CN202899156U - Electric power circuit system - Google Patents

Electric power circuit system Download PDF

Info

Publication number
CN202899156U
CN202899156U CN 201220563152 CN201220563152U CN202899156U CN 202899156 U CN202899156 U CN 202899156U CN 201220563152 CN201220563152 CN 201220563152 CN 201220563152 U CN201220563152 U CN 201220563152U CN 202899156 U CN202899156 U CN 202899156U
Authority
CN
China
Prior art keywords
base
power circuit
circuit system
steel tower
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220563152
Other languages
Chinese (zh)
Inventor
曹磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suwen Electric Energy Technology Co ltd
Original Assignee
CHANGZHOU SUWEN ELECTRIC ENERGY SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU SUWEN ELECTRIC ENERGY SCIENCE AND TECHNOLOGY Co Ltd filed Critical CHANGZHOU SUWEN ELECTRIC ENERGY SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN 201220563152 priority Critical patent/CN202899156U/en
Application granted granted Critical
Publication of CN202899156U publication Critical patent/CN202899156U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides an electric power circuit system which comprises a steel tower base. The steel tower base comprises step-type foundation pillars and a base board. The step-type foundation pillars and the base board are used for supporting a steel tower. The step-type foundation pillars are placed on the base board. The step-type foundation pillars and the base board are integrally formed. According to the electric power circuit system, an existing split-step-type base is changed into integral pouring, the difficulty that base sinking appears in areas with poor geology is overcome, economical efficiency is greatly improved compared with a cast-in-place pile base, and the electric power circuit system is convenient to implement and simple in technology.

Description

The power circuit system
Technical field
The utility model relates to a kind of power circuit system.
Background technology
In the circuit engineering construction, the iron tower foundation type of service is to suit measures to local conditions, diversified, generally adopted the split footing foundation, run into relatively poor place, address, the step basis in the circuit emerged in operation sinkage in various degree, when this mainly is larger because of basic stress, the steel tower root is opened to be restricted with the step sole plate and is produced conflict, the area, alluvial plain substantially at topography and geomorphology particularly, earth bearing strength is less, and groundwater table is higher, the area of mud layer depth, large for the iron tower foundation bearing load, no matter be in the city, or in the farmland, countryside, iron tower foundation is to adopt bored pile foundation substantially, but the bored concrete pile foundation construction cost is high, and exploitativeness is also lower.
The utility model content
The technical problems to be solved in the utility model is: in order to solve the base form that does not have a kind of not only economy in the existing iron tower foundation but also can tackle relatively poor geology, the utility model provides a kind of power circuit system, and the form that adopts footing foundation to implement monobloc cast solves the problems referred to above.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of power circuit system, comprise iron tower foundation, described iron tower foundation comprises that described step pilum places on the base plate for the step pilum and the base plate that support steel tower, and described step pilum and base plate are one-body molded.
According to the quantity of steel tower column foot, described step pilum quantity is 4.
The beneficial effects of the utility model are, this power circuit system changes into existing split footing foundation integrated poured, both overcome the difficulty that occurs immerge in the relatively poor area of geology, improve a lot in economy than bored concrete pile foundation again, and implement conveniently, technique is simple.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the structural representation of the utility model power circuit system optimal embodiment.
Among the figure 1, the step pilum, 2, base plate.
The specific embodiment
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, basic structure of the present utility model only is described in a schematic way, so it only show the formation relevant with the utility model.
As shown in Figure 1, the utility model provides a kind of power circuit system, comprise iron tower foundation, iron tower foundation comprises for the step pilum 1 and the base plate 2 that support steel tower, step pilum 1 places on the base plate 2, step pilum 1 is one-body molded with base plate 2, and according to the quantity of steel tower column foot, general step pilum 1 quantity is 4.
The concrete size of iron tower foundation needs to calculate according to the stressing conditions of steel tower.At first be that basic upper load and internal force calculate, the load of steel tower mainly contains the body of the tower wind load, wire acts on load and steel tower deadweight on the steel tower, and wherein the load and the steel tower deadweight that cause of wire is the following seven kinds of load situation that provide according to power specialty:
(1) installation situation I---conducting wire;
(2) installation situation II---lightning conducter is installed;
(3) normal condition I---maximum wind velocity;
(4) normal condition II---regelation;
(5) normal condition III---the lowest temperature;
(6) accident conditions I---disconnected wire;
(7) accident conditions II---disconnected lightning conducter.
When calculating internal force, more than seven kinds of load situation all carry out Load Combination with the steel tower deadweight.Because circuit has seven kinds of different Load Combinations in installation, operation, accident, Gu this will analyze comparison to the Load Combination of every kind of situation, carry out internal force by worst Load Combination and calculate.The internal force that the various Load Combinations of steel tower body of the tower produce all calculates by static method, and the internal force that load passes to basic end face has moment of flexure, horizontal force and vertical force, gets its maximum value as the design internal force on basis.
Iron tower foundation mainly bears uplift force, downforce and horizontal force, therefore, the design on basis at first will be carried out stability calculation, is used for determining the appearance and size on basis, and then the intensity of carrying out the basis calculates, and wherein the stability calculation on basis comprises: on pull out stable, press down stable and topple stable.In stability calculation, we only calculate topple stable.More shallow at relative depth of foundation, under the effect of the power of toppling, do not consider that generally basic moment keeps balance.
After the buried depth of commbined foundations and base plate 2 sizes were determined, we just calculated its overturning moment M, do the time spent in two-way overturning moment, can calculate respectively:
M = ( Q f + G 0 ) × l 2 ≥ K 2 S 0
Wherein
M---overturning moment,
Q f---basis deadweight (kN),
G 0---the gravity (kN) of soil directly over the foundation bed,
L---be parallel to the power S that topples 0 Base plate 2 width (m) of direction,
K 2---the buckling safety factor that topples on considering basis and base plate 2 during native gravity,
S 0---the power of toppling.
When four angles of basic role power steel tower provided, the limit overturning moment that the basis can bear was calculated by following formula:
M = ( Q f + G 0 ) 2 ≥ [ ΣT ( l + h c ) - 2 ΣH ( h + h c ) - ΣN ( l + L ) 2 ]
Wherein
T---act on upper group power (kN) of step pilum 1 end face,
N---act on the downforce (kN) of step pilum 1 end face,
L---be parallel to the power S that topples 0The distance (m) that direction step pilum is 1,
H---act on step pilum 1 end face and be parallel to the power S that topples 0The design level power (kN) of direction,
H---the buried depth (m) on basis,
h c---the height (m) of the above part in step pilum 1 ground,
L---be parallel to the width (m) of the power So direction sole plate 2 that topples.
Take above-mentioned foundation desirable embodiment of the present utility model as enlightenment, by above-mentioned description, the relevant staff can in the scope that does not depart from this utility model technological thought, carry out various change and modification fully.The technical scope of this utility model is not limited to the content on the manual, must determine its technical scope according to the claim scope.

