CN202272687U - Crystal bar lifting conveying vehicle - Google Patents

Crystal bar lifting conveying vehicle Download PDF

Info

Publication number
CN202272687U
CN202272687U CN201120330748XU CN201120330748U CN202272687U CN 202272687 U CN202272687 U CN 202272687U CN 201120330748X U CN201120330748X U CN 201120330748XU CN 201120330748 U CN201120330748 U CN 201120330748U CN 202272687 U CN202272687 U CN 202272687U
Authority
CN
China
Prior art keywords
crystal bar
pedestal
pulley
support
handwheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120330748XU
Other languages
Chinese (zh)
Inventor
史根松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG TIANRUN NEW MATERIALS CO LTD
Original Assignee
ZHEJIANG TIANRUN NEW MATERIALS CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG TIANRUN NEW MATERIALS CO LTD filed Critical ZHEJIANG TIANRUN NEW MATERIALS CO LTD
Priority to CN201120330748XU priority Critical patent/CN202272687U/en
Application granted granted Critical
Publication of CN202272687U publication Critical patent/CN202272687U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Crystals, And After-Treatments Of Crystals (AREA)

Abstract

The utility model relates to a device for conveying crystal bars, in particular to a crystal bar lifting conveying vehicle. The crystal bar lifting conveying vehicle comprises a support as well as a crystal bar fixation device and a lifting mechanism which are arranged on the support and are matched with each other, wherein the crystal bar fixation device comprises a first base as well as a crystal bar bed and a crystal bar clip which are arranged on the first base and are matched with each other, both sides of the lower part of the first base are provided with sliding rails, and both sides of the support are provided with first sliding grooves which are matched with the sliding rails; and the lifting mechanism comprises a pulley component and a chain which are matched with each other as well as a limiting device and a first hand wheel which are matched with each other, the pulley component comprises a first pulley which is fixed on the top of the support and a second pulley which is fixed on the middle part of the support, the first hand wheel and the limiting device are fixed on the middle part of the support, and the chain bypasses the first pulley, the second pulley and the first hand wheel and then is connected with a bearing object and the limiting device respectively. The device is labor-saving, improves production efficiency and saves production cost.

