model proposes is: a kind of bridge skeleton assembly unit moulding bed comprises many row shellfish thunder sheets of being located at ground concrete block and being vertical at the concrete block top; Described concrete block is the cuboid prefabricated component, is provided with the brace that connects shellfish thunder sheet between described every row shellfish thunder sheet.
The operating space is larger when making the assembly unit of bridge skeleton, construct more convenient, a kind of technique scheme preferably: above-mentioned shellfish thunder sheet has two rows, and described two row shellfish thunder sheets are symmetrical arranged along the length direction of described concrete block, and spacing is 600mm to 1200mm.
In order to increase the width of support, guarantee the stability that supports, a kind of technique scheme preferably: above-mentioned every row shellfish thunder sheet is arranged side by side by two shellfish thunder sheets and abutting end is fixedly connected with and consists of.
For the setting that makes shellfish thunder sheet more stable, the stability that guarantee to support better, a kind of technique scheme preferably: above-mentioned brace is made of rectangular frame and the ribs be located in described rectangular frame.
Bridge skeleton of the present utility model assembly unit with the beneficial effect of moulding bed is: this concrete block that moulding bed employing bearing strength is high, shape is regular is as pedestal, adopt shellfish thunder sheet easy to assembly, that hollow part is more, intensity is higher as support, simple for structure, arrange conveniently, even bank terrain environment complexity is various, also can effectively guarantee stability, the accuracy of the assembly unit of bridge skeleton, and operating personnel carry out assembly unit, the welding time space is sufficient, easy construction.
Description of drawings
Assembly unit further illustrates with moulding bed to bridge skeleton of the present utility model below in conjunction with accompanying drawing.
Fig. 1 is the structural representation of moulding bed in the utility model embodiment 1.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the left view of Fig. 1.
Fig. 4 is the structural representation of the utility model application examples 1 hogging rib section assembly unit moulding.
Fig. 5 is the top view of Fig. 4.
Fig. 6 is the structural representation of bridge floor stiff skeleton section assembly unit moulding in the utility model application examples 2.
The specific embodiment
Embodiment 1 bridge skeleton assembly unit moulding bed
The bridge skeleton assembly unit moulding bed of the present embodiment as shown in Figure 1 to Figure 3, comprises the shellfish thunder sheet 6 of being located at ground concrete block 5 and being vertical at the concrete block top.Concrete block 5 is the cuboid prefabricated components that formed by the concreting that strength grade is C25, and length is 6000mm, and width is 1800mm, is highly 500mm.Shellfish thunder sheet 6 has two rows, and two row shellfish thunder sheets 6 are symmetrical arranged along the axis a of concrete block length direction, and spacing is 900mm.Every row shellfish thunder sheet 6 is arranged side by side by two shellfish thunder sheets 6 and abutting end is fixedly connected with and consists of.Be provided with the two ends of the symmetrical shellfish thunder sheet 6 of connection and the brace 7 at middle part between two row shellfish thunder sheets 6.Brace 7 is made of rectangular frame 71 and the ribs 72 of being located in rectangular frame.
The assembly unit forming method of application examples 1 arch rib section
The concrete steps of the assembly unit forming method of arch rib section that should use-case are: first the arch rib section prefabricated component that makes is transported to the job site.As shown in Figure 4 and Figure 5, bank at the construction field (site) arranges moulding bed according to shape and the size of arch rib section 31, arch rib section prefabricated component horizontal is set up in is assembled into arch rib section 31 on moulding bed.When assembly unit, fill out steel plate by plug between adjacent arch rib section prefabricated component the shape and size of arch rib section 31 are finely tuned, be welded and fixed between arch rib section prefabricated component.
The assembly unit forming method of application examples 2 half bridge face stiff skeleton sections
The concrete steps of the assembly unit forming method of bridge floor stiff skeleton section that should use-case are: adopt the method identical with the assembly unit forming method of the arch rib section of application examples 1.As shown in Figure 6, at the construction field (site) bank arranges moulding bed according to shape and the size of bridge floor stiff skeleton section 41.Bridge floor stiff skeleton section prefabricated component horizontal is set up in is assembled into two bridge floor stiff skeleton sections 41 that be arranged in parallel on moulding bed.Be welded and fixed between bridge floor stiff skeleton section prefabricated component.
The described concrete technical scheme of above-described embodiment that is not limited to of the present utility model, all employings are equal to the technical scheme of replacing formation and are the protection domain that the utility model requires.

