CN202362907U - System host realizing environment-friendly construction intelligent monitoring and controlling management - Google Patents

System host realizing environment-friendly construction intelligent monitoring and controlling management Download PDF

Info

Publication number
CN202362907U
CN202362907U CN2011204731525U CN201120473152U CN202362907U CN 202362907 U CN202362907 U CN 202362907U CN 2011204731525 U CN2011204731525 U CN 2011204731525U CN 201120473152 U CN201120473152 U CN 201120473152U CN 202362907 U CN202362907 U CN 202362907U
Authority
CN
China
Prior art keywords
module
rack
management system
main frame
intelligent monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204731525U
Other languages
Chinese (zh)
Inventor
张昭雄
丁刚强
欧阳亚力
唐生智
彭小玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN YUEZHONG GREEN BUILDING SCI-TECH DEVELOPMENT Co Ltd
Shenzhen Kingon (group) Ltd By Share Ltd
Original Assignee
SHENZHEN YUEZHONG GREEN BUILDING SCI-TECH DEVELOPMENT Co Ltd
Shenzhen Kingon (group) Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN YUEZHONG GREEN BUILDING SCI-TECH DEVELOPMENT Co Ltd, Shenzhen Kingon (group) Ltd By Share Ltd filed Critical SHENZHEN YUEZHONG GREEN BUILDING SCI-TECH DEVELOPMENT Co Ltd
Priority to CN2011204731525U priority Critical patent/CN202362907U/en
Application granted granted Critical
Publication of CN202362907U publication Critical patent/CN202362907U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The utility model is applicable to the technical field of building construction monitoring and controlling, and provides a system host realizing environment-friendly construction intelligent monitoring and controlling management. The system host comprises a cabinet, wherein the cabinet is internally provided with a power module, a data collecting and processing module, a data node module for being connected with a detection terminal, and a communication module for transmitting data to a remote host, wherein the power module is connected with the data connecting and processing module, the data node module and the communication module respectively. With the adoption of the system host provided by the utility model, a scientific, reliable, measurable and advanced technical means is provided; and the aims of energy conservation, water conservation, construction noise reduction and dust discharge reduction during construction can be really realized, thus the host has very wide application prospect, the wiring work amount can be greatly reduced, the wiring cost can be reduced, the installation is facilitated, the troublesome wiring work is saved, the work amount of workers is small, the efficiency is high, the monitoring result is accurate, informationized management is realized, and resources are saved.

