CN202370544U - Installation equipment for back-stick type waterstop for tunnel construction joint - Google Patents
Installation equipment for back-stick type waterstop for tunnel construction joint Download PDFInfo
- Publication number
- CN202370544U CN202370544U CN2011204995538U CN201120499553U CN202370544U CN 202370544 U CN202370544 U CN 202370544U CN 2011204995538 U CN2011204995538 U CN 2011204995538U CN 201120499553 U CN201120499553 U CN 201120499553U CN 202370544 U CN202370544 U CN 202370544U
- Authority
- CN
- China
- Prior art keywords
- supporting plate
- down supporting
- tunnel
- lifting
- waterstop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses installation equipment for a back-stick type waterstop for a tunnel construction joint. The installation equipment comprises an end template, a lifting device 1, a lifting device 2 and a lifting device 3, wherein the lifting device 2 is positioned in the middle of the top of a tunnel; the lifting device 1 comprises a lifting support plate 1, a lifting screw 1 and a connecting block 1; the lifting device 2 comprises a lifting support plate 1, a lifting screw 2 and a connecting block 2; the lifting device 3 comprises a lifting support plate 3, a lifting screw 3 and a connecting block 3; the upper part of a top plate 1 is pressed against the top of the tunnel; two ends of the lower parts of the top plate 1 are respectively connected with the lifting support plate 1 and the lifting support plate 2 and pressed against the upper surface of the waterstop; the upper part of a top plate 2 is pressed against the top of the tunnel; and two ends of the lower part of the top plate 2 are respectively connected with the lifting support plate 2 and the lifting support plate 3 and pressed against the upper surface of the waterstop. The installation equipment for the back-stick type waterstop for the tunnel construction joint solves the problem that concrete at the periphery of the back-stick type waterstop on the top of the tunnel is hardly compact, and the waterproof effect of the back-stick type waterstop is improved.
Description
Technical field
The utility model relates to a kind of erection equipment of waterstop, particularly relates to a kind of construction joint of tunnel back sticking type waterstop erection equipment.
Background technology
The percolating water of tunnel and underground construction mainly occurs on the constuction joint (comprising shrinkage joint and settlement joint).Constuction joint mainly relies on the waterstop waterproof that is provided with along seam.The constuction joint sealing has two big types, promptly middle buried water stop and back sticking type waterstop.Usually, middle buried water stop inconvenient installation is owing to the installation quality existing problems cause the constuction joint seepage; The back sticking type waterstop is easy for installation, but is difficult for the closely knit constuction joint percolating water that also often causes at tunnel top because of the waterstop surrounding concrete.If can solve back sticking type waterstop density problem around tunnel top, the back sticking type waterstop then has a good application prospect.
The utility model content
The purpose of the utility model is to overcome above-mentioned deficiency of the prior art, and a kind of construction joint of tunnel back sticking type waterstop erection equipment is provided.This construction joint of tunnel back sticking type waterstop erection equipment is when keeping back sticking type waterstop easy mounting advantage; Solved at tunnel top back sticking type waterstop surrounding concrete and be difficult for closely knit problem; Thereby improve the waterproof effect of back sticking type waterstop, be convenient to promote the use of.
For realizing above-mentioned purpose; The technical scheme that the utility model adopts is: construction joint of tunnel back sticking type waterstop erection equipment; Comprise that the upper end is connected to the termination template of waterstop soffit; It is characterized in that: comprise the lifting gear one, lifting gear two and the lifting gear three that are positioned at lining concrete regional end to be poured and lay along the waterstop bearing of trend; Said lifting gear two is positioned at the middle part of tunnel top; Said lifting gear one is positioned at a side of lifting gear two, and said lifting gear three is positioned at the opposite side of lifting gear two, and said lifting gear one comprises up-down supporting plate one, the lifting screw one that is connected with up-down supporting plate one and the contiguous block one that supplies lifting screw one to pass; Said lifting screw one is threaded with contiguous block one; Said lifting gear two comprises up-down supporting plate two, the lifting screw two that is connected with up-down supporting plate two and the contiguous block two that supplies lifting screw two to pass, and said lifting screw two is threaded with contiguous block two, and said lifting gear three comprises up-down supporting plate three, the lifting screw three that is connected with up-down supporting plate three and the contiguous block three that supplies lifting screw three to pass; Said lifting screw three is threaded with contiguous block three; Said contiguous block one, contiguous block two and contiguous block three are installed on the termination steelframe of working jumbo for tunnel lining, are provided with top board one between said up-down supporting plate one and the up-down supporting plate two, and the top of said top board one is connected to tunnel top; The two ends of said top board one bottom are connected and are connected to the upper surface of waterstop respectively with up-down supporting plate one and up-down supporting plate two; Be provided with top board two between said up-down supporting plate two and the up-down supporting plate three, the top of said top board two is connected to tunnel top, and the two ends of said top board two bottoms are connected and are connected to the upper surface of waterstop respectively with up-down supporting plate two and up-down supporting plate three.
