CN202072417U - Semi-submersible type hoisting operation platform - Google Patents

Semi-submersible type hoisting operation platform Download PDF

Info

Publication number
CN202072417U
CN202072417U CN201120024196XU CN201120024196U CN202072417U CN 202072417 U CN202072417 U CN 202072417U CN 201120024196X U CN201120024196X U CN 201120024196XU CN 201120024196 U CN201120024196 U CN 201120024196U CN 202072417 U CN202072417 U CN 202072417U
Authority
CN
China
Prior art keywords
operation platform
hoisting
hoisting operation
semi
width
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120024196XU
Other languages
Chinese (zh)
Inventor
奚风
张纪赟
黄新
陈杰
韩海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SHIP DESIGN & RESEARCH INSTITUTE CO LTD
SHANGHAI ELECTRIC POWER CO Ltd
Shanghai Power Civil Construction Co Ltd
Original Assignee
JIANGSU SHIP DESIGN & RESEARCH INSTITUTE CO LTD
SHANGHAI ELECTRIC POWER CO Ltd
Shanghai Power Civil Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SHIP DESIGN & RESEARCH INSTITUTE CO LTD, SHANGHAI ELECTRIC POWER CO Ltd, Shanghai Power Civil Construction Co Ltd filed Critical JIANGSU SHIP DESIGN & RESEARCH INSTITUTE CO LTD
Priority to CN201120024196XU priority Critical patent/CN202072417U/en
Application granted granted Critical
Publication of CN202072417U publication Critical patent/CN202072417U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a semi-submersible type hoisting operation platform, relating to a specially-purposed lifting appliance for installing a seaborne offshore mud flat draught fan; a ship body is divided into an upper layer and a lower layer which adopt two structures, wherein the upper layer is a truss frame; the lower layer is a box body structure; the ship takes the shape of an isosceles trapezoid with a prow of 20m in width, a stem of 50 m in width and a ship length of 72m; and the semi-submersible type hoisting operation platform is mainly suitable for projects such as hoisting and installation of mud flat and has the characteristics of shallow draft, large hoisting capacity, high hoisting height and capability of operating on beaches.

Description

Semisubmersible hoisting operation platform
Technical field
The utility model relates to marine offshore beach blower fan Special Hoisting Equipment is installed
Background technology
Blower fan installation work at present, all being to adopt crawler crane to lift by crane installation by land, is to adopt large-scale floating crane to install in the offshore sea waters, then is blank at the offshore beach, need operation platform to possess shallow draft navigation ability, possess the working ability of sitting under the situation of beach simultaneously.
Summary of the invention
In order to overcome in the existing mudflat wind electric installation work, promptly to possess enough load-carrying abilitys, consider the highly difficult requirement of shallow draft and seat beach operation again, therefore consider design the utility model semisubmersible hoisting operation platform.
The technical scheme that its technical matters that solves semisubmersible hoisting operation platform adopts is: platform is divided into two-layer up and down, lower floor adopts traditional hull case structure to guarantee basic equipments such as hull setting-out storehouse, fresh water storehouse, oil storage storehouse, the capable rack and panel construction of removing side panel is adopted on the upper strata, mainly be in order to alleviate the hull own wt, to guarantee draft in 1.5 meters, can take advantage of tide to move ship.Row shelf structure and body structure are as a whole, when mobile, by lower part box buoyancy; In the time of in working order, pour into seawater in the casing, sit beach work.Profile adopts head 20m width, afterbody 50m width, and the isosceles trapezoid ship type of total length 72m mainly is to consider under the concentrated load of afterbody 300t turned crane, flat-bed seat beach face is long-pending when whole stability balance of flat-bed and the operation of seat beach.
Semisubmersible hoisting operation flat-bed benefit is with less disposable input, can cover all kinds of 300t hoisting capacities of beach engineering, all lifting installation work in the 100m lifting altitude, and possess after special engineering finishes, can repack the design concept of barge into.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified
Fig. 1 is the platform base regime.
In Fig. 1:
The 1-loop wheel machine, 2-promenade deck, the capable frame of 3-, 4-warehouse, 5-rest stand, 6-superstructure.
The specific embodiment
As shown in Figure 1: semisubmersible hoisting operation platform, the hoisting operation platform that hull of being made up of by row frame (3) promenade deck (2) and warehouse (4) and loop wheel machine (1) combine.
Its loop wheel machine (1) hoisting capacity can be lifted by crane 300t between swinging radius 35 to 40m, hull is to sit the beach state when work, presses and completely presses Cang Shui to carry out hoisting operation.
In not operation of loop wheel machine (1), when drawing state, gin pole need be transferred to rest stand (5) and upward drag by lower part box buoyancy.