Description

Green construction intelligent monitoring monitoring management system main frame
Technical field
The utility model belongs to building operation monitoring technical field, relates in particular to a kind of green construction intelligent monitoring monitoring management system main frame.
Background technology
Building industry belongs to the high energy consumption industry, and the CO2 emissions in the whole world 40% all come from buildings, and as the main cause that influences weather, along with hazard weather frequently occurs, this problem begins to become and can not be ignored.In China, the architectural energy consumption problem is quite outstanding.At present, China's building construction area has reached 43,000,000,000 square metres, expect the year two thousand twenty and will increase 30,000,000,000 square metres of floor area of building newly, and present building all belongs to the highly energy-consuming building more than 99%; In the existing building, have only 4% to take the energy conservation measure.Building energy consumption is high, efficiency is low, and it is the significant problem that the building industry sustainable development faces that the building discharging causes environmental pollution.Under the current environment, basically all be power consumption monitoring to existing building.And for the monitoring of working-yard; Enterprise also is based on traditional labor management, and workman's workload is big, efficient is low, serious waste of resources, and monitoring result is inaccurate; Be difficult to accomplish information system management; And because monitoring mode of the prior art, be difficult to the fault location point when its wiring is loaded down with trivial details, monitoring system breaks down, safeguard inconvenience.
The utility model content
The purpose of the utility model is to overcome the deficiency of above-mentioned prior art, and a kind of green construction intelligent monitoring monitoring management system main frame is provided, and it can significantly reduce the installation work amount, reduce wiring cost; Be convenient to install; Exempted loaded down with trivial details installation work, workman's workload is little, efficient is high, and monitoring result is accurate; Can realize information system management, be beneficial to and economize on resources.
The utility model is achieved in that a kind of green construction intelligent monitoring monitoring management system main frame; Comprise rack; Be provided with power module, digital sampling and processing in the said rack, be used for the joint detection terminal the back end module, be used for data are sent to the communication module of distance host, said power module is connected with communication module with digital sampling and processing, back end module respectively.
Particularly, also be provided with the trunk module that is used to prolong communication distance in the said rack, said trunk module is connected between said digital sampling and processing and the back end module.
Preferably, said communication module is a radio transmission apparatus, and it is built-in with SIM.
Particularly, said rack is outside equipped with antenna, and said antenna is arranged in said rack and is connected in said radio transmission apparatus.
Particularly, said back end module is connected in said sense terminals through cable, said remote terminal be intellectual water meter or/and intelligent three-phase kilowatt-hour meter or/and the construction noise measuring instrument or/and construction airborne dust measuring instrument.
Particularly, said communication module and power module are arranged at same row and are positioned at a side of rack, and said digital sampling and processing, back end module and trunk module are arranged at same row and are positioned at the opposite side of rack.
Particularly, the sidewall of said rack is provided with air vent, and said vent is provided with radiator fan.
Particularly, said rack comprises the cabinet door and has containing cavity and an end face and be provided with the cabinet of opening that said cabinet door is articulated in the open end of said cabinet, is provided with sealing strip between said cabinet and the cabinet door.
A kind of green construction intelligent monitoring monitoring management system main frame that the utility model provides, it provides technological means a kind of science, reliable, measurable, advanced, and the discharging with energy-conservation, water saving, reduction construction noise and minimizing construction airborne dust that can be real is fulfilled; Thereby have very application prospects, through a kind of green construction intelligent monitoring monitoring management system main frame that the utility model provides, can significantly reduce the installation work amount, reduce wiring cost; Be convenient to install, exempted loaded down with trivial details installation work, workman's workload is little, efficient is high; Monitoring result is accurate, can realize information system management, is beneficial to economize on resources; And when system breaks down; Be easy to orientation problem, maintain easily, its test result has high reliability.Thereby the supervision of construction site is provided a scientific and reliable, advanced person's technological means for relevant departments such as government's safety supervision and environmental administration, mechanism.
Description of drawings
Fig. 1 is the plane figure synoptic diagram of a kind of green construction intelligent monitoring monitoring management system main frame of providing of the utility model embodiment;
Fig. 2 is the principle schematic of a kind of green construction intelligent monitoring monitoring management system main frame of providing of the utility model embodiment;
Fig. 3 is the application network synoptic diagram of a kind of green construction intelligent monitoring monitoring management system main frame of providing of the utility model embodiment.
Embodiment
For the purpose, technical scheme and the advantage that make the utility model is clearer,, the utility model is further elaborated below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
As depicted in figs. 1 and 2; A kind of green construction intelligent monitoring monitoring management system main frame that the utility model embodiment provides; Can be used on the building ground energy consumption, noise, airborne dust etc. being monitored; Be a kind of high-end technology of firmware, it relates to industrial control technology, 3G wireless communication technique, computer software and network technology, environment noise test and measuring technique, air-borne dust detection and measuring technique etc., is the product of the AMS of multinomial new and high technology combination.Above-mentioned green construction intelligent monitoring monitoring management system main frame comprises rack 1; Be provided with power module 11, digital sampling and processing 12 in the said rack 1, be used for joint detection terminal 21 back end module 13, be used for data are sent to the communication module 14 of distance host, said power module 11 is connected with digital sampling and processing 12, back end module 13 and communication module 14 respectively.Power module 11 can carry out the AC/DC conversion; So that the 220v-380v AC power is transformed to direct supply; Module to be used for data acquisition processing module 12, back end module 13, communication module 14 etc. are positioned at rack 1 is supplied power; Digital sampling and processing 12 is centre management equipment and opertaing devices of remote intelligent monitoring and controlling system, the functions such as lateral transport of the order transmission of responsible regularly reading terminals data, system, data communication, network management, logout, data.Said back end module 13 is connected in said sense terminals 21 through cable; Said remote terminal be intellectual water meter or/and intelligent three-phase kilowatt-hour meter or/and the construction noise measuring instrument or/and construction airborne dust measuring instrument; Back end module 13 can read the numerical value of remote terminal; Related datas such as power consumption, water consumption, noise figure for example, and the data that read are sent to digital sampling and processing 12, handle by 12 pairs of data of digital sampling and processing.Treated data are sent to distance host by communication module 14; Gather and analyze by distance host; And exportable result and form etc.; To draw various energy consumptions and environmental evaluation in the buildings, have that data reliability height, workman's workload are little, a high efficiency, advantage such as economize on resources, can realize digitizing, informationalized management.Communication module 14 can be wireless transport module, and it is easy to use, has significantly reduced the wiring amount.Above-mentioned green construction intelligent monitoring monitoring management system main frame can be set on a plurality of building sites simultaneously, and each green construction intelligent monitoring monitoring management system main frame all can be sent to data in the same distance host, carries out Unified Treatment by this distance host.Above-mentioned green construction intelligent monitoring monitoring management system main frame, its need are connected in each sense terminals 21, have adopted the wiring method of bus type; Digital sampling and processing 12, back end module 13, communication module 14 etc. are concentrated in the rack 1; Reduce the regional centralized device, isolated the installation work amount between repeater, intelligent data network node, radio transmission apparatus, power supply and each sense terminals 21, be convenient to install and use, exempted loaded down with trivial details installation work; And when system breaks down; Can overhaul each module in the rack 1, the position of the localization of faults is safeguarded very convenient fast.