Above-mentioned construction joint of tunnel back sticking type waterstop erection equipment is characterized in that: the cross section of said up-down supporting plate one, up-down supporting plate two and up-down supporting plate three all is " L " type.
Above-mentioned construction joint of tunnel back sticking type waterstop erection equipment is characterized in that: the lower end of said lifting screw one, lifting screw two and lifting screw three all is connected with rotary handle.
Above-mentioned construction joint of tunnel back sticking type waterstop erection equipment is characterized in that: said top board one and top board two are processed by plank.
Above-mentioned construction joint of tunnel back sticking type waterstop erection equipment, it is characterized in that: said lifting gear two is positioned at the center of tunnel top, and said lifting gear one is symmetrical about the center line of tunnel top with lifting gear three.
The utility model compared with prior art has the following advantages:
1, the utility model is simple in structure, and novel and reasonable design is easy to install.
2, the utility model is provided with lifting gear one, lifting gear two, lifting gear three and top board one and top board two; When concreting; Reserve the distance between waterstop and the tunnel top through top board one and top board two; Increased the concreting thickness between waterstop and the tunnel top, effectively solved at tunnel top back sticking type waterstop surrounding concrete and be difficult for closely knit problem.
3, the cross section of the said up-down supporting plate of the utility model one, up-down supporting plate two and up-down supporting plate three all is " L " type, has strengthened being connected of up-down supporting plate one, up-down supporting plate two and up-down supporting plate three and top board one and top board two.
4, the said lifting gear two of the utility model is positioned at the center of tunnel top, and said lifting gear one is symmetrical about the center line of tunnel top with lifting gear three, can better position waterstop, has improved efficiency of construction.
5, the realization cost of the utility model is low, and result of use is good, is convenient to promote the use of.
In sum, the utility model is simple in structure, novel and reasonable design; Functional reliability is high; Long service life, this construction joint of tunnel back sticking type waterstop erection equipment have solved at tunnel top back sticking type waterstop surrounding concrete and have been difficult for closely knit problem when keeping back sticking type waterstop easy mounting advantage; Thereby improve the waterproof effect of back sticking type waterstop, be convenient to promote the use of.
Through accompanying drawing and embodiment, the technical scheme of the utility model is done further detailed description below.
Description of drawings
Fig. 1 is the overall structure sketch map of the utility model.
Fig. 2 is an A-A profile among Fig. 1.
Description of reference numerals:
The specific embodiment
A kind of construction joint of tunnel back sticking type waterstop erection equipment as depicted in figs. 1 and 2; Comprise that the upper end is connected to the termination template 15 of waterstop 19 soffits; Comprise the lifting gear one, lifting gear two and the lifting gear three that are positioned at lining concrete regional 18 ends to be poured and lay along waterstop 19 bearing of trends; Said lifting gear two is positioned at the middle part of tunnel top 11; Said lifting gear one is positioned at a side of lifting gear two; Said lifting gear three is positioned at the opposite side of lifting gear two; Said lifting gear one comprises up-down supporting plate 1, the lifting screw 1 that is connected with up-down supporting plate 1 and the contiguous block 1 that supplies lifting screw 1 to pass, and said lifting screw 1 is threaded with contiguous block 1, and said lifting gear two comprises up-down supporting plate 2 13, the lifting screw 27 that is connected with up-down supporting plate 2 13 and the contiguous block 26 that supplies lifting screw 27 to pass; Said lifting screw 27 is threaded with contiguous block 26; Said lifting gear three comprises up-down supporting plate 3 10, the lifting screw 39 that is connected with up-down supporting plate 3 10 and the contiguous block 38 that supplies lifting screw 39 to pass, and said lifting screw 39 is threaded with contiguous block 38, and said contiguous block 1, contiguous block 26 and contiguous block 38 are installed on the termination steelframe 4 of working jumbo for tunnel lining; Be provided with top board 1 between said up-down supporting plate 1 and the up-down supporting plate 2 13; The top of said top board 1 is connected to tunnel top 11, and the two ends of said top board one 5 bottoms are connected and are connected to the upper surface of waterstop 19 respectively with up-down supporting plate 1 and up-down supporting plate 2 13, be provided with top board 2 12 between said up-down supporting plate 2 13 and the up-down supporting plate 3 10; The top of said top board 2 12 is connected to tunnel top 11, and the two ends of said top board 2 12 bottoms are connected and are connected to the upper surface of waterstop 19 respectively with up-down supporting plate 2 13 and up-down supporting plate 3 10.