Claims (2)

1. semisubmersible hoisting operation platform, platform is divided into levels, adopts two kinds of structures, and the upper strata is the row shelf structure, and lower floor is a body structure, it is characterized in that: the row shelf structure is as a whole with body structure, when mobile, by lower part box buoyancy; In the time of in working order, pour into seawater in the casing, sit beach work.
2. semisubmersible hoisting operation platform according to claim 1 is characterized in that: profile adopts head 20m width, afterbody 50m width, the isosceles trapezoid ship type of total length 72m.
CN201120024196XU 2011-01-25 2011-01-25 Semi-submersible type hoisting operation platform Expired - Lifetime CN202072417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120024196XU CN202072417U (en) 2011-01-25 2011-01-25 Semi-submersible type hoisting operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120024196XU CN202072417U (en) 2011-01-25 2011-01-25 Semi-submersible type hoisting operation platform

Publications (1)

Publication Number Publication Date
CN202072417U true CN202072417U (en) 2011-12-14

Family

ID=45110524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120024196XU Expired - Lifetime CN202072417U (en) 2011-01-25 2011-01-25 Semi-submersible type hoisting operation platform

Country Status (1)

Country Link
CN (1) CN202072417U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103010412A (en) * 2012-12-06 2013-04-03 广东明阳风电产业集团有限公司 Submersible trussed offshore wind turbine installation barge
CN103010413A (en) * 2012-12-06 2013-04-03 广东明阳风电产业集团有限公司 Working method for hoisting draught fan by barge
CN109592574A (en) * 2018-12-26 2019-04-09 中国水利水电第八工程局有限公司 Above-water hoisting crane barge and its assembly method
CN110271975A (en) * 2019-06-14 2019-09-24 中国一冶集团有限公司 Small space is lauched middle steel platform and removes device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103010412A (en) * 2012-12-06 2013-04-03 广东明阳风电产业集团有限公司 Submersible trussed offshore wind turbine installation barge
CN103010413A (en) * 2012-12-06 2013-04-03 广东明阳风电产业集团有限公司 Working method for hoisting draught fan by barge
CN109592574A (en) * 2018-12-26 2019-04-09 中国水利水电第八工程局有限公司 Above-water hoisting crane barge and its assembly method
CN109592574B (en) * 2018-12-26 2020-04-17 中国水利水电第八工程局有限公司 Floating crane for hoisting on water and assembling method thereof
CN110271975A (en) * 2019-06-14 2019-09-24 中国一冶集团有限公司 Small space is lauched middle steel platform and removes device
CN110271975B (en) * 2019-06-14 2021-06-29 中国一冶集团有限公司 Steel platform demolishs device in narrow and small space offal

Similar Documents

Publication Publication Date Title
CN103981847B (en) The elevating mechanism of self lift type wind-powered electricity generation mounting platform
EP2251254A1 (en) Installation vessel for offshore wind turbines
CN103910044B (en) A kind of large-scale the floating structures semi-submersible type lifting platform and application process thereof
CN104029798B (en) Self installation production platform
CN106516027B (en) A kind of deep draft semi-submersible production platform with oil storage function
CN202072417U (en) Semi-submersible type hoisting operation platform
CN103129715A (en) Conduit-rack semi-submersible type oil-extraction platform
CN103452742A (en) Semi-submersible type multi-floater wave energy conversion device
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
CN104554625A (en) Revolving crane ship renovation method based on unmanned barge and crane barge
CN115432131A (en) Offshore wind power hydrogen production floating platform
CN204803913U (en) Take raft board combined type marine wind power fan single pile basis
CN204589969U (en) Be applicable to the small modular jack-up unit of greater coasting area operation
CN201914862U (en) Self-rising fan mounting platform
CN201745721U (en) Special installation vessel for marine intertidal wind power generating set
CN203005696U (en) Gravity anchor
CN203064175U (en) Artificial island platform
CN104554639A (en) Installation equipment for large offshore wind power equipment
KR20120139931A (en) Method and system of attaching and detaching spud can to the jack-up platform
CN201971133U (en) Bottom-supported blower installation platform
CN107618626A (en) Improved deep water semi-submersible pipe laying crane ship
CN204642060U (en) A kind of large-scale coastal waters wind power equipment installs equipment
CN104164885A (en) Caisson towing method
CN104802950A (en) Self-elevating type underwater floater tension leg platform and establishing method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20111214

CX01 Expiry of patent term