CN202438683U - Vertical metal powder continuous sintering furnace - Google Patents

Vertical metal powder continuous sintering furnace Download PDF

Info

Publication number
CN202438683U
CN202438683U CN2012200764524U CN201220076452U CN202438683U CN 202438683 U CN202438683 U CN 202438683U CN 2012200764524 U CN2012200764524 U CN 2012200764524U CN 201220076452 U CN201220076452 U CN 201220076452U CN 202438683 U CN202438683 U CN 202438683U
Authority
CN
China
Prior art keywords
pipe
heat
tremie pipe
insulation layer
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012200764524U
Other languages
Chinese (zh)
Inventor
言伟雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FULLAD TECHNOLOGY (ZHUZHOU) Co Ltd
Original Assignee
FULLAD TECHNOLOGY (ZHUZHOU) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FULLAD TECHNOLOGY (ZHUZHOU) Co Ltd filed Critical FULLAD TECHNOLOGY (ZHUZHOU) Co Ltd
Priority to CN2012200764524U priority Critical patent/CN202438683U/en
Application granted granted Critical
Publication of CN202438683U publication Critical patent/CN202438683U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Powder Metallurgy (AREA)

Abstract

The utility model relates to a vertical metal powder continuous sintering furnace which comprises an air inlet pipe, a material conveying pipe, a heat-insulating layer, a discharging pipe, a furnace cover, a heating pipe, a heating cylinder body, an inductive heater and a cooling cylinder body, wherein the heating pipe is arranged in the heating cylinder; and the heat-insulating layer and the inductive heater are sequentially arranged on the outer circumference of the heating pipe. The vertical metal powder continuous sintering furnace is characterized in that due to the adoption of a water-cooled discharging pipe with an interlayer water passing structure, i.e., a cooling water pipe is arranged in a discharging pipe interlayer which is fixedly arranged on a central flange and extends into the interlayer from one side of the discharging pipe; the central hole of the discharging pipe is a discharging channel; and due to the adoption of the water-cooled discharging pipe, the temperature of the central hole of the discharging pipe is reduced and particularly the temperature of an outlet at the bottom of the central hole of the discharging pipe is reduced and further the phenomenon that the discharging of the metal powder is blocked due to the fact that the central hole is blocked by the power attached on the inner wall of the discharging pipe can be effectively prevented, the distance between a discharge opening and a heating area is shortened, the probability of the powder falling and the powder being attached to the inner wall of the heating pipe can be greatly reduced, the casting yield of products is increased and the continuous work time and the service life of the sintering furnace are prolonged.

