CN202249157U - Round coal yard retaining wall with concrete wall columns and steel plate wall - Google Patents

Round coal yard retaining wall with concrete wall columns and steel plate wall Download PDF

Info

Publication number
CN202249157U
CN202249157U CN2011203042493U CN201120304249U CN202249157U CN 202249157 U CN202249157 U CN 202249157U CN 2011203042493 U CN2011203042493 U CN 2011203042493U CN 201120304249 U CN201120304249 U CN 201120304249U CN 202249157 U CN202249157 U CN 202249157U
Authority
CN
China
Prior art keywords
wall
steel plate
steel
buttress
coal yard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203042493U
Other languages
Chinese (zh)
Inventor
王学民
余智恩
方伟定
陶涌
童建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd
Original Assignee
Zhejiang Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Design Institute filed Critical Zhejiang Electric Power Design Institute
Priority to CN2011203042493U priority Critical patent/CN202249157U/en
Application granted granted Critical
Publication of CN202249157U publication Critical patent/CN202249157U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a round coal yard retaining wall with concrete wall columns and a steel plate wall. The round coal yard retaining wall at least consists of wall supporting columns and a side wall, wherein the wall supporting columns are made of reinforced concrete; the side wall is fixed on the wall supporting columns and is formed by steel plates and steel beams; the wall supporting columns are distributed in a ring shape; the steel beams are circumferentially fixed on all the wall supporting columns, and the circumferential steel beams are connected with the steel plates that are distributed circumferentially; the cross section of each wall supporting column is made into the variable trapezoidal cross section with the upper part being small and the lower part being big; the circumferential steel plates are connected with the circumferential steel beams in an intermittent welding way; and embedded parts are embedded on the wall supporting columns, and the circumferential steel beams are fixedly connected with the wall supporting columns by the embedded parts. The round coal yard retaining wall has the characteristics that the structure is simple, the use and the installation are convenient, the material can be saved, the using cost is reduced, the service life is prolonged, etc.

Description

The circular coal yard barricade of steel plate wall concrete pilaster
Technical field
The utility model relates to the wall-retaining structure of a kind of novel steam power station round sealed coal yard, belong to power plant civil engineering structure technical field.
Background technology
Traditional circular coal yard wall-retaining structure has following several kinds:
The separate type barricade of 1 reinforced concrete soil zone pilaster and temperature joint;
2 steel concrete do not have pilaster integral seamless ring-plate barricade;
3 reinforced concrete soil zone pilaster integral seamless formula barricades;
4 reinforced concrete soil zone pilaster and ring beam integral seamless formula barricade;
Tradition separate type barricade calculates simple, but waste of material.Traditional integral barricade calculation of complex, especially temperature action is complicated, is difficult to accurate consideration; The Crack Control that the barricade arrangement of reinforcement is caused by temperature action, reinforcement stresses are 160N/mm 2About, not only actual reinforcing bar consumption is huge, and has potential security risk.
The utility model content
The purpose of the utility model mainly is to implement the target of national energy-saving and emission-reduction, overcomes the deficiency that above-mentioned prior art exists, and a kind of easy construction is provided, the circular coal yard barricade of the steel plate wall concrete pilaster of material economy.
The purpose of the utility model is accomplished through following technical scheme; The buttress that it is processed by steel concrete at least be fixed on the sidewall wall that steel plate on the said buttress adds girder steel and form; Described buttress is uniformly distributed with ringwise; Described girder steel hoop is fixed on all buttresses, and on described hoop girder steel, is connected with the steel plate that hoop is arranged.
The cross section of said buttress is made into up-small and down-big variable cross-section trapezoidal cross-section; Described hoop steel plate is connected on the described hoop girder steel through discontinuous welding in succession.
Be embedded with built-in fitting on the described buttress, described hoop girder steel is fixedly connected on the described buttress through described built-in fitting.
The utility model is owing to brought into play the tensile strength of concrete compressive strength and steel simultaneously, and comprehensive cost practices thrift about 30% than traditional form; Construction period practiced thrift 1 month than traditional structure; Have simple in structure, easy to install and use, can economical with materials, reduce use cost, increase characteristics such as application life.
Description of drawings
Fig. 1 is the overall structure sketch map of the utility model.
Fig. 2 is the partial structurtes sketch map of the utility model.
Fig. 3 is the layout plan of the utility model.
Fig. 4 is the sectional drawing of the utility model.
Fig. 5 is the node enlarged drawing of the utility model.
The specific embodiment
To combine below accompanying drawing to the utility model make detailed introduction: Fig. 1, shown in 2; The buttress 1 that the utility model is mainly processed by steel concrete be fixed on the sidewall wall that steel plate 2 on the said buttress 1 adds girder steel 3 and form; Described buttress 1 is uniformly distributed with ringwise; Described girder steel 3 hoops are fixed on all buttresses 1, and on described hoop girder steel 3, are connected with the steel plate 2 that hoop is arranged.
The cross section of buttress shown in the figure 1 is made into up-small and down-big variable cross-section trapezoidal cross-section; Described hoop steel plate 2 is connected on the described hoop girder steel 3 through discontinuous welding in succession.
Be embedded with built-in fitting on the described buttress 1 of the utility model, described hoop girder steel 3 is fixedly connected on the described buttress 1 through described built-in fitting.
The utility model is because the barricade sidewall is stressed with stretch bending control, and the intensity of steel structure material is high, and temperature action is insensitive, does not have the crack problem of reinforced concrete structure simultaneously again, so can economical with materials.
The quantity of the buttress 1 of the said novel barricade of the utility model, preferably 36, total symmetry like this, concrete certainly quantity should be calculated definite by loading conditions such as the diameter of barricade and coal piling height.
The buttress 1 of said novel barricade adopts monolithic reinforced concrete structure, by the building-site casting and constructing.The pilaster of steel concrete can provide barricade required rigidity.According to the loading characteristic of buttress, be preferably made top little below big variable cross-section trapezoidal cross-section, like this can economical with materials.The concrete cross-sectional sizes of buttress is calculated by loading conditions such as the diameter of barricade and coal piling height and to be confirmed.
Adopt between the hoop girder steel 3 of the said novel barricade of the utility model and the hoop steel plate 2 intermittently to be welded to connect, accomplish through the field Welding construction.Hoop girder steel 3 is along the quantity of short transverse, and the thickness of the cross-sectional sizes of hoop girder steel 3 and hoop steel plate 2 is calculated by loading conditions such as the diameter of barricade and coal piling height and to confirm.
Being connected between the hoop girder steel 3 of said novel barricade and the buttress 1 preferably is employed in the buttress 1 and buries built-in fitting underground, is connected by field Welding between hoop girder steel 3 and the built-in fitting.

