CN202560097U - Side slope anchoring drill construction device - Google Patents

Side slope anchoring drill construction device Download PDF

Info

Publication number
CN202560097U
CN202560097U CN2012201094962U CN201220109496U CN202560097U CN 202560097 U CN202560097 U CN 202560097U CN 2012201094962 U CN2012201094962 U CN 2012201094962U CN 201220109496 U CN201220109496 U CN 201220109496U CN 202560097 U CN202560097 U CN 202560097U
Authority
CN
China
Prior art keywords
frame
hinged
sledge
supporting
heads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201094962U
Other languages
Chinese (zh)
Inventor
魏星
黄维菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN2012201094962U priority Critical patent/CN202560097U/en
Application granted granted Critical
Publication of CN202560097U publication Critical patent/CN202560097U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a side slope anchoring drill construction device in a rock side slope anchoring project in projects such as road building. The side slope anchoring drill construction device comprises a drilling machine and a sled type frame. Two front sled heads and two rear sled heads are respectively arranged at the front end and the rear end of the frame, a dragging frame is hinged onto the two front sled heads, a lower hinged support is fixed on the front middle portion of the frame, an upper hinged support fixed on a drilling machine channel steel frame is hinged to the lower hinged support through a pin shaft, one end of a supporting rod is hinged to and butts against the drilling machine channel steel frame, the other end of the supporting rod is provided with a plurality of locating holes, a rear support is arranged at the rear end of the frame, a supporting base is arranged at a position on the rear support opposite to the supporting rod, supporting holes are arranged on the supporting base, pin rods penetrate through the locating holes on the supporting rod and supporting holes on the supporting base to support the other end of the supporting rod on the supporting base, and auxiliary cables are tied to the front sled heads and the rear sled heads of the frame respectively. The device is light to move, reduces labor intensity, and can greatly improve working efficiency.