Claims (4)

1. a bridge skeleton assembly unit moulding bed, is characterized in that: comprise many row shellfish thunder sheets of being located at ground concrete block and being vertical at the concrete block top; Described concrete block is the cuboid prefabricated component, is provided with the brace that connects shellfish thunder sheet between described every row shellfish thunder sheet.
2. bridge skeleton assembly unit moulding bed according to claim 1, it is characterized in that: described shellfish thunder sheet has two rows, and described two row shellfish thunder sheets are symmetrical arranged along the length direction of described concrete block, and spacing is 600mm to 1200mm.
3. bridge skeleton assembly unit moulding bed according to claim 2, it is characterized in that: described every row shellfish thunder sheet is arranged side by side by two shellfish thunder sheets and abutting end is fixedly connected with and consists of.
4. one of according to claim 1 to 3 described bridge skeleton assembly unit moulding bed is characterized in that: described brace is made of rectangular frame and the ribs be located in described rectangular frame.
CN2012206891608U 2012-12-13 2012-12-13 Molding frame for assembling of bridge frameworks Expired - Fee Related CN202969278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012206891608U CN202969278U (en) 2012-12-13 2012-12-13 Molding frame for assembling of bridge frameworks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012206891608U CN202969278U (en) 2012-12-13 2012-12-13 Molding frame for assembling of bridge frameworks

Publications (1)

Publication Number Publication Date
CN202969278U true CN202969278U (en) 2013-06-05

Family

ID=48510372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012206891608U Expired - Fee Related CN202969278U (en) 2012-12-13 2012-12-13 Molding frame for assembling of bridge frameworks

Country Status (1)

Country Link
CN (1) CN202969278U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222523A (en) * 2018-02-02 2018-06-29 中建路桥集团有限公司 A kind of T beam steel bar colligations move assembled movable moulding bed
CN108708291A (en) * 2018-06-28 2018-10-26 谢志坚 A kind of bridge skeleton assembly moulding bed based on bridge security performance
CN114717964A (en) * 2022-04-27 2022-07-08 安徽省公路桥梁工程有限公司 Movable steel beam field assembly jig frame and using method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222523A (en) * 2018-02-02 2018-06-29 中建路桥集团有限公司 A kind of T beam steel bar colligations move assembled movable moulding bed
CN108222523B (en) * 2018-02-02 2019-04-30 中建路桥集团有限公司 A kind of mobile assembled movable moulding bed of T beam steel bar colligation
CN108708291A (en) * 2018-06-28 2018-10-26 谢志坚 A kind of bridge skeleton assembly moulding bed based on bridge security performance
CN114717964A (en) * 2022-04-27 2022-07-08 安徽省公路桥梁工程有限公司 Movable steel beam field assembly jig frame and using method thereof

Similar Documents

Publication Publication Date Title
CN102839678B (en) Structure for improving rigidity and stability of foundation pit steel support
CN203270461U (en) Bailey beam support without buttress in soft foundation
CN205242429U (en) Independent fixed tower crane foundation
CN205295963U (en) Long span steel case back pushes away construction with bearing structure that transversely rectifies
CN202954299U (en) Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN105568854A (en) Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder
CN202969278U (en) Molding frame for assembling of bridge frameworks
CN103276676B (en) Traffic guidance display screen frame
CN202347830U (en) Simple construction operation frame
CN202755370U (en) Structure for improving rigidity and stability of foundation pit steel support
CN203821664U (en) Support steel structure for curved-surface external curtain wall of large transport hub
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN202347828U (en) Bailey truss used during installation of steel structure
CN203960725U (en) A kind of assembly type suspension bridge
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN203144908U (en) Supporting system of urban steel box beam viaduct construction
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN102864746A (en) Bearing frame for bridge construction
CN202672023U (en) Modular detachable emergency steel bridge
CN203008130U (en) Connection node of steel rib column and steel beam
CN204662486U (en) Can for the mutual foundation of size tower crane conversion
CN204000579U (en) Steel bridge column and foundation connection structure
CN203755130U (en) Front beam and rear arch stacking device for steel arch bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20201213