Claims (3)

1. the circular coal yard barricade of a steel plate wall concrete pilaster; The buttress that it is processed by steel concrete is at least formed with the sidewall wall that is fixed on the said buttress, be made up of steel plate and girder steel; It is characterized in that described buttress is uniformly distributed with ringwise; Described girder steel hoop is fixed on all buttresses, and on described hoop girder steel, is connected with the steel plate that hoop is arranged.
2. the circular coal yard barricade of steel plate wall concrete pilaster according to claim 1 is characterized in that the cross section of said buttress is made into up-small and down-big variable cross-section trapezoidal cross-section; Described hoop steel plate is connected on the described hoop girder steel through discontinuous welding in succession.
3. the circular coal yard barricade of steel plate wall concrete pilaster according to claim 1 and 2 is characterized in that being embedded with built-in fitting on the described buttress, and described hoop girder steel is fixedly connected on the described buttress through described built-in fitting.
CN2011203042493U 2011-08-19 2011-08-19 Round coal yard retaining wall with concrete wall columns and steel plate wall Expired - Fee Related CN202249157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203042493U CN202249157U (en) 2011-08-19 2011-08-19 Round coal yard retaining wall with concrete wall columns and steel plate wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203042493U CN202249157U (en) 2011-08-19 2011-08-19 Round coal yard retaining wall with concrete wall columns and steel plate wall

Publications (1)

Publication Number Publication Date
CN202249157U true CN202249157U (en) 2012-05-30

Family

ID=46110419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203042493U Expired - Fee Related CN202249157U (en) 2011-08-19 2011-08-19 Round coal yard retaining wall with concrete wall columns and steel plate wall

Country Status (1)

Country Link
CN (1) CN202249157U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409897A (en) * 2011-08-19 2012-04-11 浙江省电力设计院 Round coal yard barricade of concrete pilaster of steel plate wall
CN105625787A (en) * 2016-02-05 2016-06-01 中国航空规划设计研究总院有限公司 Pre-stressed steel structure and concrete combined squat silo structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409897A (en) * 2011-08-19 2012-04-11 浙江省电力设计院 Round coal yard barricade of concrete pilaster of steel plate wall
CN105625787A (en) * 2016-02-05 2016-06-01 中国航空规划设计研究总院有限公司 Pre-stressed steel structure and concrete combined squat silo structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN103074941B (en) Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end
WO2017045223A1 (en) Prefabricated pier column member with steel-concrete composite structure
CN201972237U (en) Section prefabricated rectangular steel pipe concrete truss
CN203271243U (en) Chimney titanium plate steel inner barrel reverse installation construction device of thermal power plant
CN102383420B (en) High-strength concrete prefabricated pile doped with fiber-reinforced plastic bar
CN209654051U (en) A kind of inscribed lining cutting piece in steel corrugated plating Combined concrete tunnel
CN102409897A (en) Round coal yard barricade of concrete pilaster of steel plate wall
CN206784158U (en) A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN202208916U (en) High-strength concrete prefabricated pile
CN202249157U (en) Round coal yard retaining wall with concrete wall columns and steel plate wall
CN203498858U (en) Tower type crane concrete block combined foundation capable of being transferred and repeatedly used
CN102102456B (en) Powdery material repository
CN201981549U (en) Precast electric pole pile
CN203007933U (en) Compound reinforcing bar non-round concrete precast pile
CN202627615U (en) Round coal-yard coal bulkhead
CN205917726U (en) Stake girder construction integral type tower crane foundation structure
CN209482298U (en) A kind of concrete tubular pile Crane Rail support column
CN215906796U (en) Hollow interlayer concrete filled steel tube subway foundation pit support long support with flange nodes
CN204282824U (en) Prefabricated setting prop rises beam composite frame structure
CN205502058U (en) Pin -connected panel tower crane foundation
CN201065531Y (en) Longitudinal ring interlaced ridge type pipe pile
CN209585099U (en) A kind of substation truss assembled pile foundation using flanged joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP ZHEJIANG ELECTRIC P

Free format text: FORMER NAME: ZHEJIANG PROV. ELECTRIC POWER DESIGN INST.

CP01 Change in the name or title of a patent holder

Address after: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee after: Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd

Address before: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee before: Zhejiang Electric Power Design Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20150819

EXPY Termination of patent right or utility model