Description

Slope anchorage drilling construction equipment
Technical field
The utility model belongs to engineering field such as build the road, particularly be the construction equipment of the slope anchorage boring in the operation of geotechnical slope anchoring construction.
Background technology
At present domestic building in the mountain area adopts anchorinies to reinforce geotechnical slopes in a large number in the engineerings such as railway, highway.Common form of construction work often before to domatic brill anchor hole, is set up platform with scaffolding pole earlier, and platform is lifted to heavy auger on the platform with anchor pole and domatic fixing then.After boring what a hole, disassemble auger from this platform again, by manual work auger is moved on the next bore position along scaffold again and install and fix, execute again and bore next hole.Its process should guarantee to satisfy corresponding supporting capacity and stable condition with the platform that scaffold is set up, and also will guarantee accurately to install and fix the hole position of auger according to domatic measuring.It is thus clear that this construction operation mode difficulty is big, great in constructing amount, long construction period, cost of production is high.Implementing the manual work that bore operation need be more, and the danger that the constructor is caused is also bigger.In addition, if adopt large-scale special equipment, as use long-armed operation chassis, not only price is very expensive, and its operation height is also limited, surpasses 20 meters and just can't use.So current in the slope anchorage construction, its bore operation is taken a lot of work, and is time-consuming, becomes a big problem that influences anchoring engineering progress and cost.How can easyly, safe and reliable accomplish the anchor hole construction, become the job site greatest requirements.
Summary of the invention
The purpose of the utility model is in order to overcome above deficiency, to provide a kind of mobile light, lower labour intensity, greatly improve operating efficiency, can improving the slope anchorage drilling construction equipment of working security greatly.
The purpose of the utility model realizes like this:
The utility model slope anchorage drilling construction equipment; Comprise boring, Sledge type frame, sledge head, two back sledge heads before the frame front and back end has two respectively, hitch frame are hinged on the frame two preceding sledge heads; Following free bearing is fixed on the frame middle front part; The last free bearing that is fixed on the auger channel-section steel frame is hinged through bearing pin and following free bearing, and support bar one end is hinged and withstand on the auger channel-section steel frame and the other end has several locating holes, and after-poppet is contained in frame rear end; Supporting seat on the position of the relative support bar of after-poppet; Supported hole is arranged on the supporting seat, and pin rod is through in locating hole and the supported hole on the supporting seat on the support bar support bar other end is supported on the supporting seat, is respectively that auxiliary hawser is arranged on the forward and backward sledge head of frame.Relative angle between auger and the frame can be adjusted through support bar; Be through being installed in hoist engine above domatic in construction with the slope anchorage drilling construction equipment of the utility model, from domatic below dilatory to domatic by the boring position of designing mark in advance on.
Above-mentioned forward and backward sledge head is the shape that is upturned respectively, and pin is housed respectively, and auxiliary hawser one end is connected on the pin.Can be from the auxiliary equipment that pulls of four different azimuth, four hawsers both can play the effect in adjustment equipment orientation in dilatory, in bore operation, played the effect of stabilizing equipment again, also played the effect of safety rope simultaneously.
Four jiaos have screw respectively before and after the above-mentioned gantry base, and the lower end of the holdfast that screws with screw on the gantry base is a tip, and screw thread is equipped with locking nut on the holdfast.Holdfast can head into ground in bore operation, the equipment that plays avoids the effect of sliding in bore operation.
The distinguishing feature that rig had of the utility model is: 1) nonirrigated farmland Sledge type structure, overall simple, conveniently moving can be implemented in to draw on the side slope and move through hoist engine.2) the domatic relatively angle of auger drilling rod can realize adjustment as requested, and adjusting range is big.3) make supporting surface with the Sledge type frame, in mobile or drilling construction, good stability is arranged.
The utility model equipment moves light, lowers labour intensity, the saving of labor, saves time and greatly improves operating efficiency, improves working security greatly, and job practices is simple.
Description of drawings
Fig. 1 is an anchoring drilling construction equipment structure chart.
Fig. 2 is support bar and after-poppet johning knot composition.
Fig. 3 is sledge head and holdfast position structure chart.
Fig. 4 is an anchor hole job site sketch map.
Fig. 5 is the job site schematic top plan view.
The specific embodiment
Referring to Fig. 1, Fig. 2, sledge head 5 is hinged with hitch frame 10 before Sledge type frame 8 front ends two.Wirerope 17 1 ends that are wound on the hoist engine 16 tie up to hitch frame 10 middle parts.The middle front part that following free bearing 7 is fixed on frame 8 does, last free bearing 3 is fixed on the auger 1 lower channel steelframe 1-1 of drilling rod 11, and last free bearing 3 realizes that through bearing pin 12 hinge connects with following free bearing 7.After-poppet 4 is fixed on the afterbody of frame 8.Support bar 2 one ends withstand on the rear portion of auger 1 channel-section steel frame with articulated form.Be positioned on the after-poppet 4 at frame rear portion relatively that there is the supporting seat 4-1 that contains supported hole 4-2 the position of support bar 2, a certain locating hole 2-1 and the supported hole on the supporting seat that pin rod 3 inserts several locating holes on the support bars is supported on the support bar other end and realizes certain required angle of formation between auger 1 and the frame 8 on the after-poppet 4.Drill rod box 6 is contained on the gantry base.
Referring to Fig. 3, the holdfast 9 that is distributed in 8 four jiaos of frames is the screw rod of lower end tip, screws in the screw, and the holdfast top can be executed Wrench and made its downward insertion ground or upwards recess ground, through locking nut 14 latched positions.The forward and backward sledge head of 8 liang of frames 5,5-1 are the shape that is upturned, and have groove, are inserted with pin 15, and auxiliary hawser 20 ties up on the pin 15.
Adopt this Sledge type rig to geotechnical slope anchoring construction method such as Fig. 4, shown in Figure 5.The steps include: 1) carry out smooth to the side slope of need anchoring; 2) after the smooth end, on side slope, measure setting-out, mark the boring position; 3) above construction is domatic, below pre-buried some anchoring piles 19; 4) hoist engine 16 is fixed on directly over bore operation domatic; 5) before bore operation, according to anchor hole and domatic between the angle requirement, adjust the angle between auger 1 and the frame 8; 6) start hoist engine 16, hoist engine wirerope 17 is drawn to construction position, hole with slope anchorage drilling construction equipment 18, then the auxiliary hawser 20 on the forward and backward sledge head of slope anchorage drilling construction equipment mid frame is fixed on the anchoring pile 19; 7) after a bore operation finishes, restart hoist engine 16, rig 18 from bottom to top is drawn to another position, hole; 8) after a row bore operation finishes, slope anchorage rig 18 is fallen back on the side slope below, move to position, next column hole again; 9) hoist engine 16 of domatic top is also moved to directly over the position, next column hole; 10) circulation 6), 7), 8), 9) step, finish until all bore operations.
Use this equipment, can realize that auger 1 precisely locatees.Tie up to four auxiliary hawsers 20 on the forward and backward sledge head, in boring procedure, also can play good stabilization equipment.In addition, according to the situation of domatic top, also can consider to let hoist engine 16 holding positions constant, or hoist engine 16 is installed in domatic below, realize traction rig 18 and above domatic boring, install the fixed pulley group additional.
Use this equipment, implement bore operation according to above-mentioned steps, its process can obtain security guarantee well.1) when hoist engine 16 traction rigs 18 go up a slope, above the top, slope, everyone substation both sides of two constructors is arranged, pull the auxiliary hawser 20 that an end ties up to sledge head 5, and hawser 20 is wrapped on the anchoring pile 19 that fixes on the ground, and constantly hawser 20 is tightened up.This hawser 20 can play auxiliary safety effect.2) with rig 18 from the slope when transferring; Hoist engine 16 slowly loosens wirerope 17, simultaneously, stands in ground two constructor's substation both sides, below; Pull the hawser 20 that ties up on the sledge frame afterbody sledge head 5 from the below, make rig 18 return to domatic below.Such operating process does not have safety problem.Equipment can not cause downwards on domatic and roll, and the rollover situation can not occur yet.

