CN202247595U - 'Three-layer' plastic court - Google Patents

'Three-layer' plastic court Download PDF

Info

Publication number
CN202247595U
CN202247595U CN2011201809208U CN201120180920U CN202247595U CN 202247595 U CN202247595 U CN 202247595U CN 2011201809208 U CN2011201809208 U CN 2011201809208U CN 201120180920 U CN201120180920 U CN 201120180920U CN 202247595 U CN202247595 U CN 202247595U
Authority
CN
China
Prior art keywords
layer
plastic
court
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201809208U
Other languages
Chinese (zh)
Inventor
彭坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011201809208U priority Critical patent/CN202247595U/en
Application granted granted Critical
Publication of CN202247595U publication Critical patent/CN202247595U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a 'three-layer' plastic court, in particular to a plastic court with a composite structure. The plastic court is sequentially provided with a polyurethane (PU) plastic layer, a rubber particle layer and a bottom coating from top to bottom. The plastic court solves the problems of layer plastic cracking of a cement base due to expansion and contraction and high plastic construction difficulty caused by the unsmooth ground. Overall, the plastic court has the advantages of good footfeel, high ball resilience, durability and long quality guarantee period.

Description

A kind of " three-layer type " synthetic court
Technical field
The utility model relates to a kind of synthetic court, particularly a kind ofly adopts composite structured synthetic court.
Background technology
On the cement floor, build synthetic court at present, often because the basis of cement is poor, ground relief causes that the plastic cement difficulty of construction is big, materials are many, and constructs and exist surface layer out-of-flatness and plastic cement and cement floor not bonding after finishing, and causes off quality easily.In addition, because the natural law of expanding with heat and contract with cold, the cement floor can be drawn bad by flexible tension force, causes aspect plastic cement cracking.
The utility model content
The utility model is the synthetic court of a kind of composite structured " three-layer type "; It has solved concrete pedestal and has expanded with heat and contract with cold and cause problem and the ground out-of-flatness of aspect plastic cement cracking to cause the big problem of plastic cement difficulty of construction, has reduced difficulty of construction and has effectively prevented the fracture of aspect plastic cement.
The technical scheme of the employing of the utility model is: a kind of " three-layer type " synthetic court is characterized in that: said " three-layer type " synthetic court is followed successively by silicon PU plastic layer, layer of rubber particles and scratch coat from top to bottom.
The thickness of described silicon PU plastic layer is 3mm-5mm, and the thickness of layer of rubber particles is 5mm, and the thickness of scratch coat is 0.5mm.
The job practices of the utility model comprises:
1 scratch coat lays 1) choose solid smooth, coagulating cement earth foundation with certain drainage grade, no downgoing plate and the wide 10mm of being no more than of faulted joint.2) using concentration behind the moistening coagulating cement earth foundation of pickling clear water is evenly splash coagulating cement earth foundation and scrubbing of about 8% watery hydrochloric acid; Use flushing with clean water then, dry coagulating cement earth foundation and mark ponding position.3) processing in temperature joint and crack is also filled up with compressible foam with special-purpose gap-filling glue brushing temperature joint according to the concrete condition in temperature joint and crack, carries out polishing flat with portable sander after corresponding joint filling is handled.4) dry back, primary coat basis is with special-purpose priming paint roller coating basal plane, and forming bright continuous film is scratch coat.The effect of said scratch coat is priming paint to be permeated in the basal plane minute aperture, play the effect of stopping up ground steam and reinforcing basal plane.5) repair the zone that is no more than 5mm for depth of accumulated water and add quartz powder (or French chalk) with elastic layer and press mass ratio mixing in 1: 1 at the ponding place, adds thinner (xylenes) and stir and be adjusted to suitable construction denseness, is applied to the ponding place with scraper plate; Surpass the zone of 5mm for ponding, add 40-80 order sand by mass ratio 1 with priming paint: the 6-8 mix is even, smooth paving in ponding place and compacting.
After the laying of 2 layer of rubber particles treats that concrete foundation disposes, promptly form scratch coat after, rubber grain is stirred with glue special, with paver or artificial it is paved equably on said scratch coat, blade coating silicon PU primer is with the sealing of whole court.
3 silicon PU plastic layers 1 lay 1) the elastic layer elastic layer is the one-component material, only needs thinner is adjusted to after the suitable construction denseness to be coated with to scrape in basal plane with the tooth scraper plate to get final product.2) enhancement Layer enhancement Layer job practices is consistent with elastic layer.3) the surface layer surface layer is a bicomponent material, and to scale with A, B two components stir, and adds low amounts of water and is adjusted to suitable construction denseness, is coated with the glue scraper plate and scrapes in the enhancement Layer surface.Can add the special-purpose sand of surface layer in right amount according to shaggy needs.
The beneficial effect of the utility model is: the utility model has solved the ground flat degree problem and has reduced difficulty of construction, saves materials, has improved the application life in court.In addition, well solved again because the problem that concrete pedestal expands with heat and contract with cold and causes the aspect plastic cement to ftracture.On the whole, the utility model feel is good, and the ball resilience is high, and durable in use, time limit quality guarantee period is long.
Description of drawings
Fig. 1 is the structural representation of the utility model;
In the drawings, 1 silicon PU plastic layer, 2 layer of rubber particles, 3 scratch coats.
The specific embodiment
The job practices of the utility model is:
1 scratch coat 3 lays 1) choose solid smooth, coagulating cement earth foundation with certain drainage grade, no downgoing plate and the wide 10mm of being no more than of faulted joint.2) using concentration behind the moistening coagulating cement earth foundation of pickling clear water is evenly splash coagulating cement earth foundation and scrubbing of about 8% watery hydrochloric acid; Use flushing with clean water then, dry coagulating cement earth foundation and mark ponding position.3) processing in temperature joint and crack is also filled up with compressible foam with special-purpose gap-filling glue brushing temperature joint or crack according to the concrete condition in temperature joint and crack, carries out polishing flat with portable sander after corresponding joint filling is handled.4) dry back, primary coat basis is with special-purpose priming paint roller coating basal plane, and forming bright continuous film is scratch coat 3.The effect of said scratch coat 3 is priming paint to be permeated in the basal plane minute aperture, play the effect of stopping up ground steam and reinforcing basal plane.5) repair the zone that is no more than 5mm for depth of accumulated water and add quartz powder (or French chalk) with elastic layer and press mass ratio mixing in 1: 1 at the ponding place, adds thinner (xylenes) and stir and be adjusted to suitable construction denseness, is applied to the ponding place with scraper plate; Surpass the zone of 5mm for ponding, add 40-80 order sand by mass ratio 1 with priming paint: the 6-8 mix is even, smooth paving in ponding place and compacting.
After the laying of 2 layer of rubber particles 2 treats that concrete foundation disposes, promptly form scratch coat 3 after, rubber grain is stirred with glue special, with paver or artificial it is paved equably on said scratch coat 3, blade coating silicon PU primer seals whole court.
3 silicon PU plastic layers 1 lay 1) the elastic layer elastic layer is the one-component material, only needs thinner is adjusted to after the suitable construction denseness to be coated with to scrape in basal plane with the tooth scraper plate to get final product.2) enhancement Layer enhancement Layer job practices is consistent with elastic layer.4) the surface layer surface layer is a bicomponent material, and to scale with A, B two components stir, and adds low amounts of water and is adjusted to suitable construction denseness, is coated with the glue scraper plate and scrapes in the enhancement Layer surface.Can add the special-purpose sand of surface layer in right amount according to shaggy needs.
As shown in Figure 1, the utility model adopts a kind of composite structured, is followed successively by silicon PU plastic layer 1, layer of rubber particles 2 and scratch coat 3 from top to bottom.The thickness of described silicon PU plastic layer 1 is 3mm-5mm, and the thickness of layer of rubber particles 2 is 5mm, and the thickness of scratch coat 3 is 0.5mm.

