CN201901879U - Nonstandard foundation used for fixing tower crane - Google Patents

Nonstandard foundation used for fixing tower crane Download PDF

Info

Publication number
CN201901879U
CN201901879U CN2010206039002U CN201020603900U CN201901879U CN 201901879 U CN201901879 U CN 201901879U CN 2010206039002 U CN2010206039002 U CN 2010206039002U CN 201020603900 U CN201020603900 U CN 201020603900U CN 201901879 U CN201901879 U CN 201901879U
Authority
CN
China
Prior art keywords
tower crane
nonstandard
foundation
concrete
transformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206039002U
Other languages
Chinese (zh)
Inventor
钟以蕾
赵仁龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CN2010206039002U priority Critical patent/CN201901879U/en
Application granted granted Critical
Publication of CN201901879U publication Critical patent/CN201901879U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a nonstandard foundation used for fixing a tower crane, which comprises a concrete bottom pattern plate, and is characterized in that a plurality of drill holes are dug on the concrete bottom pattern plate and are internally provided with four groups of chemical glue bonding planting reinforcing bars, the two groups of the planting reinforcing bars are anchored and connected with a transformation steel girder, the two transformation steel girders are parallel to each other and are erected with two connecting transformation supports parallelly arranged, two tower crane bases are fixedly connected on each connecting transformation support, and the four tower crane bases form a rectangular position. The nonstandard foundation has the advantages of being not influenced by working conditions of the bottom pattern plate during installation of the tower crane, being capable of flexiably arranging the form of the tower crane foundation, having a simpler construction technique and being convenient in operation.

