CN202164822U - Device for positioning and anchoring templates on beam, column and shear wall - Google Patents

Device for positioning and anchoring templates on beam, column and shear wall Download PDF

Info

Publication number
CN202164822U
CN202164822U CN2011202119568U CN201120211956U CN202164822U CN 202164822 U CN202164822 U CN 202164822U CN 2011202119568 U CN2011202119568 U CN 2011202119568U CN 201120211956 U CN201120211956 U CN 201120211956U CN 202164822 U CN202164822 U CN 202164822U
Authority
CN
China
Prior art keywords
cement
templates
pull rod
pull bar
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202119568U
Other languages
Chinese (zh)
Inventor
蒋沧如
徐金华
林伟洪
李纬
吕国玉
季鄂苏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BUSINESS COLLEGE HBUT
Original Assignee
BUSINESS COLLEGE HBUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BUSINESS COLLEGE HBUT filed Critical BUSINESS COLLEGE HBUT
Priority to CN2011202119568U priority Critical patent/CN202164822U/en
Application granted granted Critical
Publication of CN202164822U publication Critical patent/CN202164822U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a device for positioning and anchoring templates on a beam, a column and a shear wall. The device comprises a pull rod used for being connected with the templates, wherein screw heads with threads are arranged at the two end parts of the pull rod, and connected with fastening bolts via the threads; the templates are matched and fixed with the pull rod via the fastening bolts; holes for allowing the fastening bolts to be inserted are formed on the templates; concrete is wrapped and poured outside the pull rod to form a pull rod cement stick; counter bores are formed at the two ends of the cement stick; the screw heads at the two ends of the pull rod are positioned in the counter bores; the pull rod cement stick is circular or square; each of the fastening bolt comprises a screw rod, a thread hole for allowing the screw head at the end part of the pull rod to be screwed into and connected is formed at one end part of the screw rod, and a rotating handle is arranged at the other end part of the screw rod; and a bolt cap is further arranged in the middle of each fastening bolt. The device provided by the utility model is used for fixing the templates on the cement beam, the cement column and the cement shear wall in cement structure construction, can effectively prevent the templates from cripling during the concrete structure construction, and greatly reduces the stable support in the prior art when the templates are supported in the structure.

