CN201846134U - Automatic inspecting system for transformer substation - Google Patents

Automatic inspecting system for transformer substation Download PDF

Info

Publication number
CN201846134U
CN201846134U CN2010202584809U CN201020258480U CN201846134U CN 201846134 U CN201846134 U CN 201846134U CN 2010202584809 U CN2010202584809 U CN 2010202584809U CN 201020258480 U CN201020258480 U CN 201020258480U CN 201846134 U CN201846134 U CN 201846134U
Authority
CN
China
Prior art keywords
inspection tour
automation
supervising device
transformer substation
transformer station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202584809U
Other languages
Chinese (zh)
Inventor
苗培青
吴斌
张海峰
王锦江
冯西涛
崔巍
邹浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN2010202584809U priority Critical patent/CN201846134U/en
Application granted granted Critical
Publication of CN201846134U publication Critical patent/CN201846134U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses an automatic inspecting system for a transformer substation, comprising an on-site terminal and a monitoring terminal; the on-site terminal comprises a plurality of cameras installed in the transformer substation; the cameras are sequentially installed according to the inspecting line of the transformer substation; the monitoring terminal comprises a monitoring device in signal connection with the cameras; the monitoring device comprises a display and a central processing unit; and the monitoring device receives the on-site picture signals shot by the cameras and automatically edits the on-site picture signals into video clips according to the sequence of the inspecting line of the transformer substation. The automatic inspecting system for a transformer substation has the following advantages: the image monitoring system of the transformer substation is combined with the standard inspecting operation instruction of the transformer substation, and the information technology is used to realize automatic and intellectualized inspection for the transformer substation.

