CN202324576U - Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall - Google Patents

Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall Download PDF

Info

Publication number
CN202324576U
CN202324576U CN2011204696343U CN201120469634U CN202324576U CN 202324576 U CN202324576 U CN 202324576U CN 2011204696343 U CN2011204696343 U CN 2011204696343U CN 201120469634 U CN201120469634 U CN 201120469634U CN 202324576 U CN202324576 U CN 202324576U
Authority
CN
China
Prior art keywords
platform
right moving
track
moving track
cornice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204696343U
Other languages
Chinese (zh)
Inventor
迟晓宇
吴明君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Original Assignee
WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd filed Critical WUHAN LINGYUN ARCHITECTURAL DECORATION ENGINEERING Co Ltd
Priority to CN2011204696343U priority Critical patent/CN202324576U/en
Application granted granted Critical
Publication of CN202324576U publication Critical patent/CN202324576U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a rail-mounted platform system used for installing a cornice and a ceiling aluminum sheet curtain wall. The platform system includes a platform mounting vehicle as well as left and right moving rails, wherein two rows of rolling bearings are arranged in parallel on left and right sides of the bottom part of the platform mounting vehicle respectively; the left and right rows of rolling bearing are in sliding connection with the left and right moving rails respectively, and can move on the left and right moving rails left and right; sliding bearings and set bolts which can be fixed with the left and right moving rails and provided with locking devices are also arranged at the bottom part of the platform mounting vehicle; and rail locking devices which can be fixed with a platform slab channel steel keel are arranged on the left and right moving rails respectively. The application of the rail-mounted platform system dispenses with the conventional method of erecting a steel pipe scaffold layer by layer in a full laying manner, simplifies the installation process, saves the installation time, greatly saves the construction cost, and provides forceful guarantee for installing and shortening the construction period.