Description

Vertical metal powder continuous fritting furnace
Technical field
The utility model relates to a kind of vertical metal powder continuous fritting furnace, the particularly a kind of vertical metal powder continuous fritting furnace that can realize continuous, quick alloying technology in powder metallurgy, hard material field to metal mixed material particle.
Technical background
The application of hard material in Surface Engineering is through thermal process technology such as thermal sprayings it to be coated in metal or surface of the work, thereby improves surface abrasion resistance damage, shock resistance, performance such as high temperature resistant, corrosion-resistant, significant prolongation workpiece service life; Also can repair waste and old workpiece, reinforcement, make its recovery or surpass original serviceability, thereby practice thrift a large amount of metal materials and production cost.Therefore the extensive use of hard material is to promoting sustainable economic development, and constructing economical society has important practical significance and far-reaching strategic importance.The thermal spraying metal dust is the hard material that a kind of consumption is maximum, purposes is the widest, also is one of strategic basic material that supports China's modern industry and modern national defense.
Compound powder or the alloy material powder all formed as the thermal spraying metal dust overwhelming majority of hard material by two or more metal materials; Be divided into low form and high temperature modification two big classes by sintering temperature; The low form powder is a kind of multiple metal (or metal+alloy) powder to be tied the compound powder (or composite powder) that obtains with binder low temperature presintering below mixing wet-milling granulations-ungrease treatment-800 ℃; It is multiple metal (or metal+alloy) the powder mixes set of formed particle together (hereinafter to be referred as the compound powder); The combination of compound powder granule interior is a kind of mechanical bond, and granule strength is low, packing is low, apparent density is little; The high temperature modification powder is the alloying powder that low form compound powder is obtained behind high temperature sintering; Alloy powder transfers the adhesion of granule interior to metallurgical binding by mechanical bond; Powder particle intensity, packing and apparent density have been improved; So alloying spraying powder is a kind of high performance hard material.
High temperature sintering is one of key technology of producing alloyed powder, also is the bottleneck technology of the high-quality alloyed powder large-scale production of serious restriction China at present.Traditional alloyed powder preparation technology is: the compound powder is placed on reaches several hours heat in the container, obtain through break process after the cooling again.This traditional handicraft cause powder grain significantly to be grown up, and grain growth will directly influence the anti-wear performance of sprayed coating because heat time heating time is long; On the other hand; Because powder accumulation concentrates heating to cause powder agglomates in container; Must carry out break process, and fragmentation causes powder size skewness, granule-morphology to change, and produces a large amount of oversizes and screenings simultaneously and causes the product casting yield low.
Summary of the invention
The purpose of the utility model is to overcome above-mentioned high-sintering process defective, provide a kind of crystallite dimension relatively stable, can optimize that granule-morphology and performance, casting yield and apparent density are all high, technological process is short, production cost is low, be fit to the vertical metal powder continuous fritting furnace of industrial-scale production.
The technical scheme of the utility model: a kind of vertical metal powder continuous fritting furnace; Comprise air inlet pipe, conveying pipeline, heat-insulation layer, tremie pipe, bell, circular heat-generating pipe, heating cylindrical shell, induction heater, cooling cylindrical shell; Circular heat-generating pipe places heating cylindrical shell center; The heat-generating pipe periphery is provided with tubular type heat-insulation layer and induction heater successively, and corresponding induction heater height position is the thermal treatment zone between the interior cylindrical zone of heat-generating pipe, it is characterized in that:
Described tremie pipe is the water-cooled tremie pipe of flanged (FLGD) cylindrical interlayer water flowing structure; This tremie pipe is fixed on the bell center flange; The centre bore outlet of tremie pipe is stretched in the heat-generating pipe and near position, the thermal treatment zone; The periphery of tremie pipe flange below and bottom end face are with the step heat-insulation layer to coat, and the centre bore of tremie pipe is a blanking channel;
Described band step heat-insulation layer is supported on the upper surface of circular heat-generating pipe through its step; Band step heat-insulation layer upper end is stretched in the bell center flange cover; The lower end is stretched in the heat-generating pipe and near position, the thermal treatment zone, and the center-hole diameter of band step heat-insulation layer bottom is greater than the outlet diameter of the centre bore of tremie pipe;
