CN202100020U - Protective shed for building construction site - Google Patents

Protective shed for building construction site Download PDF

Info

Publication number
CN202100020U
CN202100020U CN 201120159210 CN201120159210U CN202100020U CN 202100020 U CN202100020 U CN 202100020U CN 201120159210 CN201120159210 CN 201120159210 CN 201120159210 U CN201120159210 U CN 201120159210U CN 202100020 U CN202100020 U CN 202100020U
Authority
CN
China
Prior art keywords
protective shed
crossbeam
cross beams
support frame
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120159210
Other languages
Chinese (zh)
Inventor
王昌威
房东祥
仝俊峰
姚平
史永恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN 201120159210 priority Critical patent/CN202100020U/en
Application granted granted Critical
Publication of CN202100020U publication Critical patent/CN202100020U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to a protective shed, in particular to the protective shed for a building construction site, which solves the problems that the conventional protective shed is set up by steel pipes and wastes time and labor when being assembled and disassembled, the service efficiency is low, the construction cost is high and so on. The protective shed comprises a vertical support frame and a protective shed top plate, wherein, the vertical support frame comprises four upright posts; the protective shed top plate is fixed at the upper end of the vertical support frame; cross beams are connected between the upper ends of the adjacent upright posts; a plurality of positioning beams are arranged in parallel between a group of the opposite cross beams in opposite positions; a plurality of short upright posts are respectively arranged between the protective shed top plate and the cross beams as well as between the protective shed top plate and the positioning beams at intervals; in addition, the cross beams and the upright posts are connected in a movably detachable manner, and the positioning beams and the cross beams are connected in a movably detachable manner. The protective shed has the advantages of simple structure, reasonable design and strong stability, is convenient to disassemble, can better ensure the safety of builders, effectively solves the problems in the conventional protective shed that the labor intensity for assembly and disassembly is high, the conventional protective shed cannot be used repeatedly and steel material is wasted, lowers the construction cost, and can be widely applied to various construction sites.

Description

Construction site is used protection canopy
Technical field
The utility model relates to a kind of protection canopy, is specially a kind of construction site and uses protection canopy.
Background technology
In building construction process; Often need the carpenter to construct,, also need carry out reinforcing bar processing as making template etc.; As reinforcing bar is welded, bending etc.; Above-mentioned constructing operation is generally all carried out near building, in the work progress of building, all might cause personal injury to the constructor from aerial dropped object at any time.Therefore when carrying out constructing operation such as reinforcing bar at construction site, must build and safe guarding shed the constructor protected.At present, the protection canopy that use the building site generally all is to adopt steel pipe to set up to form, and not only exists installation, dismounting to waste time and energy, and labour intensity is big, and can not have enough to meet the need use, and service efficiency is low.
Summary of the invention
The utility model adopts steel pipe to set up to form in order to solve existing protection canopy, has problems such as the time-consuming effort of installing/dismounting, service efficiency are low, construction cost height, provides a kind of construction site to use protection canopy.
The utility model is to adopt following technical scheme to realize: construction site is used protection canopy; The protection canopy top board that comprises the vertical support frame that constitutes by at least four vertical rods and be fixed in vertical support frame upper end; The innovative point of the utility model is to be connected with crossbeam between the adjacent vertical rod upper end; Each crossbeam constitutes horizontal frame; Some positioning beam that wherein laterally arrange between the relative crossbeam in one group of position, each crossbeam and positioning beam respectively and be interval with some short stanchions between the protection canopy top board, the junction of the junction of crossbeam and vertical rod, positioning beam and crossbeam is employing activity detachable connected mode respectively.Described movable detachable connected mode can be form of structure such as mechanical field socket joint connection commonly used or bolt connection.
Compared with prior art; The utility model is simple in structure, reasonable in design, convenient disassembly, stable strong; Can better guarantee constructor's safety; Efficiently solve the problem that existing protection canopy installation and removal labour intensity is big, can not reuse, waste steel, reduced construction cost, can be widely used in various job sites.
Description of drawings
Fig. 1 is the elevation of the utility model;
Fig. 2 is the lateral view of the utility model;
Fig. 3 is the A-A sectional view of Fig. 1;
Among the figure: the 1-vertical rod; 2-protection canopy top board; The 3-crossbeam; The 4-positioning beam; The 5-short stanchion.
The specific embodiment
Construction site is used protection canopy; Like Fig. 1,2, shown in 3; The protection canopy top board 2 that comprises the vertical support frame that constitutes by at least four vertical rods 1 and be fixed in vertical support frame upper end, the quantity of vertical rod can confirm that adjacent vertical rod is connected with crossbeam 3 between 1 upper end according to the area of protection canopy top board; Each crossbeam constitutes horizontal frame; Some positioning beam 4 that wherein laterally arrange between the relative crossbeam in one group of position, each crossbeam 3 and positioning beam 4 are connected with some short stanchions 5 respectively and between the protection canopy top board 2 at interval, and the setting of positioning beam and short stanchion is the stability of agents enhance overall further; The junction of the junction of crossbeam 3 and vertical rod 1, positioning beam 4 and crossbeam 3 is employing activity detachable connected mode respectively, is that bolt connects or socket joint connects.