Description

A kind of crystal bar lifting carrier
Technical field
The utility model relates to a kind of device of carrying crystal bar, especially a kind of crystal bar lifting carrier.
Background technology
Along with continuous progress in science and technology, commercial production levels also improves constantly, and wherein the crystal bar industry is also developed rapidly; Domestic crystal bar production technology is constantly progressive, makes crystal bar manufacturing scale and product design also improve greatly, under this background; Increasing crystal bar manufacturer is born; Yet need the processing of process multiprogramming in the crystal bar production process, wherein having is that crystal bar is placed into the chamfering that processes crystal bar on the chamfering flour milling machine together, and the social at present way that goes up this procedure generally is that manual work installs to crystal bar on the crystal bar loader transporter; It is transported to by the chamfering flour milling machine; Manual work is lifted to crystal bar on the chamfering flour milling machine then, carries out flour milling, has strengthened labor strength, has reduced production efficiency; And since the weight of crystal bar generally all more than 50kg, heavier, two people to coact and go up rod, misoperation is bigger, crystal bar is run into the metal bed frame of grinding machine, and crystal bar is damaged, and causes bigger loss, has increased productive costs.
Summary of the invention
The utility model provides a kind of and can save labour power, enhanced productivity, the crystal bar lifting carrier that saves production cost simultaneously in order to solve defective and the deficiency that above-mentioned prior art exists.
The technical scheme of the utility model: a kind of crystal bar lifting carrier, comprise support and be arranged on crystal bar anchor fitting and the lifting mechanism that cooperatively interacts on the support,
Said crystal bar anchor fitting comprises first pedestal and is arranged on the crystal bar bed that cooperatively interacts on first pedestal and the crystal bar folder, and both sides, the said first pedestal bottom are provided with slide rail, and said support both sides are provided with first chute that cooperates slide rail;
Said lifting mechanism comprises pulley assembly and chain and the inhibiting device that cooperatively interacts and first handwheel that cooperatively interacts; Said pulley assembly comprises first pulley that is fixed on a top of the trellis and second pulley that is fixed on mid-stent; Said first handwheel and inhibiting device are fixed on mid-stent, and said chain is connected with inhibiting device with the crystal bar anchor fitting respectively after walking around first pulley, second pulley and first handwheel.
Preferably; Said crystal bar folder is arranged on first pedestal middle part, and it comprises second pedestal and is arranged on a pair of geometrical clamp on second pedestal, the end of said geometrical clamp and the second pedestal sliding block joint; Said second pedestal, one end is provided with second handwheel and the leading screw screw rod that cooperatively interacts; The middle part of said geometrical clamp is connected with leading screw screw rod leading screw, and said two geometrical clamps are symmetrical, is positioned at two geometrical clamp centers on the said leading screw screw rod and is provided with limiting stopper.
Preferably, the end of said geometrical clamp is provided with second chute that holds second pedestal, and said geometrical clamp is through second chute and the second pedestal sliding block joint.
Preferably, said crystal bar bed is arranged on the below of crystal bar folder, and it comprises the 3rd pedestal and the bed body that is arranged on the 3rd pedestal.
Preferably, said bed body comprises two cross bars that are parallel to each other, and is provided with sheave post, reinforced rib and the brace panel that is arranged in parallel between said two cross bars.
Preferably, said mid-stent is provided with stay bearing plate and strut bar, and said first handwheel is arranged on the stay bearing plate, and said inhibiting device is arranged on the strut bar.
Preferably, said inhibiting device is the fixing chain receiving bucket of chain position.
Preferably, the both sides of corresponding first handwheel of said support place side are provided with handrail.
Preferably, said frame bottom is provided with supporting seat, and said supporting seat one end is provided with roller, and the supporting seat other end is provided with cardan wheel.
The utility model is combined in crystal bar anchor fitting and lifting mechanism on the crystal bar transport trolley, makes crystal bar directly to move on the grinding machine, has saved crystal bar and has repeatedly lifted the process of putting, and not only saves labour power, enhances productivity, and practiced thrift productive costs.
Description of drawings
Fig. 1 is the Facad structure scheme drawing of the utility model;
Fig. 2 is the structure scheme drawing of the utility model;
Fig. 3 is first pedestal and a support bonded assembly structural representation in the utility model.
1. supports among the figure, 2. stay bearing plate, 3. strut bar, 4. limiting stopper, 5. supporting seat, 6. roller, 7. cardan wheel; 8. handrail, 9. brace panel, 10. slide block, 11. bracing frames, 12. reinforced ribs, 13. chutes, 21. first pulleys; 22. second pulley, 23. first handwheels, 24. chain receiving buckets, 25. chains, 41. first pedestals, 42. slide rails, 43. second handwheels; 44. the leading screw screw rod, 45. geometrical clamps, 46. bodies, 47. second pedestals, 48. sheave posts, 49. the 3rd pedestals.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further detailed explanation, but be not restriction the utility model protection domain.
Shown in Fig. 1-3; A kind of crystal bar lifting carrier; Comprise support 1 and be arranged on crystal bar anchor fitting and the lifting mechanism that cooperatively interacts on the support 1; The crystal bar anchor fitting comprises first pedestal 41 and is arranged on the crystal bar bed that cooperatively interacts on first pedestal 41 and the crystal bar folder, and the left and right sides, first pedestal, 41 bottom is provided with slide rail 42, and support 1 left and right sides is provided with the chute 13 that cooperates slide rail 42;
Lifting mechanism comprises pulley assembly and chain 25 and the inhibiting device that cooperatively interacts and first handwheel 23 that cooperatively interacts; Support 1 middle part is provided with stay bearing plate 2 and strut bar 3; First handwheel 23 is arranged on the stay bearing plate 2; Inhibiting device is arranged on the strut bar 3, and inhibiting device is the fixing chain receiving bucket 24 of chain position; Pulley assembly comprises after first pulley 21 that is fixed on support 1 top and second pulley 22 that is fixed on support 1 middle part, chain 25 are walked around first pulley 21, second pulley 22 and first handwheel 23 and being connected with inhibiting device with the crystal bar anchor fitting respectively.
Crystal bar folder is arranged on first pedestal, 41 middle parts, and it comprises second pedestal 47 and be arranged on a pair of geometrical clamp 45 on second pedestal 47, and the upper end of geometrical clamp 45 is provided with the slide block 10 that holds second pedestal 47, and geometrical clamp 45 is through slide block 10 and second pedestal, 47 sliding block joints.
Second pedestal, 47 left ends are provided with second handwheel 43 and leading screw screw rod 44 that cooperatively interacts, and the middle part of geometrical clamp 45 is connected with leading screw screw rod 44 leading screws, and two geometrical clamps 45 are symmetrical, and the center that is positioned at two geometrical clamps 45 on the leading screw screw rod 44 is provided with limiting stopper 4.
The crystal bar bed is arranged on the below of crystal bar folder, and it comprises the 3rd pedestal 49 and the bed body 46 that is arranged on the 3rd pedestal 49, and bed body 46 comprises two cross bars that are parallel to each other, and is provided with pulley 48, reinforced rib 12 and the brace panel 9 that is parallel to each other between two cross bars.
The left and right sides at support 1 back side is provided with handrail 8; Support 1 bottom is provided with supporting seat 5, and supporting seat 5 front ends are provided with bracing frame 11 and roller 6, and supporting seat 5 rear ends are provided with cardan wheel 7.
When the utility model uses, crystal bar is moved on the crystal bar bed,, crystal bar is fixed, then crystal bar is transported to the grinding machine place with second handwheel, the 43 adjustment crystal bar folders in left side.With the height of the first handwheel 23 adjustment crystal bar beds at the back side, be same horizon after making the crystal bar bed aim at grinding machine, artificial crystal bar is passed to grinding machine gets final product.
The utility model is combined in crystal bar anchor fitting and lifting mechanism on the crystal bar transport trolley, has saved crystal bar and has repeatedly lifted the process of putting, and makes crystal bar directly to move on the grinding machine, not only saves labour power, enhances productivity, and practiced thrift productive costs.

