CN202299465U - Quick adjustment device for steel beam hoisting - Google Patents

Quick adjustment device for steel beam hoisting Download PDF

Info

Publication number
CN202299465U
CN202299465U CN2012200506819U CN201220050681U CN202299465U CN 202299465 U CN202299465 U CN 202299465U CN 2012200506819 U CN2012200506819 U CN 2012200506819U CN 201220050681 U CN201220050681 U CN 201220050681U CN 202299465 U CN202299465 U CN 202299465U
Authority
CN
China
Prior art keywords
plate
locating plates
interim location
temporary locating
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200506819U
Other languages
Chinese (zh)
Inventor
陈飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG JINCHENG STEEL STRUCTURE Co Ltd
Original Assignee
SHANDONG JINCHENG STEEL STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG JINCHENG STEEL STRUCTURE Co Ltd filed Critical SHANDONG JINCHENG STEEL STRUCTURE Co Ltd
Priority to CN2012200506819U priority Critical patent/CN202299465U/en
Application granted granted Critical
Publication of CN202299465U publication Critical patent/CN202299465U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a quick adjustment device for steel beam hoisting, belonging to a tool specially used for rapidly and accurately installing a high-strength bolt of a high-rise heavy steel structure building. The quick adjustment device for steel beam hoisting comprises first temporary locating plates (1), bolt fixing holes (2), a quick connecting piece (4), adjusting bolt holes (5), a jack (6) and second temporary locating plates (8) which are arranged in a movable rectangular adjusting frame (7), wherein the number of the first temporary locating plates (1) and the number of the second temporary locating plates (8) are respectively two; the first temporary locating plates (1) are respectively provided with the bolt fixing hole (2); the second temporary locating plates (8) are respectively provided with the adjusting bolt hole (5); the quick connecting piece (4) is in a plate shape; one end of the quick connecting piece (4) is fixed by the first temporary locating plates (1), and the other end of the quick connecting piece (4) is fixed by the second temporary locating plates (8); and the jack (6) is arranged on an inner wall at one end of the second temporary locating plates (8) and the movable rectangular adjusting frame (7). According to the quick adjustment device, the high-strength bolt arranged at a joint of a steel beam can be rapidly and accurately installed, and the passing rate of the high-strength bolt can be guaranteed.

Description

Girder steel lifting fast adjuster
Technical field
A kind of girder steel lifting fast adjuster belongs to high-rise heavy type/frame type steel building high-strength bolt installation special tool quick and precisely.
Background technology
At present; High-rise Heavy Type Steel Structure building continues to greatly develop as the landmark building in a city at home, at the hoisted in position of girder steel and adjust when in place; The form that is adopted differs; But the phenomenon of ubiquity insufficiency face, only having considered of having is temporary fixed in place, but the adjustment timing time-consuming, take a lot of work, require great effort, take material; Correspondingly bring great potential safety hazard, also guaranteed not workmanship.
Practical fresh content
The technical problem that the utility model will solve is: overcome the problem that prior art exists, provide a kind of have can quick adjustment in place, but save time, laborsaving, the easy accessibility recycling rate of waterused high, practice thrift the girder steel lifting fast adjuster of use cost.
The technical scheme that technical problem adopted that the utility model will solve is: this girder steel lifting fast adjuster; Comprise portable rectangle conditioning box, be installed in the first interim location-plate, bolt hole, quick connector, adjusting bolt hole, jack and the second interim location-plate in the portable rectangle conditioning box; The first interim location-plate and the second interim location-plate are two boards; The first interim location-plate is provided with the bolt hole; The second interim location-plate is provided with the adjusting bolt hole, and connector is tabular fast, and an end is fixed through the first interim location-plate; The other end is fixed through the second interim location-plate, and jack is installed on the inwall of the second interim location-plate and portable rectangle conditioning box one end.
Regulate bolt hole be shaped as ellipse or two ends are the grooved of semicircle.
Operating principle
During use; The interim location-plate of making is welded on the finished product member; In advance quick connector is linked together with set bolt; Utilize temporary fixed bolt to carry out temporary fixed the connection to quick connector with interim location-plate after the lifting, check the differential location and the size of girder steel joint connecting cleat and girder steel connecting hole, utilize portable rectangle conditioning box and jack to regulate in place.
Compared with prior art; The girder steel lifting beneficial effect that fast adjuster had of the utility model is: owing to adopt quick connector to be connected fast with interim location-plate through temporary fixed bolt is installed; Utilize jack to regulate the length direction of elliptic bolt hole; Portable rectangle conditioning box conveniently moving can be installed high-strength bolt fast and accurately.Accomplish to save time, laborsaving, saving of labor, material-saving, both guaranteed efficiency of construction and safety, guaranteed construction quality again.This girder steel lifting fast adjuster also can repeat to use.
Description of drawings
Fig. 1 is that the master of the utility model looks sketch map;
Fig. 2 is the schematic top plan view of the utility model.
Fig. 1-2 is the most preferred embodiment of the girder steel lifting fast adjuster of the utility model.
Wherein: 1 first interim location-plate, 2 bolt holes, 3 temporary fixed bolt 4 quick connectors 5 are regulated bolt hole 6 jack 7 portable rectangle conditioning box 8 second interim location-plates.
The specific embodiment
Below in conjunction with accompanying drawing 1-2 the girder steel lifting fast adjuster of the utility model is further specified:
With reference to accompanying drawing 1-2:
This girder steel lifting fast adjuster; Comprise portable rectangle conditioning box 7, be installed in the first interim location-plate 1 in the portable rectangle conditioning box 7, bolt hole 2, connector 4, adjusting bolt hole 5, jack 6 and the second interim location-plate 8 fast; The first interim location-plate 1 and the second interim location-plate 8 are two boards; The first interim location-plate 1 is provided with bolt hole 2; The second interim location-plate 8 is provided with regulates bolt hole 5, and that regulates bolt hole 5 is shaped as the quick connector 4 of ellipse for tabular, and an end is fixed through the first interim location-plate 1; The other end is fixed through the second interim location-plate 8, and jack 6 is installed on the inwall of the second interim location-plate 8 and portable rectangle conditioning box 7 one ends.
The shape of regulating bolt hole 5 can also be designed to the grooved of two ends semicircle.
The operating principle and the course of work are following:
During use; The first interim location-plate of making 1 is welded on the finished product member, in advance quick connector 4 bolt holes 2 one ends is linked together with bolt, utilize temporary fixed bolt 3 to carry out temporary fixed the connection to quick connector 4 with the second interim location-plate 8 after the lifting; Check the differential location and the size of girder steel joint connecting cleat and girder steel connecting hole; It is in place to utilize portable rectangle conditioning box 7 and jack 6 to regulate, and high-strength bolt is installed fast and accurately, accomplishes to save time, laborsaving, saving of labor, material-saving; Both guarantee efficiency of construction and safety, guaranteed construction quality again.
The above; It only is the preferred embodiment of the utility model; Be not to be the restriction of the utility model being made other form, any professional and technical personnel of being familiar with possibly utilize the technology contents of above-mentioned announcement to change or be modified as the equivalent embodiment of equivalent variations.But every the utility model technical scheme content that do not break away to any simple modification, equivalent variations and remodeling that above embodiment did, still belongs to the protection domain of the utility model technical scheme according to the technical spirit of the utility model.

Claims (2)

1. girder steel lifts fast adjuster; Comprise portable rectangle conditioning box (7), be installed in the first interim location-plate (1), bolt hole (2), quick connector (4), adjusting bolt hole (5), jack (6) and the second interim location-plate (8) in the portable rectangle conditioning box (7); The first interim location-plate (1) and the second interim location-plate (8) are two boards; The first interim location-plate (1) is provided with bolt hole (2); The second interim location-plate (8) is provided with regulates bolt hole (5), and connector (4) is tabular fast, and an end is fixing through the first interim location-plate (1); The other end is fixing through the second interim location-plate (8), and jack (6) is installed on the inwall of the second interim location-plate (8) and portable rectangle conditioning box (7) one ends.
2. girder steel according to claim 1 lifting fast adjuster is characterized in that: regulate bolt hole (5) be shaped as ellipse or two ends are the grooved of semicircle.
CN2012200506819U 2012-02-16 2012-02-16 Quick adjustment device for steel beam hoisting Expired - Fee Related CN202299465U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200506819U CN202299465U (en) 2012-02-16 2012-02-16 Quick adjustment device for steel beam hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200506819U CN202299465U (en) 2012-02-16 2012-02-16 Quick adjustment device for steel beam hoisting

Publications (1)

Publication Number Publication Date
CN202299465U true CN202299465U (en) 2012-07-04

Family

ID=46368391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200506819U Expired - Fee Related CN202299465U (en) 2012-02-16 2012-02-16 Quick adjustment device for steel beam hoisting