Description

Automation of transformation substations inspection tour system
Technical field
The utility model relates to a kind of intelligence system, particularly a kind of automation of transformation substations inspection tour system.
Background technology
At present, the situation that power transformation operation faces is along with electrical network is constantly perfect, transformer station's quantity constantly increases, distribution is wider, distance is farther, making an inspection tour workload constantly increases, and the operations staff does not obtain in time replenishing, but intelligent grid has brought requirements at the higher level to the operational management of unattended operation transformer station.The difficulty that power transformation operation management work now mainly exists is, the manual patrol cycle is long, can not the very first time find defective, and accident treatment can't in time obtain the on-the-spot firsthand information.
Summary of the invention
For solving above technical deficiency, it is low that the utility model provides a kind of transformer station to make an inspection tour cost, makes an inspection tour the high automation of transformation substations inspection tour system of efficient.
The utility model is realized by following measure:
Automation of transformation substations inspection tour system of the present utility model, comprise on-the-spot end and monitoring client, described on-the-spot end comprises the some cameras that are arranged on transformer station and install successively according to transformer station's tour route, described monitoring client comprises the supervising device that is connected with camera signals, supervising device comprises display and central processing unit, and the central processing unit of supervising device receives the live view signal of camera shooting and makes an inspection tour the route order according to transformer station the live view signal is compiled the video clip that shows by display automatically.
Automation of transformation substations inspection tour system of the present utility model, described supervising device compare same camera automatically in captured live view of adjacent time, supervising device is connected with the warning device that can not report to the police simultaneously when picture.
Automation of transformation substations inspection tour system of the present utility model, described supervising device signal connect scheduling EMS system, the command signal that supervising device receives and recording dispatching EMS system sends, and demonstrate the live view that needs by the instruction manipulation part by display.
Automation of transformation substations inspection tour system of the present utility model is provided with from the motion tracking camera in transformer station switch operation zone.
Automation of transformation substations inspection tour system of the present utility model, described supervising device have access to on-the-spot remote lamp Optimizing Control System, fire prevention smoke-alarm system, guard against theft and alarm system and the electronic enclosure system of holding transformer station.
Automation of transformation substations inspection tour system of the present utility model, described supervising device has access to emergency commading system.
Automation of transformation substations inspection tour system of the present utility model, described supervising device are separately positioned in information centre, command centre and the Surveillance center, the memory disc battle array wherein is set in the information centre, makes an inspection tour server and monitor supervision platform; Surveillance center is the monitoring service area.
The beneficial effects of the utility model are: 1. transformer station's frequency image monitoring system and transformer station's standardization are maked an inspection tour the job instruction combination, utilize informationization technology, realized automation, intellectuality that transformer station is maked an inspection tour.2. image scene handing-over pattern when native system has realized that operation team relieves, changed the oral handing-over pattern of original dullness, grasped each transformer station's field apparatus running status, safety measure layout when being convenient to relieve intuitively, stop sending electric scope, field operation situation.Native system provides abundant picture, figure handing-over pattern, has fully improved the power transformation operation quality of relieving.3. under bad weather such as heat, severe cold, heavy rain and accident condition hazardous environment, replace manual patrol, eliminated the harm of adverse circumstances personnel.4. under the accident treatment situation, grasped the field apparatus actual state by native system in the very first time, according to the field accident symbol, instruct the maintainer in time status of equipment to be judged by image, carry out professional's configuration, repairing Work tool and material fast and prepare; Realize leader, the processing of expert's remote guide supervision field accident, improved accident treatment correctness, efficient.Improved accident work of treatment specific aim; The video recording of accident treatment overall process is for later stage accident treatment analysis provides the full and accurate firsthand information.5. realized the remote medical consultation with specialists of equipment operation, equipment deficiency, made consultation of doctors work break away from the constraint in personnel, time, space.6. realized the remote scene safety supervision management.Native system can carry out remote supervisory, long-range candid photograph violating the regulations and video recording in 24 hours to work such as on-the-spot switch operation, maintenance, civil engineerings, and work on the spot simultaneously is under the overall monitor, and staff's sense of responsibility improves greatly, has alleviated operations staff's working strength.7. converting equipment automation inspection tour system provides open technical support platform, integrate the video monitoring image resource of original dispersion, the application of in-depth supervisory control system, traditional supervisory control system is combined with the electric power system core business, reduced the cost of the investment diversification of each transformer station's aided management system such as the SF6 of transformer station on-line detecting system, fire-proof and theft-proof system, electronic enclosure system, reduce operation element amount, the maintenance workload of each system's dispersion operation, helped operations staff's system applies on top of.8. making an inspection tour efficient improves greatly, monitoring in real time that cycle changes 24 hours into, shortened the tour time, improved the tour frequency, can directly increase benefit 173.96 ten thousand yuan owing to adopt intelligent inspection tour system the whole year, simultaneously, adopts the intelligent tour of converting equipment minimizing personnel 3 people, on average expense is increased efficiency by downsizing payrolls and is saved 300,000 yuan for company by 100,000 yuan of calculating for each person every year.
Description of drawings
Fig. 1 is a structured flowchart of the present utility model.
Embodiment
As shown in Figure 1, a kind of automation of transformation substations inspection tour system of the present utility model, comprise on-the-spot end and monitoring client, on-the-spot end comprises the some cameras that are arranged on transformer station and install successively according to transformer station's tour route, monitoring client comprises the supervising device that is connected with camera signals, supervising device comprises display and central processing unit, and the central processing unit of supervising device receives the live view signal of camera shooting and makes an inspection tour the route order according to transformer station the live view signal is compiled the video clip that shows by display automatically.Be exactly the content according to " the on-the-spot tour of transformer station's standardization job instruction " specifically, and make an inspection tour strategy and make an inspection tour route according to the actual conditions formulation system of transformer station, fixed point is installed some cameras on the tour route.These cameras by supervising device control realize to equipment fix a point, timing automatic makes an inspection tour video recording.Supervising device receives the live view signal that camera takes and makes an inspection tour the route order according to transformer station the live view signal is compiled video clip automatically, and the tour personnel are adjustable to watch video shows and replace on-the-spot manual patrol and fill in the tour record.Rationally distributed, sufficient camera can carry out uninterrupted monitoring in 24 hours, video recording to transformer station's visual plant.
Supervising device is connected with warning device, and supervising device compares same camera automatically in captured live view of adjacent time, and when picture was inequality, thinking had had operation, and warning device will be reported to the police, and has improved fail safe.
The supervising device signal connects scheduling EMS system, the command signal that supervising device receives and recording dispatching EMS system sends, when carrying out remote operation, automatically obtain corresponding operating information from the EMS system, on display device, release the realtime graphic of operating equipment automatically, according to changing before and after the image, confirm whether operation is successful.Warning message is auxiliary to be checked, sets up corresponding database, receives EMS system alarm information, ejects the image scene of warning device automatically, helps the related personnel in time to understand field condition, and the very first time is made the reply solution.
Be provided with from the motion tracking camera in transformer station switch operation zone, switch operation is carried out remote monitoring, also enter operation, the tour personnel in substation equipment district simultaneously, and its operating process is recorded a video, realize the monitoring of omnibearing stereo formula from motion tracking.
Supervising device has access to on-the-spot remote lamp Optimizing Control System, fire prevention smoke-alarm system, guard against theft and alarm system and the electronic enclosure system of holding transformer station, the also compatible main website construction of each producer, the operator scheme of having unified each system has reduced the main website investment diversification construction repeatedly of each subsystem.
Supervising device has inserted emergency system, the picture control source synchronous can be input to emergency commading system, when emergency commading system called native system monitoring resource, native system can carry out operation of relays, in time abdicated the right to use of rig camera for emergency commading system.
Supervising device is separately positioned in information centre, command centre and the Surveillance center, the memory disc battle array wherein is set in the information centre, makes an inspection tour server and monitor supervision platform; Surveillance center is the monitoring service area.Setting operation team operating platform between monitoring client and on-the-spot end carries out differentiated control.On the operation team operating platform of subordinate, no longer simple oral handing-over when the tour personnel relieve, but image scene handing-over pattern when having realized that by the image on the display of supervising device operation team relieves is grasped each transformer station's field apparatus running status, electric scope, field operation situation are arranged, stopped sending to safety measure intuitively when being convenient to relieve.