Particularly, as depicted in figs. 1 and 2, a data node module 13 can be provided with 4 passages, and each passage can connect 32 intellectual water meters at most or/and intelligent three-phase kilowatt-hour meter.
Particularly, as depicted in figs. 1 and 2, also be provided with the trunk module 15 that is used to prolong communication distance in the said rack 1, said trunk module 15 is connected between said digital sampling and processing 12 and the back end module 13.Trunk module 15 can prolong the communication distance of RS-485/422 bus network, increases the number of RS-485/422 bus network equipment.Can 485 buses be carried out photoelectricity and isolate, prevent that common mode voltage from disturbing.
Preferably, as depicted in figs. 1 and 2, said communication module 14 is a wireless telecommunications system, and it is built-in with SIM.Utilize radiowave to realize the communication of equipment room, the data of gathering are sent to long distance control system, also acquisition instructions is sent to hardware device simultaneously; This communication mode has fast, simple installation and maintenance, do not receive site contour environmental impact, low cost and other advantages, can satisfy the different demands of user on communication distance and traffic rate.
Particularly, as depicted in figs. 1 and 2, said rack 1 is outside equipped with antenna 31, and said antenna 31 is arranged in said rack 1 and is connected in said wireless telecommunications system, to improve the effect of wireless telecommunications.
Particularly; As depicted in figs. 1 and 2; Said communication module 14 is arranged at same row with power module 11 and is positioned at a side of rack 1; Said digital sampling and processing 12, back end module 13 and trunk module 15 are arranged at same row and are positioned at the opposite side of rack 1, and be rationally distributed, is convenient to safeguard.
Particularly, the sidewall of said rack 1 is provided with air vent, and said vent is provided with radiator fan, has guaranteed the heat dispersion of rack 1.
Said particularly rack 1 comprises the cabinet door and has containing cavity and an end face and be provided with the cabinet of opening that said cabinet door is articulated in the open end of said cabinet, is provided with sealing strip between said cabinet and the cabinet door, and structural reliability is high.
In the practical application, like Fig. 1~shown in Figure 3, the remote monitoring monitoring management system sends data acquisition command; Through the GPRS/WCDMA cordless communication network; Accept data and convey to data acquisition place module by radio transmission apparatus, adopt the RS-232 line, give trunking data transmission.Be communicated with the RS-485 line between trunking and the back end module 13.Back end request command the most at last sends to sense terminals 21, obtains the former road of data retrieval system, and data result is in remote monitoring monitoring management system interface.
Can find out from technique scheme; Because the green construction intelligent monitoring monitoring management system main frame that provides among the utility model embodiment; Radio transmission apparatus in it, digital sampling and processing 12, trunk module 15, back end module 13, power module 11 are all concentrated and are placed in the main process equipment; Solved between outside each equipment and connected loaded down with trivial details, problems such as workload is big, efficient is low, poor reliability, shortage dirigibility, the wasting of resources; Be beneficial to the maintenance and the positioning problems of system hardware equipment greatly, its test result has high reliability.
Green construction intelligent monitoring monitoring management system itself has broad application prospects.Green building, energy-saving and emission-reduction are state policies and principles, and green construction is the building industry energy-saving and emission-reduction, realize the key link of sustainable development.Along with China is constantly perfect to legally from industry standard to the green construction notion, increasing developer and construction contractor will carry out the green construction authentication.And green construction real-time intelligent monitoring managing system is management of construction enterprises person and government regulator provides technological means a kind of science, reliable, measurable, advanced.The discharging with energy-conservation, water saving, reduction construction noise and minimizing construction airborne dust that can be real is fulfilled, thereby has very application prospects.The green construction intelligent monitoring monitoring management system main frame that arises at the historic moment is along with the application of this system and promote the growth that will promote original industrial chain.Can be therefrom developed from operator, chip manufacturer, technological provider, software developer, instrumentation manufacturer, communication apparatus supplier etc., this will produce good economic benefit and social benefit.
The network diagram of green construction intelligent monitoring monitoring management system host application is as shown in Figure 3; Green construction intelligent monitoring monitoring management system is communicated to green construction intelligent monitoring monitoring management system [Microsoft user 1] with acquisition instructions via radio transmission apparatus through wireless network GPRS/WCDMA; The former road of power consumption data that system host will obtain is returned, and is presented in the system software interface.
Native system is provided with above-mentioned green construction intelligent monitoring monitoring management system main frame; Adopt the bus type wiring method, digital sampling and processing 12, trunking, back end module 13, radio transmission apparatus and power module 11 are concentrated on a green construction intelligent monitoring monitoring management system main frame the inside.Reduce regional centralized device (or intelligent data network interface), isolate installation work amount, reduction wiring cost between repeater, intelligent data network node, radio transmission apparatus and each equipment of power supply.Be convenient to install, exempted loaded down with trivial details installation work.And when system breaks down, be easy to orientation problem, maintain easily, its test result has high reliability.
Image data flow process of the present invention is as shown in Figure 2, and acquisition step is following:
(1) green construction intelligent monitoring monitoring management system [user of Microsoft 2] sends the image data instruction;
(2) radio transmission apparatus receives data and passes to digital sampling and processing 12;
(3) trunking is transferred to back end module 13 with acquisition instructions;
(4) back end module 13 acquisition instrument terminal datas.
(5) former road return data is to system management interface;
The main effect of green construction intelligent monitoring monitoring management system main frame performance is in the construction stage, is the very important ring in the building life-cycle processes.Also be the key link that building energy conservation reduces discharging, " one environmental protection of four joints " is one of core content of green construction [user of Microsoft 3].The utility model provides a scientific and reliable, advanced person, visual instrument and technological means from construction industry soft science field for implementing " one environmental protection of four joints ".For relevant departments such as government's safety supervision and environmental administration, mechanism provide a scientific and reliable, advanced technological means to the supervision of construction site.
The above is merely the preferred embodiment of the utility model; Not in order to restriction the utility model; Any modification of being done within all spirit and principles at the utility model, be equal to replacement or improvement etc., all should be included within the protection domain of the utility model.