Description

Beam, post and shear wall formwork positioning and anchoring device
Technical field
The utility model relates to the construction formwork application, and specifically, the utility model relates to a kind of beam column shear wall formwork positioning and anchoring device.
Background technology
In the building trade, during the concrete structure construction, need to use pull bar add fixed bit to template, when preventing the concrete pouring, the mould phenomenon that expands the template distending appears in powerful lateral pressure; It is at present most of that what adopt is that single monolithic screw rod is reinforced from the form that is embedded in the PVC sleeve pipe of building the thing, build completion after, also need plastic pipe be tripped out and shutoff is carried out in left hole; Seepage appears in the halfway meeting of shutoff, in addition, and owing to the reason of building; It is also more time-consuming to trip out screw rod; And also rise to come out sometimes, must adopt the burning tapping to use stripping, have enough to meet the need untimely and lost labor and material.
Summary of the invention
The purpose of the utility model provides a kind of need not trip out and back Template Location anchor device that forms as one with the concrete structure that finishes of constructing.
For realizing above-mentioned utility model purpose; The technical scheme of the beam that the utility model provided, post and shear wall formwork positioning and anchoring device is: a kind of beam, post and shear wall formwork positioning and anchoring device; Comprise that one connects the pull bar of template; The pull bar both ends are the silk head with screw thread, with screw thread silk head respectively through the fastening bolt that has been threaded, template is through fastening bolt and pull bar matching and fixing; Offer the hole that supplies fastening bolt to insert on the template.
The pull bar outer wrap has been built concrete, is configured as the pull bar cement rod, and the cement rod two ends are provided with counterbore, and the silk head at pull bar two ends is positioned at counterbore.The pull bar cement rod is circular or square.
Fastening bolt comprises a screw rod, and an end of screw rod supplies tie rod end silk head to screw in the screwed hole that connects, and the other end of screw rod is provided with a rotary handle.The middle part of fastening bolt also is provided with a nuts.
The beneficial effect of the utility model is:
The utility model is used for concrete beam, post, shear wall etc., and concrete structure is fixed the anchorage element of two side templates in work progress.Be characterized in; Pull bar is to be tensile materials with the reinforcing bar.The length and the diameter of reinforcing bar are confirmed by the length of pull bar.Reinforcing bar outerwrap concrete is made circular or square concrete rod.The length of concrete rod equates with the isostructural out-to-out of beam column shear wall.Can effectively eliminate concrete structure and in work progress, produce template cripling phenomenon.Simultaneously; Steadiness when reducing the structure formwork in a large number supports.
Description of drawings
Fig. 1 is the utility model mounting structure sketch map;
Fig. 2 is the structural representation of fastening bolt among Fig. 1.
Be described in detail below in conjunction with the specific embodiment of accompanying drawing the utility model.
The specific embodiment
Fig. 1 is the utility model mounting structure sketch map; Fig. 2 is the structural representation of fastening bolt among Fig. 1.The utility model mainly is the Template Location anchor device that is used for beam, post and shear wall; Comprise that one connects the pull bar 2 of template 1; Pull bar 2 both ends are the silk 21 with screw thread; With screw thread silk 21 respectively through the fastening bolt 3 that has been threaded, template 1 is through fastening bolt 3 and pull bar 2 matching and fixing; Offer the hole 11 that supplies fastening bolt 3 to insert on the template 1.
Wherein, pull bar 2 outer wrap have been built concrete 22, are configured as the pull bar cement rod, and the cement rod two ends are provided with counterbore 23, and the silk 21 at pull bar 2 two ends is positioned at counterbore 23, and the pull bar cement rod be circular or square, and present embodiment is a circle.
Wherein, fastening bolt 3 comprises a screw rod 31, and there is the screwed hole 32 that supplies the 21 screw-in connection of tie rod end screw thread silk an end of screw rod 31, and the other end of screw rod 31 is provided with a rotary handle 33, and the middle part of fastening bolt 3 also is provided with a nuts 34.
During installation, rotary handle 33 rotations through fastening bolt 3 one ends apply strength, make an end of fastening bolt 3 get into threads 21 of hole 11 and pull bar 2 on the template 1 and are rotatably connected, and two ends all reach fixation through fastening bolt.Wherein, the diameter of pull bar cement rod is greater than the hole on the template 1 11, when so carrying out the concrete structure construction; Concrete can not omitted out outside the template, after construction finishes, can directly remove fastening bolt 3 and template 1; Cement rod and concrete structure become one; Ensure structural strength, and exempted the dismounting operation, avoided the generation of template cripling phenomenon.After dismounting finishes, can carry out simple cement filling and repairing for the surperficial counterbore 23 of pull bar cement rod.Pull bar 2 can adopt the reinforcing bar material, and the length and the diameter of reinforcing bar are confirmed by the length of pull bar.The length of concrete rod equates with the isostructural out-to-out of beam column shear wall.
The utility model also can have other variation; Know like those skilled in the art; The foregoing description only plays the exemplary role in the above-mentioned utility model protection scope; Concerning those of ordinary skills, in the protection domain that the utility model limited, also have a lot of conventional distortion and other embodiment, these distortion and embodiment will be within the protection domains that the utility model awaits the reply.