Country Status (1)

Country Link
CN (1) CN202299465U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835516A (en) * 2014-03-18 2014-06-04 中国三冶集团有限公司建筑安装工程公司 H-type steel beam installation gap adjusting device and use method thereof
CN103924518A (en) * 2014-04-03 2014-07-16 上海市机械施工集团有限公司 Track beam setting up device and method
CN105350787A (en) * 2015-11-06 2016-02-24 中国十七冶集团有限公司 Rapid placing method of steel structural beam column
CN106193622A (en) * 2016-07-29 2016-12-07 中国冶集团有限公司 H profile steel beam docking node locating installation method
CN108060782A (en) * 2017-10-31 2018-05-22 中建钢构有限公司 The installation method and auxiliary mounting tool of girder steel element
CN112112074A (en) * 2020-08-18 2020-12-22 中铁九局集团第四工程有限公司 Method for sectional construction of unsupported large-span hyperbolic span urban viaduct steel box girder
CN114457915A (en) * 2022-02-23 2022-05-10 中国建筑一局(集团)有限公司 Rapid installation node structure for super high-rise complex steel structure and steel structure installation method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835516A (en) * 2014-03-18 2014-06-04 中国三冶集团有限公司建筑安装工程公司 H-type steel beam installation gap adjusting device and use method thereof
CN103835516B (en) * 2014-03-18 2015-11-25 中国三冶集团有限公司 A kind of H profile steel beam installs gap adjusting device and using method thereof
CN103924518A (en) * 2014-04-03 2014-07-16 上海市机械施工集团有限公司 Track beam setting up device and method
CN105350787A (en) * 2015-11-06 2016-02-24 中国十七冶集团有限公司 Rapid placing method of steel structural beam column
CN106193622A (en) * 2016-07-29 2016-12-07 中国冶集团有限公司 H profile steel beam docking node locating installation method
CN108060782A (en) * 2017-10-31 2018-05-22 中建钢构有限公司 The installation method and auxiliary mounting tool of girder steel element
CN112112074A (en) * 2020-08-18 2020-12-22 中铁九局集团第四工程有限公司 Method for sectional construction of unsupported large-span hyperbolic span urban viaduct steel box girder
CN114457915A (en) * 2022-02-23 2022-05-10 中国建筑一局(集团)有限公司 Rapid installation node structure for super high-rise complex steel structure and steel structure installation method
CN114457915B (en) * 2022-02-23 2023-10-27 中国建筑一局(集团)有限公司 Rapid installation node structure for super high-rise complex steel structure and steel structure installation method

Similar Documents

Publication Publication Date Title
CN202299465U (en) Quick adjustment device for steel beam hoisting
CN202299464U (en) Steel column rapid hoisting and in-position correcting device
CN204152216U (en) The assembling operating platform that a kind of Construction of Steel Structure is general
CN205674164U (en) A kind of Multifunction U-bolt screwing force testing stand
CN204983169U (en) Connected node of primary and secondary roof beam
CN203791344U (en) Connection structure for connecting shaft bracket and rolling mill base in short stress path rolling mill
CN207570787U (en) A kind of reverse mounted device of jack
CN203877170U (en) Limiting device of movable tower crane
CN204126077U (en) A kind of temporary fastening device for prefabricated panel and steel column connection
CN203239025U (en) Large-scale storage tank longitudinal joint assembly adjustable clamp
CN202627275U (en) Keel structure for dry-hanging stone curtain walls
CN205348763U (en) Early support head of tearing open of building templates screw thread formula
CN204162232U (en) Counterweight iron anchor fitting
CN204096992U (en) Building engineering small beams hoisting device
CN205740047U (en) Self-locking girder steel hoisting device
CN204848024U (en) Girder steel hoist device for construction
CN204847839U (en) From taking spacing hoist girder and connection structure of end beam
CN201914843U (en) Container type crane gantry
CN205065194U (en) Swiftly pull out and insert camera support
CN202750351U (en) Pole-used optical network terminal communication box
CN203497976U (en) High-altitude installation clamping device for large electric hoists
CN206108710U (en) Join externally and hoist fixture with half external prefabricated wallboard
CN203939248U (en) A kind of fixture that hangs the vertical splicing seams welding operation of steel plate wall frame
CN203034381U (en) Steel shotcrete hoop
CN204818502U (en) Production of two roof beam hoists is with pushing mechanism perpendicularly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20200216