Claims (9)

1. a crystal bar lifting carrier comprises support and is arranged on crystal bar anchor fitting and the lifting mechanism that cooperatively interacts on the support, it is characterized in that:
Said crystal bar anchor fitting comprises first pedestal and is arranged on the crystal bar bed that cooperatively interacts on first pedestal and the crystal bar folder, and both sides, the said first pedestal bottom are provided with slide rail, and said support both sides are provided with the chute that cooperates slide rail;
Said lifting mechanism comprises pulley assembly and chain and the inhibiting device that cooperatively interacts and first handwheel that cooperatively interacts; Said pulley assembly comprises first pulley that is fixed on a top of the trellis and second pulley that is fixed on mid-stent; Said first handwheel and inhibiting device are fixed on mid-stent, and said chain is connected with inhibiting device with the crystal bar anchor fitting respectively after walking around first pulley, second pulley and first handwheel.
2. a kind of crystal bar lifting carrier according to claim 1; It is characterized in that: said crystal bar folder is arranged on first pedestal middle part; It comprises second pedestal and is arranged on a pair of geometrical clamp on second pedestal; The end of said geometrical clamp and the second pedestal sliding block joint, said second pedestal, one end is provided with second handwheel and the leading screw screw rod that cooperatively interacts, and the middle part of said geometrical clamp is connected with leading screw screw rod leading screw; Said two geometrical clamps are symmetrical, are positioned at two geometrical clamp centers on the said leading screw screw rod and are provided with limiting stopper.
3. a kind of crystal bar lifting carrier according to claim 2, it is characterized in that: the end of said geometrical clamp is provided with the slide block that holds second pedestal, and said geometrical clamp is through the slide block and the second pedestal sliding block joint.
4. a kind of crystal bar lifting carrier according to claim 1 is characterized in that: said crystal bar bed is arranged on the below of crystal bar folder, and it comprises the 3rd pedestal and the bed body that is arranged on the 3rd pedestal.
5. a kind of crystal bar lifting carrier according to claim 4 is characterized in that: said bed body comprises two parallel cross bars, is provided with sheave post, reinforced rib and the brace panel that is arranged in parallel between said two cross bars.
6. a kind of crystal bar lifting carrier according to claim 1, it is characterized in that: said mid-stent is provided with stay bearing plate and strut bar, and said first handwheel is arranged on the stay bearing plate, and said inhibiting device is arranged on the strut bar.
7. a kind of crystal bar lifting carrier according to claim 6 is characterized in that: said inhibiting device is the fixing chain receiving bucket of chain position.
8. a kind of crystal bar lifting carrier according to claim 1 is characterized in that: the both sides of corresponding first handwheel of said support place side are provided with handrail.
9. a kind of crystal bar lifting carrier according to claim 1, it is characterized in that: said frame bottom is provided with supporting seat, and said supporting seat one end is provided with bracing frame and roller, and the supporting seat other end is provided with cardan wheel.
CN201120330748XU 2011-08-30 2011-08-30 Crystal bar lifting conveying vehicle Expired - Fee Related CN202272687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120330748XU CN202272687U (en) 2011-08-30 2011-08-30 Crystal bar lifting conveying vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120330748XU CN202272687U (en) 2011-08-30 2011-08-30 Crystal bar lifting conveying vehicle

