CN106193622A - H profile steel beam docking node locating installation method - Google Patents

H profile steel beam docking node locating installation method Download PDF

Info

Publication number
CN106193622A
CN106193622A CN201610614576.6A CN201610614576A CN106193622A CN 106193622 A CN106193622 A CN 106193622A CN 201610614576 A CN201610614576 A CN 201610614576A CN 106193622 A CN106193622 A CN 106193622A
Authority
CN
China
Prior art keywords
girder steel
adjustment seat
bolt hole
connecting plate
adjusting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610614576.6A
Other languages
Chinese (zh)
Other versions
CN106193622B (en
Inventor
吴钢
刘斌
唐明丰
田红云
郭继舟
李少祥
夏春
吴旭
管安康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201610614576.6A priority Critical patent/CN106193622B/en
Publication of CN106193622A publication Critical patent/CN106193622A/en
Application granted granted Critical
Publication of CN106193622B publication Critical patent/CN106193622B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The open a kind of H profile steel beam docking node locating installation method of the present invention, specifically includes following steps: pre-install connecting plate in the web both sides of girder steel one;Girder steel one handling is docked at girder steel two;Positioning installation apparatus is provided;Governor motion is installed;Snap fastener is installed;Calibration connecting plate and the bolt hole on girder steel two;Bolt hole at connecting plate and two steel beam web plates is inserted into high-strength bolt, it is achieved connecting plate and the connection of two steel beam web plates;Dismounting positioning installation apparatus, the flange surfaces at girder steel one and girder steel two arranges a top board, top board corresponding offer bolt hole equal with on the edge of a wing of girder steel one and girder steel two, and top board is connected with girder steel one and girder steel two by high-strength bolt.The invention have the benefit that this method uses adjustment structure and snap fastener combination, connecting plate and the transversion malposition of steel beam web plate bolt hole and longitudinally displaced can be eliminated, it is interim fixing that rapid alignment realizes two H profile steel beam splice docking, prepares for follow-up connection installation procedure.

