CN201896289U - 具有双向倾斜度的锚杆定位装置 - Google Patents

具有双向倾斜度的锚杆定位装置 Download PDF

Info

Publication number
CN201896289U
CN201896289U CN2010205161882U CN201020516188U CN201896289U CN 201896289 U CN201896289 U CN 201896289U CN 2010205161882 U CN2010205161882 U CN 2010205161882U CN 201020516188 U CN201020516188 U CN 201020516188U CN 201896289 U CN201896289 U CN 201896289U
Authority
CN
China
Prior art keywords
anchor pole
positioning framework
beam frame
spacing
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205161882U
Other languages
English (en)
Inventor
张永涛
肖文福
高雄
游新鹏
张平
蒋健
刘颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CONSTRUCTION HEADQUARTERS OF CHANGJIANG HIGHWAY AND BRIDGE
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd, China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN2010205161882U priority Critical patent/CN201896289U/zh
Application granted granted Critical
Publication of CN201896289U publication Critical patent/CN201896289U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种具有双向倾斜度的锚杆定位装置,它包括由上段定位框架和下段定位框架构成定位框架,下段定位框架竖向设置,上段定位框架与下段定位框架之间有第一倾斜角,定位框架上设有锚杆限位梁框,锚杆限位梁框上设锚杆限位孔,所述各锚杆限位孔的轴线与水平面之间有第二倾斜角。本实用新型的定位架和限位装置的定位***,可以实现长重锚杆的精确定位,提高了定位精度,优化了操作流程,提高了生产效率,保证了工程质量。

Description

具有双向倾斜度的锚杆定位装置
技术领域
本实用新型属于桥梁建造设备领域,尤其涉及一种在桥梁建造过程中对锚杆进行定位的装置。
背景技术
对于横桥向为门形,纵桥向为人字形的钢塔,其与混凝土承台通过数十根高强钢锚杆连接。为了优化结构受力,钢塔底面为横桥向和纵桥向双向倾斜面,因此,与钢塔底面垂直的高强钢锚杆也具有双向倾斜度。单根锚杆长达10多米,重达近一吨。高强钢锚杆的定位准确与否直接关系到钢塔首节段的定位精度,进而影响整个钢塔的安装精度,同时,高强钢锚杆要求严格的轴向受拉,因此定位精度要求非常高,而现有技术中没有相应的装置能满足上述高强钢锚杆施工的要求。
发明内容
本实用新型的目的在于提供一种具有双向倾斜度的锚杆定位装置,以满足上述要求。
本实用新型的技术方案为:具有双向倾斜度的锚杆定位装置,它包括由上段定位框架和下段定位框架构成定位框架,下段定位框架竖向设置,上段定位框架与下段定位框架之间有第一倾斜角,定位框架上设有锚杆限位梁框,所述锚杆限位梁框包括:上段定位框架的顶部设有第一锚杆限位梁框,第一锚杆限位梁框上设第一锚杆限位孔;上段定位框架与下段定位框架之间设有第二锚杆限位梁框,第二锚杆限位梁框上设第二锚杆限位孔;下段定位框架上设有第三锚杆限位梁框,第三锚杆限位梁框上设第三锚杆限位孔;第一锚杆限位孔的轴线,第二锚杆限位孔的轴线和第三锚杆限位孔的轴线与锚杆的轴线重合,所述各锚杆限位孔的轴线与水平面之间有第二倾斜角。
所述锚杆限位梁框上设有卡板,所述杆限位孔卡设在卡板上。
所述卡板包括上半卡板和下半卡板,上半卡板和下半卡板上分别开设有半圆弧槽孔,两个半圆弧槽孔构成所述杆限位孔。
所述锚杆限位梁框上设有挡板,挡板上设有千斤顶。
下段定位框架和/或上段定位框架上设有手拉葫芦。
本实用新型解决具有双向倾斜度的高强钢锚杆的精确定位问题,保证塔座施工精度和钢塔施工质量,本实用新型设计了一套结合辅助牵引装置即手拉葫芦,定位架和限位装置的定位***,可以实现长重锚杆的精确定位,提高了定位精度,优化了操作流程,提高了生产效率,保证了工程质量。
附图说明
图1具有双向倾斜度的锚杆定位装置立面示意图。
图2锚杆限位梁框示意图。
图3限位调整装置示意图。
图4卡板及限位调整装置示意图。
具体实施方式
如图1所示,下段定位框架110和上段定位框架120相互固定连接构成定位框架,下段定位框架110竖直设置,上段定位框架120与下段定位框架110之间具有一个倾斜角度α。定位框架上设有锚杆限位梁框。锚杆限位梁框分三层设置,上段定位框架的顶部设有第一锚杆限位梁框130,上段定位框架与下段定位框架之间设有第二锚杆限位梁框140,下段定位框架上设有第三锚杆限位梁框150,三层锚杆限位梁框结构相同,平行设置,与水平面之间具有一个倾斜角度β。
下段定位框架110和上段定位框架120上设有牵引装置,本实施例中的的牵引装置为手拉葫芦140,本实施例中上下分别设有四个手拉葫芦140,手拉葫芦140的另一端与锚杆100连接。
第一锚杆限位梁框上设有第一锚杆限位孔,第二锚杆限位梁框上设有第二锚杆限位孔,第三锚杆限位梁框上设有第三锚杆限位孔,上下三层的相对应的锚杆限位孔的轴线与锚杆100的轴线重合。
以第一锚杆限位梁框的结构加以说明,如图2所示,锚杆限位梁框130上设有卡板,卡板包括上半卡板131和下半卡板132,两个半卡板上分别开设有半圆弧槽孔133,134两个半圆弧槽孔133,134拼合后构成所述的锚杆限位孔135。
本实施例中第一锚杆限位梁框上还设有锚杆100的调位装置;调位装置如图3、4所示,它包括锚杆限位梁框或上设有挡板,挡板上设有千斤顶,挡板包括垂直的两个方向设置的挡板151和挡板152,挡板151和挡板152上均可拆卸连接有千斤顶153和154。
施工时,下段定位框架110和上段定位框架120由槽钢焊接组成,包括立柱、平联、斜撑。
锚杆100安装前先在定位框架上测量放样,根据放样结果在三层锚杆限位梁框上安装半边弧形定位的所述卡板,并在顶部的第一锚杆限位梁框上安装锚杆调位用的调位的千斤顶153、154,锚杆采用塔吊安装,通过辅助牵引装置中的手拉葫芦140辅助牵引进入定位***。锚杆安装完成通过调位千斤顶153、154初步调整锚杆精度,使锚杆贴紧弧形定位上半卡板131,并让锚杆锚固端螺母与底梁115紧密接触,带紧定位螺母,复测锚杆定位精度,合格后,安装另一上半卡板132,使两个半圆弧槽孔134拼合卡紧锚杆,并拧紧止退螺母,锚杆定位完成。