Description

A kind of rail mounted plateform system that is used for cornice and the installation of furred ceiling aluminum facade
Technical field
The utility model relates to the construction and installation technical field, particularly a kind of rail mounted plateform system that is used for cornice and the installation of furred ceiling aluminum facade.
Background technology
Along with popularizing of science and technology development and urban modernization; People are increasingly high to the facade effect requirements that building appears; The building of various complex-curved effects emerges in an endless stream, and the facade effect that building demonstrates is more and more abundanter, visual impact is also increasingly high, so the city is more and more finer.And to realize the building of these " strange, lofty ", will there be very big challenge in its curtain wall construction mounting means.
Existing building curtain wall is installed, and generally all is to adopt full shop to set up the mode of scaffold, and for the building of moulding more complicated, if adopt the mode of setting up scaffold, operation is difficulty very all, and is difficult for realizing that old also very high.For example, Beijing milky way SOHO is that fusiform high building is formed by four moulding shapes; Connect by some complex-curved crossovers between four towers; Every layer of outer facade of office layer is side and hangs single or hyperbolic aluminium sheet, and every floor plate is received successively or outer choosing, and is similar to the bread shape of cutting into slices layer by layer; And every layer of each side extension aluminium sheet radian is all inequality, moulded one-tenth free curve state.This type building, because of outer facade all is complex-curved, scaffold can only successively be encorbelmented fixing; Set up difficulty, install and dismantle time-consuming, cost is high; And scaffold very easily collides mounted curtain wall, is prone to cause finished product to destroy, and causes certain loss for whole engineering.
Summary of the invention
The purpose of the utility model is in order to overcome the difficulty that above-mentioned special complex-curved facade curtain wall construction is installed; A kind of be used for cornice and the installation of furred ceiling aluminum facade are provided; And it is simple to operate, flexible; Easy construction, convenient, efficient, safety, and can reduce installation cost, shorten the rail mounted plateform system of construction period.
Said a kind of rail mounted plateform system that is used for cornice and the installation of furred ceiling aluminum facade comprises platform-type installation car and left and right moving track; In the bottom of platform-type installation car parallel be provided with left and right two row rolling bearings; Left and right row's rolling bearing is slidingly connected with left and right moving track respectively; And can be on left and right moving track move left and right, also be provided with in platform-type installation car bottom can with fixing sliding bearing that has locking device and the tight fixed bolt of left and right moving track; On left and right moving track, be respectively equipped with can with platform floor channel-section steel keel fixed track locking device.
Said plateform system also comprises a perpendicular supporting steel pipe of putting, and the support just lower end of pipe is connected with the bracing frame snap close of platform-type installation car through just managing locker.
Said platform is installed car and is comprised mounting platform, the bracing frame of falling the trapezoid platform, around mounting platform, is respectively equipped with safe protective railing, and said left and right row's rolling bearing, sliding bearing and tight fixed bolt are installed in the bottom of the bracing frame of falling the trapezoid platform respectively.
Said left and right moving track is respectively i-beam track, and every track length is 100-200cm, and left and right moving track laterally arranges, between spacing equate with spacing between left and right row's rolling bearing.
The utility model adopts portable railway mounting platform car simple to operate, flexible, easy construction can save all scaffolds; The track platform truck can move a week around every layer of aluminium sheet platform on the simple and easy track of laying voluntarily, realize the installation of border side extension curved surface aluminium sheet.Improve efficiency of construction greatly, reduced installation cost, shortened the construction period.
Description of drawings
Fig. 1 is the lateral view of the utility model,
Fig. 2 is the utility model front longitudinal sectional view,
Fig. 3 is the vertical view of the utility model,
Fig. 4 is the structural representation of buckle device sliding bearing with lock in the utility model,
Fig. 5 is the enforcement state diagram of the utility model.
Among the figure: the 1-platform is installed car, 2-safe protective railing, 3-mounting platform, the 4-bracing frame of falling the trapezoid platform; 5, the left and right row's rolling bearing of 6-, 7-track locking device, 8-sliding bearing; 9, the left and right moving track of 10-, 11-has just managed locker, the 12-tight fixed bolt; 13-structure platform place channel-section steel keel, 14-supporting steel pipe, 15-aluminium sheet.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.Among Fig. 1,2,3,4; A kind of rail mounted plateform system that is used for cornice and the installation of furred ceiling aluminum facade comprises platform-type installation car 1 and left and right moving track 9,10; In the bottom of platform-type installation car 1 parallel be provided with left and right two row rolling bearings; Left and right row's rolling bearing 5,6 is slidingly connected with left and right moving track 9,10 respectively; And can be on left and right moving track 9,10 move left and right, also be provided with in platform-type installation car 1 bottom can with fixing sliding bearing that has locking device 8 and the tight fixed bolt 12 of left and right moving track 9,10; On left and right moving track 9,10, be respectively equipped with can with platform floor channel-section steel keel 13 fixed track locking devices 7.Said plateform system also comprises a perpendicular supporting steel pipe 14 of putting, and the support just lower end of pipe 14 is connected with the bracing frame snap close of platform-type installation car through just managing locker 11.
Can i-beam track be laid in advance and form left and right moving track 9,10 on the floor platform aluminium sheet cannelure steel joist; Because of having done water-proof heat-insulation layer on the floor platform concrete structure, therefore, all set up scaffold or other are used for the installed platform system; All can not destroy the water-proof heat-insulation layer of building itself; Under this condition, adopt the simple and easy track of laying voluntarily, left and right moving track 9,10 is fixed on the steel joist of curtain wall self; Track establishes one's own system, and can not destroy the waterproof and the insulation layer of building itself.Two row's rolling bearings that platform-type installation car 1 is installed through the bottom contact with slide; Touch with have gentle hands moving, the position that platform-type installation car 1 is moved to aluminium sheet need to be installed, arrive destination locations after; Locking sliding bearing 8 and tight fixed bolt 12; Platform-type installation car 1 is fixed, and bracing reinforcement steel pipe 14 and platform truck snap close are got up, and steel pipe top holds out against the upper strata concrete floor; Make it become fixing curtain wall mounting platform, the construction operation workman can easily realize installation exercise on platform truck.