Description

H profile steel beam docking node locating installation method
Technical field
The present invention relates to Steel Structure Installation, be specifically related to a kind of H profile steel beam docking node locating installation method.
Background technology
Steel Structure Installation would generally relate to the erection stage of various section steel beam and support, the characteristic in this stage It is that substance is little, radix is big, step is more in installation, expends the time long.At present, section steel beam and supporting uses isostructural installation more Hoisting machinery coordinates lifting, then it is fixing to be responsible for structure connection by installation personnel.Due to the steel construction cycle when lifting is located by connecting Longer, hoisting machinery stays cool during this period, it is impossible to gives full play to hoisting machinery feature rapidly and efficiently, not only increases Construction uses the cost of crane, and constrains installation progress.
It addition, steel construction is in installation process, the link that is located by connecting is the longest one procedure, and this operation includes tying up Tie up and hang, be accurately positioned, fix temporarily, reinforce the steps such as perfect, off the hook decoupling device, wherein the longest time-consuming temporarily anchoring to exactly Link is improved in reinforcing.In interim fixing link, for realizing the simplicity of operation, take to weld temporary support or direct spot welding more Mode, the most later carry out the cleaning work of excess surface support and overlap to installing the later stage, but this type of work exist certain The danger factors such as construction quality and processing safety;In link is improved in reinforcing, some uncertain factors often occur (as pressed More solito program now coordinates the hoisting machinery of installation to be substantially at stagnation waiting state: as between girder steel element and connecting plate How with bolts connecting, girder steel element is more with the bolt hole offered on connecting plate, the time expended that overlaps is long, and lifting Time girder steel element rock, add the difficulty to hole), constrain the continuity of its operating process, whole installation process is taken Between cannot accurately estimate.
Summary of the invention
It is an object of the invention to, for the deficiencies in the prior art, it is provided that the H profile steel beam docking node in hole, a kind of quick school Locating mounting method.
The technical solution used in the present invention is: a kind of H profile steel beam docking node locating installation method, specifically includes following step Rapid:
Step one, the web both sides of girder steel one pre-install connecting plate, a part for connecting plate is overlapping with the web part of girder steel one, The bolt hole offered on connecting plate is directed at the bolt hole offered on girder steel one web;
Step 2, girder steel one handling is docked at girder steel two, make the levelness on both edges of a wing keep consistent, web Perpendicularity keeps consistent;Gap is left between girder steel one and girder steel two butt end;Launch connecting plate, another of connecting plate simultaneously Part is overlapping with the web of girder steel two;
Step 3, offer positioning installation apparatus, described positioning installation apparatus includes adjustment structure and snap fastener, governor motion bag Including the first adjustment seat, the second adjustment seat and adjusting rod, the first adjustment seat is connected with one end of adjusting rod, the other end of adjusting rod with Second adjustment seat connects, and the closure of the length direction of adjusting rod and two girder steels is consistent;Snap fastener includes fixing card body, Offering the bayonet socket of hook on retaining clip, bayonet socket can match with the edge of a wing side of girder steel;First adjustment seat and the second regulation The outside of seat is each configured with fixing card body;
Step 4, installation governor motion: the first adjustment seat and the second adjustment seat are individually positioned in the wing of two girder steel butt ends Edge surface;
Step 5, installation snap fastener: the bayonet socket of retaining clip is inserted respectively into the edge of a wing side of two girder steels, and pretension is locked Bolt, makes the side of two steel beam flange of bayonet socket clamping, tightens retaining clip and connects the adjusting nut of governor motion, makes regulation machine Structure and snap fastener form an entirety, reach to carry the requirement of stress;
Step 6, calibration connecting plate are with the bolt hole on girder steel two: be rotationally connected plate, make on the bolt hole on connecting plate and girder steel Bolt hole alignment;
Step 7, it is inserted into high-strength bolt at the bolt hole of connecting plate and two steel beam web plates, it is achieved connecting plate and two girder steels The connection of web;
Step 8, dismounting positioning installation apparatus, the flange surfaces at girder steel one and girder steel two arranges a top board, top board and girder steel One and girder steel two the edge of a wing on all correspondences offer bolt hole, top board is connected with girder steel one and girder steel two by high-strength bolt.
By such scheme, in step 4, regulate adjusting rod, make distance between the first adjustment seat and the second adjustment seat with The docking distance of two girder steels is adaptive.
By such scheme, in step 6, when the bolt hole of connecting plate exists longitudinally with the bolt hole on girder steel two web During dislocation, regulate the clamping screw in the first adjustment seat and the second adjustment seat simultaneously, make girder steel one flat with the flange plate of girder steel two Together, eliminate longitudinally displaced;When the bolt hole of connecting plate exists transversion malposition with the bolt hole on girder steel two web, rotate regulation Bar, changes the distance between the first adjustment seat and the second adjustment seat, it is ensured that the bolt hole of connecting plate and girder steel two is in the horizontal direction Upper alignment, eliminates transversion malposition.
By such scheme, described retaining clip is provided with clamp adjusting rod, one end of clamp adjusting rod and fixing card body Being connected, the other end of clamp adjusting rod passes the first adjustment seat, matches with adjusting nut;In step 6, on connecting plate After bolt hole is directed at the bolt hole on girder steel, by the clamp adjusting rod of the clamp that is tightened, make retaining clip and two steel The edge of a wing laminating of beam.
By such scheme, described adjusting rod can be expansion link.
By such scheme, in step 7, with reamer or file to not repairing by the bolt hole adaptive with clamping screw Whole;During finishing, the clamping screw around this bolt hole is all tightened, it is ensured that the web of connecting plate and two girder steels fits tightly.
By such scheme, offer the first external screw thread in one end of adjusting rod, the first external screw thread be opened in the first regulation The first screw-internal thread fit in Zuo;The other end at adjusting rod offers the second external screw thread, the second external screw thread be opened in second The second screw-internal thread fit in adjustment seat, described first external screw thread and the second externally threaded hand of spiral are contrary.
By such scheme, the first adjustment seat is identical with the structure of the second adjustment seat, and both become axial symmetry to be distributed in adjusting rod Two ends;Described first adjustment seat is cuboid, and the length direction of the first adjustment seat is identical with the length direction of adjusting rod;? Offering the regulating tank of up/down perforation in one adjustment seat, the first male end of adjusting rod may pass through regulating tank;In described first The centrage of screw thread and the width center line of the first adjustment seat bottom surface are parallel.
