CN201901879U - Nonstandard foundation used for fixing tower crane - Google Patents
Nonstandard foundation used for fixing tower crane Download PDFInfo
- Publication number
- CN201901879U CN201901879U CN2010206039002U CN201020603900U CN201901879U CN 201901879 U CN201901879 U CN 201901879U CN 2010206039002 U CN2010206039002 U CN 2010206039002U CN 201020603900 U CN201020603900 U CN 201020603900U CN 201901879 U CN201901879 U CN 201901879U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- nonstandard
- foundation
- concrete
- transformation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model relates to a nonstandard foundation used for fixing a tower crane, which comprises a concrete bottom pattern plate, and is characterized in that a plurality of drill holes are dug on the concrete bottom pattern plate and are internally provided with four groups of chemical glue bonding planting reinforcing bars, the two groups of the planting reinforcing bars are anchored and connected with a transformation steel girder, the two transformation steel girders are parallel to each other and are erected with two connecting transformation supports parallelly arranged, two tower crane bases are fixedly connected on each connecting transformation support, and the four tower crane bases form a rectangular position. The nonstandard foundation has the advantages of being not influenced by working conditions of the bottom pattern plate during installation of the tower crane, being capable of flexiably arranging the form of the tower crane foundation, having a simpler construction technique and being convenient in operation.
Description
Technical field
The utility model relates to a kind of fixing nonstandard basis of tower crane that is used for.
Background technology
At present when high-building construction, adopt large-scale tower crane to allocate and transport various constructional materialss, because the boom of tower crane can become orthogonal profile with body of the tower, so can be installed in crane near the building of constructing, its effective work range is superior to crawler belt, rubber tired crane, particularly occur high-rise, behind the super highrise building, the working depth of tower crane can reach 100~160m, more embody its superiority, it is easy to operate to add itself, characteristics such as luffing is simple, comprehensive certain situation is both at home and abroad seen the lifting of builing industry from now on, transportation, the key machine of lifting operation remains tower crane.And in recent years, build more and more higher, a large amount of super high rise buildings has appearred, what conventional tower crane adopted is to utilize the basis of the part of self having built up of building as large-scale tower crane, the operating mode of arranging along with tower crane becomes increasingly complex, the form of tower crane also changes day by day, tower crane generally adopts traditional embedded part to construct at present, promptly still placing built-in fitting in the uncompleted former concrete structure, and with modes such as tower crane base and built-in fitting firm welding, this kind mode must be before big bottom slab concreting concrete be accurately buried embedded part underground and is finished, and relatively is subjected to the restriction of engineering time.Because the load that tower crane need bear is big more, its area is big more, and difficulty of construction is also high more.If the big base plate of concrete has been constructed and has been finished, according to traditional practice of building the tower crane concrete foundation again, more loaded down with trivial details and the man-machine material expense increasing of required operation, and treat that this concrete foundation of tower crane dismounting back need cut, and building waste transported outward, the more important thing is destructible original base structure in the construction, cause unsafe factor.Therefore demand developing the nonstandard basis that tower crane is fixed that is used for that makes new advances urgently.
Summary of the invention
The purpose of this utility model is to solve in the prior art existing problem in the tower crane immobilizing foundation is set, and a kind of fixing nonstandard foundation structure of tower crane that is used for is provided.A kind of fixing nonstandard basis of tower crane that is used for of the utility model design, comprise the big base plate of concrete, it is characterized in that: digging at the big base plate of concrete has several boring, boring in by chemical glue cementing value muscle, the value muscle that is worth is formed four groups, two class value muscle and a conversion girder steel anchor connection, two conversion girder steels are parallel to each other, put on the shelf at two conversion girder steels and to be provided with two connections conversions bearings that be arranged in parallel, be fixedly connected with two tower crane bases on the every connection conversion bearing, four tower crane bases constitute a rectangle position.The utility model has the advantages that the influence of big base plate operating mode when not installed by tower crane, the form of tower crane can be set neatly, construction technology is simpler, and is easy to operate.
Description of drawings
Accompanying drawing 1 is a structure schematic top plan view of the present utility model.
Accompanying drawing 3 is looked schematic diagram for structure of the present utility model front.
