CN202559206U - Kerb system of road central reserve - Google Patents

Kerb system of road central reserve Download PDF

Info

Publication number
CN202559206U
CN202559206U CN2012201701819U CN201220170181U CN202559206U CN 202559206 U CN202559206 U CN 202559206U CN 2012201701819 U CN2012201701819 U CN 2012201701819U CN 201220170181 U CN201220170181 U CN 201220170181U CN 202559206 U CN202559206 U CN 202559206U
Authority
CN
China
Prior art keywords
road kerb
cushion block
kerb
road
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201701819U
Other languages
Chinese (zh)
Inventor
陈修和
张玉斌
陈为成
马祖桥
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Transport Consulting and Design Institute Co Ltd
Original Assignee
Anhui Transport Consulting and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Transport Consulting and Design Institute Co Ltd filed Critical Anhui Transport Consulting and Design Institute Co Ltd
Priority to CN2012201701819U priority Critical patent/CN202559206U/en
Application granted granted Critical
Publication of CN202559206U publication Critical patent/CN202559206U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a kerb system of a road central reserve. The kerb system comprises a lower base course, an upper base course, kerbs and a subbase course. Cushion blocks are placed between the top face of the lower base course and the side face of the upper base course adjacent with the central reserve, the kerbs are placed in the middle of top faces of the cushion blocks, and side blocks are placed between the top faces of the cushion blocks and the side faces of the kerbs closely adjacent with guardrails. The kerb system of the road central reserve can shorten construction periods of the kerb system of the road central reserve, and reduces pollution on the road base courses in the construction process; and the overall construction and installation are simple, and construction and quality control are convenient.

Description

Highway median strip road kerb system
Technical field
The utility model relates to highway construction field, the road kerb system of particularly a kind of highway median strip.
Background technology
The road kerb at highway median strip place generally is placed on basic unit's end face, is used for separating asphalt surface course with banketing in the median strip, and minimizing earth and muddy water are to the pollution of asphalt surface course, and the lateral support of increase surface layer, are convenient to the compacting of surface layer.Yet adopt the road kerb system of said structure, must wait for that could be directed against the road kerb system after base layer construction finishes constructs.First, incur loss through delay banketing, afforesting the duration of median strip, finally influence the date that highway is open to traffic; Second, adopt the road kerb system of this structure, banketing or polluting basic unit or surface layer during greening construction easily, influence the laying of roadway quality, when duration during anxiety, this contradiction is particularly outstanding.
The utility model content
For overcome the existing structure highway median strip road kerb system construction cycle long, pollute the problem of road base layer easily, the utility model provides a kind of road kerb system of new construction.
The concrete scheme of the utility model is following:
Highway median strip road kerb system; Comprise and go to a grassroots level, attend basic unit, road kerb, subbase; Cushion block is placed in end face and the attend basic unit side folded position adjacent with central partition going to a grassroots level; Road kerb is placed at middle part at the cushion block end face, places lateral mass in cushion block end face and folded position, the road kerb side of next-door neighbour's guardrail.
The cross section of said cushion block is a rectangle, with last basic unit height such as grade.
The material of said cushion block is a concrete.
The material of said lateral mass is cement concrete or mortar.
The useful technique effect of the utility model is:
1, adopt the road kerb system of this structure after; Going to a grassroots level construction finishes the back just can construction cushion block, road kerb; To banket with the greening construction time in advance; Reduce the time of attending basic unit, surface layer and banketing, afforesting crossed construction, but reduction of erection time and minimizing are polluted, the reduction crossed construction is organized difficulty, guarantee the surface construction quality;
2, the caking property of road kerb and cushion block is good than the caking property between road kerb and the last basic unit; And increased side direction in traditional road kerb side and propped up block; Make the stability of road kerb greatly increase, not only help the linear smooth and easy attractive in appearance of road kerb, more help improving the degree of compaction at facing concrete shortcut kerb place; Reduce the rainwater infiltration amount, prolong service life of road surface;
3, the cushion block in the utility model adopts rectangular cross section, not only is beneficial to slding form operation, and when last base layer construction, can serves as a side template, reduces the template installation workload;
4, the unitary construction of the road kerb system of this structure and installation are all comparatively simple, are convenient to construction and quality control.
Description of drawings
Fig. 1 is the cross sectional representation of the utility model.
Fig. 2 is the enlarged drawing of a-quadrant among Fig. 1.
Sequence number among the last figure: road kerb 1, cushion block 2, lateral mass 3, go to a grassroots level 4, surface layer 5, attend basic unit 6, guardrail 7, subbase 8.
The specific embodiment
Below in conjunction with accompanying drawing and practical implementation the utility model is done further to specify.
Embodiment:
Referring to Fig. 1, highway median strip road kerb system comprises and goes to a grassroots level 4, attendes basic unit 6, road kerb 1, subbase 8.
Place cushion block 2 in go to a grassroots level 4 end faces and the folded position, basic unit 6 sides of attending adjacent, place road kerb 1, place lateral mass 3 in cushion block 2 end faces and folded position, road kerb 1 side of next-door neighbour's guardrail 7 at the middle part of cushion block 2 end faces with central partition.
The cross section of cushion block 2 is a rectangle, and with last basic unit 6 height such as grade.The width of cushion block 2 is 1~3 times of road kerb 1 width, can firmly put above that to guarantee road kerb 1.In addition, the material of said cushion block 2 is a concrete.
The cross section of lateral mass 3 is triangle, trapezoidal or rectangle.The material of lateral mass 3 is cement concrete or cement mortar.3 retainings of lateral mass effect prevents that when carrying out the surface layer compacting road kerb 1 is passed and deformed.