By such scheme, described retaining clip is provided with gusset, gusset offers the draw-in groove coordinated with bayonet socket outer wall, It is welded and fixed at draw-in groove and bayonet connection.
By such scheme, the side surface upper part at bayonet socket is fixed with locking nut, and locking nut matches with clamping screw, The lower end of clamping screw can compress with the flange surfaces of girder steel.
The present invention mainly has the beneficial effect that
The present invention mainly provides the benefit that:
1, the present invention uses adjustment structure and snap fastener combination, can eliminate the transversion malposition of connecting plate and steel beam web plate bolt hole With longitudinally displaced, it is interim fixing that rapid alignment realizes two H profile steel beam splice docking, does standard for follow-up connection installation procedure Standby;This fabricated structure is flexible for installation, applied widely, low to requirements of installation space;And Liang Ge mechanism can form one and be subject to Power is overall, has certain bearing capacity, and safety is high, good reliability, it is possible to ensure the connection in two H profile steel beam later stages;With Time, the two mechanism is detachable mechanism, overcomes in traditional method that temporary weld is fixing is produced the fraud being difficult to dismantle End, has the advantage such as simple in construction, easy to operate, use safety.
What 2, this device was mainly taked is circular hole and alignment pin location, threaded fixing, assembly and disassembly is convenient;Use solid The edge of a wing on H profile steel beam banjo fixing butt jointing both sides is blocked in rationed marketing, retaining clip, then is fixed with clamping screw, convenient and swift.
3, the adjustment structure in this device and snap fastener are Demountable, repeatable utilization, are applicable not only to H The docking of section steel beam, is also applied for the docking of steel I-beam.
4, this device employing common iron and standard component are as main material, easy to make, low cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of mounting and positioning device in the present invention.
Fig. 2 is the first adjustment seat and the connection diagram of the second adjustment seat.
Fig. 3 is the structural representation of snap fastener.
Fig. 4 is the schematic diagram of step one in this method.
Fig. 5 is the application state schematic diagram (two) of the present embodiment.
Fig. 6 is the application state schematic diagram (three) of the present embodiment.
Fig. 7 is the application state schematic diagram (four) of the present embodiment.
In figure: 1, adjusting rod;2, the first adjustment seat;2.1, regulating tank;2.2, hole, location;2.3, adjustment hole;3, second adjust Joint seat;4, steady pin;5, retaining clip;5.1, clamp adjusting rod;5.2, bayonet socket;5.3, gusset;5.4, draw-in groove;5.5, regulation spiral shell Female;6, clamping screw;6.1, locking nut;7, girder steel one;8, girder steel two;9, hinge;10, connecting plate.
Detailed description of the invention
In order to be more fully understood that the present invention, with specific embodiment, the present invention is further described below in conjunction with the accompanying drawings.
The present invention is as a example by the docking of girder steel 1 and girder steel 28, it is provided that a kind of H profile steel beam docking node locating is installed Method, specifically includes following steps:
Step one, pre-install connecting plate 10 in the web both sides of girder steel 1 by hinge 9, a part for connecting plate 10 and girder steel 1 Web part overlapping, the bolt hole that connecting plate 10 is offered is directed at the bolt hole offered on girder steel 1 web;
Girder steel 1 handling is docked by step 2, employing crane gear at girder steel 28, the levelness on both edges of a wing Keeping consistent, web perpendicularity keeps consistent;The gap of 5 ~ 10mm is left between girder steel 1 and girder steel 28 butt end;Simultaneously Launching connecting plate 10, another part of connecting plate 10 is overlapping with the web of girder steel 28, the bolt hole of connecting plate 10 and girder steel 28 On bolt hole substantially aligned;
Step 3, offer positioning installation apparatus, as it is shown in figure 1, described positioning installation apparatus includes adjustment structure and snap fastener, Governor motion includes the first adjustment seat the 2, second adjustment seat 3 and adjusting rod 1, and the first adjustment seat 2 is connected with one end of adjusting rod 1, The other end and second adjustment seat 3 of adjusting rod 1 connect, the closure one of the length direction of adjusting rod 1 and two H profile steel beams Cause;Snap fastener includes fixing card body 5, and retaining clip 5 offers the bayonet socket 5.2 of hook, and bayonet socket 5.2 can be with H profile steel beam Edge of a wing side matches;The outside of the first adjustment seat 2 and the second adjustment seat 3 is each configured with fixing card body 5;
Step 4, installation governor motion: the first adjustment seat 2 and the second adjustment seat 3 are individually positioned in two H profile steel beam butt ends Flange surfaces (the first adjustment seat 2 is positioned at the flange surfaces of girder steel 1, and the second adjustment seat 3 is positioned at the edge of a wing table of girder steel 28 Face), regulate adjusting rod 1, make the distance between the first adjustment seat 2 and the second adjustment seat 3 fit with the distance of docking of two H profile steel beams Join, and by steady pin 4, first adjustment seat 2 and the second adjustment seat 3 are separately fixed at the edge of a wing table of girder steel 1 and girder steel 28 Face, as shown in Figure 4;
Step 5, installation snap fastener: the bayonet socket 5.2 of retaining clip 5 is inserted respectively into the edge of a wing side of two H profile steel beams, Pretension clamping screw 6, makes the side of bayonet socket 5.2 clamping H profile steel flange of beam, tightens retaining clip 5 and connects the regulation of governor motion Nut 5.5, makes governor motion and snap fastener form an entirety, reaches to carry the requirement of stress, as shown in Figure 5;
Step 6, calibration connecting plate 10 are with the bolt hole on girder steel 28: be rotationally connected plate 10, make the bolt hole on connecting plate 10 It is directed at the bolt hole on girder steel 8;If both bolts hole exist longitudinally displaced, regulate the first adjustment seat 2 and second simultaneously and adjust Clamping screw 6 on joint seat 3, makes girder steel 1 concordant with the flange plate of girder steel 28, eliminates longitudinally displaced;If both bolts hole There is transversion malposition, rotate adjusting rod 1, change the distance between the first adjustment seat 2 and the second adjustment seat 3, it is ensured that connecting plate 10 It is directed in the horizontal direction with the bolt hole of girder steel 28, eliminates transversion malposition;
Step 7, it is inserted into high-strength bolt at the bolt hole of connecting plate 10 and two steel beam web plates, it is achieved connecting plate 10 and two H The connection of section steel beam web, as shown in Figure 6;
Step 8, dismantling described device, the flange surfaces at girder steel 1 and girder steel 28 arranges a top board, top board and girder steel one 7 and girder steel 28 the edge of a wing on all correspondences offer bolt hole, top board is connected with girder steel 1 and girder steel 28 by high-strength bolt, As shown in Figure 7.
