CN202000661U - Large-section super-high steel-rib bare-concrete double-column construction mould plate - Google Patents

Large-section super-high steel-rib bare-concrete double-column construction mould plate Download PDF

Info

Publication number
CN202000661U
CN202000661U CN2011200128882U CN201120012888U CN202000661U CN 202000661 U CN202000661 U CN 202000661U CN 2011200128882 U CN2011200128882 U CN 2011200128882U CN 201120012888 U CN201120012888 U CN 201120012888U CN 202000661 U CN202000661 U CN 202000661U
Authority
CN
China
Prior art keywords
twin columns
mould
deformation joint
chamfering
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200128882U
Other languages
Chinese (zh)
Inventor
全有维
唐潮
顾海勇
沈兴东
史公勋
戚肇刚
夏峰海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN2011200128882U priority Critical patent/CN202000661U/en
Application granted granted Critical
Publication of CN202000661U publication Critical patent/CN202000661U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a large-section super-high steel-rib bare-concrete double-column construction mould plate which structurally comprises two chamfer arc-shaped steel moulds, two straight-plate steel moulds and a deformation joint wood mould. The deformation joint wood mould is installed between adjacent double columns, and the chamfer arc-shaped steel moulds are installed on two opposite edges of the adjacent double columns. The straight-plate steel moulds which serve as extended moulds of the chamfer arc-shaped steel moulds and the deformation joint wood mould are formed into a T shape and installed on two lateral edges of the adjacent double columns, and the two ends of the chamfer arc-shaped steel moulds are fixedly connected with the straight-plate steel moulds through inclined pull threaded rods. Accordingly, the mould plate guarantees that opposite pull bolt holes do not exist. If a reasonable construction method is applied, especially if attention is paid to the pouring speed, delaminating thickness and vibration sequence from the perimeter to the center during the concrete pouring process, residual bubbles can be reduced. After the mould plate is disassembled, the surfaces of the concretes are smooth, and the quality of the concretes and the formed appearance are good, thereby satisfying the requirement of bare concretes. In addition, because the mould plate is reasonable in design, the efficiency of mould plate assembling and disassembling is greatly improved. The mould plate is most suitable for the large-section super-high steel-rib bare-concrete double-column construction.