Claims (4)

1. highway median strip road kerb system; Comprise and go to a grassroots level, attend basic unit, road kerb, subbase; It is characterized by: cushion block is placed in end face and the attend basic unit side folded position adjacent with central partition going to a grassroots level; Road kerb is placed at middle part at the cushion block end face, places lateral mass in cushion block end face and folded position, the road kerb side of next-door neighbour's guardrail.
2. highway according to claim 1 median strip road kerb system is characterized by: the cross section of said cushion block is a rectangle, with last basic unit height such as grade.
3. highway according to claim 1 median strip road kerb system is characterized by: the material of said cushion block is a concrete.
4. highway according to claim 1 median strip road kerb system is characterized by: the material of said lateral mass is cement concrete or mortar.
CN2012201701819U 2012-04-20 2012-04-20 Kerb system of road central reserve Expired - Lifetime CN202559206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201701819U CN202559206U (en) 2012-04-20 2012-04-20 Kerb system of road central reserve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201701819U CN202559206U (en) 2012-04-20 2012-04-20 Kerb system of road central reserve

Publications (1)

Publication Number Publication Date
CN202559206U true CN202559206U (en) 2012-11-28

Family

ID=47208877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201701819U Expired - Lifetime CN202559206U (en) 2012-04-20 2012-04-20 Kerb system of road central reserve

Country Status (1)

Country Link
CN (1) CN202559206U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103233409A (en) * 2013-04-18 2013-08-07 济南城建集团有限公司 Curbstone mounting construction method
CN104005313A (en) * 2014-06-16 2014-08-27 葛洲坝集团第二工程有限公司 Construction method for asphalt concrete pavement separation zone kerbs
CN104452554A (en) * 2014-12-11 2015-03-25 济南黄河路桥工程公司 Road vertical side stone construction method and vertical side stone back concrete steel mold
CN106012722A (en) * 2016-06-06 2016-10-12 陈俞任 Sponge street
CN108301293A (en) * 2018-02-06 2018-07-20 广州市佑安土木工程有限公司 A kind of construction method of road surface steady layer of water and appurtenant work

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103233409A (en) * 2013-04-18 2013-08-07 济南城建集团有限公司 Curbstone mounting construction method
CN103233409B (en) * 2013-04-18 2016-08-10 济南城建集团有限公司 Vertical along stone construction method of installation
CN104005313A (en) * 2014-06-16 2014-08-27 葛洲坝集团第二工程有限公司 Construction method for asphalt concrete pavement separation zone kerbs
CN104005313B (en) * 2014-06-16 2015-12-02 中国葛洲坝集团第二工程有限公司 Asphalt concrete pavement dividing strip road kerb construction method
CN104452554A (en) * 2014-12-11 2015-03-25 济南黄河路桥工程公司 Road vertical side stone construction method and vertical side stone back concrete steel mold
CN106012722A (en) * 2016-06-06 2016-10-12 陈俞任 Sponge street
CN108301293A (en) * 2018-02-06 2018-07-20 广州市佑安土木工程有限公司 A kind of construction method of road surface steady layer of water and appurtenant work
CN108301293B (en) * 2018-02-06 2020-07-03 广州市佑安土木工程有限公司 Construction method of road surface water stabilization layer and auxiliary engineering

Similar Documents

Publication Publication Date Title
CN202559206U (en) Kerb system of road central reserve
CN202898938U (en) Seepage and drainage combined pavement structure for urban road and landscape road
CN201785689U (en) Large-gap water draining and noise reducing asphalt pavement built by utilizing steel slags
CN203295913U (en) Novel ecological permeable road structure
CN109972475A (en) A kind of ecological permeable paving structure
CN203514144U (en) Asphalt concrete pavement structure for plateau area
CN201678926U (en) Novel combined type water-permeable sidewalk
CN203613426U (en) Groove-shaped embankment structure
CN205804068U (en) Town road structure
CN202220319U (en) Unidirectional water permeable sidewalk base course
CN107794822B (en) Permeable pavement based on sponge city idea
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN102644224A (en) Novel roadbed side slope building protecting method and precast concrete blocks therefor
CN206721596U (en) A kind of pavement structure of permeable road
CN202500068U (en) Road water permeable brick and pavement structure
CN210238171U (en) Pedestrian and vehicle road in park
CN202849886U (en) Concrete slab road surface structure
CN106996063A (en) A kind of pavement structure of permeable road
CN203782491U (en) Water-proof structure for ballastless track railway subgrade surface
CN208762819U (en) Wisdom reservoir catchment system is descended in a kind of city on a large scale
CN202849888U (en) Concrete slab pavement structure
CN208815366U (en) A kind of assembled macrovoid asphalt paving
CN202500209U (en) Brick drainage ditch
CN210596902U (en) Intersection permeable pavement structure
CN218373102U (en) Assembled retaining road surface structure with water purification effect

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ANHUI TRANSPORT CONSULTING + DESIGN INSTITUTE CO.,

Free format text: FORMER NAME: ANHUI TRANSPORTATION CONSULTING + DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 230088 Hefei high tech Zone, Anhui camphor Road, No. 180

Patentee after: ANHUI TRAFFIC PLANNING AND DESIGN INSTITUTE CO., LTD.

Address before: 230088 Hefei high tech Zone, Anhui camphor Road, No. 180

Patentee before: Anhui Communications Consulting & Design Institue

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121128