CN202031000U - Urban road network - Google Patents
Urban road network Download PDFInfo
- Publication number
- CN202031000U CN202031000U CN2011200016961U CN201120001696U CN202031000U CN 202031000 U CN202031000 U CN 202031000U CN 2011200016961 U CN2011200016961 U CN 2011200016961U CN 201120001696 U CN201120001696 U CN 201120001696U CN 202031000 U CN202031000 U CN 202031000U
- Authority
- CN
- China
- Prior art keywords
- unidirectional
- roads
- road
- urban
- express way
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to an urban road network, which is arranged based on the existing checkerboard urban road, namely an ordinary road. Unidirectional quick roads and ordinary roads are interwoven vertically and transversely and are arranged at intervals. Unidirectional quick overpasses are arranged at the intersection positions between the unidirectional quick roads and the ordinary roads. The urban road network aims at improving traffic capacity of the urban roads through the unidirectional quick roads and the unidirectional quick overpasses so as to diverge traffic pressure of other roads, resolve a problem of urban congestion, and bring convenience to trips of people. The urban road network is characterized in that a nearby unidirectional quick road can be found to realize rapid transit when goes to destinations in any direction, and users can choose the closest road to run to achieve the purpose of saving gas. Adjacent unidirectional quick roads have the traffic capacity of expressways and have various functions of the urban roads simultaneously, thereby being a perfect combination of the expressways and the ordinary roads. The urban road network can be rebuilt based on the existing roads, is small in investment, simple in construction and easy to put into operation, covers small area, and has more complete functions than the expressways.
Description
Technical field
The utility model relates to City road traffic system, and a kind of improvement to urban road network of specific design belongs to International Classification of Patents E01C technical field.
Background technology
When policies of reform and opening to the outside world were brought economic development and prosperity to us, a large amount of rural peoples yarded up to the city.When seeking and creating self-value, also brought pressure to urban traffic.Although relevant government department adopts various measures, make the city area area expand and expand, road construction is upgraded every year, and ways such as one-way road, viaduct are all used, and urban traffic is stopped up still serious.Chasing after its reason mainly contains: one, human settlements density height, commercial concentrating; Two, economic condition is good, and car owning amount is big; Three, the city area enlarges, and distance prolongs relatively; Four, traffic peak is concentrated relatively, and vehicle flowrate has surpassed road passage capability.
According to defined in the existing Code for planning design of transport on urban road like that, urban road should be divided into through street, arterial road, secondary trunk road and branch road four classes.One-way road is made in some place as required into, but still is difficult to transport solution and blocks up.It is big mainly to show as through street construction cost, and it is big to build difficulty, with factors such as existing urban layout are inharmonious, makes it to build fewly, is stranded and phenomenon, i.e. so-called " do not increase, be unable to come down " such as cause that the import and export of through street are blocked up.The area in existing city is built bigger and bigger, and road is repaiied more and more, and garage is more and more stifled, and this becomes the contradiction that almost can't overcome.
Summary of the invention
The purpose of this utility model is to provide a kind of improvement project---a kind of urban road network of optimal design of urban traffic.
The purpose of this utility model is achieved through the following technical solutions.
A kind of urban road network, be that existing urban road based on checkerboard is an ordinary road and being provided with, it comprises unidirectional express way, is divided into vertical express way and horizontal express way again, and unidirectional express way and ordinary road are interweaved in length and breadth, are provided with at interval.
Described unidirectional express way is provided with three above principal direction direct lanes, a left turn lane, a right-turn lane, and the contrary principal direction track of 1-2 bar; The contrary each other direction of adjacent unidirectional express way.
Intersection location in unidirectional express way and ordinary road is provided with unidirectional quick overpass bridge.
Interchange can be adopted in the intersection of vertical express way in the unidirectional express way and horizontal express way.
Described unidirectional quick overpass bridge is divided into upper and lower two-layerly, and the upper strata of overpass bridge is provided with three above direct lanes and a left turn lane, and the lower floor of overpass bridge is provided with two direct lanes, a left turn lane and three right-turn lanes.