Description

Heavy in section superelevation reinforcing bar clear-water concrete twin columns construction formwork
Technical field
The utility model relates to a kind of template, and the construction formwork of particularly a kind of suitable construction heavy in section superelevation reinforcing bar clear-water concrete twin columns belongs to building operations template field.
Background technology
When constructing by the separated heavy in section of deformation joint superelevation clear-water concrete twin columns, owing to have reinforcing bar in the cylinder, Screw arbor with nut at both-ends can not be to wearing, and headroom is about 70cm between the reinforcing bar of twin columns, after reinforcing bar binding is finished between the slit headroom have only 28cm, template between the twin columns is installed and can't be operated, be Fair-Faced Concrete Column because of twin columns again, the split bolt eyelet can not appear in shaft, and the bloated mould phenomenon of mould can not appear running in the twin columns moulding, the slit Forming Quality should satisfy the clear-water concrete requirement, the necessary complete removal of seam inner formword, roomy because of the twin columns cross section again, so be different from the construction of ordinary concrete twin columns, in order to ensure by the separated heavy in section of deformation joint superelevation clear-water concrete twin columns construction quality, its stencil design is most important.
Summary of the invention
The purpose of this utility model is in order to ensure the construction quality by the separated heavy in section of deformation joint superelevation clear-water concrete twin columns, it is easy for installation to design a kind of scene, simple to operate, remove easily, concrete quality and molded appearance are good, twin columns gap width unanimity, and the two sides is smooth in the seam, the seam faulting of slab ends is little, vertical, parallel, the unmatchful heavy in section superelevation reinforcing bar clear-water concrete twin columns construction formwork that draws bolt eyelet and bloated mould phenomenon of slit twin columns linea angulata bar.
Heavy in section of the present utility model superelevation reinforcing bar clear-water concrete twin columns construction formwork, its structure comprises two chamfering arc punching blocks, two straight slab moulds and deformation joint wooden model, described deformation joint wooden model is contained between the adjacent twin columns, chamfering arc punching block is contained on two opposite side of adjacent twin columns, straight slab mould becomes the T font to be contained on two sides of adjacent twin columns as the prolongation mould of chamfering arc punching block with the deformation joint wooden model, chamfering arc punching block is with tiltedly drawing screw rod to fixedly connected with straight slab mould from two ends.
Described two chamfering arc punching blocks comprise chamfering curved plate, vertical rib channel-section steel and at least two transverse channel steels, wherein, two chamfering curved plate medial surface bucklings become corresponding with two opposite side and the adjacent chamfering of default twin columns respectively, vertical rib channel-section steel vertically distributes and is welded on the lateral surface of chamfering arc steel facing, the transverse channel steels cross direction profiles also is welded on the lateral surface of vertical rib channel-section steel, and the transverse channel steels two ends are respectively equipped with tiltedly draws nut; Described two straight slab moulds comprise steel plate, vertical rib channel-section steel and at least two transverse channel steels, wherein, vertical rib channel-section steel vertically distributes and is welded on the lateral surface of steel plate, and the transverse channel steels cross direction profiles also is welded on the lateral surface of vertical rib channel-section steel, and the transverse channel steels two ends are respectively equipped with tiltedly draws nut.
For the ease of removing, described deformation joint wooden model comprises wooden form and gripper shoe, and wooden form is contained on the deformation joint both sides, and gripper shoe is supported between the wooden form.
Heavy in section of the present utility model superelevation reinforcing bar clear-water concrete twin columns construction formwork, can guarantee the unmatchful bolt eyelet that draws with tiltedly drawing screw rod that chamfering arc punching block is fastenedly connected from the cylinder outside with straight slab mould, wooden model in the deformation joint can be guaranteed twin columns slit quality, add rational job practices, particularly in concreting process, note the order of vibrating of speed of perfusion, lift height and peripheral rear center of elder generation, can reduce residual bubble, make mortar be full of the aggregate space and make the concrete smooth surface.After the form removal, the concrete smooth surface, concrete quality and molded appearance are good, twin columns gap width unanimity, the two sides is smooth in the seam, and the seam faulting of slab ends is less than 2mm, slit twin columns linea angulata bar is vertical, parallel, the unmatchful phenomenons such as bolt eyelet and bloated mould of drawing, and concrete formation satisfies the clear-water concrete requirement.Also reasonable because of stencil design, make template assembly and remove efficient and improve greatly, shorten the required duration of conventional way greatly, thereby saved a large amount of turnovers we rent tools expenses such as expense and project management.The most suitablely carry out the construction of heavy in section superelevation reinforcing bar clear-water concrete twin columns and use.
Description of drawings
Accompanying drawing 1 is a kind of cross section structure schematic diagram of twin columns construction formwork of the present utility model;