In the present invention, all high-strength bolts must be the tightest rear the tightest, and the tightest high-strength bolt need to use impingement electric wrench Or moment of torsion adjustable electric wrench;And the tightliest high-strength bolt has strict requirements, the tightest torque-shear type high-strength bolt must use torque-shear type Electric wrench, the tightest moment of torsion type high-strength bolt must use moment of torsion type electric wrench.All high-strength bolts should freely pass into joins therewith The hole closed, to the hole that can not freely pass into, application reamer or file are repaired, and must not be loaded by force by high-strength bolt or with fiery Flame cutting bolt hole;Repair Kong Shiying will all tighten by bolt about, make the web of more than 10 two H profile steel beams of connecting plate closely paste Close, prevent chip fall into plate folded between.
In the present invention, as in figure 2 it is shown, adjusting rod 1 can be that (now the two ends of adjusting rod 1 can be with the first adjustment seat 2 for expansion link It is fixedly linked with the second adjustment seat 3), by control and regulation adjustable in length first adjustment seat 2 of bar 1 and the second adjustment seat 3 Distance so that it is suitable with the docking location of two H profile steel beams;Adjusting rod 1 can be with the first adjustment seat 2 and the second adjustment seat 3 spiral shell Stricture of vagina connects, and offers the first external screw thread, the first external screw thread and first be opened in the first adjustment seat 2 in one end of adjusting rod 1 Screw-internal thread fit;The other end at adjusting rod 1 offers the second external screw thread, the second external screw thread be opened in the second adjustment seat 3 The second screw-internal thread fit, described first external screw thread and the second externally threaded hand of spiral are contrary;When rotating adjusting rod 1, first Adjustment seat 2 and the second adjustment seat 3 can close to each other or away from.
First adjustment seat 2 is identical with the structure of the second adjustment seat 3, and both become axial symmetry to be distributed in the two ends of adjusting rod 1;Institute Stating the first adjustment seat 2 is cuboid, and the length direction of the first adjustment seat 2 is identical with the length direction of adjusting rod 1;In the first regulation Offering the regulating tank 2.1 of up/down perforation on seat 2, the first male end of adjusting rod 1 may pass through regulating tank 2.1;Described first The centrage of female thread and the width center line of the first adjustment seat 2 bottom surface are parallel.
Offering the hole, location 2.2 of up/down perforation in the first adjustment seat 2, matches with alignment pin 4 in hole 2.2, location;With (this spacing hole is really on the H profile steel beam docking node edge of a wing to offer spacing hole on the H profile steel beam of hole 2.2, location correspondence position Bolt hole, utilize this bolt hole to position), the aperture of spacing hole is more than the external diameter of alignment pin 4, and alignment pin 4 can be inserted into spacing hole, Realize first adjustment seat 2 location on girder steel 1;First adjustment seat 2 offers the through adjustment hole in left and right 2.3, adjusts Knothole 2.3 matches with clamp adjusting rod 5.1, and one end of clamp adjusting rod 5.1 is connected with fixing card body 5, clamp adjusting rod 5.1 The other end through the first adjustment seat 2 or the second adjustment seat 3, match with adjusting nut 5.5, it is achieved fixing card body 5 and first The connection (and/or connection of the second adjustment seat 3) of adjustment seat 2, the centrage of adjustment hole 2.3 and the centrage phase positioning hole 2.2 The most vertical, the centrage in hole 2.2, location is vertical with the upper surface of the first adjustment seat 2, the centrage of adjustment hole 2.3 and the first regulation Left surface or the right flank of seat 2 are vertical.
As it is shown on figure 3, be provided with gusset 5.3 on retaining clip 5, gusset 5.3 offer and coordinates with bayonet socket 5.2 outer wall Draw-in groove 5.4, draw-in groove 5.4 is welded and fixed with bayonet socket 5.2 junction.Side surface upper part at bayonet socket 5.2 is fixed with locking nut 6.1 (can be welding), locking nut 6.1 matches with clamping screw 6, and the lower end of clamping screw 6 can be with the flange surfaces of H profile steel beam Compress.The open height of clamping screw 6 adjustable bayonet socket 5.2, makes bayonet socket 5.2 align with the upper surface of two H profile steel flange of beams Clamping, eliminates the fissure of displacement of H profile steel web and the vertical direction of connecting plate 10 upper bolt hole.
In the present embodiment, adjusting rod 1 is a diameter of 36mm, the round steel of a length of 420mm processes, at adjusting rod 1 Two ends process the external screw thread in opposite direction (namely plus thread and left-hand thread) of M24 respectively, and reach is 110mm;Described Two through holes are arranged on the shaft at this adjusting rod 1 two ends 175mm, and diameter is φ 16mm, the centrage of two through holes Perpendicular.
In the present embodiment, the first adjustment seat 2 is processed by long 175mm, wide 60mm, the steel plate of thick 36mm, adjusts first It is circle that the vertical through location hole 2.2(of a diameter of 20mm is offered in the front end (front end is away from one end of adjusting rod 1) of joint seat 2 Hole), the center in hole 2.2, location is 24mm with the distance of the first adjustment seat 2 front end surface, and the upper surface in the first adjustment seat 2 sets The vertical through regulating tank 2.1 of the wide 36mm of long 70mm, the center of regulating tank 2.1 with the distance of the first adjustment seat 2 front end surface is 105mm, with distance 30mm of the first adjustment seat 2 lateral surface;The first of M24 is offered in the back-end central position of the first adjustment seat 2 Internal thread hole, a length of 40mm of the first internal thread hole.
In the present embodiment, location steady pin 4 is made up of the round steel of a diameter of φ 16mm, a length of 75mm of alignment pin 4;Even Connecting bolt on fishplate bar 10 and top board is the full silk hexagon-headed bolt of M20*100mm, is high-strength bolt.
In the present embodiment, retaining clip 5 is made up of length 230mm, width 90mm, the steel plate of thickness 10mm.Steel plate is converted into The bayonet socket 5.2 of hook-type, the height of bayonet socket 5.2 is 40mm, the degree of depth is 70mm;In the bottom of bayonet socket 5.2 away from opening edge 35mm, away from card The circular hole of an a diameter of φ 22mm is offered at mouth 5.2 side 45mm, and this circular hole bottom concentric position one M20's of welding Locking nut 6.1, locking nut 6.1 coordinates with clamping screw 6;Again with two block lengths be 180mm, width be 130mm, thickness be The steel plate of 10mm makes two pieces of gussets 5.3, and gusset 5.3 side vertical center opens an a length of 80mm, the degree of depth is 60mm's Square draw-in groove 5.4, draw-in groove 5.4 coordinates with the outer wall of bayonet socket 5.2, and draw-in groove 5.4 is strengthened by welding with the junction of bayonet socket 5.2 Fixing, gusset 5.3 is 10mm with the distance of bayonet socket 5.2 both sides;The full silk screw rod using M20*170mm makes clamp adjusting rod 5.1, clamp adjusting rod 5.1 inserts in the adjustment hole 2.3 of φ 16mm, and insertion depth is 40mm, and keeps clamp adjusting rod 5.1 The angle that the body of rod is formed with bayonet socket 5.2 opening place vertical plane is 90 °, the portion contacted clamp adjusting rod 5.1 with retaining clip 5 Divide and weld.
These are only the preferred embodiments of the present invention, not thereby limit the scope of the claims of the present invention, every utilize this Equivalent structure or equivalence flow process that bright description and accompanying drawing content are made convert, or it is relevant to be directly or indirectly used in other Technical field, be the most in like manner included in the scope of patent protection of the present invention.