Claims (8)

1. green construction intelligent monitoring monitoring management system main frame; It is characterized in that; Comprise rack; Be provided with power module, digital sampling and processing in the said rack, be used for the joint detection terminal the back end module, be used for data are sent to the communication module of distance host, said power module is connected with communication module with digital sampling and processing, back end module respectively.
2. green construction intelligent monitoring monitoring management system main frame as claimed in claim 1; It is characterized in that; Also be provided with the trunk module that is used to prolong communication distance in the said rack, said trunk module is connected between said digital sampling and processing and the back end module.
3. green construction intelligent monitoring monitoring management system main frame as claimed in claim 1 is characterized in that said communication module is a radio transmission apparatus, and it is built-in with SIM.
4. green construction intelligent monitoring monitoring management system main frame as claimed in claim 3 is characterized in that said rack is outside equipped with antenna, and said antenna is arranged in said rack and is connected in said radio transmission apparatus.
5. green construction intelligent monitoring monitoring management system main frame as claimed in claim 1; It is characterized in that; Said back end module is connected in said sense terminals through cable, said remote terminal be intellectual water meter or/and intelligent three-phase kilowatt-hour meter or/and the construction noise measuring instrument or/and construction airborne dust measuring instrument.
6. green construction intelligent monitoring monitoring management system main frame as claimed in claim 2; It is characterized in that; Said communication module and power module are arranged at same row and are positioned at a side of rack, and said digital sampling and processing, back end module and trunk module are arranged at same row and are positioned at the opposite side of rack.
7. green construction intelligent monitoring monitoring management system main frame as claimed in claim 1 is characterized in that the sidewall of said rack is provided with air vent, and said vent is provided with radiator fan.
8. green construction intelligent monitoring monitoring management system main frame as claimed in claim 1; It is characterized in that; Said rack comprises the cabinet door and has containing cavity and an end face and be provided with the cabinet of opening; Said cabinet door is articulated in the open end of said cabinet, is provided with sealing strip between said cabinet and the cabinet door.
CN2011204731525U 2011-11-24 2011-11-24 System host realizing environment-friendly construction intelligent monitoring and controlling management Expired - Lifetime CN202362907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204731525U CN202362907U (en) 2011-11-24 2011-11-24 System host realizing environment-friendly construction intelligent monitoring and controlling management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204731525U CN202362907U (en) 2011-11-24 2011-11-24 System host realizing environment-friendly construction intelligent monitoring and controlling management