Claims (5)

1. a beam, post and shear wall formwork positioning and anchoring device; Comprise that one connects the pull bar of template, it is characterized in that said pull bar both ends are the silk head with screw thread; With screw thread silk head respectively through the fastening bolt that has been threaded, template is through fastening bolt and pull bar matching and fixing; Offer the hole that supplies fastening bolt to insert on the template.
2. a kind of beam according to claim 1, post and shear wall formwork positioning and anchoring device; It is characterized in that described pull bar outer wrap has been built concrete, is configured as the pull bar cement rod; The cement rod two ends are provided with counterbore, and the silk head at pull bar two ends is positioned at counterbore.
3. a kind of beam according to claim 1, post and shear wall formwork positioning and anchoring device; It is characterized in that; Described fastening bolt comprises a screw rod, and an end of screw rod supplies tie rod end silk head to screw in the screwed hole that connects, and the other end of screw rod is provided with a rotary handle.
4. a kind of beam according to claim 3, post and shear wall formwork positioning and anchoring device is characterized in that the middle part of described fastening bolt also is provided with a nuts.
5. a kind of beam according to claim 2, post and shear wall formwork positioning and anchoring device is characterized in that, described pull bar cement rod is circular or square.
CN2011202119568U 2011-06-22 2011-06-22 Device for positioning and anchoring templates on beam, column and shear wall Expired - Fee Related CN202164822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202119568U CN202164822U (en) 2011-06-22 2011-06-22 Device for positioning and anchoring templates on beam, column and shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202119568U CN202164822U (en) 2011-06-22 2011-06-22 Device for positioning and anchoring templates on beam, column and shear wall

Publications (1)

Publication Number Publication Date
CN202164822U true CN202164822U (en) 2012-03-14

Family

ID=45800658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202119568U Expired - Fee Related CN202164822U (en) 2011-06-22 2011-06-22 Device for positioning and anchoring templates on beam, column and shear wall

Country Status (1)

Country Link
CN (1) CN202164822U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677893A (en) * 2012-04-26 2012-09-19 中天建设集团有限公司 Horizontal inner support device of formwork
CN106592822A (en) * 2016-11-10 2017-04-26 同济大学 Self-resetting steel plate shear wall based on hyperelastic shape memory alloy screw

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677893A (en) * 2012-04-26 2012-09-19 中天建设集团有限公司 Horizontal inner support device of formwork
CN106592822A (en) * 2016-11-10 2017-04-26 同济大学 Self-resetting steel plate shear wall based on hyperelastic shape memory alloy screw

Similar Documents

Publication Publication Date Title
CN204386614U (en) Realize the lining trolley of lining cutting vault filling and injecting slurry and tunnel lining synchronization implementation
CN202913682U (en) Embedded wall connecting piece
CN102704667A (en) Scaffold pre-buried assembled connecting wall device
CN107237493A (en) Quickly remove formula and reserve device in concrete floor hole
CN108060718B (en) Detachable assembly type column and foundation ductility node connection mode
CN202164822U (en) Device for positioning and anchoring templates on beam, column and shear wall
CN203531365U (en) Bolt anchor stiffness wall connecting piece
CN202767370U (en) Shear wall reinforcing steel bar locating frame clamp
CN204435906U (en) Planting reinforced bar into concrete device
CN207553314U (en) A kind of concrete postposition beam anchor bar constructing structure
CN106638307A (en) Deeply-buried anchorage device
CN103774791A (en) FRP bar connection device, connection method and anchor rod
CN202689344U (en) Tensioning bar connecting device
CN103866866A (en) Ultra-high layer core tube and outer framework beam post-cast joint
CN203499017U (en) Wall tie bar pre-embedded positioning device
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN203613538U (en) Hollow anchor bolt with steel bar skeleton
CN206607880U (en) A kind of unidirectional detachable split bolt
CN202644965U (en) Embedded adjustable wall connecting device of scaffold
CN205134188U (en) Bury ground tackle deeply
CN201671339U (en) Fixing device for wall bodies and beam column templates of buildings
CN204827500U (en) Pinniform wedge body stock
CN201250516Y (en) Single-side wall mould holder strengthening device
CN204212416U (en) A kind of sealing up screw is to drawing fastening devices
CN203846679U (en) Tie bar of embedded sleeve of infilled wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120314

Termination date: 20120622