Claims (10)

1. H profile steel beam docking node locating installation method, it is characterised in that specifically include following steps:
Step one, the web both sides of girder steel one pre-install connecting plate, a part for connecting plate is overlapping with the web part of girder steel one, The bolt hole offered on connecting plate is directed at the bolt hole offered on girder steel one web;
Step 2, girder steel one handling is docked at girder steel two, make the levelness on both edges of a wing keep consistent, web Perpendicularity keeps consistent;Gap is left between girder steel one and girder steel two butt end;Launch connecting plate, another of connecting plate simultaneously Part is overlapping with the web of girder steel two;
Step 3, offer positioning installation apparatus, described positioning installation apparatus includes adjustment structure and snap fastener, governor motion bag Including the first adjustment seat, the second adjustment seat and adjusting rod, the first adjustment seat is connected with one end of adjusting rod, the other end of adjusting rod with Second adjustment seat connects, and the closure of the length direction of adjusting rod and two girder steels is consistent;Snap fastener includes fixing card body, Offering the bayonet socket of hook on retaining clip, bayonet socket can match with the edge of a wing side of girder steel;First adjustment seat and the second regulation The outside of seat is each configured with fixing card body;
Step 4, installation governor motion: the first adjustment seat and the second adjustment seat are individually positioned in the wing of two girder steel butt ends Edge surface;
Step 5, installation snap fastener: the bayonet socket of retaining clip is inserted respectively into the edge of a wing side of two girder steels, and pretension is locked Bolt, makes the side of two steel beam flange of bayonet socket clamping, tightens retaining clip and connects the adjusting nut of governor motion, makes regulation machine Structure and snap fastener form an entirety, reach to carry the requirement of stress;
Step 6, calibration connecting plate are with the bolt hole on girder steel two: be rotationally connected plate, make on the bolt hole on connecting plate and girder steel Bolt hole alignment;
Step 7, it is inserted into high-strength bolt at the bolt hole of connecting plate and two steel beam web plates, it is achieved connecting plate and two girder steels The connection of web;
Step 8, dismounting positioning installation apparatus, the flange surfaces at girder steel one and girder steel two arranges a top board, top board and girder steel One and girder steel two the edge of a wing on all correspondences offer bolt hole, top board is connected with girder steel one and girder steel two by high-strength bolt.
2. H profile steel beam docking node locating installation method as claimed in claim 1, it is characterised in that in step 4, regulation Adjusting rod, make distance between the first adjustment seat and the second adjustment seat and two girder steels to dock distance adaptive.
3. H profile steel beam docking node locating installation method as claimed in claim 1, it is characterised in that in step 6, when even When the bolt hole of fishplate bar exists longitudinally displaced with the bolt hole on girder steel two web, regulate the first adjustment seat and the second regulation simultaneously Clamping screw on seat, makes girder steel one concordant with the flange plate of girder steel two, eliminates longitudinally displaced;Bolt hole and steel when connecting plate When bolt hole on beam two web exists transversion malposition, rotate adjusting rod, change between the first adjustment seat and the second adjustment seat Distance, it is ensured that connecting plate is directed in the horizontal direction with the bolt hole of girder steel two, eliminates transversion malposition.
4. H profile steel beam docking node locating installation method as claimed in claim 1, it is characterised in that on described retaining clip Being provided with clamp adjusting rod, one end of clamp adjusting rod is connected with fixing card body, and the other end of clamp adjusting rod is through the first tune Joint seat, matches with adjusting nut;In step 6, after the bolt hole on connecting plate is directed at the bolt hole on girder steel, pass through Be tightened the clamp adjusting rod of clamp, makes the edge of a wing of retaining clip and two girder steels fit.
5. H profile steel beam docking node locating installation method as claimed in claim 2, it is characterised in that described adjusting rod can be Expansion link.
6. H profile steel beam docking node locating installation method as claimed in claim 1, it is characterised in that in step 7, by hinge Cutter or file are to not repairing by the bolt hole adaptive with clamping screw;By complete for the clamping screw around this bolt hole during finishing Portion tightens, it is ensured that the web of connecting plate and two girder steels fits tightly.
7. H profile steel beam docking node locating installation method as claimed in claim 1, it is characterised in that in one end of adjusting rod Offer the first external screw thread, the first external screw thread and the first screw-internal thread fit being opened in the first adjustment seat;Another at adjusting rod One end offers the second external screw thread, the second external screw thread and the second screw-internal thread fit being opened in the second adjustment seat, and described first External screw thread and the second externally threaded hand of spiral are contrary.
8. H profile steel beam docking node locating installation method as claimed in claim 1, it is characterised in that the first adjustment seat and the The structure of two adjustment seats is identical, and both become axial symmetry to be distributed in the two ends of adjusting rod;Described first adjustment seat is cuboid, first The length direction of adjustment seat is identical with the length direction of adjusting rod;First adjustment seat offers the regulating tank of up/down perforation, First male end of adjusting rod may pass through regulating tank;The centrage of described first female thread and the width of the first adjustment seat bottom surface Center line is parallel.
9. H profile steel beam docking node locating installation method as claimed in claim 1, it is characterised in that on described retaining clip It is provided with gusset, gusset offers the draw-in groove coordinated with bayonet socket outer wall, is welded and fixed at draw-in groove and bayonet connection.
10. H profile steel beam docking node locating installation method as claimed in claim 1, it is characterised in that on the side of bayonet socket Portion is fixed with locking nut, and locking nut matches with clamping screw, and the lower end of clamping screw can be with the flange surfaces of girder steel Compress.
CN201610614576.6A 2016-07-29 2016-07-29 H profile steel beam docks node locating installation method Active CN106193622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610614576.6A CN106193622B (en) 2016-07-29 2016-07-29 H profile steel beam docks node locating installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610614576.6A CN106193622B (en) 2016-07-29 2016-07-29 H profile steel beam docks node locating installation method

