CN204826619U - Mould is hung to superimposed sheet instrument formula - Google Patents

Mould is hung to superimposed sheet instrument formula Download PDF

Info

Publication number
CN204826619U
CN204826619U CN201520413727.2U CN201520413727U CN204826619U CN 204826619 U CN204826619 U CN 204826619U CN 201520413727 U CN201520413727 U CN 201520413727U CN 204826619 U CN204826619 U CN 204826619U
Authority
CN
China
Prior art keywords
formwork
placing
floor slab
superimposed sheet
laminated floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520413727.2U
Other languages
Chinese (zh)
Inventor
赵志刚
武强
任学军
王京
杨春明
郑飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA XINXING CONSTRUCTION ENGINEERING Co.,Ltd.
Original Assignee
CHINA XINXING BAOXIN CONSTRUCTION Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA XINXING BAOXIN CONSTRUCTION Corp filed Critical CHINA XINXING BAOXIN CONSTRUCTION Corp
Priority to CN201520413727.2U priority Critical patent/CN204826619U/en
Application granted granted Critical
Publication of CN204826619U publication Critical patent/CN204826619U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a mould is hung to superimposed sheet instrument formula is at the cast -in -place slab band support concrete placement of coincide floor, including pouring the template, it is in by many T type jib hoist and mount to pour the template on the bottom surface of the cast -in -place slab band of coincide floor, T type jib is arranged along the cast -in -place slab band of coincide floor, T type jib is equipped with horizontal pole and thread brace rod, the thread brace rod perpendicular to horizontal pole, horizontal pole overlap joint are on the top surface of coincide floor, and thread brace rod passes and pours the template and will pour the template through the nut and compress tightly on the bottom surface of coincide floor. The beneficial effects of the utility model are that: but the deviation of effective control superimposed sheet elevation, the setting of superimposed sheet tongue -and -groove do benefit to the template inlays in between the board seam, the difficult production mould that rises, the material can be sparingly had enough to meet the need, production efficiency is improved.