Be provided with cooling water pipe in the described tremie pipe interlayer; One side ports extend near the interlayer bottom position this cooling water pipe from tremie pipe top; Tremie pipe centre bore upper end is provided with the center surveillance mirror; Tremie pipe top one side is provided with conveying pipeline, and this conveying pipeline gets into from the side with the centre bore of tremie pipe and communicates;
Described bell is provided with the peephole of band surveillance mirror, and this peephole original position is to pass water-cooled tremie pipe flange, bell center flange and band step heat-insulation layer successively;
The another kind of form of the centre bore pelvic outlet plane position of described tremie pipe, this pelvic outlet plane are higher than or put down the upper surface in circular heat-generating pipe, and under this form, the cooling medium in the tremie pipe interlayer can be a water, also can be gas.
This vertical metal powder continuous fritting furnace, overall structure are vertical structure, and sintering furnace comprises bell, heating cylindrical shell, the cooling cylindrical shell that the water-cooled tremie pipe is housed, and the three is stacked with one heart from top to bottom.Circular heat-generating pipe places heating cylindrical shell center, and the heat-generating pipe periphery is provided with heat-insulation layer and induction heater successively, and corresponding inductor height position is the thermal treatment zone between the interior cylindrical zone of heat-generating pipe; Heating cylindrical shell top is provided with bell, and the bell center is provided with the water-cooled tremie pipe; The cooling cylindrical shell is the through-hole type cylinder of band circular cone.Nitrogen or argon gas get into the tremie pipe centre bore and are heated metal dust and mix from air inlet pipe, and order gets into the thermal treatment zone, cooling zone, and the powder that companion sinters discharges out of the furnace from cooling off cylindrical shell bottom discharge mouth.
The production work of this vertical metal powder continuous fritting furnace is made as continuously-running duty; Maximum operation (service) temperature is 2200 ℃; Mode of heating is an eddy-current heating; Be mainly used in the compound metal dust is carried out sintering rapidly, continuously, to obtain crystallite dimension and the metastable high-quality metal of alloying powder of granule-morphology.Sintering furnace is by charging, heating, cooling three parts of arranged concentric are formed from top to bottom.That feeding part is responsible for is controlled, to the thermal treatment zone powder is provided equably; Heating part is responsible for the compound powder is heated rapidly to technological temperature and realizes alloying technology, makes compound become alloyed powder; Cooling segment is responsible for alloyed powder is cooled off fast and sees off outside the stove.
The innovative point of the utility model is: reduce tremie pipe centre bore temperature through adopting water-cooling pattern; Particularly reduce tremie pipe centre bore outlet at bottom temperature; Preventing effectively that powder is bonded on the tremie pipe inwall stops up centre bore and causes the metal dust blanking to be obstructed; Experiment showed, if tremie pipe centre bore temperature is too high, only need several hrs even dozens of minutes tremie pipe to stop up; On the other hand; The tremie pipe discharging opening is stretched into the heat-generating pipe endoporus and near the thermal treatment zone, shortened discharging opening to the distance between the thermal treatment zone, can significantly reduce powder and descend slowly and lightly and be bonded at the ratio on the heat-generating pipe inwall; Improve the product casting yield, prolong sintering furnace stream time and service life.
Production process: add protective gas from the air inlet pipe of top, the thermal treatment zone and the air inlet pipe of below, the thermal treatment zone respectively; Air in the body of heater is discharged out of the furnace, after oxygen content is lower than process value in the affirmation stove, send to body of heater; The thermal treatment zone in the heat-generating pipe begins to heat up; After temperature arrives process value, by feeding mechanism that the compound powder of certain particle size scope is controlled through conveying pipeline, add water-cooled tremie pipe centre bore equably, get into the thermal treatment zone; And fall with the freely falling body mode; In dropping process, be rapidly heated to technological temperature and accomplish alloying technology process (or sintering process), continue to drop to the cooling cylindrical shell of below, the thermal treatment zone then, cool off after cooling cylindrical shell bottom discharge pipe is fallen outside the stove through the thermal treatment zone.Material is controlled by feeding mechanism, continuously, evenly, controllably passes through tremie pipe, the thermal treatment zone, cooling zone and discharge nozzle in proper order, has realized continuous production processes.
Description of drawings
Fig. 1 is the structural representation of this sintering furnace;
The WC-12Co alloy powder stereoscan photograph (100X) that Fig. 2 produces for this sintering furnace;
The WC-12Co alloy powder stereoscan photograph (5000X) that Fig. 3 produces for this sintering furnace;
Among the figure: 1-peephole, 2-bell center flange, 3-cooling water pipe, 4-air inlet pipe, 5-center surveillance mirror; The 6-conveying pipeline, 7-band step heat-insulation layer, 8-tremie pipe, 9-bell; 10-tremie pipe centre bore, the 11-heat-generating pipe, 12-heats cylindrical shell, the 13-thermal treatment zone; 14-tubular type heat-insulation layer, the 15-induction heater, 16-cools off cylindrical shell, 17-air inlet pipe.
