CN202658532U - Bridge wet joint construction template - Google Patents

Bridge wet joint construction template Download PDF

Info

Publication number
CN202658532U
CN202658532U CN 201220340599 CN201220340599U CN202658532U CN 202658532 U CN202658532 U CN 202658532U CN 201220340599 CN201220340599 CN 201220340599 CN 201220340599 U CN201220340599 U CN 201220340599U CN 202658532 U CN202658532 U CN 202658532U
Authority
CN
China
Prior art keywords
bridge
steel plate
wet joint
template
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220340599
Other languages
Chinese (zh)
Inventor
韩俊
王辅圣
严来章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN 201220340599 priority Critical patent/CN202658532U/en
Application granted granted Critical
Publication of CN202658532U publication Critical patent/CN202658532U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge wet joint construction template, which is characterized in that bearing steel plates which extend outside bridge wing edges in a cantilever type are arranged on the bottom portions of the bridge wing edges by embedding, wherein the bearing steel plates which are arranged on the bridge wing edges on the two sides are commonly lapped and connected with steel plates to form a wet joint template. The bridge wet joint construction template guarantees construction quality and safety, and reduces construction influence to traffic under a bridge at the same time.

Description

The bridge seam construction formwork that wets
Technical field
The utility model relates to the construction formwork of the wet seam of a kind of Bridge Construction device, the particularly overpass bridge such as high-flying highway or railway.
Background technology
After bridge erection, need build wet joint concrete between the adjacent beams body.Since concreting need to be at the bottom of flange of beam branching standing template, the operating personnel does not have the operating space, traditional Support Method formwork erection and suspension method formwork erection are larger to the traffic impact under the bridge, particularly impact is larger when acrossing highway or railway.
Summary of the invention
The utility model is for avoiding the existing weak point of above-mentioned prior art, and a kind of bridge seam construction formwork that wets is provided, and has both satisfied the construction requirement of wet joint concrete between beam, does not also affect traffic under the bridge.
The utility model is that the technical solution problem adopts following technical scheme:
The design feature of the wet seam construction formwork of the utility model bridge is: the bottom on the bridge edge of a wing, be the supporting steel plate that cantilevered extends in the outside on the bridge edge of a wing by pre-buried setting, on the supporting steel plate on the bridge edge of a wing, both sides, jointly set up junction steel plate, form wet joint template.
The design feature of the wet seam construction formwork of the utility model bridge also is: be that side full weld at junction steel plate is connected between described junction steel plate and supporting steel plate.
Compared with the prior art, the utility model beneficial effect is embodied in:
The utility model reduces construction to the impact of traffic under the bridge when guaranteeing construction quality and safety.
Description of drawings
Fig. 1 is the utility model structural representation.
Number in the figure: Bridge 1 flange of beam; 2 wet seams; 3 supporting steel plates; 4 weld seams; 5 junction steel plates.
The specific embodiment
Referring to Fig. 1, the form of structure of the wet seam construction formwork of present embodiment Bridge is: the bottom on the prefabricated bridge edge of a wing 1, utilize drag hook and be the supporting steel plate 3 that cantilevered extends in the outside on the bridge edge of a wing 1 by pre-buried setting, on the supporting steel plate 3 on the bridge edge of a wing, both sides 1, jointly set up junction steel plate 5, form wet joint template with this, continue to finish the construction operation of wet seam 2 at wet joint template, after the construction operation of finishing wet seam 2, junction steel plate 5 is not removed as a kind of permanent structure with supporting steel plate 3; In order to guarantee firm connection, be that the side full weld at junction steel plate 5 is connected between junction steel plate 5 and supporting steel plate 3, form weld seam 4.
Form of structure of the present utility model especially is fit to the wet seam construction of bridge of acrossing highway or railway.

Claims (2)

1. the wet seam construction formwork of a bridge, it is characterized in that the bottom in the bridge edge of a wing (1), be the supporting steel plate (3) that cantilevered extends in the outside on the bridge edge of a wing (1) by pre-buried setting, on the supporting steel plate (3) on the bridge edge of a wing, both sides (1), jointly set up junction steel plate (5), form wet joint template.
2. the wet seam construction formwork of bridge according to claim 1 is characterized in that between described junction steel plate (5) and supporting steel plate (3) it being that side full weld at junction steel plate (5) is connected.
CN 201220340599 2012-07-13 2012-07-13 Bridge wet joint construction template Expired - Fee Related CN202658532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220340599 CN202658532U (en) 2012-07-13 2012-07-13 Bridge wet joint construction template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220340599 CN202658532U (en) 2012-07-13 2012-07-13 Bridge wet joint construction template