Publications (2)

Publication Number Publication Date
CN106193622A true CN106193622A (en) 2016-12-07
CN106193622B CN106193622B (en) 2018-04-10

Family

ID=57498009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610614576.6A Active CN106193622B (en) 2016-07-29 2016-07-29 H profile steel beam docks node locating installation method

Country Status (1)

Country Link
CN (1) CN106193622B (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869115A (en) * 2017-11-20 2018-04-03 苏交科集团股份有限公司 Prefabricated concrete component multidirectional displacement adjusting device and construction method
CN108060782A (en) * 2017-10-31 2018-05-22 中建钢构有限公司 The installation method and auxiliary mounting tool of girder steel element
CN108086485A (en) * 2017-11-03 2018-05-29 中建钢构有限公司 A kind of steel construction large-sized bolt gusset plate installation closing device and installation method
CN108442521A (en) * 2018-05-30 2018-08-24 中国建筑第八工程局有限公司 Board plug type I-steel adjustable-length connecting node and its construction method
CN108560820A (en) * 2018-05-30 2018-09-21 中国建筑第八工程局有限公司 Board plug type box beam is adjustable connecting node and its construction method
CN108643353A (en) * 2018-05-30 2018-10-12 中国建筑第八工程局有限公司 A kind of the box beam connecting node and its construction method of adjustable length
CN108946466A (en) * 2018-07-21 2018-12-07 国网福建省电力有限公司 Ring rail lifts Special safety device
CN109868749A (en) * 2019-03-15 2019-06-11 中铁大桥局集团有限公司 A kind of steel truss girder hole-specifically sets up closure mouth wind-resistance locking device and application method
CN110039242A (en) * 2019-05-16 2019-07-23 上海外高桥造船有限公司 T arranges docking facilities
CN110185271A (en) * 2019-06-04 2019-08-30 惠生(南通)重工有限公司 The fixed device of device to hole and interconnection method for the docking of H profile steel column
CN110485749A (en) * 2019-09-04 2019-11-22 陕西省建筑科学研究院有限公司 A kind of device for positioning and resetting for H profile steel component external prestressing steel strand wires
CN110656585A (en) * 2019-09-29 2020-01-07 山东省公路建设(集团)有限公司 Auxiliary tool ruler for transverse connection and hole alignment of separated steel box girder and construction method
CN110700413A (en) * 2019-10-19 2020-01-17 深圳金鑫绿建股份有限公司 Detachable steel beam mounting connecting piece and steel beam connecting method
CN111085848A (en) * 2019-12-16 2020-05-01 中建四局安装工程有限公司 H-shaped steel beam installation and butt joint combination tool and butt joint installation method
CN111395652A (en) * 2020-04-01 2020-07-10 尤立亚 H-shaped steel with height adjusting function
CN111997262A (en) * 2020-09-15 2020-11-27 中国五冶集团有限公司 Steel beam high-altitude connecting plate and connecting method thereof
CN112144900A (en) * 2020-09-30 2020-12-29 无锡市光彩机械制造有限公司 Integrated profile steel adjusting device
CN112681764A (en) * 2020-11-18 2021-04-20 中国一冶集团有限公司 Steel structure beam butt joint adjusting device
CN112792491A (en) * 2021-02-03 2021-05-14 中铁十七局集团城市建设有限公司 Welding method of H-shaped steel structure and horizontal positioning and connecting device
CN114227107A (en) * 2021-12-24 2022-03-25 浙江中南建设集团钢结构有限公司 Accurate positioning method for H-shaped steel member stiffening plate
CN114351858A (en) * 2021-12-20 2022-04-15 安徽跨宇钢结构网架工程有限公司 End butt joint node of H-shaped steel and construction method
CN114458021A (en) * 2022-01-17 2022-05-10 北辰建筑科技(深圳)有限公司 Construction process for butt joint of upper layer and lower layer of shear wall of steel-concrete composite pipe
CN114541651A (en) * 2022-03-02 2022-05-27 王磊 Steel structure supporting beam for building
CN114776047A (en) * 2022-04-14 2022-07-22 中建八局第一建设有限公司 Steel beam mounting and fixing device and implementation method
CN116464305A (en) * 2023-06-19 2023-07-21 山西八建集团有限公司 Accurate assembly device based on field conversion truss installation
CN117513543A (en) * 2024-01-08 2024-02-06 山西一建集团有限公司 Door type steel structure steel beam node connection structure
CN118208052A (en) * 2024-05-22 2024-06-18 临汾世豪钢结构有限公司 Auxiliary device for steel structure installation and use method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541476A (en) * 2019-08-01 2019-12-06 中国华冶科工集团有限公司 steel beam butt joint method and steel clamping plate for steel beam butt joint