The specific embodiment
Comprise the big base plate 1 of concrete among the figure, it is characterized in that: digging at the big base plate of concrete has several boring 2, boring in by chemical glue cementing value muscle 3, the value muscle that is worth is formed four groups, two class value muscle and a conversion girder steel 4 anchor connections, two conversion girder steels are parallel to each other, and putting on the shelf at two conversion girder steels is provided with two connection conversion bearings 5 that be arranged in parallel, be fixedly connected with 6, four tower crane bases of two tower crane bases on the every connection conversion bearing and constitute a rectangle position.
Value muscle construction sequence: boring: should use electric hammer boring, should note avoiding damaging the interior original reinforcing bar of concrete during boring.Clear hole: before implanting reinforcing bar with the clear hole of special-purpose steel brush at least 3 times.Dedusting: adopt air blowing tube or the interior dust of air compressor removing hole wall and ponding at least 3 times.The pre-notes: use special-purpose combining nozzle, the 4 rifle adhesives that flowed out by combining nozzle must die out at first.Injecting glue: begin injecting glue after at the bottom of the combining nozzle patchhole, slowly combining nozzle is moved outward, guarantee no bubble or hole in the hole, injecting glue is to filling up 2/3 of hole depth.Bar planting: implant reinforcing bar to there being colloid to overflow with continuous rotation mode, gel time
Preceding implantable or adjustment reinforcing bar,
Extremely
Between can not the disturbance reinforcing bar.Follow-up construction:
Extremely
Between can begin construction, but can not apply moment of torsion (25% design power value).
After, can bring into play design power value fully.
During adopted value muscle mode, can bear the tower crane load of suitable numerical value, use more flexibly effectively than other forms of tower crane.
In follow-up construction, two conversion girder steels are carried out anchor connection with the value muscle, fixedly connected with the conversion girder steel again after subsequently again will two connecting the parallel placement of conversion bearing, and at last four tower crane bases changed bearing and can be carried out the installation of tower crane after fixedly connected with being connected.After the building operations completion, also need not go again and cut construction in its basis, thereby also can not exert an adverse impact to concrete foundation.
Claims (1)
1. one kind is used for the fixing nonstandard basis of tower crane, comprise the big base plate of concrete, it is characterized in that: digging at the big base plate of concrete has several boring, boring in by chemical glue cementing value muscle, the value muscle that is worth is formed four groups, two class value muscle and a conversion girder steel anchor connection, two conversion girder steels are parallel to each other, put on the shelf at two conversion girder steels and to be provided with two connections conversions bearings that be arranged in parallel, be fixedly connected with two tower crane bases on the every connection conversion bearing, four tower crane bases constitute a rectangle position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206039002U CN201901879U (en) | 2010-11-12 | 2010-11-12 | Nonstandard foundation used for fixing tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206039002U CN201901879U (en) | 2010-11-12 | 2010-11-12 | Nonstandard foundation used for fixing tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201901879U true CN201901879U (en) | 2011-07-20 |
Family
ID=44272480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206039002U Expired - Fee Related CN201901879U (en) | 2010-11-12 | 2010-11-12 | Nonstandard foundation used for fixing tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201901879U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103508332A (en) * | 2013-10-12 | 2014-01-15 | 中建三局建设工程股份有限公司 | Tower crane and switch base thereof |
CN105314548A (en) * | 2014-07-28 | 2016-02-10 | 中建四局第六建筑工程有限公司 | Method and structure for mounting and jacking internal climbing tower crane of structural beam bearing type |
CN105926952A (en) * | 2016-06-30 | 2016-09-07 | 浙江精工钢结构集团有限公司 | Floor conversion steel beam moving along with truck-mounted crane and using method of floor conversion steel beam |
CN107473054A (en) * | 2017-08-09 | 2017-12-15 | 重庆市渝建实业股份有限公司 | Construction elevator building method for building construction |