Claims (5)

1.一种具有双向倾斜度的锚杆定位装置,它包括由上段定位框架和下段定位框架构成定位框架,其特征在于下段定位框架竖向设置,上段定位框架与下段定位框架之间有第一倾斜角,定位框架上设有锚杆限位梁框,所述锚杆限位梁框包括:上段定位框架的顶部设有第一锚杆限位梁框,第一锚杆限位梁框上设第一锚杆限位孔;上段定位框架与下段定位框架之间设有第二锚杆限位梁框,第二锚杆限位梁框上设第二锚杆限位孔;下段定位框架上设有第三锚杆限位梁框,第三锚杆限位梁框上设第三锚杆限位孔;第一锚杆限位孔的轴线,第二锚杆限位孔的轴线和第三锚杆限位孔的轴线与锚杆的轴线重合,所述各锚杆限位孔的轴线与水平面之间有第二倾斜角。
2.如权利要求1所述具有双向倾斜度的锚杆定位装置,其特征在于锚杆限位梁框上设有卡板,所述杆限位孔卡设在卡板上。
3.如权利要求2所述具有双向倾斜度的锚杆定位装置,其特征在于所述卡板包括上半卡板和下半卡板,上半卡板和下半卡板上分别开设有半圆弧槽孔,两个半圆弧槽孔构成所述杆限位孔。
4.如权利要求1所述具有双向倾斜度的锚杆定位装置,其特征在于所述锚杆限位梁框上设有挡板,挡板上设有千斤顶。
5.如权利要求1所述具有双向倾斜度的锚杆定位装置,其特征在于下段定位框架和/或上段定位框架上设有手拉葫芦。 
CN2010205161882U 2010-09-03 2010-09-03 具有双向倾斜度的锚杆定位装置 Expired - Fee Related CN201896289U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205161882U CN201896289U (zh) 2010-09-03 2010-09-03 具有双向倾斜度的锚杆定位装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205161882U CN201896289U (zh) 2010-09-03 2010-09-03 具有双向倾斜度的锚杆定位装置

Publications (1)

Publication Number Publication Date
CN201896289U true CN201896289U (zh) 2011-07-13

Family

ID=44254202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205161882U Expired - Fee Related CN201896289U (zh) 2010-09-03 2010-09-03 具有双向倾斜度的锚杆定位装置

