CN202265809U - 进水口导水叠梁 - Google Patents

进水口导水叠梁 Download PDF

Info

Publication number
CN202265809U
CN202265809U CN2011203565797U CN201120356579U CN202265809U CN 202265809 U CN202265809 U CN 202265809U CN 2011203565797 U CN2011203565797 U CN 2011203565797U CN 201120356579 U CN201120356579 U CN 201120356579U CN 202265809 U CN202265809 U CN 202265809U
Authority
CN
China
Prior art keywords
water guide
water
stoplog
stop log
guide stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203565797U
Other languages
English (en)
Inventor
张文辉
杨建红
詹振彪
王化恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
PowerChina Northwest Engineering Corp Ltd
Original Assignee
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORTHWEST HYDRO CONSULTING ENGINEERS CHECC filed Critical NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority to CN2011203565797U priority Critical patent/CN202265809U/zh
Application granted granted Critical
Publication of CN202265809U publication Critical patent/CN202265809U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Barrages (AREA)

Abstract

本实用新型属于水电站引水发电***的取水结构,特别是有取表层水流要求的进水口导水叠梁,其特征是:包括导水叠梁主体、横向支撑梁及导水叠梁支撑墙,所述的导水叠梁主体是由多个钢制叠梁连接构成,导水叠梁主体设置在进水口的上游侧,导水叠梁主体的两端支撑在两个平行的导水叠梁支撑墙顶部的叠梁门槽内;所述的两个导水叠梁支撑墙的下半部分墙体上分别对应开有四个横向串通孔,两个导水叠梁支撑墙之间设置有多个横向支撑梁;所述的叠梁门槽内设置有轨道。本实用新型的导水叠梁通过改变导水叠梁主体中的叠梁数量以适应水库水位变化,从而满足引水建筑物取表层水的要求。

Description

进水口导水叠梁
技术领域
本实用新型属于水电站引水发电***的取水结构,特别是有取表层水流要求的进水口导水叠梁。
背景技术
常规水电站进水口一般由拦污栅、检修闸门和事故闸门组成。但当库水位变动较大,或者由于下游生态要求,需要保证较深处的库水不流向下游,以免下游生态和生物群产生严重危害。此时常规的进水口不能保证在各种水位条件下,使进入电站压力管道的水只能来自水库表层。
发明内容
本实用新型的目的是提供一种进水口导水叠梁,它能有效引用水库表层水流,并避免深层库水进入下游。
本实用新型的技术方案:设计一种进水口导水叠梁,其特征是:包括导水叠梁主体、横向支撑梁及导水叠梁支撑墙,所述的导水叠梁主体是由多个钢制叠梁连接构成,导水叠梁主体设置在进水口的上游侧,导水叠梁主体的两端支撑在两个平行的导水叠梁支撑墙顶部的叠梁门槽内;所述的两个导水叠梁支撑墙的下半部分墙体上分别对应开有四个横向串通孔,两个导水叠梁支撑墙之间设置有多个横向支撑梁;所述的叠梁门槽内设置有轨道。
所述的横向支撑梁为钢筋混凝土结构。
 所述的横向支撑梁的断面为圆形或其他流线型。
本实用新型的有益效果是:本实用新型所述的结构,它能有效引用水库表层水流,并避免深层库水进入下游。该结构充分利用岸塔式进水口混凝土结构,避免另外设置专门的分层取水结构,并采用导水叠梁结构,通过改变叠梁数量来满足取表层水的要求。导水叠梁支撑墙上设置面积足够大的串通孔,使水流能够横向流动,试验表明设置串通孔后可以有效改善水流条件,减少涡流,降低水头损失。设置横向支撑梁增加隔墙延伸段的横向刚度,横向支撑梁断面为圆形或其他流线型改善水流条件。 
附图说明
下面结合实施例和实施例附图对本实用新型做进一步说明,但不作为对本实用新型的限定:
图1是本实用新型实施例的进水口导水叠梁横剖面图;
图2是本实用新型实施例的进水口导水叠梁顶层平面布置图;
图3是本实用新型实施例的进水口导水叠梁底层平面布置图。
图中:1、 导水叠梁主体;2、导水叠梁检修门库;3、导水叠梁支撑墙;4、横向支撑梁;5、拦污栅;6、检修闸门;7、工作闸门;8、横向串通孔;9、叠梁门槽;10、轨道。
具体实施方式
实施例1
在实施例中没有详细叙述到的结构,其结构与现有的已知结构相同。
图中拦污栅5、检修闸门6、工作闸门7为一般进水口的常规结构,其作用是完成电站常规进水口正常运行和检修所必需设置的结构。
如图1-3所示,本实施例的导水叠梁结构包括导水叠梁主体1、横向支撑梁4及导水叠梁支撑墙3,所述的导水叠梁主体1是由多个钢制叠梁连接构成,分节垂直高度2m,通过顶部启闭机进行提升操作,当库水位发生变化时,可以调整叠梁数量以适应水位变化。导水叠梁主体1设置在进水口的上游侧,导水叠梁主体1的两端支撑在两个平行的导水叠梁支撑墙3顶部的叠梁门槽9内;所述的两个导水叠梁支撑墙3的下半部分墙体上分别对应开有四个横向串通孔8,两个导水叠梁支撑墙3之间设置有多个横向支撑梁4;所述的叠梁门槽9内设置有钢制轨道10供叠梁提升和就位操作。所述轨道10也可以是其它金属。
导水叠梁需要改变挡水高度或检修时,可通过启闭设备将导水叠梁放置在导水叠梁检修门库2中。
本实用新型通过设置在上游的附加导水叠梁结构,阻挡水库底层水流进入进水口,通过水力学模型试验的验证,可以保证进入引水隧洞内的水流来自表层10m范围内,从而满足下游生态用水要求。
实施例2
 实施例2和实施例1基本相同,不同之处是,所述的横向支撑梁4为钢筋混凝土结构。
所述的横向支撑梁4的断面为圆形或其他流线型。