The specific embodiment:
Referring to Fig. 1; A kind of vertical metal powder continuous fritting furnace; Comprise air inlet pipe, conveying pipeline 6, heat-insulation layer, tremie pipe 8, bell 9, circular heat-generating pipe 11, heating cylindrical shell 12, induction heater 15, cooling cylindrical shell 16, circular heat-generating pipe 11 places heating cylindrical shell 12 centers, and heat-generating pipe 11 peripheries are provided with tubular type heat-insulation layer 14 and induction heater 15 successively; Corresponding induction heater 15 height positions are the thermal treatment zone 13 between heat-generating pipe 11 interior cylindrical zone, it is characterized in that:
Described tremie pipe 8 is the water-cooled tremie pipe of flanged (FLGD) cylindrical interlayer water flowing structure; This tremie pipe 8 is fixed on the bell center flange 2; The outlet of the centre bore 10 of tremie pipe 8 is stretched in the heat-generating pipe 11 and near 13 positions, the thermal treatment zone; The periphery of tremie pipe 8 flanges below and bottom end face are with step heat-insulation layer 7 to coat, and the centre bore 10 of tremie pipe 8 is a blanking channel;
Described band step heat-insulation layer 7 is supported on the upper surface of circular heat-generating pipe 11 through its step; Band step heat-insulation layer 7 upper ends are stretched in the bell center flange cover; The lower end is stretched in the heat-generating pipe 11 and near 13 positions, the thermal treatment zone, and the center-hole diameter of band step heat-insulation layer 7 bottoms is greater than the outlet diameter of the centre bore 10 of tremie pipe 8;
Be provided with cooling water pipe 3 in described tremie pipe 8 interlayers; One side ports extend near the interlayer bottom position this cooling water pipe 3 from tremie pipe 8 tops; Tremie pipe 8 centre bores 10 upper ends are provided with center surveillance mirror 5; Tremie pipe 8 tops one side is provided with conveying pipeline 6, and this conveying pipeline 6 gets into from the side with the centre bore 10 of tremie pipe 8 and communicates;
Described bell is provided with the peephole 1 of band surveillance mirror, and this peephole 1 original position is to pass water-cooled tremie pipe flange, bell center flange 2 and band step heat-insulation layer 7 successively;
The another kind of form of the pelvic outlet plane position of the centre bore 10 of described tremie pipe 8, this pelvic outlet plane are higher than or put down in the upper surface of circular heat-generating pipe 11, and under this form, the cooling medium in tremie pipe 8 interlayers can be a water, also can be gas.
The bell that water-cooled tremie pipe 8 is housed 9 of this sintering furnace, heating cylindrical shell 12, cooling cylindrical shell 16, the three is stacked with one heart from top to bottom.The interval corresponding inductor of heat-generating pipe 11 center holes 15 height positions are the thermal treatment zone 13; Heating cylindrical shell top is provided with bell 9, and bell 9 centers are provided with water-cooled tremie pipe 8; Cooling cylindrical shell 16 through-hole type cylinders for the band circular cone.
Nitrogen or argon gas get into tremie pipes 8 centre bores and are heated metal dust and mix from air inlet pipe 4, and order gets into the thermal treatment zone, cooling zone, and the powder that companion sinters discharges out of the furnace from cooling off cylindrical shell bottom discharge mouth.
Production process: add protective gas from the air inlet pipe 4 of top, the thermal treatment zone and the air inlet pipe 17 of below, the thermal treatment zone respectively; Air in the body of heater is discharged out of the furnace, after oxygen content is lower than process value in the affirmation stove, send to body of heater; The thermal treatment zone 13 in the heat-generating pipe 11 begins to heat up; After temperature arrives process value, by feeding mechanism that the compound powder of certain particle size scope is 6 controlled through conveying pipeline, add the centre bore 10 of water-cooled tremie pipe 8 equably, get into the thermal treatment zone 13; And fall with the freely falling body mode; In dropping process, be rapidly heated to technological temperature and accomplish the alloying technology process, continue to drop to the cooling cylindrical shell 16 of 13 belows, the thermal treatment zone then, cool off after cooling cylindrical shell 16 bottom discharge pipes are fallen outside the stove through the thermal treatment zone 13.Material is controlled by feeding mechanism, continuously, evenly, controllably passes through tremie pipe, the thermal treatment zone, cooling zone and discharge nozzle in proper order, has realized continuous production processes.
WC-12Co (tungsten carbide-12 cobalt) the alloy powder stereoscan photograph that Fig. 2, Fig. 3 produce for this sintering furnace; Wherein Fig. 2 multiplication factor is 100 times, and Fig. 3 multiplication factor is 5000 times, and photo shows that this powder particle has produced liquid-phase sintering to a certain extent; The surface is closely knit smooth; Pattern more trends towards sphere, the broken phenomenon of not breaking basically, and those broken fine particles have all become sphere; Realized that the granule interior starting powder transfers metallurgical binding to by mechanical bond, formed sintered alloy powder with certain strength character.

Claims (2)

1. vertical metal powder continuous fritting furnace; Comprise air inlet pipe, conveying pipeline (6), heat-insulation layer, tremie pipe (8), bell (9), circular heat-generating pipe (11), heating cylindrical shell (12), induction heater (15), cooling cylindrical shell (16); Circular heat-generating pipe (11) places heating cylindrical shell (12) center; Heat-generating pipe (11) periphery is provided with tubular type heat-insulation layer (14) and induction heater (15) successively; Corresponding induction heater (15) height position is the thermal treatment zone (13) between the interior cylindrical zone of heat-generating pipe (11), it is characterized in that:
Described tremie pipe (8) is the water-cooled tremie pipe of flanged (FLGD) cylindrical interlayer water flowing structure; This tremie pipe (8) is fixed on the bell center flange (2); The outlet of the centre bore (10) of tremie pipe (8) is stretched in the heat-generating pipe (11) and near position, the thermal treatment zone (13); The periphery of tremie pipe (8) flange below and bottom end face are with step heat-insulation layer (7) to coat, and the centre bore (10) of tremie pipe (8) is a blanking channel;
Described band step heat-insulation layer (7) is supported on the upper surface of circular heat-generating pipe (11) through its step; Band step heat-insulation layer (7) upper end is stretched in the bell center flange cover; The lower end is stretched in the heat-generating pipe (11) and near position, the thermal treatment zone (13), and the center-hole diameter of band step heat-insulation layer (7) bottom is greater than the outlet diameter of the centre bore (10) of tremie pipe (8);
Be provided with cooling water pipe (3) in described tremie pipe (8) interlayer; One side ports extend near the interlayer bottom position this cooling water pipe (3) from tremie pipe (8) top; Tremie pipe (8) centre bore (10) upper end is provided with center surveillance mirror (5); Tremie pipe (8) top one side is provided with conveying pipeline (6), and this conveying pipeline (6) gets into from the side with the centre bore (10) of tremie pipe (8) and communicates;
Described bell is provided with the peephole (1) of band surveillance mirror, and this peephole (1) original position is to pass water-cooled tremie pipe flange, bell center flange (2) and band step heat-insulation layer (7) successively;
2. vertical metal powder continuous fritting furnace as claimed in claim 1; Centre bore (10) the pelvic outlet plane position that it is characterized in that described tremie pipe (8) is higher than or puts down in the upper surface of circular heat-generating pipe (11); Under this form; Cooling medium in tremie pipe (8) interlayer can be a water, also can be gas.
CN2012200764524U 2012-03-02 2012-03-02 Vertical metal powder continuous sintering furnace Withdrawn - After Issue CN202438683U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200764524U CN202438683U (en) 2012-03-02 2012-03-02 Vertical metal powder continuous sintering furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200764524U CN202438683U (en) 2012-03-02 2012-03-02 Vertical metal powder continuous sintering furnace

Publications (1)

Publication Number Publication Date
CN202438683U true CN202438683U (en) 2012-09-19

Family

ID=46820138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200764524U Withdrawn - After Issue CN202438683U (en) 2012-03-02 2012-03-02 Vertical metal powder continuous sintering furnace

Country Status (1)

Country Link
CN (1) CN202438683U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102581269A (en) * 2012-03-02 2012-07-18 株洲弗拉德科技有限公司 Vertical continuous sintering furnace for metal powder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102581269A (en) * 2012-03-02 2012-07-18 株洲弗拉德科技有限公司 Vertical continuous sintering furnace for metal powder

Similar Documents

Publication Publication Date Title
CN105689728B (en) A kind of devices and methods therefor producing 3D printing metal alloy spherical powder
CN104607823B (en) A kind of manufacture method of spherical self-melting alloy solder
CN108247072A (en) A kind of method that spherical 3D printing powder is prepared using plasma
KR101426008B1 (en) Multiplex atomization nozzle and manufacturing apparatus of powder for the same
CN107900367B (en) Novel atomizer of titanium and titanium alloy powder for 3D printing
WO2019024421A1 (en) Method for preparing target material and target material
US10654106B2 (en) Process for producing metals and metal alloys using mixing cold hearth
KR102326418B1 (en) Composite material powder with synthetic grains for additive synthesis
CN104475744A (en) Device and method for preparing spherical titanium powder and titanium alloy powder through gas atomization
CN103121105A (en) Method for preparing micro spherical niobium (Nb)-wolfram (W)-molybdenum (Mo)-zirconium (Zr) alloy powder
CN111470481B (en) Method for preparing high-purity aluminum nitride spherical powder by plasma reaction atomization
CN102528016A (en) Powdered alloy steel for metal injection molding and preparation method thereof
CN102248171A (en) Gas atomization method for preparing oxygen supersaturated iron-based alloy powder
CN105568055A (en) Plasma preparing method for titanium-based alloy spherical powder
CN107983965A (en) High-temperature plasma aerosolization superfine spherical metal powder preparation method and equipment
CN107052354B (en) A kind of device and method preparing high sphericity 3D printing refractory metal powder
CN106119663B (en) Intermediate zone inner surface alloy powder, preparation and its coating on cement rotary kiln
CN102554249A (en) Method for preparing tungsten carbide based thermal spraying alloy powder
CN202438683U (en) Vertical metal powder continuous sintering furnace
CN102581269B (en) Vertical continuous sintering furnace for metal powder
CN101912974A (en) Vertical superhigh-temperature continuous balling furnace
CN208178424U (en) The induction atomization of continous way cold crucible prepares titanium valve equipment
CN112658271A (en) Efficient composite gas atomization powder preparation device and method
CN1274445C (en) Atomizing formation apparatus for producing spherical casting WC powder
CN201735799U (en) Vertical extra-high temperature continuous spheroidizing furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120919

Effective date of abandoning: 20130515

RGAV Abandon patent right to avoid regrant