Publications (1)

Publication Number Publication Date
CN202272687U true CN202272687U (en) 2012-06-13

Family

ID=46193060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120330748XU Expired - Fee Related CN202272687U (en) 2011-08-30 2011-08-30 Crystal bar lifting conveying vehicle

Country Status (1)

Country Link
CN (1) CN202272687U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102886692A (en) * 2012-09-17 2013-01-23 芜湖市续元工贸有限公司 Installing bracket
CN103232011A (en) * 2013-05-16 2013-08-07 烽火通信科技股份有限公司 Optical cable metal belt moving vehicle
CN104085817A (en) * 2014-07-01 2014-10-08 广东溢达纺织有限公司 Carrying trolley for needle cylinder
CN105253816A (en) * 2015-11-11 2016-01-20 翁红俊 Forklift special for mounting manual electrical cabinet
CN109353954A (en) * 2018-10-30 2019-02-19 安徽华星智能停车设备有限公司 A kind of three-dimensional parking device mounting device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102886692A (en) * 2012-09-17 2013-01-23 芜湖市续元工贸有限公司 Installing bracket
CN103232011A (en) * 2013-05-16 2013-08-07 烽火通信科技股份有限公司 Optical cable metal belt moving vehicle
CN103232011B (en) * 2013-05-16 2015-12-09 烽火通信科技股份有限公司 A kind of optical cable metal belt transport trolley
CN104085817A (en) * 2014-07-01 2014-10-08 广东溢达纺织有限公司 Carrying trolley for needle cylinder
CN105253816A (en) * 2015-11-11 2016-01-20 翁红俊 Forklift special for mounting manual electrical cabinet
CN109353954A (en) * 2018-10-30 2019-02-19 安徽华星智能停车设备有限公司 A kind of three-dimensional parking device mounting device

Similar Documents

Publication Publication Date Title
CN202272687U (en) Crystal bar lifting conveying vehicle
CN110329903A (en) The hardware pipe fitting portal jib crane of changeable fixture
CN204237513U (en) A kind of material lifting tip lorry
CN201857072U (en) Conveying work frame for automobile edge-closing assembly parts
CN202864660U (en) Front floor panel lifting appliance
CN203466691U (en) Automatic overturn equipment for generator stator
CN106736933A (en) A kind of polishing machine for being easy to metallic article to replace
CN102897248B (en) Wire disassembling device of automobile
CN103659179A (en) Producing and processing technology and processing equipment for pulsator washing machine box
CN103639700A (en) Device for producing and processing box body of pulsator washing machine
CN205555914U (en) Transformer overhauls uses hoisting apparatus
CN202785293U (en) Instrument desk assembly lifting appliance
CN2771066Y (en) Special brick-transport cart for baking-free steaming-free brick manufacturing process
CN104289640B (en) The Automatic-clamping bar reinforced bar device of conveying bar reinforcing bar equipment
CN205602599U (en) Frock floor truck
CN205472419U (en) Buffer tank lifting device
CN206108251U (en) Nimble portable conveyer
CN202464780U (en) Fixing device used for crystal bar elevating carrying vehicle
CN207272549U (en) One kind welding auxiliary mould
CN206466689U (en) A kind of SIP wallboards delivery platform
CN202388173U (en) Forklift upper frame welding tool
CN202464651U (en) Height adjusting device used for crystal bar elevating carrying vehicle
CN201932259U (en) Mechanical disassembling platform of scrapped cars
CN206318632U (en) A kind of bridge crane large span supporting mechanism
CN207373141U (en) Shot-blasting machine machine frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120613

Termination date: 20130830