Accompanying drawing 2 is a kind of structural representations of chamfering arc punching block of the present utility model;
Accompanying drawing 3 is a kind of structural representations of straight slab mould of the present utility model.
The specific embodiment
Referring to accompanying drawing 1,1 among the figure is two chamfering arc punching blocks, and 2 is two straight slab moulds, the 3rd, and the deformation joint wooden model, the 4th, two the adjacent twin columns waiting to build clear-water concrete that surrounded by template, the 5th, tiltedly draw screw rod.Heavy in section of the present utility model superelevation reinforcing bar clear-water concrete twin columns construction formwork, its structure comprises two chamfering arc punching blocks 1, two straight slab moulds 2 and deformation joint wooden models 3, described deformation joint wooden model 3 is contained between the adjacent twin columns 4, chamfering arc punching block 1 is contained on two opposite side of adjacent twin columns 4, straight slab mould 2 is contained on two sides of adjacent twin columns 4 as 3 one-tenth T fonts of prolongation mould and deformation joint wooden model of chamfering arc punching block 1, and chamfering arc punching block 1 usefulness tiltedly draws screw rod 5 to fixedly connected with straight slab mould 2 from two ends.The piece of chamfering arc punching block 1 and straight slab mould 2 preferably is located at the place, point of contact of circular arc and straight line.
The structure of described two chamfering arc punching blocks 1 comprises chamfering curved plate 1-1, vertical rib channel-section steel 1-2 and at least two transverse channel steels 1-3, wherein, two chamfering curved plate 1-1 medial surface bucklings become corresponding with two opposite side and the adjacent chamfering of default twin columns 4 respectively, vertical rib channel-section steel 1-2 vertically distributes and is welded on the lateral surface of chamfering arc steel facing 1-1, transverse channel steels 1-3 cross direction profiles also is welded on the lateral surface of vertical rib channel-section steel 1-2, transverse channel steels 1-3 two ends are respectively equipped with and tiltedly draw nut 1-4, and its structure as shown in Figure 2.Described two straight slab moulds 2 comprise steel plate 2-1, vertical rib channel-section steel 2-2 and at least two transverse channel steels 2-3, wherein, vertical rib channel-section steel 2-2 vertically distributes and is welded on the lateral surface of steel plate 2-1, transverse channel steels 2-3 cross direction profiles also is welded on the lateral surface of vertical rib channel-section steel 2-2, transverse channel steels 2-3 two ends are respectively equipped with and tiltedly draw nut 2-4, and its structure as shown in Figure 3.Chamfering arc punching block 1 is through tiltedly drawing nut 1-4 with tiltedly drawing screw rod 5 to be fastenedly connected through tiltedly drawing nut 2-4 and straight slab mould 2, and its structure as shown in Figure 1.For the ease of removing, described deformation joint wooden model comprises wooden form and gripper shoe, and wooden form is contained on the deformation joint both sides, and gripper shoe is supported between the wooden form.As building the clear-water concrete twin columns body that lateral sizes does not wait, the size of straight slab mould 2 can be made adaptability revision and get final product.
When concrete pouring construction is operated, should note deformation joint concreting, practicable symmetrical blanking, symmetry is vibrated, pay special attention to the concreting time, control concrete speed of perfusion and lift height, concreting speed preferably was controlled at 3m/ hour, about layer height 2m, want during concrete vibrating evenly, on vibrating during layer concrete, should insert lower-layer concrete 50mm~100mm, to eliminate the loose contact between two-layer, must before the lower-layer concrete initial set, carry out the every layer concrete vibrating spear insertion depth of strict control simultaneously, when guaranteeing on vibrating layer concrete, vibrating spear inserts down that layer depth is no more than 200mm, therefore vibrates at every layer concrete and finishes back reply vibrating spear and identify, with convenient grasp vibrating spear insertion depth.Earlier along the template periphery circle that shakes, from coil to coil vibrates to the center then when vibrating, and Shi Gong advantage is like this: peripheral concrete is first closely knit, when second circle and center when vibrating, the periphery concrete repeatedly is squeezed, and can reduce residual bubble, and make mortar be full of the aggregate space.Other step is identical with the job practices of ordinary concrete post.When the pillar concrete strength reaches certain intensity and can guarantee that its surface is not damaged because of stripping, just dismountable.Generally can after 24h is finished in concreting, remove, and should in time adjust striking time according to variations in temperature.It is airtight to hang up plastic sheeting immediately after the form removal, carries out moisture-keeping maintaining, and curing time is no less than 14d.As the need insulation, outside plastic sheeting, can cover straw screen or mat or straw bag.After the form removable, should be immediately to the template scrubbing of polishing, brushing clear-water concrete dedicated templates lacquer, turnover is used.
After the form removal, the concrete smooth surface, concrete quality and molded appearance are good, twin columns gap width unanimity, the two sides is smooth in the seam, and the seam faulting of slab ends is less than 2mm, slit twin columns linea angulata bar is vertical, parallel, the mould phenomenon that do not have to expand, concrete formation satisfies the clear-water concrete requirement, the most suitablely carries out heavy in section superelevation reinforcing bar clear-water concrete twin columns construction and uses.