Description

A kind of fixing nonstandard basis of tower crane that is used for
Technical field
The utility model relates to a kind of fixing nonstandard basis of tower crane that is used for.
Background technology
At present when high-building construction, adopt large-scale tower crane to allocate and transport various constructional materialss, because the boom of tower crane can become orthogonal profile with body of the tower, so can be installed in crane near the building of constructing, its effective work range is superior to crawler belt, rubber tired crane, particularly occur high-rise, behind the super highrise building, the working depth of tower crane can reach 100~160m, more embody its superiority, it is easy to operate to add itself, characteristics such as luffing is simple, comprehensive certain situation is both at home and abroad seen the lifting of builing industry from now on, transportation, the key machine of lifting operation remains tower crane.And in recent years, build more and more higher, a large amount of super high rise buildings has appearred, what conventional tower crane adopted is to utilize the basis of the part of self having built up of building as large-scale tower crane, the operating mode of arranging along with tower crane becomes increasingly complex, the form of tower crane also changes day by day, tower crane generally adopts traditional embedded part to construct at present, promptly still placing built-in fitting in the uncompleted former concrete structure, and with modes such as tower crane base and built-in fitting firm welding, this kind mode must be before big bottom slab concreting concrete be accurately buried embedded part underground and is finished, and relatively is subjected to the restriction of engineering time.Because the load that tower crane need bear is big more, its area is big more, and difficulty of construction is also high more.If the big base plate of concrete has been constructed and has been finished, according to traditional practice of building the tower crane concrete foundation again, more loaded down with trivial details and the man-machine material expense increasing of required operation, and treat that this concrete foundation of tower crane dismounting back need cut, and building waste transported outward, the more important thing is destructible original base structure in the construction, cause unsafe factor.Therefore demand developing the nonstandard basis that tower crane is fixed that is used for that makes new advances urgently.
Summary of the invention
The purpose of this utility model is to solve in the prior art existing problem in the tower crane immobilizing foundation is set, and a kind of fixing nonstandard foundation structure of tower crane that is used for is provided.A kind of fixing nonstandard basis of tower crane that is used for of the utility model design, comprise the big base plate of concrete, it is characterized in that: digging at the big base plate of concrete has several boring, boring in by chemical glue cementing value muscle, the value muscle that is worth is formed four groups, two class value muscle and a conversion girder steel anchor connection, two conversion girder steels are parallel to each other, put on the shelf at two conversion girder steels and to be provided with two connections conversions bearings that be arranged in parallel, be fixedly connected with two tower crane bases on the every connection conversion bearing, four tower crane bases constitute a rectangle position.The utility model has the advantages that the influence of big base plate operating mode when not installed by tower crane, the form of tower crane can be set neatly, construction technology is simpler, and is easy to operate.
Description of drawings
Accompanying drawing 1 is a structure schematic top plan view of the present utility model.
Accompanying drawing 2 is looked schematic diagram for the structure of the present utility model left side.
Accompanying drawing 3 is looked schematic diagram for structure of the present utility model front.
The specific embodiment
Comprise the big base plate 1 of concrete among the figure, it is characterized in that: digging at the big base plate of concrete has several boring 2, boring in by chemical glue cementing value muscle 3, the value muscle that is worth is formed four groups, two class value muscle and a conversion girder steel 4 anchor connections, two conversion girder steels are parallel to each other, and putting on the shelf at two conversion girder steels is provided with two connection conversion bearings 5 that be arranged in parallel, be fixedly connected with 6, four tower crane bases of two tower crane bases on the every connection conversion bearing and constitute a rectangle position.
Value muscle construction sequence: boring: should use electric hammer boring, should note avoiding damaging the interior original reinforcing bar of concrete during boring.Clear hole: before implanting reinforcing bar with the clear hole of special-purpose steel brush at least 3 times.Dedusting: adopt air blowing tube or the interior dust of air compressor removing hole wall and ponding at least 3 times.The pre-notes: use special-purpose combining nozzle, the 4 rifle adhesives that flowed out by combining nozzle must die out at first.Injecting glue: begin injecting glue after at the bottom of the combining nozzle patchhole, slowly combining nozzle is moved outward, guarantee no bubble or hole in the hole, injecting glue is to filling up 2/3 of hole depth.Bar planting: implant reinforcing bar to there being colloid to overflow with continuous rotation mode, gel time Preceding implantable or adjustment reinforcing bar, Extremely Between can not the disturbance reinforcing bar.Follow-up construction:
Figure 728142DEST_PATH_IMAGE002
Extremely
Figure 482471DEST_PATH_IMAGE003
Between can begin construction, but can not apply moment of torsion (25% design power value).
Figure 157166DEST_PATH_IMAGE004
After, can bring into play design power value fully.
During adopted value muscle mode, can bear the tower crane load of suitable numerical value, use more flexibly effectively than other forms of tower crane.
In follow-up construction, two conversion girder steels are carried out anchor connection with the value muscle, fixedly connected with the conversion girder steel again after subsequently again will two connecting the parallel placement of conversion bearing, and at last four tower crane bases changed bearing and can be carried out the installation of tower crane after fixedly connected with being connected.After the building operations completion, also need not go again and cut construction in its basis, thereby also can not exert an adverse impact to concrete foundation.

Claims (1)

1. one kind is used for the fixing nonstandard basis of tower crane, comprise the big base plate of concrete, it is characterized in that: digging at the big base plate of concrete has several boring, boring in by chemical glue cementing value muscle, the value muscle that is worth is formed four groups, two class value muscle and a conversion girder steel anchor connection, two conversion girder steels are parallel to each other, put on the shelf at two conversion girder steels and to be provided with two connections conversions bearings that be arranged in parallel, be fixedly connected with two tower crane bases on the every connection conversion bearing, four tower crane bases constitute a rectangle position.
CN2010206039002U 2010-11-12 2010-11-12 Nonstandard foundation used for fixing tower crane Expired - Fee Related CN201901879U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206039002U CN201901879U (en) 2010-11-12 2010-11-12 Nonstandard foundation used for fixing tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206039002U CN201901879U (en) 2010-11-12 2010-11-12 Nonstandard foundation used for fixing tower crane

Publications (1)

Publication Number Publication Date
CN201901879U true CN201901879U (en) 2011-07-20

Family

ID=44272480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206039002U Expired - Fee Related CN201901879U (en) 2010-11-12 2010-11-12 Nonstandard foundation used for fixing tower crane

Country Status (1)