Claims (7)

1. automation of transformation substations inspection tour system, it is characterized in that: comprise on-the-spot end and monitoring client, described on-the-spot end comprises the some cameras that are arranged on transformer station and install successively according to transformer station's tour route, described monitoring client comprises the supervising device that is connected with camera signals, and supervising device comprises display and central processing unit.
2. automation of transformation substations inspection tour system according to claim 1, it is characterized in that: supervising device is connected with warning device.
3. automation of transformation substations inspection tour system according to claim 1 is characterized in that: described supervising device signal connects scheduling EMS system.
4. automation of transformation substations inspection tour system according to claim 1 is characterized in that: be provided with from the motion tracking camera in transformer station switch operation zone.
5. automation of transformation substations inspection tour system according to claim 1 is characterized in that: described supervising device has access to on-the-spot remote lamp Optimizing Control System, fire prevention smoke-alarm system, guard against theft and alarm system and the electronic enclosure system of holding transformer station.
6. automation of transformation substations inspection tour system according to claim 1 is characterized in that: described supervising device has access to emergency commading system.
7. according to any described automation of transformation substations inspection tour system in the claim 1 to 6, it is characterized in that: described supervising device is separately positioned in information centre, command centre and the Surveillance center, the memory disc battle array wherein is set in the information centre, makes an inspection tour server and monitor supervision platform; Surveillance center is the monitoring service area.
CN2010202584809U 2010-07-14 2010-07-14 Automatic inspecting system for transformer substation Expired - Fee Related CN201846134U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202584809U CN201846134U (en) 2010-07-14 2010-07-14 Automatic inspecting system for transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202584809U CN201846134U (en) 2010-07-14 2010-07-14 Automatic inspecting system for transformer substation

Publications (1)

Publication Number Publication Date
CN201846134U true CN201846134U (en) 2011-05-25

Family

ID=44041010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202584809U Expired - Fee Related CN201846134U (en) 2010-07-14 2010-07-14 Automatic inspecting system for transformer substation

Country Status (1)

Country Link
CN (1) CN201846134U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820702A (en) * 2011-06-07 2012-12-12 北京华电通达科技有限公司 Transformer station management system
CN102983631A (en) * 2012-12-07 2013-03-20 沧州供电公司 Electronic shift change method for information control of transformer substation
CN106204786A (en) * 2016-07-15 2016-12-07 山东智洋电气股份有限公司 Operating condition of transformer station equipment one key inspection method
CN112435436A (en) * 2020-11-03 2021-03-02 国网智能科技股份有限公司 Multi-dimensional linkage rechecking method, device and system for monitoring fire of transformer substation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820702A (en) * 2011-06-07 2012-12-12 北京华电通达科技有限公司 Transformer station management system
CN102983631A (en) * 2012-12-07 2013-03-20 沧州供电公司 Electronic shift change method for information control of transformer substation
CN106204786A (en) * 2016-07-15 2016-12-07 山东智洋电气股份有限公司 Operating condition of transformer station equipment one key inspection method
CN112435436A (en) * 2020-11-03 2021-03-02 国网智能科技股份有限公司 Multi-dimensional linkage rechecking method, device and system for monitoring fire of transformer substation

Similar Documents

Publication Publication Date Title
CN101917061A (en) Automatic inspection method and device for substation
CN106026405B (en) Relay protection in-service monitoring based on EMS system and analysis system
CN103049826B (en) Automated system is safeguarded in operation of power networks
CN203324773U (en) Wind farm centralized control system
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN103441571A (en) Integrated monitoring system information platform for transformer substation
CN201393089Y (en) System for monitoring secondary device operating status of digital substation
CN111597231B (en) Intelligent substation inspection system based on multi-source heterogeneous system data mining
CN214429325U (en) Comprehensive monitoring linkage platform for auxiliary system of intelligent substation
CN111147822B (en) Monitoring system for transformer substation emergency repair
CN110957704B (en) Intelligent inspection method and system for protection action tripping of transformer substation
CN201846134U (en) Automatic inspecting system for transformer substation
CN201426053Y (en) Intelligent visual remote control operating system for substation equipment
CN110989529A (en) Transformer substation management platform based on intelligent technology application
CN103383769A (en) Grid fault hidden danger management analytical method and system
CN107966943B (en) Centralized master control monitoring intelligent data analysis system for multi-stage transformer substation
CN114139742A (en) Power distribution network management and control system and management and control method
CN113162233A (en) Auxiliary equipment monitoring system for third-generation intelligent substation
CN116014893A (en) Remote visual intelligent inspection system for transformer substation
CN203070068U (en) Perception transmission equipment
CN108303956B (en) Automatic on-duty centralized monitoring system for power grid dispatching
CN114357762A (en) Wisdom power equipment high in clouds control automatic system
CN110676935B (en) Intelligent operation and maintenance closed-loop operation system and method for transformer substation
CN113036926A (en) Auxiliary monitoring system for urban rail transit substation
CN203589845U (en) Power transformer and distribution station platform area panorama patrol monitor system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110525

Termination date: 20120714