Claims (2)

1. power circuit system, comprise iron tower foundation, it is characterized in that: described iron tower foundation comprises that described step pilum (1) places on the base plate (2) for the step pilum (1) and the base plate (2) that support steel tower, and described step pilum (1) is one-body molded with base plate (2).
2. power circuit as claimed in claim 1 system, it is characterized in that: described step pilum (1) quantity is 4.
CN 201220563152 2012-10-30 2012-10-30 Electric power circuit system Expired - Lifetime CN202899156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220563152 CN202899156U (en) 2012-10-30 2012-10-30 Electric power circuit system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220563152 CN202899156U (en) 2012-10-30 2012-10-30 Electric power circuit system

Publications (1)

Publication Number Publication Date
CN202899156U true CN202899156U (en) 2013-04-24

Family

ID=48119845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220563152 Expired - Lifetime CN202899156U (en) 2012-10-30 2012-10-30 Electric power circuit system

Country Status (1)

Country Link
CN (1) CN202899156U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499501A (en) * 2014-12-08 2015-04-08 国家电网公司 Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499501A (en) * 2014-12-08 2015-04-08 国家电网公司 Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line
CN104499501B (en) * 2014-12-08 2017-02-22 国家电网公司 Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line

Similar Documents

Publication Publication Date Title
CN1995557A (en) Stake-barrel base
CN102828525A (en) Foundation structure of power transmission line tower
CN202117068U (en) Micropile plate-type composite foundation
CN101761090A (en) Space truss multi-barrel base of offshore wind power unit
CN202899156U (en) Electric power circuit system
CN204212177U (en) A kind of double doing in the hole of stand column pile cheats diaphragm wall structure
CN204676585U (en) A kind of transmission line of electricity open caisson Screw Anchor composite foundation
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN203498860U (en) Anchor rod foundation structure with concrete blocks for photovoltaic module brackets
CN205116207U (en) Offshore wind farm fan combined type embedded rock pile basis
CN102995652A (en) Electric power circuit system
CN204125935U (en) A kind of micropore castinplace pile being applicable to solar photovoltaic bracket basis
CN110607801A (en) Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN202689029U (en) Anchor rod foundation of photovoltaic module support
CN110670620A (en) Cast-in-place gravity type suction caisson foundation with wing plates
CN103726505B (en) Offshore wind plant wind turbine foundation
CN202194146U (en) Single-row-pile foundation pit bracing structure
CN201169781Y (en) Cap digging pit structure
CN211257051U (en) Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity
CN201809777U (en) Silently-pressed mini-group-pile foundation for transmission line towers
CN213390202U (en) Combined type polygonal tubular structure fan foundation
CN103362123A (en) Reverse Y-shaped filling pile and construction method thereof
CN203080540U (en) Iron tower foundation of power transmission line
CN203403433U (en) Simple strip foundation arrangement structure of photovoltaic module supports in photovoltaic power station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 213200 Jiangsu city of Changzhou province Wujin Dragon Road Economic Development Zone No. 2

Patentee after: SUWEN ELECTRIC ENERGY TECHNOLOGY CO.,LTD.

Address before: 213200 Jiangsu city of Changzhou province Wujin Dragon Road Economic Development Zone No. 2

Patentee before: CHANGZHOU SUWEN ELECTRIC ENERGY SCIENCE AND TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address

Address after: 213161 No. 3 Changfan Road, Wujin Economic Development Zone, Changzhou City, Jiangsu Province

Patentee after: SUWEN ELECTRIC ENERGY TECHNOLOGY CO.,LTD.

Address before: 213200 No. 2 Tenglong Road, Wujin Economic Development Zone, Changzhou City, Jiangsu Province

Patentee before: SUWEN ELECTRIC ENERGY TECHNOLOGY CO.,LTD.

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20130424

CX01 Expiry of patent term