CN204662486U - Can for the mutual foundation of size tower crane conversion - Google Patents

Can for the mutual foundation of size tower crane conversion Download PDF

Info

Publication number
CN204662486U
CN204662486U CN201520349771.1U CN201520349771U CN204662486U CN 204662486 U CN204662486 U CN 204662486U CN 201520349771 U CN201520349771 U CN 201520349771U CN 204662486 U CN204662486 U CN 204662486U
Authority
CN
China
Prior art keywords
tower crane
little
base section
joint
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520349771.1U
Other languages
Chinese (zh)
Inventor
冯志法
王凯栋
刘笛
王伟
林磊
孟杭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Yijian Construction Group Ltd
Original Assignee
Zhejiang Provincial Yijian Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Yijian Construction Group Ltd filed Critical Zhejiang Provincial Yijian Construction Group Ltd
Priority to CN201520349771.1U priority Critical patent/CN204662486U/en
Application granted granted Critical
Publication of CN204662486U publication Critical patent/CN204662486U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The mutual foundation of Gong the size tower crane conversion that the utility model relates to, comprise lattice column, described lattice column is four corner places being separately positioned on foundation ditch, comprise little tower crane base section, large tower crane joint and centering linkage, described large tower crane joint is arranged on by the foundation ditch that lattice column is formed, described little tower crane base section is inserted in large tower crane joint, centering linkage saves with large tower crane respectively and is connected with little tower crane base section, makes large tower crane save the concrete platform jointly forming three-back-shaped structure with little tower crane base section; Pass through the technical program, large tower crane joint and little tower crane base section is made fixedly to cast in machine hole with one heart, little tower crane is arranged on little tower crane, ensure the construction requirement such as material transition, earthwork handling in soil excavation stage, once engineering enters the structure construction stage, change the large tower crane meeting construction requirement at once, with satisfied construction needs, reach the maximization of economic benefit simultaneously.

Description

Can for the mutual foundation of size tower crane conversion
Technical field
The utility model relates to a kind of tower crane, particularly relates to a kind of mutual foundation for the conversion of size tower crane.
Background technology
Along with urban architecture constantly develops to underground, the number of plies of basement is also in continuous increase, especially the larger engineering of surrounding enviroment impact is subject in the excavation earthwork, often need to adopt vertical supporting to add the form of horizontal support, the now use as early as possible of tower crane can accelerate the progress of engineering greatly, simultaneously in soil excavation and foundation pit support construction stage, for the consideration of economic benefit, only need to use small load tower crane, and when engineering enters the structure construction stage, super-heavy component, the lifting of oversized equipment then needs large load tower crane just can complete.
Traditional tower crane is all the difference of tower crane height according to different and load, do independent basis respectively, for certain job site, the best construction location of tower crane is unique often, for this reason can only be corresponding basic according to the tower crane construction that load is larger, thus cause larger waste and the delay of material and duration.
Utility model content
In view of this, main purpose of the present utility model is to provide a kind of mutual foundation for the conversion of size tower crane, staircase air bag protecting device, pass through the technical program, the shoveling stage is accurately calculated and optimum position arranged by structure construction stage tower crane before construction, to play tower crane, later greatest benefit is installed, tower crane is made at the soil excavation initial stage, and little tower crane base section is determined simultaneously core be arranged on large tower crane joint in after carry out pre-buried, little tower crane is arranged on little tower crane, ensure the material transition in soil excavation stage, the construction requirements such as earthwork handling, once engineering enters the structure construction stage, change the large tower crane meeting construction requirement at once, with satisfied construction needs, reach the maximization of economic benefit simultaneously.
In order to achieve the above object, the technical solution of the utility model is achieved in that a kind of mutual foundation for the conversion of size tower crane, comprise lattice column, described lattice column is four corner places being separately positioned on foundation ditch, comprise little tower crane base section, large tower crane joint and centering linkage, described large tower crane joint is arranged on by the foundation ditch that lattice column is formed, described little tower crane base section is inserted in large tower crane joint, centering linkage saves with large tower crane respectively and is connected with little tower crane base section, large tower crane is made to save the concrete platform jointly forming three-back-shaped structure with little tower crane base section.
Described centering linkage is formed by being fixedly connected with dish, lateral connection bar and oblique connecting rod, the lower end of four oblique connecting rods is saved corner, bottom respectively and is connected with each self-corresponding large tower crane, the upper end of four oblique connecting rods respectively be fixedly connected with dish and be connected, the outboard end of four lateral connection bars is connected with the corner of little tower crane base section respectively, and the medial extremity of four lateral connection bars is connected with fixed disk.
Two adjacent lattice columns are provided with horizontal shore and bridging, and the two ends of described horizontal shore and bridging are separately fixed on corresponding two adjacent lattice columns.
Beneficial effect after employing technique scheme is: a kind of mutual foundation for the conversion of size tower crane, pass through the technical program, large tower crane joint and little tower crane base section is made fixedly to cast in machine hole with one heart, little tower crane is arranged on little tower crane, ensure the construction requirement such as material transition, earthwork handling in soil excavation stage, once engineering enters the structure construction stage, change the large tower crane meeting construction requirement at once, with satisfied construction needs, reach the maximization of economic benefit simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation of lattice column.
Fig. 2 is the structural representation of concrete platform.
Fig. 3 is the schematic top plan view of Fig. 2.
In figure, 1 lattice column, 2 little tower crane base sections, 3 large tower crane joints, 4 are fixedly connected with dish, 5 lateral connection bars, 6 oblique connecting rods, 7 horizontal shores, 8 bridgings.
Detailed description of the invention
Below in conjunction with accompanying drawing, specific embodiment in the utility model is described in further detail.
As shown in Figure 1-Figure 3, the mutual foundation of Gong the size tower crane conversion that the utility model relates to, comprise lattice column 1, described lattice column 1 is four corner places being separately positioned on foundation ditch, comprise little tower crane base section 2, large tower crane joint 3 and centering linkage, described large tower crane joint 3 is arranged in the foundation ditch that is made up of lattice column 1, described little tower crane base section 2 is inserted in large tower crane joint 3, centering linkage saves 3 respectively and is connected with little tower crane base section 2 with large tower crane, large tower crane is made to save the 3 concrete platforms that form three-back-shaped structure common with little tower crane base section 2.
Described centering linkage is formed by being fixedly connected with dish 4, lateral connection bar 5 and oblique connecting rod 6, the lower end of four oblique connecting rods 5 save 3 with each self-corresponding large tower crane respectively bottom corner be connected, the upper end of four oblique connecting rods 6 respectively be fixedly connected with dish 4 and be connected, the outboard end of four lateral connection bars 5 is connected with the corner of little tower crane base section 2 respectively, the medial extremity of four lateral connection bars 5 be fixedly connected with dish 4 and be connected.
Two adjacent lattice columns 1 are provided with horizontal shore 7 and bridging 8, and the two ends of described horizontal shore 7 and bridging 8 are separately fixed on corresponding two adjacent lattice columns 1.
The above, be only better possible embodiments of the present utility model, and be not used to limit scope of the present utility model.

Claims (3)

