CN201991203U - Scaffold - Google Patents

Scaffold Download PDF

Info

Publication number
CN201991203U
CN201991203U CN2011200410050U CN201120041005U CN201991203U CN 201991203 U CN201991203 U CN 201991203U CN 2011200410050 U CN2011200410050 U CN 2011200410050U CN 201120041005 U CN201120041005 U CN 201120041005U CN 201991203 U CN201991203 U CN 201991203U
Authority
CN
China
Prior art keywords
vertical
scaffold
bar
rods
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200410050U
Other languages
Chinese (zh)
Inventor
曹广英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200410050U priority Critical patent/CN201991203U/en
Application granted granted Critical
Publication of CN201991203U publication Critical patent/CN201991203U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold, which comprises vertical rods (1) and L-shaped clamping heads (3), wherein a plurality of parallel vertical rods are connected with cross rods (5); the cross rods are connected with supporting rods (4) which are perpendicular to the cross rods and the vertical rods; a scaffold board (6) is laid on the supporting rods; the upper ends of the vertical rods are provided with bushings (2) which are perpendicular to the vertical rods; cross edges of the clamping heads are sleeved in the bushings; the bushings and the cross edges of the clamping heads are provided with a plurality of bolt holes which are the same and are coaxially arranged at intervals; and vertical edges of the clamping heads are provided with radial through fixing holes. The scaffold has the beneficial effects of simple and stable structure, higher convenience in disassembly, higher lightness, reduced joint points of pipes, reduced workload of workers, short construction period, safety in use and attractive appearance.

Description

Scaffold
Technical field
The utility model relates to a kind of building appliance, particularly a kind of scaffold.
Background technology
At present, scaffold is a requisite operation facility in the building trade.Scaffold has generally that a plurality of rod members are interlaced builds formation, and wherein, rod member comprises multiple, generally comprise the rod member and the vertical rod member of placing of horizontal placement, sometimes in order to satisfy specific demand, increase the stability and the intensity of scaffold, the rod member of oblique placement also is set.Many rod members arranged crosswise intermeshes, and in the staggered place of rod member, and is fixedly connected by the suitable fastener rod member that will interlock.But this form pipe connects too much, and tie point is many, and workload is big, and is long in time limit, not only dangerous but also be inconvenient to dismantle appearance poor.
Summary of the invention
For solving above technical deficiency, the utility model provides a kind of easy disassembly, the scaffold of safety and stability.
The utility model is realized by following measure:
A kind of scaffold of the present utility model, comprise vertical bar, also comprise L shaped chuck, plurality of vertical bar arranged side by side is connected with cross bar, be connected with the support bar perpendicular to cross bar and vertical bar on the cross bar, be covered with scaffold floor on the described support bar, the upper end of described vertical bar is provided with and the vertical vertical sleeve pipe of bar, the horizontal edge of chuck is enclosed within the sleeve pipe, is provided with the bolt hole of several same and axially spaced-apart on sleeve pipe and the chuck horizontal edge.
The vertical edge of above-mentioned chuck is provided with the fixing hole that radially runs through.
The beneficial effects of the utility model are:
Scaffold of the present utility model, simple and stable structure, dismounting is more convenient, and is slightly higher, reduced the tie point of pipe, reduced workman's workload, and time duration is short, and safe in utilization, outward appearance is good.
Description of drawings
Fig. 1 is a side structure schematic diagram of the present utility model.
Fig. 2 is a perspective view.
Among the figure: 1 vertical bar, 2 sleeve pipes, 3 chucks, 4 support bars, 5 cross bars, 6 scaffold floors, 7 guardrails.
The specific embodiment
As shown in Figure 1, 2, scaffold of the present utility model, comprise vertical bar 1 and L shaped chuck 3, plurality of vertical bar 1 arranged side by side is connected with cross bar 5, be connected with on the cross bar 5 perpendicular to the cross bar 5 and the vertical support bar 4 of bar 1, be covered with scaffold floor 6 on the support bar 4, vertically the upper end of bar 1 is provided with the sleeve pipe 2 vertical with vertical bar 1, the horizontal edge of chuck 3 is enclosed within the sleeve pipe 2, is provided with the bolt hole of several same and axially spaced-apart on sleeve pipe 2 and chuck 3 horizontal edges.The vertical edge of chuck 3 is provided with the fixing hole that radially runs through.Support bar 4 edges are provided with guardrail 7, vertically have been cross-linked bracing piece between the bar 1.
During use, adjust the length that chuck 3 horizontal edges stretch into sleeve pipe 2, and, connect with bolt with the bolt hole alignment according to the thickness of body of wall.After chuck 3 is clipped in the body of wall top edge, pass fixing hole with bolt chuck 3 vertical edges are connected with body of wall, can play fixation.

