CN201915420U - Foundation of temporary gate building - Google Patents

Foundation of temporary gate building Download PDF

Info

Publication number
CN201915420U
CN201915420U CN2010206395469U CN201020639546U CN201915420U CN 201915420 U CN201915420 U CN 201915420U CN 2010206395469 U CN2010206395469 U CN 2010206395469U CN 201020639546 U CN201020639546 U CN 201020639546U CN 201915420 U CN201915420 U CN 201915420U
Authority
CN
China
Prior art keywords
basis
framework
bar
steel
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206395469U
Other languages
Chinese (zh)
Inventor
游兴荣
李志钱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN2010206395469U priority Critical patent/CN201915420U/en
Application granted granted Critical
Publication of CN201915420U publication Critical patent/CN201915420U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a gate building foundation, which is used for construction of a temporary gate building. The foundation is a cubic frame formed by welding steel components, a steel plate is arranged on the upper end surface of the frame, and bolts used for connection are mounted on the steel plate. The gate building foundation is simple in structure, can be quickly built and detached for shifting and can be reused. In addition, materials of the gate building foundation can be obtained conveniently.

Description

Interim bar basis
[technical field]
The utility model relates to temporary building, relates in particular to a kind of basis that interim bar is built in the building site that is used for.
[background technology]
Building temporory structure in the object of construction production implementation process is a wherein indispensable ring, the gate that faces in building not only satisfies outside this basic function as the main Vomitory of personnel, machinery, material, can also show the corporate image and the on-the-spot safety construction of company by it.
Common bar column way has two kinds: a kind of is with brick square column; Another kind is the steel frame that welds with materials such as angle steel.The basis way is generally concrete square basis (or pre-embedded bolt is connected with the steel frame column) in the above, such basis can only once be used usually, be unfavorable for resources conservation, and operation more (template, pour concrete, pre-embedded bolt location, form removal etc.) in the construction, and concrete is solidified to and reaches the curing time that specified intensity need be certain, and is therefore quick inadequately.
[summary of the invention]
The technical problems to be solved in the utility model provides a kind of basis that interim bar is built in the building site that is used for, and it is built fast, and conveniently moving is reusable.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is, a kind of bar basis, be used for the building site and build interim bar, the basis is the framework of the cube shaped that is welded into the steel member, the upper surface of framework is provided with steel plate, is equipped with on the steel plate to connect to use bolt, and bolt is perpendicular to the upper surface.。
As preferably, locate respectively to install a block plate for four jiaos of described framework upper surface, steel plate and framework welding; Every block plate welds with being connected with bolt.
As preferably, girth member is equipped with in the middle part of described framework.
As preferably, armored concrete slab is equipped with in the bottom of described framework.
As preferably, described frame facet is equipped with armored concrete slab.
As preferably, inner sand or sand stone, the perhaps airtight water tank of filling of described framework.
As preferably, described steel member is a channel-section steel.
As preferably, described girth member is an angle steel.
The beneficial effects of the utility model are, and are simple in structure, draw materials conveniently, but fast construction and dismounting shift, reusable.
[description of drawings]
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is the front view of the interim bar of the utility model basis embodiment 1.
Fig. 2 is the vertical view of the interim bar of the utility model basis embodiment 1.
Fig. 3 is the scheme of installation of the interim bar of the utility model basis embodiment 1.
Fig. 4 is the scheme of installation of the interim bar of the utility model basis embodiment 2.
Among the figure, 1-channel-section steel, 2-steel plate, 3-bolt, 4-angle steel, 5-armored concrete slab.
[specific embodiment]
Embodiment 1 illustrated in figures 1 and 2 is that interim bar is built in a kind of building site that is used for, the basis is the framework of the cube shaped that is welded into 14# or 16# channel-section steel 1, one 250 * 205 * 10 steel plate 2 is respectively welded at four jiaos of places of the upper surface of framework, center position is welded with the bolt 3 that is used to connect on every block plate 2, and bolt 3 is vertical with the upper surface of steel plate 2.
For guaranteeing the intensity of framework, be welded with the girth member that 4 angle steel 4 are made in the middle part of frame facet.
For increasing the stability of whole foundation framework, place an armored concrete slab 5 in the bottom of framework, concrete slab 5 is pushed down framework.
The mounting method of present embodiment is as shown in Figure 3: ready-made framework is positioned on the concrete bed course according to prior location unwrapping wire (does the concrete bed course at the bottom of the foundation pit), to from framework, pass on the channel-section steel 1 that is pressed in base of frame according to the ready-made armored concrete slab 5 of size, back-up sand in the hole then, the concrete hardened ground is done with ground on every side in the top, utilizes the concrete on the deadweight of framework, armored concrete slab, sand of steel member and top to bind and guarantees the stable of top column frame.
The inner used filler of foundation framework can be suited measures to local conditions, as sand, sand stone or airtight water tank.
In embodiment shown in Figure 42, can also load onto armored concrete slab 5, one at frame facet, increase the weight of framework, the 2nd, add the frictional force between big frame and the filling sand (perhaps sand stone), thereby increase the stability of foundation framework.Way is a pre-embedded bolt or leave bolt hole on prefabricated armored concrete slab 5, also has bolt hole equally on the channel-section steel 1 of framework, armored concrete slab 5 is mounted on the both sides of framework by bolt.Other structures of embodiment 2 are identical with embodiment 1.
Present embodiment is simple in structure, and the making of can gathering materials on the spot in the building site is detachable and be transported to other building sites and continue to use after construction is finished.