Country Status (1)

Country Link
CN (1) CN201896289U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320186A (zh) * 2016-10-18 2017-01-11 中铁大桥局集团第五工程有限公司 一种拱座预埋锚杆定位***及施工方法
CN109592558A (zh) * 2018-11-29 2019-04-09 中交路桥华南工程有限公司 多用途的锚杆吊架
CN111535184A (zh) * 2020-04-17 2020-08-14 中交二公局第二工程有限公司 一种斜拉桥钢塔锚固螺杆定位支架及定位方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320186A (zh) * 2016-10-18 2017-01-11 中铁大桥局集团第五工程有限公司 一种拱座预埋锚杆定位***及施工方法
CN106320186B (zh) * 2016-10-18 2019-02-15 中铁大桥局集团第五工程有限公司 一种拱座预埋锚杆定位***及施工方法
CN109592558A (zh) * 2018-11-29 2019-04-09 中交路桥华南工程有限公司 多用途的锚杆吊架
CN109592558B (zh) * 2018-11-29 2024-05-14 中交路桥华南工程有限公司 多用途的锚杆吊架
CN111535184A (zh) * 2020-04-17 2020-08-14 中交二公局第二工程有限公司 一种斜拉桥钢塔锚固螺杆定位支架及定位方法

Similar Documents

Publication Publication Date Title
CN203270600U (zh) 高精度设备预埋螺栓安装用固定支架
CN102561712A (zh) 大型钢柱、设备基础固定螺栓精确定位架及其施工方法
CN106087744B (zh) 斜拉桥混凝土梁索导管支撑定位装置及方法
CN202645026U (zh) 钢结构的钢柱柱脚校正装置
CN203783165U (zh) 预埋件多方位精确调节装置
CN201896289U (zh) 具有双向倾斜度的锚杆定位装置
CN212002364U (zh) 一种钢结构立柱用地脚螺栓安装定位装置
CN214737333U (zh) 一种可拆卸调节式预制墩柱桥梁承台预埋主筋定位装置
CN106351246A (zh) T型螺栓直径≤48mm的整体式套筒安装方法
CN102140839B (zh) 楼梯定型支模架
CN108374350B (zh) 一种钢锚梁和钢牛腿单元的组拼胎架及安装方法
CN102704696B (zh) 一种高大重钢立柱空间***
CN111502253A (zh) 集束体系钢结构建筑楼板用顶托式免支模***及施工方法
CN104499435A (zh) 一种用于自锚式悬索桥散索鞍底座安装的托架
CN212477455U (zh) 一种桥梁斜拉索锚筒预埋定位装置
CN110144927B (zh) 一种预埋地脚螺栓群的装置
CN210827533U (zh) 一种预埋地脚螺栓群的装置
CN211589918U (zh) 一种集装箱导轨反顶安装装置
CN203213002U (zh) 一种桥梁加固中体外预应力索的可调式减振装置
CN214993151U (zh) 一种矮塔斜拉桥分丝管索鞍精确快速定位装置
CN220450671U (zh) 一种斜拉桥索鞍快速安装定位架
CN219839956U (zh) 一种滑移式节段梁精密定位装置
CN216947886U (zh) 一种大型锚碇散索鞍偏角安装定位装置
CN221029614U (zh) 可调节装配式钢锚梁支架
CN210395117U (zh) 一种调节稳固钢箱梁钢板位置的便捷装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CONSTRUCTION HEADQUARTERS OF JIANGSU YANGTZE RIVER

Free format text: FORMER OWNER: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU 2ND ENGINEERING CO., LTD. THE CHINA COMMUNICATIONS WUHAN INSTITUTE OF HARBOR ENGINEERING DESIGN CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110818

Address after: 430032. 11 Golden Lake Road, Dongxihu lake, Wuhan, Hubei

Co-patentee after: Jiangsu Construction Headquarters of Changjiang Highway and Bridge

Patentee after: China Communications 2nd Navigational Bureau

Co-patentee after: China Communications 2nd Navigational Bureau 2nd Engineering Co., Ltd.

Co-patentee after: The China Communications Wuhan Institute Of Harbor Engineering Design Co., Ltd.

Address before: 430032. 11 Golden Lake Road, Dongxihu lake, Wuhan, Hubei

Co-patentee before: China Communications 2nd Navigational Bureau 2nd Engineering Co., Ltd.

Patentee before: China Communications 2nd Navigational Bureau

Co-patentee before: The China Communications Wuhan Institute Of Harbor Engineering Design Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110713

Termination date: 20170903