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0782800A (en) * 1993-06-29 1995-03-28 Railway Technical Res Inst Method for constructing composite joint of friction joint using high strength bolt and welded joint
JPH0914218A (en) * 1995-07-04 1997-01-14 Buruman Kk Main member jointing fixture for temporary structure
CN201794168U (en) * 2010-06-29 2011-04-13 山东莱钢建设有限公司 Steel column butt-joint connector
CN202299465U (en) * 2012-02-16 2012-07-04 山东锦城钢结构有限责任公司 Quick adjustment device for steel beam hoisting
CN203649749U (en) * 2013-12-31 2014-06-18 成都东南钢结构有限公司 H-shaped steel structure butted fastener capable of rapid positioning
CN204139624U (en) * 2014-09-02 2015-02-04 中建钢构有限公司 H profile steel beam Fast Installation positioning apparatus
CN104912342A (en) * 2015-06-16 2015-09-16 中国五冶集团有限公司 Steel column butt joint regulating device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0782800A (en) * 1993-06-29 1995-03-28 Railway Technical Res Inst Method for constructing composite joint of friction joint using high strength bolt and welded joint
JPH0914218A (en) * 1995-07-04 1997-01-14 Buruman Kk Main member jointing fixture for temporary structure
CN201794168U (en) * 2010-06-29 2011-04-13 山东莱钢建设有限公司 Steel column butt-joint connector
CN202299465U (en) * 2012-02-16 2012-07-04 山东锦城钢结构有限责任公司 Quick adjustment device for steel beam hoisting
CN203649749U (en) * 2013-12-31 2014-06-18 成都东南钢结构有限公司 H-shaped steel structure butted fastener capable of rapid positioning
CN204139624U (en) * 2014-09-02 2015-02-04 中建钢构有限公司 H profile steel beam Fast Installation positioning apparatus
CN104912342A (en) * 2015-06-16 2015-09-16 中国五冶集团有限公司 Steel column butt joint regulating device