Country Link
CN (1) CN201901879U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103508332A (en) * 2013-10-12 2014-01-15 中建三局建设工程股份有限公司 Tower crane and switch base thereof
CN105314548A (en) * 2014-07-28 2016-02-10 中建四局第六建筑工程有限公司 Method and structure for mounting and jacking internal climbing tower crane of structural beam bearing type
CN105926952A (en) * 2016-06-30 2016-09-07 浙江精工钢结构集团有限公司 Floor conversion steel beam moving along with truck-mounted crane and using method of floor conversion steel beam
CN107473054A (en) * 2017-08-09 2017-12-15 重庆市渝建实业股份有限公司 Construction elevator building method for building construction
CN108252319A (en) * 2018-04-09 2018-07-06 上海市机械施工集团有限公司 A kind of non-embedded type postposition tower crane device suitable for construction
CN108373115A (en) * 2018-04-11 2018-08-07 贵州新联***工程集团有限公司 A kind of device of construction tower crane difference pedestal conversion
CN109750687A (en) * 2019-01-27 2019-05-14 浙江大学城市学院 The steel construction tower crane foundation platform of adjustable dimension
CN110902581A (en) * 2019-12-02 2020-03-24 袁明凯 Tower crane device for building

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103508332A (en) * 2013-10-12 2014-01-15 中建三局建设工程股份有限公司 Tower crane and switch base thereof
CN103508332B (en) * 2013-10-12 2015-11-18 中建三局建设工程股份有限公司 Tower machine and switch base thereof
CN105314548A (en) * 2014-07-28 2016-02-10 中建四局第六建筑工程有限公司 Method and structure for mounting and jacking internal climbing tower crane of structural beam bearing type
CN105926952A (en) * 2016-06-30 2016-09-07 浙江精工钢结构集团有限公司 Floor conversion steel beam moving along with truck-mounted crane and using method of floor conversion steel beam
CN105926952B (en) * 2016-06-30 2018-04-24 浙江精工钢结构集团有限公司 A kind of flooring conversion girder steel and its application method with truck crane movement
CN107473054A (en) * 2017-08-09 2017-12-15 重庆市渝建实业股份有限公司 Construction elevator building method for building construction
CN108252319A (en) * 2018-04-09 2018-07-06 上海市机械施工集团有限公司 A kind of non-embedded type postposition tower crane device suitable for construction
CN108373115A (en) * 2018-04-11 2018-08-07 贵州新联***工程集团有限公司 A kind of device of construction tower crane difference pedestal conversion
CN109750687A (en) * 2019-01-27 2019-05-14 浙江大学城市学院 The steel construction tower crane foundation platform of adjustable dimension
CN109750687B (en) * 2019-01-27 2024-05-10 浙江大学城市学院 Steel structure tower crane foundation bearing platform with adjustable size
CN110902581A (en) * 2019-12-02 2020-03-24 袁明凯 Tower crane device for building

Similar Documents

Publication Publication Date Title
CN201901879U (en) Nonstandard foundation used for fixing tower crane
CN102767303B (en) Precast concrete tower and construction method thereof
CN105256812B (en) Foundation ditch prefabricated assembled concrete supporting construction and its construction method
CN203256761U (en) Tower crane foundation arranged on top plate of basement
CN204899204U (en) Mouthful structure concrete structure's of department a template system fetches earth among reverse construction method
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN102650212A (en) Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel
CN105421477A (en) Construction method for tower crane foundation
CN106088120B (en) A kind of cofferdam decentralization construction method
CN101560766B (en) Grid-like underground continuous wall plate and production method thereof
CN101949215A (en) Mounting construction method of steel structure support seat
CN105714678A (en) Composite gravity anchorage
CN109930624A (en) A kind of embedding petrographic province blower foundation of offshore wind farm and construction method
CN104818729B (en) Can be for the mutual foundation of big or small tower crane conversion
CN101725147B (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN101666085B (en) Prefabricated part composite cement soil wall and construction method thereof
CN101117801A (en) Superposition pile for engineering reconstruction and pile forming method
CN106193101B (en) Tower crane steel platform pile foundation and its construction method
CN105019645A (en) Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN102926382A (en) Construction method of soil mixing wall (SMW) engineering method
CN205134326U (en) Prefabricated assembled concrete bearing structure of foundation ditch
CN201722700U (en) Infrastructure of tower crane
CN205296173U (en) Utilize structure of foundation ditch support system bearing tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110720

Termination date: 20171112