Publications (1)

Publication Number Publication Date
CN202362907U true CN202362907U (en) 2012-08-01

Family

ID=46574077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204731525U Expired - Lifetime CN202362907U (en) 2011-11-24 2011-11-24 System host realizing environment-friendly construction intelligent monitoring and controlling management

Country Status (1)

Country Link
CN (1) CN202362907U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103543709A (en) * 2013-09-24 2014-01-29 陕西明路光电技术有限责任公司 Environmental pollution monitoring and managing system of construction site
CN104656719A (en) * 2014-12-30 2015-05-27 济南东之林智能软件有限公司 Dust removing system
CN105446285A (en) * 2014-09-28 2016-03-30 中建四局第六建筑工程有限公司 Construction data collection method on the basis of radio frequency technology
CN105547363A (en) * 2015-12-21 2016-05-04 曹军 Noise and dust online monitoring system and realization method thereof
CN106933175A (en) * 2017-03-21 2017-07-07 中建三局第建设工程有限责任公司 Green construction management system
CN109163758A (en) * 2018-08-30 2019-01-08 浙江祥生建设工程有限公司 Dust from construction sites noise supervisory systems
CN115471105A (en) * 2022-09-26 2022-12-13 兰州石化职业技术大学 Green energy-saving construction system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103543709A (en) * 2013-09-24 2014-01-29 陕西明路光电技术有限责任公司 Environmental pollution monitoring and managing system of construction site
CN105446285A (en) * 2014-09-28 2016-03-30 中建四局第六建筑工程有限公司 Construction data collection method on the basis of radio frequency technology
CN104656719A (en) * 2014-12-30 2015-05-27 济南东之林智能软件有限公司 Dust removing system
CN105547363A (en) * 2015-12-21 2016-05-04 曹军 Noise and dust online monitoring system and realization method thereof
CN106933175A (en) * 2017-03-21 2017-07-07 中建三局第建设工程有限责任公司 Green construction management system
CN109163758A (en) * 2018-08-30 2019-01-08 浙江祥生建设工程有限公司 Dust from construction sites noise supervisory systems
CN115471105A (en) * 2022-09-26 2022-12-13 兰州石化职业技术大学 Green energy-saving construction system

Similar Documents

Publication Publication Date Title
CN202362907U (en) System host realizing environment-friendly construction intelligent monitoring and controlling management
CN202471872U (en) Dirt online monitoring system of power transmission line insulator
CN101551658B (en) Elevator energy consumption monitoring method and device
CN102736590A (en) Remote energy efficiency diagnosis system
CN204288281U (en) Industrial enterprise's electric energy management system
CN105007039A (en) Distributed photovoltaic power generation on-line monitoring system based on wireless sensor network
CN101118692A (en) Indoor temperature monitoring system and monitoring methods thereof
CN201281811Y (en) System for real time monitoring, remotely controlling and statistically analyzing clerical office monomer equipment energy consumption
CN106288423A (en) A kind of solar heat pump water system based on Internet of Things energy optimal control
CN202522906U (en) Comprehensive electric energy information collector based on photovoltaic power station information system
CN107832946A (en) A kind of power energy monitoring and controlling for workshop and management method and system
CN102393716A (en) Energy-saving building monitoring system based on wireless sensing network
CN208028843U (en) A kind of solar panel dust pelletizing system and photovoltaic generating system
CN202153309U (en) Remote management device for oil well in oil field
CN202394363U (en) Humiture monitoring system for communicating by using power line carrier and radio
CN203283978U (en) Elevator maintenance regulatory system based on RFID (radio frequency identification device) technology
CN104467164A (en) Dual-power-supply input data acquisition terminal
CN105242610B (en) A kind of ground wire supervisory systems and method
CN204270121U (en) A kind of multifunctional data acquiring terminal
CN204347129U (en) Multichannel metering separate intelligent wireless ammeter
CN210955469U (en) Novel wireless self-organizing meter reading control device for water-gas-electricity three-meter
CN207458308U (en) Intelligent monitoring of stray current remote data acquisition system
CN111127862A (en) Water affair centralized meter reading system and operation method thereof
Wang et al. Analysis and Research on Security Protection and Control of Intelligent Substation Based on Visualization Technology
CN202737588U (en) Digital distribution transform integrated management unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120801