Claims (2)

1. scaffold, comprise vertical bar, it is characterized in that: also comprise L shaped chuck, plurality of vertical bar arranged side by side is connected with cross bar, be connected with the support bar perpendicular to cross bar and vertical bar on the cross bar, be covered with scaffold floor on the described support bar, the upper end of described vertical bar is provided with and the vertical vertical sleeve pipe of bar, the horizontal edge of chuck is enclosed within the sleeve pipe, is provided with the bolt hole of several same and axially spaced-apart on sleeve pipe and the chuck horizontal edge.
2. scaffold according to claim 1 is characterized in that: the vertical edge of described chuck is provided with the fixing hole that radially runs through.
CN2011200410050U 2011-02-18 2011-02-18 Scaffold Expired - Fee Related CN201991203U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200410050U CN201991203U (en) 2011-02-18 2011-02-18 Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200410050U CN201991203U (en) 2011-02-18 2011-02-18 Scaffold

Publications (1)

Publication Number Publication Date
CN201991203U true CN201991203U (en) 2011-09-28

Family

ID=44667692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200410050U Expired - Fee Related CN201991203U (en) 2011-02-18 2011-02-18 Scaffold

Country Status (1)

Country Link
CN (1) CN201991203U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568881A (en) * 2014-10-10 2016-05-11 无锡梓昱安全用品科技有限公司 Convenient-adjusting type construction indication rack
CN105625203A (en) * 2014-11-26 2016-06-01 无锡梓昱安全用品科技有限公司 Multipurpose construction protective rack

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568881A (en) * 2014-10-10 2016-05-11 无锡梓昱安全用品科技有限公司 Convenient-adjusting type construction indication rack
CN105625203A (en) * 2014-11-26 2016-06-01 无锡梓昱安全用品科技有限公司 Multipurpose construction protective rack

Similar Documents

Publication Publication Date Title
CN101736896B (en) Cross-plate scaffold
CN204728676U (en) Bearing hanging rack for supporting variable cross-section wall
CN201991203U (en) Scaffold
CN204492134U (en) Be convenient to the height scaffolding installed
CN206581579U (en) A kind of track-type facilities of elevating scaffold
CN201924284U (en) Screw rod seat pipe double-split Bailey bracket
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN202899588U (en) Assembling scaffold structure
CN204168835U (en) Green house moulded by a kind of wood
CN203430009U (en) Construction hanging basket
CN204252518U (en) Scaffold mounting structure
CN202876290U (en) Rock climbing graduation wall dual-purpose apparatus
CN203603450U (en) Clamping slot type steel pipe scaffold
CN209129335U (en) A kind of construction carrier
CN210767782U (en) Guide rail pole setting connecting piece that convenient concatenation was used
CN204357089U (en) A kind of building construction scaffold
CN202767518U (en) Single space truss for supporting concrete shear wall moldboard and assembling structure
CN202214976U (en) Steel wire rope support device
CN202509750U (en) Height-adjustable type scaffold
CN104481127A (en) Rigidly-connected and high-strength die plate supporting system
CN201574572U (en) Angle-adjustable operating platform hanging rack
CN204662981U (en) Steel form shelf type suspension scaffold
CN215564361U (en) Scaffold reinforcing apparatus for building engineering
CN204149336U (en) A kind of concrete mixing plant supporting construction
CN215055585U (en) Concrete frame structure face limit safety device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20120218