Claims (3)

1. heavy in section superelevation reinforcing bar clear-water concrete twin columns construction formwork, it is characterized in that comprising two chamfering arc punching blocks, two straight slab moulds and deformation joint wooden model, described deformation joint wooden model is contained between the adjacent twin columns, chamfering arc punching block is contained on two opposite side of adjacent twin columns, straight slab mould becomes the T font to be contained on two sides of adjacent twin columns as the prolongation mould of chamfering arc punching block with the deformation joint wooden model, chamfering arc punching block is with tiltedly drawing screw rod to fixedly connected with straight slab mould from two ends.
2. heavy in section as claimed in claim 1 superelevation reinforcing bar clear-water concrete twin columns construction formwork, it is characterized in that described two chamfering arc punching blocks comprise chamfering curved plate, vertical rib channel-section steel and at least two transverse channel steels, wherein, two chamfering curved plate medial surface bucklings become corresponding with two opposite side and the adjacent chamfering of default twin columns respectively, vertical rib channel-section steel vertically distributes and is welded on the lateral surface of chamfering arc steel facing, the transverse channel steels cross direction profiles also is welded on the lateral surface of vertical rib channel-section steel, and the transverse channel steels two ends are respectively equipped with tiltedly draws nut; Described two straight slab moulds comprise steel plate, vertical rib channel-section steel and at least two transverse channel steels, wherein, vertical rib channel-section steel vertically distributes and is welded on the lateral surface of steel plate, and the transverse channel steels cross direction profiles also is welded on the lateral surface of vertical rib channel-section steel, and the transverse channel steels two ends are respectively equipped with tiltedly draws nut.
3. heavy in section as claimed in claim 1 or 2 superelevation reinforcing bar clear-water concrete twin columns construction formwork is characterized in that described deformation joint wooden model comprises wooden form and gripper shoe, and wooden form is contained on the deformation joint both sides, and gripper shoe is supported between the wooden form.
CN2011200128882U 2011-01-17 2011-01-17 Large-section super-high steel-rib bare-concrete double-column construction mould plate Expired - Lifetime CN202000661U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200128882U CN202000661U (en) 2011-01-17 2011-01-17 Large-section super-high steel-rib bare-concrete double-column construction mould plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200128882U CN202000661U (en) 2011-01-17 2011-01-17 Large-section super-high steel-rib bare-concrete double-column construction mould plate

Publications (1)

Publication Number Publication Date
CN202000661U true CN202000661U (en) 2011-10-05

Family

ID=44703406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200128882U Expired - Lifetime CN202000661U (en) 2011-01-17 2011-01-17 Large-section super-high steel-rib bare-concrete double-column construction mould plate

Country Status (1)

Country Link
CN (1) CN202000661U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121310A (en) * 2011-01-17 2011-07-13 中建八局第三建设有限公司 Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof
CN111005560A (en) * 2019-12-19 2020-04-14 黄为英 High-applicability building formwork fastening device
CN115288436A (en) * 2022-08-23 2022-11-04 中建三局集团有限公司 Double-column synchronous construction tool type template at large-section narrow deformation joint and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121310A (en) * 2011-01-17 2011-07-13 中建八局第三建设有限公司 Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof
CN111005560A (en) * 2019-12-19 2020-04-14 黄为英 High-applicability building formwork fastening device
CN115288436A (en) * 2022-08-23 2022-11-04 中建三局集团有限公司 Double-column synchronous construction tool type template at large-section narrow deformation joint and construction method

Similar Documents

Publication Publication Date Title
CN102121310B (en) Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof
CN201206328Y (en) Preform formwork of cast-in-place concrete rib floor
CN104631706B (en) One kind exempts from form removal concrete column and its construction method
CN204826619U (en) Mould is hung to superimposed sheet instrument formula
CN206186048U (en) A side mould for precast concrete superimposed sheet
CN201666157U (en) Inverted arch integral type moving die carrier
CN202000661U (en) Large-section super-high steel-rib bare-concrete double-column construction mould plate
CN105538488A (en) Pipe gallery box culvert pouring mould
CN106320373A (en) Supporting system at position of post-pouring belt of underground garage roof and construction method
CN203393880U (en) Enhanced type reinforced concrete laminated floor slab
CN204781960U (en) High -rise building shear force wall movement joint department template is propped up and is established and reinforcement system
CN207997396U (en) One kind exempting from formwork constructional column shaper
CN107587637B (en) Aerated concrete block box type internal mold hollow floor system and construction method thereof
CN103510703B (en) Method for constructing concrete arch columns with variable cross-sections
CN203429847U (en) Square hole ribbed support prestressed concrete composite slab
CN105350718A (en) Reinforcement permanency beam formwork and manufacturing method for concrete structural member with shearing resistance
CN103056957A (en) Reinforced concrete precast column vertical type prefabrication method
CN202519586U (en) Steel-wood combination type clear water concrete bridge pier formwork structure
CN212689559U (en) Concrete pouring template with thin-wall structure
CN114232791A (en) Self-bearing system for construction load of fabricated building and construction method thereof
CN106914984A (en) A kind of construction method of prefabricated composite construction board
CN202047590U (en) Combined exterior wall template
CN110919825A (en) Large die table die for plate type prefabricated part assembly line construction
CN205735443U (en) A kind of template containing joint production for precast assembly
CN206016254U (en) Building precast constructional column exempts from the U-shaped shell of formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20111005

Effective date of abandoning: 20120704