Claims (1)

1. a construction site is used protection canopy; Comprise vertical support frame that constitutes by at least four vertical rods (1) and the protection canopy top board (2) that is fixed in vertical support frame upper end; It is characterized in that being connected with crossbeam (3) between adjacent vertical rod (1) upper end; Each crossbeam constitutes horizontal frame; The some positioning beam (4) that wherein laterally arrange between the relative crossbeam in one group of position, each crossbeam (3) and positioning beam (4) respectively and be interval with some short stanchions (5) between the protection canopy top board (2), the junction of the junction of crossbeam (3) and vertical rod (1), positioning beam (4) and crossbeam (3) is employing activity detachable connected mode respectively.
CN 201120159210 2011-05-18 2011-05-18 Protective shed for building construction site Expired - Fee Related CN202100020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120159210 CN202100020U (en) 2011-05-18 2011-05-18 Protective shed for building construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120159210 CN202100020U (en) 2011-05-18 2011-05-18 Protective shed for building construction site

Publications (1)

Publication Number Publication Date
CN202100020U true CN202100020U (en) 2012-01-04

Family

ID=45386038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120159210 Expired - Fee Related CN202100020U (en) 2011-05-18 2011-05-18 Protective shed for building construction site

Country Status (1)

Country Link
CN (1) CN202100020U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276914A (en) * 2013-06-13 2013-09-04 安徽建工第四工程有限公司 Safety protection shed cover containing steel pipes
CN103696579A (en) * 2013-12-16 2014-04-02 上海建工四建集团有限公司 Vertical material conveyor
CN103835512A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 Shaped splicable protective shed mounting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276914A (en) * 2013-06-13 2013-09-04 安徽建工第四工程有限公司 Safety protection shed cover containing steel pipes
CN103276914B (en) * 2013-06-13 2015-09-30 安徽四建控股集团有限公司 Safety protection shed cover containing steel pipes
CN103696579A (en) * 2013-12-16 2014-04-02 上海建工四建集团有限公司 Vertical material conveyor
CN103835512A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 Shaped splicable protective shed mounting method
CN103835512B (en) * 2014-02-28 2016-03-02 中天建设集团有限公司 Regularization assemble type protection canopy mounting method

Similar Documents

Publication Publication Date Title
CN202706503U (en) Electric lifting discharging platform for main building construction
CN210067544U (en) Prefabricated steel structure protective shed frame for railway business line
CN202100020U (en) Protective shed for building construction site
CN103362298A (en) Mobile tower scaffold with circular disc connecting device
CN106499173B (en) The aluminum alloy mould plate mechanism of building floor construction is used for based on BIM technology
CN206513015U (en) The aluminum alloy mould plate mechanism that building floor is constructed is used for based on BIM technology
CN210216163U (en) Self-supporting cantilever formwork support system
CN202689536U (en) Ultra-high concrete beam and slab structure template erecting system
CN204282823U (en) Detachable discharging platform
CN203684061U (en) Steel pedestrian overcrossing fast to disassemble or assemble
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN204326607U (en) A kind of assembled steel reinforced machining shed
CN102864746A (en) Bearing frame for bridge construction
CN202577162U (en) Combined-type steel pipe bracket
CN204252573U (en) Adjustable quick basement roof reinforcement support system
CN214062466U (en) Reinforcing bar processing canopy
CN205024955U (en) Concatenation formula steel construction board
CN202611255U (en) Assembled steel bar processing shed
CN209816670U (en) Pedestrian passageway arranged on steel pipe supported in steel sleeve box
CN203213123U (en) Supporting structure for building foundation pit construction
CN208717939U (en) A kind of efficiently molding building hoist foundation structure
CN202265776U (en) Triangular truss combined type ultralong hanging basket for bridge
CN219908589U (en) Support system for construction of cable tower lower beam
CN204919363U (en) High mound pin -connected panel strength nature skeleton of anti high wind
CN203961239U (en) High-altitude overhanging awning construction operation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20170518

CF01 Termination of patent right due to non-payment of annual fee