Publications (1)

Publication Number Publication Date
CN202658532U true CN202658532U (en) 2013-01-09

Family

ID=47453449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220340599 Expired - Fee Related CN202658532U (en) 2012-07-13 2012-07-13 Bridge wet joint construction template

Country Status (1)

Country Link
CN (1) CN202658532U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510466A (en) * 2013-10-11 2014-01-15 中铁十九局集团有限公司 Wet joint construction method of T-shaped beam bridge floor system
CN105507156A (en) * 2015-12-13 2016-04-20 中铁十九局集团第二工程有限公司 Mounting method of T-beam bridge decking wet joint formwork
CN108643036A (en) * 2018-05-21 2018-10-12 江苏省交通工程集团有限公司 A kind of wet seam construction of prefabricated case beam
CN108755459A (en) * 2018-08-10 2018-11-06 山东交通学院 A kind of compound anti-bend reinforced construction of old Hollow Slab Beam Bridge steel wire rope MPC and construction method
CN110747742A (en) * 2019-09-17 2020-02-04 广东工业大学 Sectional type bridge wet joint construction template and construction method
CN110747741A (en) * 2019-09-17 2020-02-04 广东工业大学 Wet joint construction template and construction method
CN112376400A (en) * 2020-11-07 2021-02-19 厦门中亚联合建设工程有限公司 Wet joint structure of precast concrete beam and construction process thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510466A (en) * 2013-10-11 2014-01-15 中铁十九局集团有限公司 Wet joint construction method of T-shaped beam bridge floor system
CN103510466B (en) * 2013-10-11 2015-07-01 中铁十九局集团有限公司 Wet joint construction method of T-shaped beam bridge floor system
CN105507156A (en) * 2015-12-13 2016-04-20 中铁十九局集团第二工程有限公司 Mounting method of T-beam bridge decking wet joint formwork
CN108643036A (en) * 2018-05-21 2018-10-12 江苏省交通工程集团有限公司 A kind of wet seam construction of prefabricated case beam
CN108755459A (en) * 2018-08-10 2018-11-06 山东交通学院 A kind of compound anti-bend reinforced construction of old Hollow Slab Beam Bridge steel wire rope MPC and construction method
CN110747742A (en) * 2019-09-17 2020-02-04 广东工业大学 Sectional type bridge wet joint construction template and construction method
CN110747741A (en) * 2019-09-17 2020-02-04 广东工业大学 Wet joint construction template and construction method
CN112376400A (en) * 2020-11-07 2021-02-19 厦门中亚联合建设工程有限公司 Wet joint structure of precast concrete beam and construction process thereof

Similar Documents

Publication Publication Date Title
CN202658532U (en) Bridge wet joint construction template
CN204530418U (en) A kind of steel plate combination beam bridge
CN208105050U (en) A kind of wet seam construction formwork of bridge
CN108978499A (en) A kind of oblique pull suspension cable co-operative system bridge erection method
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN103669665A (en) Elevation difference joint construction technology for steel bar truss floor deck construction
CN204804057U (en) Beam column connecting device of prefabricated frame
CN104452581B (en) A kind of cantilever base spiral shell anchor formula comb plate stretching device
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN103806593B (en) A kind of precast concrete
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN104110002A (en) Method for replacing bridge deck slabs of steel truss girder bridge
CN102635070B (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN108867345B (en) Steel bridge invisible bent cap structure capable of saving space under urban bridge and construction method thereof
CN103835232A (en) Bridge deck structure with longitudinal beams and transverse beam combined
CN103741857B (en) U-shaped girder steel and steel bar truss floor support plate floor system
CN104746434A (en) Closure segment formwork system without dismantling outer formwork
CN202831392U (en) Connecting steel component for joint part of steel reinforced concrete laminated beams
CN203475315U (en) Shear pin type bracket support
CN203947419U (en) A kind of high-speed railway bridge pinner template
CN203846402U (en) Steel-concrete superposed beam top plate support-free construction device
CN203583776U (en) Truss structure of reinforced concrete beam
CN204139334U (en) Girder steel and steel column weld temporary connecting structure entirely
CN202913349U (en) Longitudinal-cross beam combined bridge face structure
CN202347665U (en) Connection node constructional member of reinforced concrete beam and steel beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130109

Termination date: 20200713