CN108252319A (en) * | 2018-04-09 | 2018-07-06 | 上海市机械施工集团有限公司 | A kind of non-embedded type postposition tower crane device suitable for construction |
CN108373115A (en) * | 2018-04-11 | 2018-08-07 | 贵州新联***工程集团有限公司 | A kind of device of construction tower crane difference pedestal conversion |
CN109750687A (en) * | 2019-01-27 | 2019-05-14 | 浙江大学城市学院 | The steel construction tower crane foundation platform of adjustable dimension |
CN110902581A (en) * | 2019-12-02 | 2020-03-24 | 袁明凯 | Tower crane device for building |
-
2010
- 2010-11-12 CN CN2010206039002U patent/CN201901879U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103508332A (en) * | 2013-10-12 | 2014-01-15 | 中建三局建设工程股份有限公司 | Tower crane and switch base thereof |
CN103508332B (en) * | 2013-10-12 | 2015-11-18 | 中建三局建设工程股份有限公司 | Tower machine and switch base thereof |
CN105314548A (en) * | 2014-07-28 | 2016-02-10 | 中建四局第六建筑工程有限公司 | Method and structure for mounting and jacking internal climbing tower crane of structural beam bearing type |
CN105926952A (en) * | 2016-06-30 | 2016-09-07 | 浙江精工钢结构集团有限公司 | Floor conversion steel beam moving along with truck-mounted crane and using method of floor conversion steel beam |
CN105926952B (en) * | 2016-06-30 | 2018-04-24 | 浙江精工钢结构集团有限公司 | A kind of flooring conversion girder steel and its application method with truck crane movement |
CN107473054A (en) * | 2017-08-09 | 2017-12-15 | 重庆市渝建实业股份有限公司 | Construction elevator building method for building construction |
CN108252319A (en) * | 2018-04-09 | 2018-07-06 | 上海市机械施工集团有限公司 | A kind of non-embedded type postposition tower crane device suitable for construction |
CN108373115A (en) * | 2018-04-11 | 2018-08-07 | 贵州新联***工程集团有限公司 | A kind of device of construction tower crane difference pedestal conversion |
CN109750687A (en) * | 2019-01-27 | 2019-05-14 | 浙江大学城市学院 | The steel construction tower crane foundation platform of adjustable dimension |
CN109750687B (en) * | 2019-01-27 | 2024-05-10 | 浙江大学城市学院 | Steel structure tower crane foundation bearing platform with adjustable size |
CN110902581A (en) * | 2019-12-02 | 2020-03-24 | 袁明凯 | Tower crane device for building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201901879U (en) | Nonstandard foundation used for fixing tower crane | |
CN102767303B (en) | Precast concrete tower and construction method thereof | |
CN105256812B (en) | Foundation ditch prefabricated assembled concrete supporting construction and its construction method | |
CN203256761U (en) | Tower crane foundation arranged on top plate of basement | |
CN204899204U (en) | Mouthful structure concrete structure's of department a template system fetches earth among reverse construction method | |
CN102653945A (en) | Foundation reinforcing and replacing structure and construction method thereof | |
CN102650212A (en) | Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel | |
CN105421477A (en) | Construction method for tower crane foundation | |
CN106088120B (en) | A kind of cofferdam decentralization construction method | |
CN101560766B (en) | Grid-like underground continuous wall plate and production method thereof | |
CN101949215A (en) | Mounting construction method of steel structure support seat | |
CN105714678A (en) | Composite gravity anchorage | |
CN109930624A (en) | A kind of embedding petrographic province blower foundation of offshore wind farm and construction method | |
CN104818729B (en) | Can be for the mutual foundation of big or small tower crane conversion | |
CN101725147B (en) | Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space | |
CN101666085B (en) | Prefabricated part composite cement soil wall and construction method thereof | |
CN101117801A (en) | Superposition pile for engineering reconstruction and pile forming method | |
CN106193101B (en) | Tower crane steel platform pile foundation and its construction method | |
CN105019645A (en) | Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method | |
CN107313551A (en) | A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method | |
CN203834809U (en) | Steel pipe column structure for steel pipe column concrete side pouring method | |
CN102926382A (en) | Construction method of soil mixing wall (SMW) engineering method | |
CN205134326U (en) | Prefabricated assembled concrete bearing structure of foundation ditch | |
CN201722700U (en) | Infrastructure of tower crane | |
CN205296173U (en) | Utilize structure of foundation ditch support system bearing tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110720 Termination date: 20171112 |