Claims (10)

1. a bar basis is used for the building site and builds interim bar, it is characterized in that, described basis is the framework of the cube shaped that is welded into the steel member, and the upper surface of framework is provided with steel plate, is equipped with on the steel plate to connect to use bolt, and bolt is perpendicular to the upper surface.
2. bar according to claim 1 basis is characterized in that, a block plate is respectively installed at four jiaos of places of described framework upper surface, steel plate and framework welding; Every block plate welds with being connected with bolt.
3. bar according to claim 2 basis is characterized in that girth member is equipped with in the middle part of described framework.
4. according to any one described bar basis of claim 3, it is characterized in that armored concrete slab is equipped with in the bottom of described framework.
5. according to any one described bar basis of claim 4, it is characterized in that described frame facet is equipped with armored concrete slab.
6. according to any one described bar basis of claim 1-5, it is characterized in that inner sand or sand stone, the perhaps airtight water tank of filling of described framework.
7. according to any one described bar basis of claim 1-5, it is characterized in that described steel member is a channel-section steel.
8. according to any one described bar basis of claim 1-5, it is characterized in that described girth member is an angle steel.
9. bar according to claim 6 basis is characterized in that, described steel member is a channel-section steel.
10. bar according to claim 6 basis is characterized in that, described girth member is an angle steel.
CN2010206395469U 2010-12-02 2010-12-02 Foundation of temporary gate building Expired - Fee Related CN201915420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206395469U CN201915420U (en) 2010-12-02 2010-12-02 Foundation of temporary gate building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206395469U CN201915420U (en) 2010-12-02 2010-12-02 Foundation of temporary gate building

Publications (1)

Publication Number Publication Date
CN201915420U true CN201915420U (en) 2011-08-03

Family

ID=44415224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206395469U Expired - Fee Related CN201915420U (en) 2010-12-02 2010-12-02 Foundation of temporary gate building

Country Status (1)

Country Link
CN (1) CN201915420U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372804A (en) * 2013-08-13 2015-02-25 波马加尔斯基公司 Anchoring device for the foundations of a ski lift structure, and method for manufacturing such a device
CN105908831A (en) * 2016-05-27 2016-08-31 宜兴市太湖地基工程有限公司 Foundation structure
CN108035436A (en) * 2017-12-22 2018-05-15 武汉建工集团股份有限公司 A kind of standard knot formula building site bar that can be recycled

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372804A (en) * 2013-08-13 2015-02-25 波马加尔斯基公司 Anchoring device for the foundations of a ski lift structure, and method for manufacturing such a device
CN105908831A (en) * 2016-05-27 2016-08-31 宜兴市太湖地基工程有限公司 Foundation structure
CN108035436A (en) * 2017-12-22 2018-05-15 武汉建工集团股份有限公司 A kind of standard knot formula building site bar that can be recycled

Similar Documents

Publication Publication Date Title
CN104746422A (en) Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN209053120U (en) Bolt Bolted angle connection assembled counterfort retaining wall
CN101718097B (en) Prefabricated precast concrete tower crane foundation in the shape of bolt connecting box
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN102619152A (en) Split mounting type prefabricated reinforced concrete construction temporary road
CN202611258U (en) Large-diameter foundation bolt assembly bracket
CN201915420U (en) Foundation of temporary gate building
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN104929047A (en) V-shaped pier outer support construction method
CN103967332B (en) The construction method of a kind of building site enclosing
CN101881029B (en) Detachable tower foundation
CN206308702U (en) A kind of portable basis of derrick crane
CN102733406A (en) Railway construction method of solid concrete roadbed in large-size industrial plant
CN204173804U (en) A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure
CN201671063U (en) Movable steel base for construction precast beams and standard knot thereof
CN201512809U (en) Bolt connecting box-shaped prefabricated assembly type concrete tower crane foundation
CN104153386B (en) Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof
CN102454298B (en) Large-sized reinforced concrete construction of frame beam method
CN204059589U (en) A kind of shaped steel combination formula supporting and the cantilevered structure of going along with sb. to guard him
CN202787300U (en) Control form for positions of foundation bolts of fixed tower crane
CN201704698U (en) Detachable tower footing
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN207295497U (en) A kind of interim steel pipe support base steel plate installation leveling structure
CN105839824B (en) Shed deckhead construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20131202