The utility model has solved the urban road network existing road brings traffic jam, one-way trip inconvenience and sky way more because of traffic lights deficiency.The utility model tries hard to improve by unidirectional express way and unidirectional quick grade separation the traffic capacity of urban road, to shunt the traffic pressure of other roads, solves the difficult problem that urban traffic is stopped up, the facility that provides the people to go on a journey.Be characterized in: the target to any direction is advanced, and all can find unidirectional express way to realize rapid transit nearby, also can select nearest road driving to reach fuel-efficient purpose.The adjacent one-way express way has the traffic capacity of speedway, possesses every function of urban road simultaneously again, is the perfect adaptation of speedway and ordinary road.The utility model can be reconstructed on existing road, has small investment, floor space is few, engineering is simple, and is easy to implement, but has the function more complete than speedway.
Description of drawings
Fig. 1 is the schematic diagram of urban road network of the present utility model;
Fig. 2 is the schematic diagram of unidirectional quick overpass bridge.
Among Fig. 1: 01-18 is horizontal ordinary road (comprises therefrom choosing and become unidirectional express way), and a-r is vertical ordinary road (comprises therefrom choosing and become unidirectional express way); 2,3,5,6 thick lines are unidirectional express way, the principal direction north of the unidirectional express way of 2-, the principal direction of the unidirectional express way of 3-is to the south, 4-is an ordinary road, the principal direction of the unidirectional express way of 5-eastwards, the principal direction of the unidirectional express way of 6-is westwards; Among Fig. 2: the direct lane of the unidirectional quick overpass bridge of A2-upper strata, left turn lane, the unidirectional quick overpass bridge upper strata of A3-, the unidirectional quick overpass bridge of B2, C2, D2-lower floor direct lane, the unidirectional quick overpass bridge of C3-left turn lane, A1, B1, C1, D1---unidirectional quick overpass bridge right-turn lane.Except that the track, upper strata, each lanes of lower floor is obeyed the traffic lights commander.
The specific embodiment
Referring to Fig. 1, urban road network, be that existing urban road with checkerboard is an ordinary road: horizontal ordinary road 01-18, vertical ordinary road a-r is provided with for the basis, therefrom choose certain road reconstruction and become unidirectional express way, be divided into unidirectional longitudinally express way 2,3 and horizontal unidirectional express way 5,6, unidirectional express way and ordinary road are interweaved in length and breadth, are provided with at interval.The intersection location of unidirectional express way and ordinary road is provided with unidirectional quick overpass bridge.Interchange can be adopted in the intersection of vertical express way in the unidirectional express way and horizontal express way, also can use traffic lights.Crossing employing traffic lights commander between the ordinary road.
As shown in fig. 1, belt road is numbered 01-18, and vertically road number is a, b, c-----r, and wherein thick line 03,06,09,12,15,18 and b, e, h, k, n, q are unidirectional express way.03,09,15 principal directions eastwards, 06,12,18 principal directions are westwards; B, h, n principal direction are to the south, and d, k, q principal direction are northwards; Other road is an ordinary road.When the B district from Fig. 1 when travel in the A district, can select 10 road directions west to turn right to 03 tunnel left-hand rotation to the e road and get final product.When the B district from Fig. 1 when travel in the C district, can select 11 road directions east to turn right to and turn left to the p road or the right-hand rotation of q road gets final product.When the A district from Fig. 1 when travel in the C district, can select b road direction south to turn left to the p road or turn right and to get final product in the q road to 15 the tunnel.
Referring to Fig. 2, unidirectional quick overpass bridge divides two layers up and down, and upper strata A2 is three above direct lanes (unidirectional quick principal direction) and left turn lane of A3; The B2 of lower floor, C2 and D2 are two direct lanes (comprising the left turn lane), and C3 is the left turn lane, and A1, B1, C1 and D1 are the right-turn lane.When vehicle (comprising left-hand bend) when unidirectional principal direction is travelled, can directly pass through, other direction vehicle ' (comprising bicycle) is obeyed traffic lights commander.
In a word, the utility model selects a certain amount of road reconstruction to become unidirectional express way in the existing urban road of checkerboard, comprises vertical and horizontal.When large span is travelled, can select unidirectional express way to travel, avoid waiting of traffic lights and reached the rapid transit purpose.Can shunt simultaneously the traffic pressure of ordinary road.When closely travelling or not having urgent thing, can select road driving nearby.