Description

A kind of superimposed sheet tool-type hangs mould
Technical field
The utility model belongs to building operations instrument, particularly relates to a kind of superimposed sheet tool-type and hangs mould.
Background technology
Along with the development of builing industry, traditional house building pattern progressively to industrialized building mode development, realizes standardization, scale, industrialization and assembling further; Fabricated construction is the one of industrialized building, it is a kind of concrete shear wall structure be formed by connecting by monolithic by cast-in-place wall, prefabricated panel, prefabricated superimposed sheet, wherein the lifting construction of laminated floor slab is the important component part of this structural system, how laminated floor slab hoard strip supports fast and ensures that pouring quality has become the difficult problem perplexed in current fabricated construction, needs better formwork for placing supporting tool.
Summary of the invention
The purpose of this utility model proposes the technical scheme that a kind of superimposed sheet tool-type hangs mould, ensures the concrete pouring quality of laminated floor slab hoard strip.
To achieve these goals, the technical solution of the utility model is: a kind of superimposed sheet tool-type hangs mould, supports concreting at the hoard strip of laminated floor slab; Comprise formwork for placing; Described formwork for placing is lifted on the bottom surface of described laminated floor slab hoard strip by many T-shaped suspension rods, and described T-shaped suspension rod arranges along the hoard strip of laminated floor slab; T-shaped suspension rod is provided with cross bar and thread, and described thread is perpendicular to described cross bar, and cross bar is overlapped on the end face of laminated floor slab, and thread will be pressed on the bottom surface of laminated floor slab by nut through formwork for placing.
Further, seal ring is provided with at described thread through formwork for placing place.
Further, the bottom surface of laminated floor slab hoard strip is provided with tongue and groove, the width of described tongue and groove corresponds to the width of formwork for placing, and formwork for placing embeds in tongue and groove; Be provided with chock in the bottom surface of the both sides of formwork for placing, the thread of described T-shaped suspension rod compresses described chock by dead-wood, and formwork for placing is pressed on the bottom surface of laminated floor slab by chock.
Further, the cross bar of described T-shaped suspension rod is the reinforcing bar that diameter is not less than 16mm.
Further, described in adjacent two, the spacing of T-shaped suspension rod is not more than 800mm.
The beneficial effects of the utility model are: the deviation that effectively can control superimposed sheet absolute altitude, and the setting of superimposed sheet tongue and groove is beneficial to template and is embedded between plate seam, are not easy generation and rise mould; Circulation material can be saved, enhance productivity.
Below in conjunction with drawings and Examples, the utility model is described in detail.
Accompanying drawing explanation
Fig. 1 is the utility model structure chart, is side top view;
Fig. 2 is the utility model structure chart, is side-lower view;
Fig. 3 is that the utility model local splits enlarged drawing.
Detailed description of the invention
As shown in Figure 1, Figure 2, a kind of superimposed sheet tool-type hangs mould, supports concreting at the hoard strip 11 of laminated floor slab 10; Comprise formwork for placing 20; Described formwork for placing is lifted on the bottom surface of described laminated floor slab hoard strip by many T-shaped suspension rods 30, and described T-shaped suspension rod arranges along the hoard strip of laminated floor slab; T-shaped suspension rod is provided with cross bar 31 and thread 32, and described thread is perpendicular to described cross bar, and cross bar is overlapped on the end face of laminated floor slab, and thread will be pressed on the bottom surface of laminated floor slab by nut 33 through formwork for placing.
Seal ring 40 is provided with through formwork for placing place at described thread.
The bottom surface of laminated floor slab hoard strip is provided with tongue and groove 12, and the width of described tongue and groove corresponds to the width of formwork for placing, and formwork for placing embeds in tongue and groove; Be provided with chock 50 in the bottom surface of the both sides of formwork for placing, the thread of described T-shaped suspension rod compresses described chock by dead-wood 60, and formwork for placing is pressed on the bottom surface of laminated floor slab by chock.
The cross bar of described T-shaped suspension rod is the reinforcing bar that diameter is not less than 16mm.
Described in adjacent two, the spacing L of T-shaped suspension rod is not more than 800mm.
Embodiment one:
As shown in Figure 1, Figure 2, a kind of superimposed sheet tool-type hangs mould, supports concreting, be provided with connecting reinforcement 13 at hoard strip place at the hoard strip 11 of laminated floor slab 10.The bottom surface of laminated floor slab hoard strip is provided with tongue and groove 12, and tongue and groove is that 50mm is wide, 5mm is dark.
Formwork for placing 20 is provided with in the bottom surface of laminated floor slab; The width W of formwork for placing corresponds to the tongue and groove width of laminated floor slab, and formwork for placing embeds in tongue and groove.
Respectively be provided with a chock 50 in the bottom surface of the both sides of formwork for placing, be provided with dead-wood 60 in chock bottom surface.
Formwork for placing, chock, dead-wood are fixed on laminated floor slab by T-shaped suspension rod.T-shaped suspension rod has cross bar 31 and thread 32, and thread is perpendicular to described cross bar, and T-shaped suspension rod is diameter is 16mm indented bars, and the thread of T-shaped suspension rod is M14 bolt.The thread of T-shaped suspension rod is through formwork for placing and dead-wood, and compress dead-wood by wing nut 33 and chevron card 34, formwork for placing is pressed on the bottom surface of laminated floor slab by chock by dead-wood.
Formwork for placing is lifted on the bottom surface of described laminated floor slab hoard strip by many T-shaped suspension rods, and T-shaped suspension rod arranges along the hoard strip of laminated floor slab; The spacing L=600mm of T-shaped suspension rod described in adjacent two.
Spillage during in order to prevent concreting, is provided with seal ring 40 at thread through formwork for placing place.
The utility model makes simple, utilizes diameter 16mm reinforcing bar and M14 stud weld are connected into " T " font and add seal ring.
Utilization hangs mould directly and laminated floor slab drawknot, can better ensure laminated floor slab absolute altitude, occur faulting of slab ends phenomenon after avoiding concreting to complete.Superimposed sheet edges of boards tongue and groove arranges and hangs mould with the use of avoiding the mould that rises, the faulting of slab ends phenomenon that produce after conventional template installs concrete placings with tool-type, improves construction quality and the concrete impression quality of strip concrete placings.
Eliminate the operation that support system is installed, improve efficiency of construction.
Be conducive to accelerating construction progress, the construction period can be shortened significantly.
The utility model is applicable to the formwork erection construction that fabricated construction plate seam is 100 ~ 300mm.