During use, after the lining concrete formwork jumbo was in place, rotation and lifting screw rod 1, lifting screw 27 and lifting screw 39 made it drive up-down supporting plate 1, up-down supporting plate 2 13 and up-down supporting plate 3 10 respectively and rise.When waiting that supporting plate 1, up-down supporting plate 2 13 and up-down supporting plate 3 10 are near tunnel top 11; Top board 1 is installed between up-down supporting plate 1 and the up-down supporting plate 2 13; Top board 2 12 is installed between up-down supporting plate 2 13 and the up-down supporting plate 3 10; And then the lifting screw 1 of screwing, lifting screw 27 and lifting screw 39; With termination template 15 upper surface of waterstop 19 is connected to the soffit of top board 1 and top board 2 12 then, after this utilizes 16 steel forms 17 of template steelframe, and build lining concrete at lining concrete to be poured regional 18.Owing to use the said construction joint of tunnel back sticking type of the utility model waterstop erection equipment, be embedded in the certain degree of depth of concrete at tunnel top 11 back sticking type waterstops 19, make waterstop 19 concrete on every side closely knit easily.Lining cutting termination template 15 method for dismounting are identical with routine; After just termination template 15 has been torn open, the supporting plate that respectively goes up and down be need screw off, top board 1 and top board 2 12 taken off; Both keep the easy-to-install advantage of back sticking type waterstop, obtained the waterproof effect of middle buried water stop at tunnel top 11 again.Have in the tunnel under the supporting condition of bow member supporting or shaping rule, utilize the utility model to carry out the back sticking type waterstop impermeability that can make things convenient for constructing tunnel and improve constuction joint is installed.
As shown in Figure 2; The cross section of said up-down supporting plate 1, up-down supporting plate 2 13 and up-down supporting plate 3 10 all is " L " type; Can realize like this top board 1 and top board 2 12 are better located, strengthen being connected of up-down supporting plate 1, up-down supporting plate 2 13 and up-down supporting plate 3 10 and top board 1 and top board 2 12.The lower end of said lifting screw 1, lifting screw 27 and lifting screw 39 all is connected with rotary handle 14.Said top board 1 and top board 2 12 are processed by plank.
As shown in Figure 1, said lifting gear two is positioned at the center of tunnel top 11, and said lifting gear one is symmetrical about the center line of tunnel top 11 with lifting gear three.
The above; It only is the preferred embodiment of the utility model; Be not that the utility model is done any restriction; Every according to the utility model technical spirit to any simple modification, change and equivalent structure transformation that above embodiment did, all still belong in the protection domain of the utility model technical scheme.
Claims (5)
1. construction joint of tunnel back sticking type waterstop erection equipment; Comprise that the upper end is connected to the termination template (15) of waterstop (19) soffit; It is characterized in that: comprise the lifting gear one, lifting gear two and the lifting gear three that are positioned at (18) end, lining concrete zone to be poured and lay along waterstop (19) bearing of trend; Said lifting gear two is positioned at the middle part of tunnel top (11); Said lifting gear one is positioned at a side of lifting gear two; Said lifting gear three is positioned at the opposite side of lifting gear two; Said lifting gear one comprises up-down supporting plate one (1), the lifting screw one (2) that is connected with up-down supporting plate one (1) and the contiguous block one (3) that supplies lifting screw one (2) to pass; Said lifting screw one (2) is threaded with contiguous block one (3); Said lifting gear two comprises up-down supporting plate two (13), the lifting screw two (7) that is connected with up-down supporting plate two (13) and the contiguous block two (6) that supplies lifting screw two (7) to pass, and said lifting screw two (7) is threaded with contiguous block two (6), and said lifting gear three comprises up-down supporting plate three (10), the lifting screw three (9) that is connected with up-down supporting plate three (10) and the contiguous block three (8) that supplies lifting screw three (9) to pass; Said lifting screw three (9) is threaded with contiguous block three (8); Said contiguous block one (3), contiguous block two (6) and contiguous block three (8) are installed on the termination steelframe (4) of working jumbo for tunnel lining, are provided with top board one (5) between said up-down supporting plate one (1) and the up-down supporting plate two (13), and the top of said top board one (5) is connected to tunnel top (11); The two ends of said top board one (5) bottom are connected and are connected to the upper surface of waterstop (19) respectively with up-down supporting plate one (1) and up-down supporting plate two (13); Be provided with top board two (12) between said up-down supporting plate two (13) and the up-down supporting plate three (10), the top of said top board two (12) is connected to tunnel top (11), and the two ends of said top board two (12) bottoms are connected and are connected to the upper surface of waterstop (19) respectively with up-down supporting plate two (13) and up-down supporting plate three (10).
2. construction joint of tunnel back sticking type waterstop erection equipment according to claim 1 is characterized in that: said up-down supporting plate one (1), up-down supporting plate two (13) and up-down supporting plate three (10) cross sections all are " L " type.