Claims (3)

1. slope anchorage drilling construction equipment; Comprise auger (1), Sledge type frame (8); Sledge head (5) and two back sledge heads (5-1) before the frame front and back end has two respectively; Hitch frame (10) is hinged on the frame two preceding sledge heads, and following free bearing (7) is fixed on frame (8) middle front part, and the last free bearing (3) that is fixed on the auger channel-section steel frame (1-1) is hinged through bearing pin (12) and following free bearing (7); Support bar (2) one ends are hinged and withstand on that auger channel-section steel frame (1-1) is gone up and the other end has several locating holes (2-1); After-poppet (4) is contained in frame (8) rear end, on the position of the relative support bar (2) of after-poppet (4) supporting seat (4-1) is arranged, and supported hole (4-2) is arranged on the supporting seat (4-1); Pin rod (13) is through in locating hole and the supported hole on the supporting seat (4-1) on the support bar support bar (2) other end is supported on the supporting seat (4-1), is respectively that auxiliary hawser (20) is arranged on the forward and backward sledge head of frame.
2. slope anchorage drilling construction equipment as claimed in claim 1 is characterized in that forward and backward sledge head (5), (5-1) are the shape that is upturned respectively, and pin (15) is housed respectively, and auxiliary hawser one end is connected on the pin (15).
3. according to claim 1 or claim 2 slope anchorage drilling construction equipment is characterized in that four jiaos have screw respectively before and after frame (8) base, and the lower end of the holdfast (19) that screws with screw on the gantry base is a tip, and the holdfast upper end is with locking nut (14).
CN2012201094962U 2012-03-22 2012-03-22 Side slope anchoring drill construction device Expired - Fee Related CN202560097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201094962U CN202560097U (en) 2012-03-22 2012-03-22 Side slope anchoring drill construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201094962U CN202560097U (en) 2012-03-22 2012-03-22 Side slope anchoring drill construction device

Publications (1)

Publication Number Publication Date
CN202560097U true CN202560097U (en) 2012-11-28

Family

ID=47209762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201094962U Expired - Fee Related CN202560097U (en) 2012-03-22 2012-03-22 Side slope anchoring drill construction device

Country Status (1)

Country Link
CN (1) CN202560097U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587830A (en) * 2012-03-22 2012-07-18 四川大学 Side slope anchoring hole drilling construction equipment and side slope anchoring hole drilling construction method
WO2016154722A1 (en) * 2015-04-03 2016-10-06 Highwahl Inc. Mobile drilling system
CN110241832A (en) * 2019-06-10 2019-09-17 中鼎国际工程有限责任公司 A kind of open-pit slope protection full-automatic anchoring process and equipment
CN112459707A (en) * 2020-11-19 2021-03-09 大连理工大学 Construction method of drilling device for complex high and steep slope

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587830A (en) * 2012-03-22 2012-07-18 四川大学 Side slope anchoring hole drilling construction equipment and side slope anchoring hole drilling construction method
WO2016154722A1 (en) * 2015-04-03 2016-10-06 Highwahl Inc. Mobile drilling system
CN110241832A (en) * 2019-06-10 2019-09-17 中鼎国际工程有限责任公司 A kind of open-pit slope protection full-automatic anchoring process and equipment
CN112459707A (en) * 2020-11-19 2021-03-09 大连理工大学 Construction method of drilling device for complex high and steep slope
CN112459707B (en) * 2020-11-19 2021-09-07 大连理工大学 Construction method of drilling device for complex high and steep slope

Similar Documents

Publication Publication Date Title
CN102587830A (en) Side slope anchoring hole drilling construction equipment and side slope anchoring hole drilling construction method
CN202560097U (en) Side slope anchoring drill construction device
CN113585965B (en) Roadbed high slope anchor rod frame beam movable drilling platform
CN101577403B (en) Flexible earth anchor drilling and taking machine
CN110578476B (en) Slope drilling construction platform
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN203822175U (en) Drilling machine rack
CN111622126A (en) Construction method of high-altitude vertical manned channel in high mountain rock area
CN102561200B (en) Pushing device for bridge erecting machine to pass roadbed and method for bridge erecting machine to pass roadbed
CN103670286A (en) All-dimensional moving base seat for steel pylon composite foundation anchoring drill rig
CN201310102Y (en) Static load test conversion beam
CN108643829B (en) Anchor hole construction method for high slope anchoring
CN103628903B (en) Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
CN205895138U (en) Supplementary utensil of side slope stock frame roof beam drilling
CN110778279A (en) Lifting type synchronous drilling equipment
CN201343705Y (en) Auxiliary device for anchoring rear supporting legs of lower guide beam of bridge-erecting machine
CN202832238U (en) All-dimensional moving base seat for steel pylon composite foundation anchoring drill rig
CN205188965U (en) A guide bracket for side slope treatment equipment
CN205295957U (en) Device of setting a roof beam in place
CN206512706U (en) One kind can tuning it is multi-functional it is middle pick fetch earth plant stake device
CN2219929Y (en) Pressure pile reinforcing device capable of working indoor
CN212656243U (en) Geotechnical engineering slope reinforcing device
CN205062673U8 (en) A kind of bridge construction drilling platform
CN217897902U (en) Supporting bracket for mine roadway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20130322