Claims (5)

1. superimposed sheet tool-type hangs a mould, supports concreting at the hoard strip of laminated floor slab; Comprise formwork for placing; It is characterized in that, described formwork for placing is lifted on the bottom surface of described laminated floor slab hoard strip by many T-shaped suspension rods, and described T-shaped suspension rod arranges along the hoard strip of laminated floor slab; T-shaped suspension rod is provided with cross bar and thread, and described thread is perpendicular to described cross bar, and cross bar is overlapped on the end face of laminated floor slab, and formwork for placing is pressed on the bottom surface of laminated floor slab by nut through formwork for placing by thread.
2. a kind of superimposed sheet tool-type according to claim 1 hangs mould, it is characterized in that, is provided with seal ring at described thread through formwork for placing place.
3. a kind of superimposed sheet tool-type according to claim 1 hangs mould, it is characterized in that, the bottom surface of laminated floor slab hoard strip is provided with tongue and groove, and the width of described tongue and groove corresponds to the width of formwork for placing, and formwork for placing embeds in tongue and groove; Be provided with chock in the bottom surface of the both sides of formwork for placing, the thread of described T-shaped suspension rod compresses described chock by dead-wood, and formwork for placing is pressed on the bottom surface of laminated floor slab by chock.
4. a kind of superimposed sheet tool-type according to claim 1 hangs mould, it is characterized in that, the cross bar of described T-shaped suspension rod is the reinforcing bar that diameter is not less than 16mm.
5. a kind of superimposed sheet tool-type according to claim 1 hangs mould, and it is characterized in that, described in adjacent two, the spacing of T-shaped suspension rod is not more than 800mm.
CN201520413727.2U 2015-06-16 2015-06-16 Mould is hung to superimposed sheet instrument formula Active CN204826619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520413727.2U CN204826619U (en) 2015-06-16 2015-06-16 Mould is hung to superimposed sheet instrument formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520413727.2U CN204826619U (en) 2015-06-16 2015-06-16 Mould is hung to superimposed sheet instrument formula

Publications (1)

Publication Number Publication Date
CN204826619U true CN204826619U (en) 2015-12-02

Family

ID=54684234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520413727.2U Active CN204826619U (en) 2015-06-16 2015-06-16 Mould is hung to superimposed sheet instrument formula

Country Status (1)

Country Link
CN (1) CN204826619U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544970A (en) * 2016-02-01 2016-05-04 成都市第六建筑工程公司 Composite floor slab cast-in-place slab fixing device with bottom mold and construction method
CN106043943A (en) * 2016-07-05 2016-10-26 上海建工二建集团有限公司 Prefabricated composite slab shock absorption buffer type stacking frame and stacking method
CN106801511A (en) * 2017-02-27 2017-06-06 中建八局第三建设有限公司 A kind of super large reserved opening hanging mould structure and its construction method
CN106930459A (en) * 2017-04-23 2017-07-07 江苏旺材科技有限公司 A kind of superimposed sheet hoard strip hangs shell template
CN107605177A (en) * 2017-10-27 2018-01-19 北京城建北方建设有限责任公司 The construction method of efficient precast floor slab and its independent support frame
CN107687219A (en) * 2017-07-24 2018-02-13 北京城建十建设工程有限公司 For the preparation method of the connection component and superimposed sheet that make superimposed sheet
CN109025261A (en) * 2018-08-17 2018-12-18 上海宝冶建筑工程有限公司 Superimposed sheet piece matches mold device and method
CN109025260A (en) * 2018-07-26 2018-12-18 中民筑友科技投资有限公司 A kind of prefabricated floor slab back casting band joint structure and its construction method
CN109113192A (en) * 2018-08-24 2019-01-01 宁波建工工程集团有限公司 It is a kind of can bidirectional modulation assembled superimposed sheet seam mortar leakage prevention plugging device
CN109306758A (en) * 2018-11-01 2019-02-05 沈阳建筑大学 Prefabricated plate superposed type floor connector and preparation method thereof and construction method
CN113152763A (en) * 2021-04-12 2021-07-23 中国十七冶集团有限公司 Wrong platform prevention device for ZDB prestressed concrete laminated slab and use method of wrong platform prevention device