1. the mutual foundation can changed for size tower crane, comprise lattice column, described lattice column is four corner places being separately positioned on foundation ditch, it is characterized in that, comprise little tower crane base section, large tower crane joint and centering linkage, described large tower crane joint is arranged on by the foundation ditch that lattice column is formed, described little tower crane base section is inserted in large tower crane joint, centering linkage saves with large tower crane respectively and is connected with little tower crane base section, makes large tower crane save the concrete platform jointly forming three-back-shaped structure with little tower crane base section.
2. the mutual foundation for the conversion of size tower crane according to claim 1, it is characterized in that, described centering linkage is formed by being fixedly connected with dish, lateral connection bar and oblique connecting rod, the lower end of four oblique connecting rods is saved corner, bottom respectively and is connected with each self-corresponding large tower crane, the upper end of four oblique connecting rods respectively be fixedly connected with dish and be connected, the outboard end of four lateral connection bars is connected with the corner of little tower crane base section respectively, and the medial extremity of four lateral connection bars is connected with fixed disk.
3. the mutual foundation for the conversion of size tower crane according to claim 1, it is characterized in that, two adjacent lattice columns are provided with horizontal shore and bridging, and the two ends of described horizontal shore and bridging are separately fixed on corresponding two adjacent lattice columns.
CN201520349771.1U 2015-05-27 2015-05-27 Can for the mutual foundation of size tower crane conversion Withdrawn - After Issue CN204662486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520349771.1U CN204662486U (en) 2015-05-27 2015-05-27 Can for the mutual foundation of size tower crane conversion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520349771.1U CN204662486U (en) 2015-05-27 2015-05-27 Can for the mutual foundation of size tower crane conversion

Publications (1)

Publication Number Publication Date
CN204662486U true CN204662486U (en) 2015-09-23

Family

ID=54132882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520349771.1U Withdrawn - After Issue CN204662486U (en) 2015-05-27 2015-05-27 Can for the mutual foundation of size tower crane conversion

Country Status (1)

Country Link
CN (1) CN204662486U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818729A (en) * 2015-05-27 2015-08-05 浙江省一建建设集团有限公司 Common foundation for transformation of large and small tower cranes
CN111186778A (en) * 2020-03-04 2020-05-22 山东中建众力设备租赁有限公司 Mechanism and method for variable cross-section installation of foundation sections of tower crane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818729A (en) * 2015-05-27 2015-08-05 浙江省一建建设集团有限公司 Common foundation for transformation of large and small tower cranes
CN104818729B (en) * 2015-05-27 2016-05-18 浙江省一建建设集团有限公司 Can be for the mutual foundation of big or small tower crane conversion
CN111186778A (en) * 2020-03-04 2020-05-22 山东中建众力设备租赁有限公司 Mechanism and method for variable cross-section installation of foundation sections of tower crane
CN111186778B (en) * 2020-03-04 2021-06-22 山东中建众力设备租赁有限公司 Mechanism and method for variable cross-section installation of foundation sections of tower crane

Similar Documents

Publication Publication Date Title
CN102839678B (en) Structure for improving rigidity and stability of foundation pit steel support
CN207553318U (en) A kind of anti-displacement constructing structure of wall column reinforcing bar
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN104818729B (en) Can be for the mutual foundation of big or small tower crane conversion
CN204662486U (en) Can for the mutual foundation of size tower crane conversion
CN203768788U (en) Tool type foundation pit soil conveying trestle bridge
CN202755370U (en) Structure for improving rigidity and stability of foundation pit steel support
CN110656723B (en) Rail support for sliding construction of cylindrical arch shell roof
CN105178354B (en) One farming word beam column cap and flatslab construction system
CN102425190A (en) Superposed tower crane foundation
CN203531005U (en) Steel structure combined type tower crane base structure
CN104164889B (en) Demountable tower crane foundation
CN204510215U (en) For the steel platform of foundation pit construction
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN203755171U (en) Bridge back-pulling bearing construction support
CN203701549U (en) High-altitude large-span cantilever formwork
CN106193101A (en) Tower crane steel platform pile foundation and construction method thereof
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN205975995U (en) Cast -in -place concrete floor indent steel tube frame
CN205296206U (en) Tower cane foundation
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction
CN204199691U (en) A kind of handrail formwork for placing structure of spiral stairs
CN103508339B (en) Mobile tower flap seat
CN203347110U (en) Section steel stirrup applied to high-rise building raft foundation construction
CN202644562U (en) Tower crane formed by foundation beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150923

Effective date of abandoning: 20160518

C25 Abandonment of patent right or utility model to avoid double patenting