3. construction joint of tunnel back sticking type waterstop erection equipment according to claim 1 and 2 is characterized in that: the lower end of said lifting screw one (2), lifting screw two (7) and lifting screw three (9) all is connected with rotary handle (14).
4. construction joint of tunnel back sticking type waterstop erection equipment according to claim 1 and 2 is characterized in that: said top board one (5) and top board two (12) are processed by plank.
5. construction joint of tunnel back sticking type waterstop erection equipment according to claim 1 and 2, it is characterized in that: said lifting gear two is positioned at the center of tunnel top (11), and said lifting gear one is symmetrical about the center line of tunnel top with lifting gear three.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204995538U CN202370544U (en) | 2011-12-03 | 2011-12-03 | Installation equipment for back-stick type waterstop for tunnel construction joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204995538U CN202370544U (en) | 2011-12-03 | 2011-12-03 | Installation equipment for back-stick type waterstop for tunnel construction joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202370544U true CN202370544U (en) | 2012-08-08 |
Family
ID=46594250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204995538U Expired - Fee Related CN202370544U (en) | 2011-12-03 | 2011-12-03 | Installation equipment for back-stick type waterstop for tunnel construction joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202370544U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102367735A (en) * | 2011-12-03 | 2012-03-07 | 长安大学 | Back-to-back waterstop installation equipment for tunnel construction joint |
CN107035388A (en) * | 2017-05-19 | 2017-08-11 | 四川皓德斯新材料科技有限公司 | A kind of tunnel double-lining compounded rubber lifting locking plug template and its application method |
CN107060828A (en) * | 2017-05-19 | 2017-08-18 | 四川皓德斯新材料科技有限公司 | A kind of flexible bulkhead of compounded rubber vertical rod and its application method |
-
2011
- 2011-12-03 CN CN2011204995538U patent/CN202370544U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102367735A (en) * | 2011-12-03 | 2012-03-07 | 长安大学 | Back-to-back waterstop installation equipment for tunnel construction joint |
CN102367735B (en) * | 2011-12-03 | 2013-09-11 | 长安大学 | Back-to-back waterstop installation equipment for tunnel construction joint |
CN107035388A (en) * | 2017-05-19 | 2017-08-11 | 四川皓德斯新材料科技有限公司 | A kind of tunnel double-lining compounded rubber lifting locking plug template and its application method |
CN107060828A (en) * | 2017-05-19 | 2017-08-18 | 四川皓德斯新材料科技有限公司 | A kind of flexible bulkhead of compounded rubber vertical rod and its application method |
CN107060828B (en) * | 2017-05-19 | 2023-07-18 | 四川皓德斯新材料科技有限公司 | Composite rubber vertical rod telescopic plug board and use method thereof |
CN107035388B (en) * | 2017-05-19 | 2023-07-18 | 四川皓德斯新材料科技有限公司 | Tunnel secondary lining composite rubber lifting plug template and application method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204266220U (en) | A kind of plugging device of precipitation well in foundation pit | |
CN103114643B (en) | Large-caliber drainage pipeline construction assembly and construction method thereof | |
CN205530344U (en) | Utility tunnel is pour to split type no mould | |
CN102367735B (en) | Back-to-back waterstop installation equipment for tunnel construction joint | |
CN202370544U (en) | Installation equipment for back-stick type waterstop for tunnel construction joint | |
CN204023628U (en) | A kind of water-stopping structure | |
CN105971007A (en) | Split type non-formwork pouring underground comprehensive pipe gallery | |
CN201045214Y (en) | Special-shaped concrete drain pipe | |
CN205171502U (en) | Device is flowed in lap guard of underground continuous wall flexible rubber hose formula | |
CN204662506U (en) | A kind of cable communication well | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
CN204370466U (en) | A kind of jacket offshore wind turbine foundation with bracket | |
CN208777690U (en) | A kind of reserved floor sealing hole template component of drainage pipeline | |
CN203367936U (en) | Cable trench | |
CN202689053U (en) | Water proof structure of basement expansion joint | |
CN204941552U (en) | A kind of subway station of parallel shield method enlarging construction | |
CN209874074U (en) | Porous inclined plane slip casting embedded pipe | |
CN204418670U (en) | The sealing concrete pad used in a kind of building operations | |
CN204491947U (en) | A kind of laminated floor slab | |
CN203403445U (en) | Steel sleeve used for plugging basement tube well | |
CN214882625U (en) | Firm profiled steel structure high-speed railway built-in fitting | |
CN202492799U (en) | Waterproof and drainage structure for bridge pavement layer | |
CN202707085U (en) | Tunnel lining water stopping belt clamp | |
CN206143818U (en) | Novel anticorrosive room build basis | |
CN217053663U (en) | Limited space buttress with small transverse width and combined side anchor hoop structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120808 Termination date: 20141203 |
|
EXPY | Termination of patent right or utility model |