Claims (3)

1.进水口导水叠梁,其特征是:包括导水叠梁主体(1)、横向支撑梁(4)及导水叠梁支撑墙(3),所述的导水叠梁主体(1)是由多个钢制叠梁连接构成,导水叠梁主体(1)设置在进水口的上游侧,导水叠梁主体(1)的两端支撑在两个平行的导水叠梁支撑墙(3)顶部的叠梁门槽(9)内;所述的两个导水叠梁支撑墙(3)的下半部分墙体上分别对应开有四个横向串通孔(8),两个导水叠梁支撑墙(3)之间设置有多个横向支撑梁(4);所述的叠梁门槽(9)内设置有轨道(10)。
2.根据权利要求1所述的进水口导水叠梁,其特征是:所述的横向支撑梁(4)为钢筋混凝土结构。
3.根据权利要求1所述的进水口导水叠梁,其特征是:所述的横向支撑梁(4)的断面为圆形或其他流线型。
CN2011203565797U 2011-09-22 2011-09-22 进水口导水叠梁 Expired - Lifetime CN202265809U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203565797U CN202265809U (zh) 2011-09-22 2011-09-22 进水口导水叠梁

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203565797U CN202265809U (zh) 2011-09-22 2011-09-22 进水口导水叠梁

Publications (1)

Publication Number Publication Date
CN202265809U true CN202265809U (zh) 2012-06-06

Family

ID=46156608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203565797U Expired - Lifetime CN202265809U (zh) 2011-09-22 2011-09-22 进水口导水叠梁

Country Status (1)

Country Link
CN (1) CN202265809U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480910A (zh) * 2014-12-04 2015-04-01 中国电建集团贵阳勘测设计研究院有限公司 兼顾农业灌溉及生活供水的取水口构筑方法及结构
CN107740387A (zh) * 2017-11-21 2018-02-27 湖南湘投清水塘水电开发有限责任公司 水力发电导墙结构及导墙拆除方法
CN114908716A (zh) * 2022-06-17 2022-08-16 中国电建集团贵阳勘测设计研究院有限公司 一种基于高水头、大削落深度条件下的水利枢纽***
CN115419023A (zh) * 2022-10-19 2022-12-02 浙江九州治水科技股份有限公司 卧管启闭机、闸门控制方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480910A (zh) * 2014-12-04 2015-04-01 中国电建集团贵阳勘测设计研究院有限公司 兼顾农业灌溉及生活供水的取水口构筑方法及结构
CN107740387A (zh) * 2017-11-21 2018-02-27 湖南湘投清水塘水电开发有限责任公司 水力发电导墙结构及导墙拆除方法
CN114908716A (zh) * 2022-06-17 2022-08-16 中国电建集团贵阳勘测设计研究院有限公司 一种基于高水头、大削落深度条件下的水利枢纽***
CN115419023A (zh) * 2022-10-19 2022-12-02 浙江九州治水科技股份有限公司 卧管启闭机、闸门控制方法
CN115419023B (zh) * 2022-10-19 2023-11-14 浙江九州治水科技股份有限公司 卧管启闭机、闸门控制方法

Similar Documents

Publication Publication Date Title
CN103344411B (zh) 一种中浅水同向波流制造方法及实验水槽
CN202265809U (zh) 进水口导水叠梁
CN102322071B (zh) 一种220kV变电站主变压器的万能基础结构
CA3067651C (en) Method for improving inlet flow pattern of multihole inflow pump station
CN204343269U (zh) 一种电站分层取水的装置
CN205035779U (zh) 一种适用于输水隧洞调压及检修交通的施工支洞
CN102535422B (zh) 一种水利升船***
CN109371929B (zh) 设置有泄洪通道***的水工挡水建筑物
CN109263817A (zh) 用于水电工程大水位差的漂浮光伏电站***
CN204456047U (zh) 一种具有中间消能室底板长廊道的输水***
CN202247941U (zh) 汽轮发电机的基础
CN107419745A (zh) 一种键盘式防爆***
CN201953104U (zh) 一种发电厂主厂区
CN203978442U (zh) 一种公铁合建水下隧道
CN201883416U (zh) 半气垫封闭式虹吸井
CN203188187U (zh) 一种水电站地面厂房的端部挡水墙结构
CN205207899U (zh) 富水砂层大直径顶管顶进装置
CN201746823U (zh) 进水口消涡结构
CN205088644U (zh) 内置式驱动支撑机构液压坝
CN203188353U (zh) 一种水力消能器
CN204495163U (zh) 三角斜面消音防溅降噪器
CN203625876U (zh) 一种水电站垂直升船机
CN204125968U (zh) 一种电缆井防积水装置
CN202325541U (zh) 一种具有改良结构的隧道结构
CN202416274U (zh) 半地下式电站厂房上游侧墙体结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA XIBEI ENGINEERING CORPORATION

Free format text: FORMER NAME: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING

Owner name: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST

Free format text: FORMER NAME: HYDROCHINA XIBEI ENGINEERING CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee before: Northwest Hydro Consulting Engineers, CHECC

CX01 Expiry of patent term

Granted publication date: 20120606

CX01 Expiry of patent term