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108060782A (en) * 2017-10-31 2018-05-22 中建钢构有限公司 The installation method and auxiliary mounting tool of girder steel element
CN108086485A (en) * 2017-11-03 2018-05-29 中建钢构有限公司 A kind of steel construction large-sized bolt gusset plate installation closing device and installation method
CN107869115B (en) * 2017-11-20 2023-08-29 苏交科集团股份有限公司 Multidirectional displacement adjusting device for precast concrete member and construction method
CN107869115A (en) * 2017-11-20 2018-04-03 苏交科集团股份有限公司 Prefabricated concrete component multidirectional displacement adjusting device and construction method
CN108442521B (en) * 2018-05-30 2023-06-20 中国建筑第八工程局有限公司 Insertion plate type I-steel length-adjustable connecting node and construction method thereof
CN108442521A (en) * 2018-05-30 2018-08-24 中国建筑第八工程局有限公司 Board plug type I-steel adjustable-length connecting node and its construction method
CN108560820A (en) * 2018-05-30 2018-09-21 中国建筑第八工程局有限公司 Board plug type box beam is adjustable connecting node and its construction method
CN108643353A (en) * 2018-05-30 2018-10-12 中国建筑第八工程局有限公司 A kind of the box beam connecting node and its construction method of adjustable length
CN108946466B (en) * 2018-07-21 2019-10-22 国网福建省电力有限公司 Ring rail lifts Special safety device
CN108946466A (en) * 2018-07-21 2018-12-07 国网福建省电力有限公司 Ring rail lifts Special safety device
CN109868749A (en) * 2019-03-15 2019-06-11 中铁大桥局集团有限公司 A kind of steel truss girder hole-specifically sets up closure mouth wind-resistance locking device and application method
CN110039242A (en) * 2019-05-16 2019-07-23 上海外高桥造船有限公司 T arranges docking facilities
CN110185271A (en) * 2019-06-04 2019-08-30 惠生(南通)重工有限公司 The fixed device of device to hole and interconnection method for the docking of H profile steel column
CN110185271B (en) * 2019-06-04 2024-03-26 惠生清洁能源科技集团股份有限公司 Hole alignment fixing device and method for butt joint of H-shaped steel upright posts
CN110485749A (en) * 2019-09-04 2019-11-22 陕西省建筑科学研究院有限公司 A kind of device for positioning and resetting for H profile steel component external prestressing steel strand wires
CN110656585A (en) * 2019-09-29 2020-01-07 山东省公路建设(集团)有限公司 Auxiliary tool ruler for transverse connection and hole alignment of separated steel box girder and construction method
CN110700413A (en) * 2019-10-19 2020-01-17 深圳金鑫绿建股份有限公司 Detachable steel beam mounting connecting piece and steel beam connecting method
CN111085848A (en) * 2019-12-16 2020-05-01 中建四局安装工程有限公司 H-shaped steel beam installation and butt joint combination tool and butt joint installation method
CN111085848B (en) * 2019-12-16 2021-08-13 中建四局安装工程有限公司 H-shaped steel beam installation and butt joint combination tool and butt joint installation method
CN111395652A (en) * 2020-04-01 2020-07-10 尤立亚 H-shaped steel with height adjusting function
CN111997262A (en) * 2020-09-15 2020-11-27 中国五冶集团有限公司 Steel beam high-altitude connecting plate and connecting method thereof
CN112144900A (en) * 2020-09-30 2020-12-29 无锡市光彩机械制造有限公司 Integrated profile steel adjusting device
CN112681764A (en) * 2020-11-18 2021-04-20 中国一冶集团有限公司 Steel structure beam butt joint adjusting device
CN112792491A (en) * 2021-02-03 2021-05-14 中铁十七局集团城市建设有限公司 Welding method of H-shaped steel structure and horizontal positioning and connecting device
CN114351858A (en) * 2021-12-20 2022-04-15 安徽跨宇钢结构网架工程有限公司 End butt joint node of H-shaped steel and construction method
CN114227107A (en) * 2021-12-24 2022-03-25 浙江中南建设集团钢结构有限公司 Accurate positioning method for H-shaped steel member stiffening plate
CN114227107B (en) * 2021-12-24 2023-09-26 浙江中南绿建科技集团有限公司 Accurate positioning method for stiffening plate of H-shaped steel member
CN114458021A (en) * 2022-01-17 2022-05-10 北辰建筑科技(深圳)有限公司 Construction process for butt joint of upper layer and lower layer of shear wall of steel-concrete composite pipe
CN114541651B (en) * 2022-03-02 2023-10-31 正元智慧装备有限责任公司 Steel construction supporting beam for building
CN114541651A (en) * 2022-03-02 2022-05-27 王磊 Steel structure supporting beam for building
CN114776047A (en) * 2022-04-14 2022-07-22 中建八局第一建设有限公司 Steel beam mounting and fixing device and implementation method
CN114776047B (en) * 2022-04-14 2023-07-07 中建八局第一建设有限公司 Steel beam installation and fixation device and implementation method
CN116464305A (en) * 2023-06-19 2023-07-21 山西八建集团有限公司 Accurate assembly device based on field conversion truss installation
CN116464305B (en) * 2023-06-19 2023-09-26 山西八建集团有限公司 Accurate assembly device based on field conversion truss installation
CN117513543A (en) * 2024-01-08 2024-02-06 山西一建集团有限公司 Door type steel structure steel beam node connection structure
CN117513543B (en) * 2024-01-08 2024-04-02 山西一建集团有限公司 Door type steel structure steel beam node connection structure
CN118208052A (en) * 2024-05-22 2024-06-18 临汾世豪钢结构有限公司 Auxiliary device for steel structure installation and use method thereof

Also Published As

Publication number Publication date
CN106193622B (en) 2018-04-10

Similar Documents

Publication Publication Date Title
CN106193622A (en) H profile steel beam docking node locating installation method
CN106223628A (en) H profile steel beam docking node locating erecting device
CN205600219U (en) Light -duty pipeline is to mouthpart based on large pipe welding
CN206689675U (en) A kind of multifunctional pipe welds contra-aperture device
CN207406036U (en) A kind of adjustable beam bottom support jacking device
CN111745316A (en) Rapid positioning and correcting method for butt joint of steel pipes
CN203197496U (en) Multi-direction adjustable oblique supporting device
CN206277093U (en) Steel reinforcement cage spreading abutment sleeve
CN201124293Y (en) Conduit pipeline clamping, welding positioning clamp
CN106706419A (en) Device for simulating boundary condition of simple support during plate piece testing
CN209066900U (en) Steel girder erection bracket
CN103406711A (en) Special tool for aligning butt joint of steel pipes
CN203779027U (en) Adjustable fixed shape-maintaining device for assembling combined profiles
KR20130003180U (en) Clamp device for wedding pipe
CN203712181U (en) Mouth aligning device for small pipeline welding
US10961734B2 (en) Non-weld joist reinforcement system and method
CN108979168A (en) Steel girder erection bracket and its installation and application
CN207079948U (en) A kind of life rope fixed mount
CN106049680A (en) Combined framework with grid frame and truss being located on same plane and connecting piece
CN207431647U (en) A kind of welded pipe line contra-aperture device
CN213318665U (en) Quick positioning and correcting device for butt joint of steel pipe
CN110466494B (en) Hovercraft air guide sleeve and processing method thereof
CN208358152U (en) One kind being used for the vertically arranged device of profile
CN101941531A (en) Micro-satellite assembly and disassembly method based on large-span hanging
CN107327028B (en) Curved surface main structure and time structure connection construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant