CN202416940U - Integrated steel-structure three-dimension parking lot - Google Patents

Integrated steel-structure three-dimension parking lot Download PDF

Info

Publication number
CN202416940U
CN202416940U CN2011205217401U CN201120521740U CN202416940U CN 202416940 U CN202416940 U CN 202416940U CN 2011205217401 U CN2011205217401 U CN 2011205217401U CN 201120521740 U CN201120521740 U CN 201120521740U CN 202416940 U CN202416940 U CN 202416940U
Authority
CN
China
Prior art keywords
ramp
landing
parking
abutment
support post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205217401U
Other languages
Chinese (zh)
Inventor
刘金国
刘园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011205217401U priority Critical patent/CN202416940U/en
Application granted granted Critical
Publication of CN202416940U publication Critical patent/CN202416940U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides an integrated steel-structure three-dimension parking lot which comprises an uplink ramp, supporting columns, a parking platform, guardrails, a downlink ramp, sidewalks and a connection bridge. The parking lot is in a steel structure integrally; the parking platform is supported and fixed by the supporting columns; two ends of the parking platform are provided with the uplink ramp and the downlink ramp respectively; two sides of the parking platform are provided with the sidewalks; the connection bridge is movably connected between the sidewalks and the parking platform; and the sides of the parking platform, the uplink ramp, the downlink ramp and the sidewalks are provided with the guardrails. The integrated steel-structure three-dimension parking lot has the advantages of simple structure, convenience of construction, less investment, large parking amount and flexible construction site.

Description

Integral steel structure sky parking
Affiliated technical field
The utility model relates to a kind of steel work monolithic architecture thing.
Background technology
Because the full amount of having of car is big, it is difficult to stop in the downtown area, and the needs of parking can not be satisfied in existing parking lot; Building the underground parking receives the geological conditions restriction many; And investment is big, and building surface parking lots needs a large amount of soils, becomes the difficult problem of urban municipal construction work.
The utility model content
The purpose of the utility model is to avoid the deficiency of prior art and a kind of integral steel structure sky parking is provided, and can build above the urban road, above the public land of sub-district etc., does not influence traffic, does not influence the use of ground installation.
The technical scheme that the utility model adopted is: integral steel structure sky parking; Comprise up-ramp, support post, landing, protect block, down ramp, pavement and connect bridge; Integral body is steel work; Landing is by the support post support fixation, and the two ends of landing are provided with up-ramp and down ramp, and the both sides of landing are provided with the pavement; The bridge that is connected for flexibly connecting between pavement and the landing, landing, up-ramp, down ramp and pavement side are provided with to protect and block.
Landing, up-ramp, down ramp are formed by connecting in bridge arch, abutment, and bridge arch is a seamless steel pipe, and abutment is a steel plate, protect block with abutment between for set bolt is connected, for buckle is connected, be connected for flange between bridge arch and the support post between bridge arch and the abutment; The support post bottom is fixed with and is embedded in underground base plate.
Be covered with rubber layer on up-ramp and the down ramp, rubber layer is provided with the ice-melt heater.
Compared with prior art, the utility model has the advantages that: 1, simple in structure, easy construction, small investment, parking capacity is big, builds flexibly locally, can thoroughly solve the difficult problem of city parking; 2, the parking lot is an integral design, and adopts being connected of ground movablely, has solved the problem of expanding with heat and contract with cold of steel work; 3, up and down ramp is provided with heater, and is covered with rubber layer, even also there is not up, descending vehicle problem of slip in winter.
Description of drawings
Fig. 1 is the sectional structure sketch map of the utility model.
Fig. 2 is the embodiment sectional structure sketch map of the utility model.
Fig. 3 is the main part syndeton sketch map of the utility model.
Fig. 4 is the schematic top plan view of the utility model.
Among the figure: among the figure: 1 is up-ramp, and 2 is support post, and 3 is landing, and 4 block for protecting, and 5 is base plate, and 6 is the pavement, and 7 is set bolt, and 8 is bridge arch, and 9 is buckle, and 10 is flange, and 11 is down ramp, and 12 is the parking space, and 13 for connecting bridge, and 14 is abutment.
The specific embodiment
Specify the embodiment of the utility model below in conjunction with accompanying drawing.
Embodiment 1:
Integral steel structure sky parking builds above urban road, and overpass is set.Integral steel structure sky parking; Comprise up-ramp 1, support post 2, landing 3, protect block 4, down ramp 11, pavement 6 and connect bridge 13; It is characterized in that the whole steel work that is; Landing 3 is by support post 2 support fixation, and the two ends of landing 3 are provided with up-ramp 1 and down ramp 11, and the both sides of landing 3 are provided with pavement 6; Be connected bridge 13 for what flexibly connect between pavement 6 and the landing 3, landing 3, up-ramp 1, down ramp 11 and pavement 6 sides are provided with to protect and block 4.
Landing 3, up-ramp 1, down ramp 11 are formed by connecting in bridge arch 8, abutment 14; Bridge arch 8 is a seamless steel pipe; Abutment 14 is a steel plate; Protect block 4 with abutment 14 between be connected for set bolt 7, be connected for buckle 9 between bridge arch 8 and the abutment 14, be connected for flange 10 between bridge arch 8 and the support post 2; Support post 2 bottoms are fixed with and are embedded in underground base plate 5.
Be covered with rubber layer on up-ramp 1 and the down ramp 11, rubber layer is provided with the ice-melt heater.
Embodiment 2:
Integral steel structure sky parking builds above sub-district transformer station, heat exchange station and other communal facilities.Integral steel structure sky parking; Comprise up-ramp 1, support post 2, landing 3, protect block 4, down ramp 11; Its integral body is steel work; Landing 3 is by support post 2 support fixation, and the two ends of landing 3 are provided with up-ramp 1 and down ramp 11, landing 3, up-ramp 1, and down ramp 11 sides be provided with to protect and block 4.
Landing 3, up-ramp 1, down ramp 11 are formed by connecting in bridge arch 8, abutment 14; Bridge arch 8 is a seamless steel pipe; Abutment 14 is a steel plate; Protect block 4 with abutment 14 between be connected for set bolt 7, be connected for buckle 9 between bridge arch 8 and the abutment 14, be connected for flange 10 between bridge arch 8 and the support post 2; Support post 2 bottoms are fixed with and are embedded in underground base plate 5.
Be covered with rubber layer on up-ramp 1 and the down ramp 11, rubber layer is provided with the ice-melt heater.

Claims (3)

1. integral steel structure sky parking; Comprise up-ramp, support post, landing, protect block, down ramp, pavement and connect bridge, it is characterized in that the whole steel work that is, landing is by the support post support fixation; The two ends of landing are provided with up-ramp and down ramp; The both sides of landing are provided with the pavement, the bridge that is connected for flexibly connecting between pavement and the landing, and landing, up-ramp, down ramp and pavement side are provided with to protect and block.
2. integral steel structure according to claim 1 sky parking; It is characterized in that landing, up-ramp, down ramp are formed by connecting in bridge arch, abutment; Bridge arch is a seamless steel pipe, and abutment is a steel plate, protect block with abutment between be connected for set bolt; For buckle is connected, be connected for flange between bridge arch and the support post between bridge arch and the abutment; The support post bottom is fixed with and is embedded in underground base plate.
3. integral steel structure according to claim 1 sky parking is characterized in that being covered with rubber layer on up-ramp and the down ramp, and rubber layer is provided with the ice-melt heater.
CN2011205217401U 2011-12-14 2011-12-14 Integrated steel-structure three-dimension parking lot Expired - Fee Related CN202416940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205217401U CN202416940U (en) 2011-12-14 2011-12-14 Integrated steel-structure three-dimension parking lot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205217401U CN202416940U (en) 2011-12-14 2011-12-14 Integrated steel-structure three-dimension parking lot

Publications (1)

Publication Number Publication Date
CN202416940U true CN202416940U (en) 2012-09-05

Family

ID=46741716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205217401U Expired - Fee Related CN202416940U (en) 2011-12-14 2011-12-14 Integrated steel-structure three-dimension parking lot

Country Status (1)

Country Link
CN (1) CN202416940U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161329A (en) * 2013-04-18 2013-06-19 东南大学 Straight-moving self-walking movable three-dimensional garage
CN105464425A (en) * 2015-12-01 2016-04-06 先源开 Space combined type steel structure parking lot

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161329A (en) * 2013-04-18 2013-06-19 东南大学 Straight-moving self-walking movable three-dimensional garage
CN105464425A (en) * 2015-12-01 2016-04-06 先源开 Space combined type steel structure parking lot

Similar Documents

Publication Publication Date Title
CN202898938U (en) Seepage and drainage combined pavement structure for urban road and landscape road
WO2014015739A1 (en) Inspection well apparatus resistant to differential settlement and method of constructing same
CN202416940U (en) Integrated steel-structure three-dimension parking lot
CN205893896U (en) But road of fast assembly construction
CN101311413A (en) Process for using underground passage combined with roads on ground as passage of trolley bus
CN202227749U (en) Underground automatic parking area for track traffic
CN2913433Y (en) Tridimensional traffic lines and elevated track utilizing road middle and edge space
CN201610649U (en) Ground network type integrated road bridge parking platform made of irons
CN214783250U (en) Station room and inter-bridge deformation joint drainage structure
CN202767112U (en) Differential settlement resistant inspection well device
CN209368600U (en) Modern tram railway roadbed
CN201574605U (en) Double-layer parking platform
CN110846964B (en) Construction method of municipal soft soil roadbed
CN106677207A (en) Staggered type underground traffic pipe gallery car entrance and exit structure
CN202072999U (en) Integral type steel structure flyover
CN101372825A (en) Method for using underground passage combined with ground road as trolley bus passage
CN215829178U (en) Ditch-crossing traffic device capable of being installed quickly
CN106758782B (en) Structure capable of reducing horizontal acting force at end part of bridge abutment butt strap
CN207047681U (en) Bridge assembly
CN202194061U (en) Combined bridge
CN212582334U (en) Assembled waterlogging-prevention, drainage and collision-prevention road isolation pier
CN205115951U (en) Porous pavement that can be used to driveway
CN106193697B (en) Road parking system
CN204825611U (en) Stereo garage based on overpass
CN221320651U (en) Water permeability road structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20181214

CF01 Termination of patent right due to non-payment of annual fee