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544970A (en) * 2016-02-01 2016-05-04 成都市第六建筑工程公司 Composite floor slab cast-in-place slab fixing device with bottom mold and construction method
CN106043943A (en) * 2016-07-05 2016-10-26 上海建工二建集团有限公司 Prefabricated composite slab shock absorption buffer type stacking frame and stacking method
CN106801511A (en) * 2017-02-27 2017-06-06 中建八局第三建设有限公司 A kind of super large reserved opening hanging mould structure and its construction method
CN106930459A (en) * 2017-04-23 2017-07-07 江苏旺材科技有限公司 A kind of superimposed sheet hoard strip hangs shell template
CN107687219A (en) * 2017-07-24 2018-02-13 北京城建十建设工程有限公司 For the preparation method of the connection component and superimposed sheet that make superimposed sheet
CN107605177A (en) * 2017-10-27 2018-01-19 北京城建北方建设有限责任公司 The construction method of efficient precast floor slab and its independent support frame
CN109025260A (en) * 2018-07-26 2018-12-18 中民筑友科技投资有限公司 A kind of prefabricated floor slab back casting band joint structure and its construction method
CN109025261A (en) * 2018-08-17 2018-12-18 上海宝冶建筑工程有限公司 Superimposed sheet piece matches mold device and method
CN109113192A (en) * 2018-08-24 2019-01-01 宁波建工工程集团有限公司 It is a kind of can bidirectional modulation assembled superimposed sheet seam mortar leakage prevention plugging device
CN109306758A (en) * 2018-11-01 2019-02-05 沈阳建筑大学 Prefabricated plate superposed type floor connector and preparation method thereof and construction method
CN113152763A (en) * 2021-04-12 2021-07-23 中国十七冶集团有限公司 Wrong platform prevention device for ZDB prestressed concrete laminated slab and use method of wrong platform prevention device

Similar Documents

Publication Publication Date Title
CN204826619U (en) Mould is hung to superimposed sheet instrument formula
CN103243817B (en) A kind of assembled beam-column attachment means
CN204059601U (en) A kind of steel bar connecting structure of prefabricated concrete element
CN105133755A (en) Method for construction of steel bar welding net rack composite shear wall and shear wall structure
CN107587713A (en) A kind of concrete panel expansion joint uses the two-sided anti-deformation construction method of interior formwork
CN104863296A (en) Integrally modular steel bar truss floor plate and construction method thereof
CN103452350A (en) Fabricated electronic workshop and construction method thereof
CN207919737U (en) A kind of assembled steel-Combined concrete frame structure
CN104060757B (en) Precast concrete frame supports shear wall wallboard
CN218668057U (en) Integrated form mould shell superimposed shear wall
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN209227581U (en) Assembly concrete prismoid shaped basis and column steel connection structure
CN207332060U (en) A kind of assembled hollow floor
CN205935352U (en) Building carrier plate is from formwork
CN203129166U (en) Pre-fabricated foundation of big-moment bottom flange plate electric pole
CN204781520U (en) Detachable die block steel bar truss building carrier plate
CN212405735U (en) Assembled wallboard convenient to dismouting repeatedly usable
CN210239112U (en) Sinking type assembled steel formwork for toilet
CN105239770B (en) Integrated casting steel framework plastic building template system
CN204510688U (en) A kind of temporary fixing structure of precast wall panel
CN211037486U (en) One-way superimposed sheet and formwork structure with no rib at groove and tongue of end part
CN203856199U (en) Prefabricated square steel stepping die
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN207700531U (en) The framework of steel reinforcement of removable bed die and cast-in-place building panel
CN104712139B (en) Construction method for radian column formwork erection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100009 Pei Yongli No. 3, Xicheng District, Beijing

Patentee after: CHINA XINXING CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 100009 Pei Yongli No. 3, Xicheng District, Beijing

Patentee before: CHINA XINXING BUILDING ENGINEERING Corp.

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 100009 Pei Yongli No. 3, Xicheng District, Beijing

Patentee after: CHINA XINXING BUILDING ENGINEERING Corp.

Address before: 100079 No.9, shunbatao, dongtieying, Yongwai, Fengtai District, Beijing

Patentee before: CHINA XINXING BAOXIN CONSTRUCTION Corp.

CP03 Change of name, title or address