Said platform is installed car 1 and is comprised mounting platform 3, the bracing frame of falling the trapezoid platform 4; Around mounting platform 3, be respectively equipped with safe protective railing 2, said left and right row's rolling bearing 5,6, sliding bearing 8 and tight fixed bolt 12 are installed in the bottom of the bracing frame of falling the trapezoid platform 4 respectively.
Said left and right moving track 9,10 is respectively i-beam track; Every track length is 100-200cm, and track can be laid according to facade moulding tendency, and every section track is grown about 1.5 meters; The orbital docking place can be according to architectural image; Make track angled, only need two sections tracks to be used alternatingly, just can satisfy the mounting platform car and move around the building storey border.Left and right moving track 9,10 laterally arranges, between spacing and left and right row's rolling bearing 5, the spacing between 6 equate, guarantee that the mounting platform car can be free to slide in groove steel rail.
Aluminium sheet steel joist for floor platform position does not need any other platform, and the workman can install keel on structure floor in advance; When curved sides extension aluminium sheet and furred ceiling aluminium sheet are installed, only need on platform floor steel joist, to lay two of preprepared i-beam tracks, two tracks are locked on the platform floor channel-section steel keel 13 through track locking device 7; Platform truck moves in orbit, to the position that needs, and the locking platform truck; Install, after this position installs, lay down track section; Platform truck continues to move to hypomere track place, installs.The preceding paragraph track promptly detachably is used to install down track section, and track can reuse.In this manner, can adopt a plurality of sliding platforms, realize different floors, many scope of operations are constructed simultaneously, and installation effectiveness is very high.
In the time need carrying out the installation of aluminium sheet 15 or keel to the outer facade of building certain more complicated; The wage rail road of at first on this place's platform steel joist, laying two 1.5 meters long forms left and right moving track 9,10, and left and right moving track 9,10 is fixed through track locking device 7; Then mobile platform being installed car 1 lies against on the left and right moving track 9,10; Sliding bearing 8 is put i-beam track, promote the platform dolly, dolly is easily moved in orbit needs the position; The locking sliding bearing also fixes tight fixed bolt 12, and the whole erection platform truck will be fixed.Platform safety supporting steel pipe 14 is utilized the standard snap close, latch on the platform truck steelframe, play the effect that safety is consolidated.
So far, the workman can utilize the mounting platform 3 of the bracing frame of falling the trapezoid platform 4 of encorbelmenting, and carries out the construction and installation of outer facade aluminium sheet and keel, like Fig. 4; Simultaneously, furred ceiling aluminium sheet and keel also can utilize this platform to install.
After this position aluminium sheet operation is accomplished; The workman under the platform truck to the structure floor face, lay next section i-beam track, according to the building structure situation; Two adjacent tracks can become the broken line angle distribution; After fixing new track, open the locking device of the sliding bearing 8 of platform truck, unclamp the snap close of tight fixed bolt 12 and supporting steel pipe 14.Promote platform truck, platform truck is moved to down on the track section, the platform cart stationary measure above repeating.Thereby the aluminium sheet and the keel that carry out next position are installed.And this moment, the track at a last operation place can be dismantled, and transfers to the scope of operation that next is about to installation.
According to the patent characteristics of this mounting platform car, each setting is arranged 4 workmans, can easily accomplish corresponding each item work (comprise rail transfer, platform truck moves and be fixing, safety guarantee, aluminium sheet and keel construction and installation).According to this order, construct one by one around the floor border at floor gap.Also can be according to construction period, at same floor, different parts is constructed simultaneously, forms the construction operation face of " in full flourish ".
After platform truck is finished using, can be at floor structure platform place, dismounting voluntarily, the bolt of loosening each connecting portion can be rod member and connector with the platform truck dismounting, the packing back is transported to the position that needs from every layer of platform curtain wall access door position.Also can utilize the overall budget tower crane, directly the handling of mounting platform dolly carried out the installation exercise at other positions to the floor that needs.
This cover system has more perfectly solved the problem of complicated outer facade curtain wall construction difficult installation; Particularly as milky way SOHO engineering, building integral is shaped as spindle, irregular; Perhaps moulding is lofty, and the outer curtain wall of the complex model building that visual impact is big is installed.
If set up the mode of scaffolding platform according to general routine; The curved sides of milky way SOHO is hung aluminium sheet and is added up according to the 1-15 layer; About 15000 square metres of the gross area estimate that the scaffold expense will be near 3,000,000 yuan, and scaffold takes up room; Form cross-operation with the curtain wall construction, the influence that adjacent work post construction is caused is also very big.After adopting the rail mounted mounting platform car of the utility model, platform and orbit occupancy space are little, only need be to install in the scope of operation, can move around the floor border with the installation site, and can realize that many scope of operations install simultaneously.According to engineering practical situations statistics, establish 3 mounting platform cars for every layer, can install simultaneously by a plurality of floors as required; As according to 4 floors, every layer of three installation group, each 4 people of group construction; 72 of curved surface aluminium sheets can be installed, about 260 square meters of area every day.And adopt the construction of common scaffolding platform, and the setting up the huge time of expending of scaffold, it is also very big to set up cost.This track mounting platform car, according to the commercial value behind the produce in factory, 8000 yuan of every less thaies; Consider that when the whole building duration was nervous, many scope of operations were launched construction simultaneously, need 16 in this track mounting platform car enough to use; Calculate ten thousand yuan of the about 8000X16=12.8 of total cost valency like this.Than setting up more than 250 ten thousand yuan of common scaffold direct saving funds.
Through practical application, this scheme simple installation, quick improves effect, has practiced thrift the construction and installation cost simultaneously greatly.