Claims (2)

1. " three-layer type " synthetic court, it is characterized in that: said " three-layer type " synthetic court is followed successively by silicon PU plastic layer, layer of rubber particles and scratch coat from top to bottom.
2. " three-layer type " according to claim 1 synthetic court is characterized in that: the thickness of described silicon PU plastic layer is 3mm-5mm, and the thickness of layer of rubber particles is 5mm, and the thickness of scratch coat is 0.5mm.
CN2011201809208U 2011-06-01 2011-06-01 'Three-layer' plastic court Expired - Fee Related CN202247595U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201809208U CN202247595U (en) 2011-06-01 2011-06-01 'Three-layer' plastic court

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201809208U CN202247595U (en) 2011-06-01 2011-06-01 'Three-layer' plastic court

Publications (1)

Publication Number Publication Date
CN202247595U true CN202247595U (en) 2012-05-30

Family

ID=46108857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201809208U Expired - Fee Related CN202247595U (en) 2011-06-01 2011-06-01 'Three-layer' plastic court

Country Status (1)

Country Link
CN (1) CN202247595U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589468A (en) * 2018-05-03 2018-09-28 湖北民族学院 Move terrace and its preparation process
CN110396897A (en) * 2019-07-05 2019-11-01 杭州宝力体育设施工程有限公司 A kind of plastic cement race track convenient for draining

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589468A (en) * 2018-05-03 2018-09-28 湖北民族学院 Move terrace and its preparation process
CN110396897A (en) * 2019-07-05 2019-11-01 杭州宝力体育设施工程有限公司 A kind of plastic cement race track convenient for draining
CN110396897B (en) * 2019-07-05 2021-05-11 杭州宝力体育设施工程有限公司 Plastic course convenient to drainage

Similar Documents

Publication Publication Date Title
CN103397587B (en) A kind of silicon PU court and preparation method thereof
CN103343505B (en) Court surface is laid with acrylic acid elastic material system and laying method thereof
US20070071551A1 (en) Surface seeded fine aggregate concrete simulating quarried stone
CN106884535A (en) A kind of construction technology of imitative stone material Self-leveling waterproof mortar
CN104047410B (en) Stone material paving construction method
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN103953181B (en) Cement flooring breakage method for repairing and constructing
CN108797929A (en) Ecological stone material construction
CN110528823A (en) Self-leveling and PVC plastic floor construction method
CN202247595U (en) 'Three-layer' plastic court
CN210195143U (en) Large-area integral seamless epoxy grindstone artistic floor anti-cracking paving structure
CN113738082A (en) Epoxy terrazzo wet-paving process
CN206487115U (en) A kind of super abrasive polyurethane garage terrace
CN210597982U (en) Composite copper plate structure with back bolt on floor
CN111962349A (en) Wear-resistant concrete ground construction process
CN204940039U (en) Plant stone Bridge Surface Paving by Cement structure for one kind
CN107540314A (en) A kind of post-cast strip basal plane inorganic agent and its construction method
CN107419858A (en) A kind of inner wall render smears construction method
CN206448488U (en) A kind of anti-corrosion type oiliness polyurethane color mortar coatings
CN108316608A (en) A kind of ground ruggedized construction and its construction method
CN105155388A (en) Road surface laying method for exposed aggregate finish
CN206157511U (en) High wear -resisting floor
CN108049286A (en) A kind of volleyball court terrace and its preparation process
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN208502160U (en) A kind of ground ruggedized construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20130601