The utility model has the advantages that:
1, the adjacent one-way express way has the traffic capacity of a speedway, possesses every function of urban road simultaneously again, is the perfect adaptation of speedway and ordinary road.
2, can on existing road, reconstruct, have small investment, floor space is few, engineering structures is simple, and is easy to implement, but has the function more complete than speedway.
Claims (5)
1. urban road network, be that existing urban road based on checkerboard is an ordinary road and being provided with, it is characterized in that: it comprises unidirectional express way, is divided into vertical express way and horizontal express way again, and unidirectional express way and ordinary road are interweaved, are provided with at interval.
2. urban road network according to claim 1 is characterized in that: described unidirectional express way, be provided with three above principal direction direct lanes, a left turn lane, a right-turn lane, and the contrary principal direction track of 1-2 bar; The contrary each other direction of adjacent unidirectional express way.
3. urban road network according to claim 1 is characterized in that: the intersection location in unidirectional express way and ordinary road is provided with unidirectional quick overpass bridge.
4. urban road network according to claim 1 is characterized in that: interchange can be adopted in the intersection of vertical express way in the unidirectional express way and horizontal express way.
5. urban road network according to claim 3, it is characterized in that: described unidirectional quick overpass bridge, be divided into upper and lower two-layer, the upper strata of overpass bridge is provided with three above direct lanes and a left turn lane, and the lower floor of overpass bridge is provided with two direct lanes, a left turn lane and three right-turn lanes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200016961U CN202031000U (en) | 2011-01-06 | 2011-01-06 | Urban road network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200016961U CN202031000U (en) | 2011-01-06 | 2011-01-06 | Urban road network |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202031000U true CN202031000U (en) | 2011-11-09 |
Family
ID=44893303
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200016961U Expired - Fee Related CN202031000U (en) | 2011-01-06 | 2011-01-06 | Urban road network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202031000U (en) |
-
2011
- 2011-01-06 CN CN2011200016961U patent/CN202031000U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102425090B (en) | Urban three-dimensional road for aggregating and utilizing land and avoiding traffic jam | |
JP2007506876A (en) | A kind of completely three-dimensional urban road system and the traffic style that adopts the system | |
CN202194041U (en) | Flyover | |
CN101851886B (en) | Trinity overall-style three-dimensional public transport system | |
CN102182129A (en) | Bird nest intercommunicating flyover for full-time full-directional passing at road intersection | |
CN202030999U (en) | Urban road network | |
CN102277806A (en) | Shift-type interchange for all-time omnidirectional traffic at intersection of roads | |
CN102268852A (en) | Two-phase implementation method of urban road transport system | |
CN102392401A (en) | Method and bridge for realizing continuous passing of vehicles at level crossing by utilizing U-shaped rotary bridges | |
CN201027293Y (en) | High speed road for city district floor | |
CN202688809U (en) | T-junction flyover with pedestrian and vehicle lanes | |
CN204530358U (en) | Track, crossroad is without intersection current traffic system continuously | |
CN1590647A (en) | Full stereoscopic city road system and traffic method using said system | |
CN202787004U (en) | Junction type all-communication flyover crossing structure | |
CN204982577U (en) | All -round multilevel traffic facility of city crossroad | |
CN204475094U (en) | The back-shaped traffic system in intersection | |
CN202031000U (en) | Urban road network | |
CN103590291A (en) | Crossroad and T road all-directional no-parking flyover | |
CN102900000B (en) | Comprehensive complete straight-through direct left-hand rotation right lateral viaduct | |
CN202090253U (en) | Two crossroad full unblocked cross composite bridges of right turn bridges | |
CN103541285A (en) | Conflict-free stereoscopic composite bridge | |
CN203383113U (en) | Cross road and T road all-directional no-parking flyover | |
CN202390735U (en) | U-shaped turning bridge for realizing continuous passing of vehicles at level crossing | |
CN102605694A (en) | T-junction flyover with pedestrian and vehicle lanes | |
CN101806027A (en) | Roundabout stereo intersection and transfer station of parallel elevated roads |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111109 Termination date: 20150106 |
|
EXPY | Termination of patent right or utility model |