Claims (4)

1. one kind is used for the rail mounted plateform system that cornice and furred ceiling aluminum facade are installed; It is characterized in that: said plateform system comprises platform-type installation car (1) and left and right moving track (9,10); In the bottom of platform-type installation car (1) parallel be provided with left and right two row rolling bearings; Left and right row's rolling bearing (5,6) is slidingly connected with left and right moving track (9,10) respectively; And can go up move left and right at left and right moving track (9,10), also be provided with in platform-type installation car (1) bottom can with fixing sliding bearing that has locking device (8) and the tight fixed bolt (12) of left and right moving track (9,10); On left and right moving track (9,10), be respectively equipped with can with platform floor channel-section steel keel (13) fixed track locking devices (7).
2. according to the said a kind of rail mounted plateform system that is used for cornice and the installation of furred ceiling aluminum facade of claim 1; It is characterized in that: said plateform system also comprises a perpendicular supporting steel pipe (14) of putting, and the lower end of supporting steel pipe (14) is connected with the bracing frame snap close of platform-type installation car through steel tube lock buckle device (11).
3. according to claim 1 or 2 said a kind of rail mounted plateform systems that are used for cornice and the installation of furred ceiling aluminum facade; It is characterized in that: said platform is installed car (1) and is comprised mounting platform (3), the bracing frame of falling the trapezoid platform (4); Around mounting platform (3), be respectively equipped with safe protective railing (2), said left and right row's rolling bearing (5,6), sliding bearing (8) and tight fixed bolt (12) are installed in the bottom of the bracing frame of falling the trapezoid platform (4) respectively.
4. according to claim 1 or 2 said a kind of rail mounted plateform systems that are used for cornice and the installation of furred ceiling aluminum facade; It is characterized in that: said left and right moving track (9,10) is respectively i-beam track; Every track length is 100-200cm; Left and right moving track (9,10) laterally arranges, between spacing equate with spacing between left and right row's rolling bearing (5,6).
CN2011204696343U 2011-11-23 2011-11-23 Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall Expired - Lifetime CN202324576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204696343U CN202324576U (en) 2011-11-23 2011-11-23 Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204696343U CN202324576U (en) 2011-11-23 2011-11-23 Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall

Publications (1)

Publication Number Publication Date
CN202324576U true CN202324576U (en) 2012-07-11

Family

ID=46436557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204696343U Expired - Lifetime CN202324576U (en) 2011-11-23 2011-11-23 Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall

Country Status (1)

Country Link
CN (1) CN202324576U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711301A (en) * 2013-12-30 2014-04-09 江河创建集团股份有限公司 Construction method and device for two-track movable electric basket and lifting hoist
CN104627793A (en) * 2015-01-29 2015-05-20 刘广天 Cover plate type device for preventing lift car from inclining forwards
CN107313586A (en) * 2017-07-05 2017-11-03 中国十七冶集团有限公司 A kind of special-shaped cornice decorative curtain wall mounting platform of building and construction method
CN109763638A (en) * 2018-12-24 2019-05-17 中建三局集团有限公司 A kind of high-altitude overhanging facade special type working vehicle and its construction method
CN109812026A (en) * 2019-03-26 2019-05-28 中国建筑第四工程局有限公司 A kind of high-altitude ceiling decoration aluminium sheet installation method and device
CN110761546A (en) * 2019-10-31 2020-02-07 中冶武汉冶金建筑研究院有限公司 Weight-balancing-free movable telescopic construction hanging basket
CN113863643A (en) * 2021-09-01 2021-12-31 深圳市中装科技幕墙工程有限公司 Movable high-altitude overhanging construction platform, construction system and manufacturing method thereof
CN114197847A (en) * 2021-11-25 2022-03-18 中建八局第二建设有限公司 Construction method of assembled roof cornice modeling curtain wall

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711301A (en) * 2013-12-30 2014-04-09 江河创建集团股份有限公司 Construction method and device for two-track movable electric basket and lifting hoist
CN104627793A (en) * 2015-01-29 2015-05-20 刘广天 Cover plate type device for preventing lift car from inclining forwards
CN107313586A (en) * 2017-07-05 2017-11-03 中国十七冶集团有限公司 A kind of special-shaped cornice decorative curtain wall mounting platform of building and construction method
CN109763638A (en) * 2018-12-24 2019-05-17 中建三局集团有限公司 A kind of high-altitude overhanging facade special type working vehicle and its construction method
CN109812026A (en) * 2019-03-26 2019-05-28 中国建筑第四工程局有限公司 A kind of high-altitude ceiling decoration aluminium sheet installation method and device
CN109812026B (en) * 2019-03-26 2023-09-19 中国建筑第四工程局有限公司 Method and device for installing decorative aluminum plate of overhead ceiling
CN110761546A (en) * 2019-10-31 2020-02-07 中冶武汉冶金建筑研究院有限公司 Weight-balancing-free movable telescopic construction hanging basket
CN113863643A (en) * 2021-09-01 2021-12-31 深圳市中装科技幕墙工程有限公司 Movable high-altitude overhanging construction platform, construction system and manufacturing method thereof
CN114197847A (en) * 2021-11-25 2022-03-18 中建八局第二建设有限公司 Construction method of assembled roof cornice modeling curtain wall
CN114197847B (en) * 2021-11-25 2023-03-21 中建八局第二建设有限公司 Construction method of assembled roof cornice modeling curtain wall

Similar Documents

Publication Publication Date Title
CN202324576U (en) Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall
CN101514586B (en) Hanger rail type electric hanging boat and construction method thereof
CN206092022U (en) Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling
CN105908960A (en) Construction rack for construction of high and large space
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN210659228U (en) Movable single-side formwork system for subway construction
CN210857774U (en) Roof light framework plate installation device
CN209538639U (en) Make track movable Scaffold by oneself
CN102777026A (en) Method for constructing ultra-long rear casting plate supporting system by using Bailey frames
CN208380058U (en) Removable hanging basket suspension scaffold
CN211923574U (en) Construction device for constructing top floor of building
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN202559618U (en) Multi-step connection type cage staircase
CN215591798U (en) Curtain wall plate traction transfer device for tower crane dismantling part
CN201401000Y (en) Special hanging basket for installing noise barrier roof boards
CN2209702Y (en) Saffold
JP2008057226A (en) Method of constructing building on bridge girder, and bridge having the building
CN210508434U (en) Roof steel skeleton light net rack cement composite board mounting system
CN210105254U (en) Remove adjustable high formula construction cat ladder
CN103206077B (en) Structure for steel structure roof inner slab installation foot hand cradle
CN115126233B (en) Construction method for using cantilever beam plate high formwork with complex outer vertical surface as outer wall scaffold
CN111663758A (en) Suspended scaffold and construction method
CN202370540U (en) Grotto bridge type construction trolley of large-span underground powerhouse
CN111636667A (en) High-altitude operation platform construction method and operation platform applied to large-span plant
CN214329834U (en) Daylighting roof construction trolley system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120711